6. HRSR 02-06-2012ITEM # 6.
~~ MEMORANDUM
Elk
River
TO: Housing Redevelopment Authority
FROM: Bob Ruprecht, Building Official
DATE: February 6, 2012
SUBJECT: 724 Main Street Wall Improvements
BACKGROUND
The HRA buildings located at 716 and 720 Main Street (adjacent to 714 Main Street) were
demolished late December, 2011. The Shared Wall Agreement with Robert and Denise
Robeck, owners of 714 Main Street (Elk River Meats), outlines that if a building is
demolished, the party demolishing the buildings must promptly repair the wall at their sole
cost and expense. Staff has explored options to address the east wall of 714 Main Street.
The attached memo from structural engineering firm Braun Intertec outlines items which
need to be addressed. In addition to the report, staff has spoken with several contractors to
determine the necessary improvements moving forward.
RECOMMENDATIONS
Staff recommendations are as follows:
• Power wash and remove loose material from the wall in preparation for new coating.
• Remove existing steel door and surrounding brick, infill opening as necessary.
• Replace or repair flashing as necessary.
• Install EFIS (Exterior Insulation Finish System) with various thicknesses to make for
a more level surface.
With HRA authorization, staff will move forward with obtaining quotes for the
recommended improvements. Work will begin once a contractor is selected. Director of
Economic Development Annie Deckert and I met with Bob Robeck, owner of Elk River
Meats, to discuss the building improvements. Mr. Robeck agrees with staff's
recommendations and expressed interest in potentially moving forward with additional
improvements to the building.
P®NERE® er
N:\Departments\Community Development\Economic Development\HRA to move\Agenda\Yeaz 2012\2-6-12 HRA ~~~~("'
Agenda\724 Main Street Improvements ILdoc w¢~
FINANCIAL IMPACT
Research and preliminary bids indicate the cost of the above recommendations to be
approximately $30,000. In their 2012 budget, the HRA budgeted $15,000 for an engineering
study for the HRA buildings and $5,000 for building maintenance and repair. This money
could be used for the wall improvements. Additional expenses would come out of the HRA
development fund (current balance is $817,654)
ATTACHMENTS
• Memorandum dated January 10, 2012 from Braun Intertec re: 714 Main Street
N:\Departments\Community Development\Economic Development\HRA to move\Agenda\Year 2012\2-6-12 HRA Agenda\724 Main
Street Improvements ILdoc
Memorandum
Date.: January 10, 2012
To: Annie Deckert
City of Elk River
13065 Orono Parkway NW
Elk River, MN 55330
From: Jason S. Hanlon, PE, SE
Re: Site Observations -Jan. 5, 2012
7.24 Main St.
Elk River, MN
Project BL-11-06693
hereby certify that this plan, specification or report
was prepared by me or under my direct supervision
and that I am a d ly licensed pro ssional engineer
under the he Stat ne a.
Jason S. Hanlon
Date: 1/10/12
Minnesota Registration No. 41941
This memo is in regards to the site visit that were completed by Jason Hanlon, of Braun Intertec, on
January 5, 2012 to observe the current conditions of the demolition and the existing, exposed conditions
of the east wall of the 724 Building.
The wall in question appears to be in relatively good condition with no significant signs of distress or
settlement. There are some areas where the mortar in the joints is lacking and could use some tuck-
pointing, but overall the condition of the wall is good and in our opinion does not require significant
structural repair.
The following items need to be addressed moving forward:
- It was determined that the foundation depth along this wall is only 22-inches below grade and will
require some additional frost protection since this wall is now exposed to external temperatures
on the east side. Braun Intertec provided a detail (S1, dated 1/9/12) for this condition for the City
to implement.
- The exterior face of the east wall needs to be weatherized. This wall has not experienced external
conditions in some time, or if at all, and needs to be updated to provide the appropriate
protection. This may include, but not limited to, water proofing of the exterior face through
possible exterior finishes (i.e., stucco), updating the flashing along the parapet and at the front and
rear corners of the building, and infill of bearing pockets and openings accordingly.
Braun Intertec is available to help with preparing corrective measure details for the conditions noted
above. Please contact us if the City would like additional assistance with this matter or need any other
evaluations completed.
Please let me know if you have any questions.