5. HRA SR 03-05-2012ilk
River
REQUEST FOR ACTION
TO ITEM NUMBER
Housin Redevelo ment Authori 5.
AGENDA SECTION MEETING DATE PREPARED BY
March 5, 2012 Annie Deckert, Director of Economic
Develo ment
ITEM DESCRIPTION REVIEWED B~/
Authorize entering into contract for the completion of concept Cal Portner, Ci Administrator
plans and recommendations for 716 & 720 Main Street REVIEWED BY
improvements
ACTION REQUESTED
Authorize entering into a contract for the completion of concept plans and recommendations for 716 &
720 Main Street improvements
BACKGROUND
In 2006, the HRA purchased 716 and 720 Main Street in Elk River with the intent to expand downtown
surface parking. On October 3, 2011, the HRA authorized staff to obtain proposals for costs to
demolish the. Main Street buildings. On December 12, 2011, the HRA approved a contract with Veit and
Company for the demolition and removal of the buildings. The buildings were demolished and removed
the week of December 26.
At the February 6, 2012, meeting, staff recommended working with a landscape architect to create
concepts for the design of the area, incorporating information from discussions with the HRA and
downtown businesses (similar to the process used with the construction of River's Edge Commons).
DISCUSSION
Staff has held discussions with various downtown business owners throughout the past couple months to
solicit input for the area. Conversations indicated a high interest in additional parking with aesthetic
amenities. Reoccurring ideas included planters, benches, outdoor dining tables and attractive landscaping.
Business owners also mentioned utilizing the location for events (Farmer's Market, street dance, etc.) and
the creation of one trash enclosure for the dumpsters from the businesses on the block.
Staff has invited the Hosington Koegler Group and Landform to present proposals and cost estimates to
complete the design concepts for this, project. All input for the proposed improvements have been
shared with the consultants. The HRA is encouraged to provide additional input and/or ask questions of
the consultants.
Consultants will be submitting detailed concepts to provide to contractors for construction bids. Staff
will work with City Engineer Justin Femrite for the creation of the construction documents. Tonight
the HRA is asked to recommend a consultant and approve the contract to ensure the project continues
to move forward.
Consultant proposals include the following: three design concepts, quote package for the design and cost
of services.
• Hoisington Koegler Group- $6,500
• Landform $3,300
Please note that the HRA does not need to accept the low quote, but should move forward with the plan
and group they feel best fits the scope of the project.
TIMELINE
Below is the proposed timeline for this project (subject to change):
Aril 2 HRA meeting
• Consultant to present design concepts
• Seek HRA input on concepts
• Approve concept, authorize moving forward with RFP for bids on project
May 7 HRA meeting
• Action requested to approve contract with contractor for project
The goal. is to have the project completed no later than June 28. Opening day for the Farmer's Market
will be Thursday, June 28. Hours for the market are from 2:00 - 6:00 p.m. so it will not overlap with the
concert series. Discussions with the Park and Recreation Department indicated that if the HRA project
is not complete by June 28, they will be choosing an alternate temporary location somewhere in the
downtown.
FINANCIAL IMPACT
Cost of the concept designs will come out of the Other Professional Services line item.
ATTACHMENTS
^ Project Area Map
^ Proposal from the Hosington Koegler Group
^ Proposal from Landform
Action Motion by Second by Vote
Follow Up
"'' .~.
tdi~'~ t "'r ^~u "~~,~i
=~1 ~Cl~ ~ ..2i~
~.
y _
FEBRUARY 27TH, 2012
"t ..
. , ~:
G .'^x
4''.
Hoisington Koegler Group (HKGi) is a firm of talented planners, landscape architects, and urban designers who share their
passion for planning and design with client communities striving to create lasting places of quality. HKGi has twenty-nine years
of experience designing high quality and distinctive public and private spaces on budget and on time. Communities seek HKGi
to lead their planning and design efforts because of our ability to creatively synthesize complex program needs and planning
issues within a process of community consensus-building.
Tamarack Nature Center Plan, Ramsey County, MN
UMORE Park rendering, Dakota County, MN
oa~o
February 27, 2012
Annie Deckert
Director of Economic Development
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
Re: Professional Design Services -Downtown Concept Planning.
Dear Annie and members of the HRA:
Hoisington Koegler Group is pleased to present this proposal to the City of Elk River for downtown concept planning services. HKGi is a
leading urban planning, urban design and landscape architecturefirm in theTwin Citiesthat has built a reputation for innovation and
creativity through its thirty year history. HKGi specializes in the planning and design of public realms including community planning,
downtown districts, performance spaces, waterfronts, urban plazas and streetscapes.
If we are fortunate to be chosen to work with Elk River, I will manage the project, oversee the design and be your primary contact. On
our team will be Bryan Harjes and Gabrielle Grinde, both of whom are extremely talented Landscape Architects with a great deal of
experience in working on projects of similar scale and context.
The following scope of work is in direct response to the tasks outlined in your request for proposals....
In this task, HKGi will collaborate with staffto discuss ideas for the site and collect and review all available background information in
order to understand the context and City vision for what the project area could become.
Specific tasks include:
• Facilitate akick-off meeting with City staffto review available background materials and brainstorm potential initial program
ideas for the project space.
• Tour downtown and the project site with City staff and stakeholder representatives.
• Organize available base mapping including survey and soils(if available), utilities, ownership, and aerial photos.
• Prepare an analysis graphic that identifies the relationship of the project site to long term redevelopment opportunities,
pedestrian linkages and desire lines, and how the site relates to area business's and existing public space in downtown.
TASK 2 -EXPLORE THE ALTERNATIVES AND RELATED COSTS
This task will use the collected mapping, background and analysis information, combined with the desired program, to prepare
a minimum of (3) design concepts for the HRA project site. The concepts will explore the integration of the following program
elements:
• Public gathering space
• Integration of planned farmers market
• Parkirig - minimum of 25 additional spaces
• Landscaping to enhance the site and/or mitigate adjacencies
• Kiosk/signage to complement existing downtown signage and reinforce City brand
A potential common trash enclosure for area business use
• Potential public art integration
Options far wall treatments at existing adjacent building
Any other program features desired by HRA, stakeholders, and/or staff
HKGi will prepare illustrative plan graphics and vignette sketches that depict the concept design ideas for the downtown site. The
design alternatives will be integrated into a downtown map so that the scale and relationship of the design can be reviewed within the
context of the downtown. Costs for each of the design alternatives will be developed based cost data from similar built projects.
The plans along with related estimated costs will then be presented to the HRA at the April 2nd meeting for discussion. If necessary,
feedback will be integrated by modifying the preferred design option accordingly and resubmitting the design to staff,
This task will involve refinement of the preferred design into a simple drawing set (plans, sections, outline specifications) to facilitate
acquiring quotes from area contractors. While it is difficult to determine the complexity of this drawing set prior to selecting a design
for the site, I have included an estimate based on the design integrating relatively simple materials and construction techniques.
It is assumed that City staff will coordinate the solicitation of quotes for the improvements and will oversee the construction of the
project. HKGi is available to support the quote solicitation and construction oversight tasks if desired, and would be willing to work
hourly as needed to ensure that the project is implemented in accordance with the design.
ROPOSED FEES
HKGi proposes to complete the above described scope of work for the following fees:
Task 1 -Understand What Exists and What is Desired $500.00
Task 2 -Explore the Alternatives and Related Costs $3,700.00
Task 3 - Prepare a Quote Package for the Design $2,300.00*
TOTAL PROPOSED PROJECT FEES:
$6,500.00
* More complex ideas would require additional drawings and detailing to ensure that they are constructed in accordance with the
desired design.
We look forward to working with the City of Elk River on this important community project. If you have any questions, please feel free
to contact meat 612.252.7125 or pawl@hkgi.com
Sincerely,
Hoisington Koegler Group Inc.
Paul Paige, RLA
Vice President
~, _ .~w_
ELK RIVER, MINNESOTA
River's Edge Commons Park is located in the heart of downtown Elk River, Minnesota. The park connects Main Street to the adjacent
Mississippi River and provides a venue for community festivals and concerts in the park, drawing thousands of visitors every year to
the downtown.
The City recognized the need to better assure the long-term viability of downtown by making a stronger connection to the rest of the
community and by utilizing the riverfront location. River's Edge Commons Park is critical to that plan and has provided a significant
economic boost to the downtown business district since opening in 2007.
The design process for the park began when Hoisington Koegler Group was commissioned by the City to develop park concepts and
complete construction documents for the design; culminating in the construction of the park in the summer of 2007. The design
incorporates an upper square with shade trees and a popular in grade fountain feature at the street level, a grand staircase with a terraced
stone amphitheater at the hillside, and a performance area and gazebo overlooking the River below. The project has earned high
reviews from the public and the industry, being recognized with an honor award by
the Minnesota Recreation and Parks Association as a significant public park space. HKGi
ELK RIVER vOWNiOWtd CONCEPT PLANhf)FIG PROPOSAL- PAGE S
BLOOMINGTON, MINNESOTA
The Pocket Park transformed an abandon gas station into a small public park and streetscape identity feature for the City of Bloomington
at the core of the City's redevelopment district of Old Shakopee Road and France Avenue. The project is an outgrowth from our
redevelopment study for the Bloomington HRA. The study recommended redevelopment that focused on a more residential commercial
area, including walkways, landscaping, and small outdoor gathering places.
Hoisington Koegler Group was commissioned by the Bloomington HRA to develop park concepts, prepare construction documents
for bidding, and oversee construction of the park by the summer of 2005. The project consists of creating a space for people to
move through or sit, with landscaping to buffer the blank wall of the adjacent business. Creating small berms and using grasses and
evergreens help to create year round interest. The circular center garden offers opportunities for future enhanced garden or an artwork
installation.
R ,
;~" w *~,w; ~ r 1 t ,r p
~~~~ ~ ~> 'fir-/~l /
HRA POCKET PARK
PROJECT EXPERIENCE
MOUND. MINNESOTA
During the early 20th Century, passenger steamers shuttled tourists from "the Big Lake," Lake Minnetonka, through Lost Lake Canal
and into Downtown Mound. These excursions afforded visitors the opportunity to spend a leisurely day along the shores of Lost Lake.
Seeking to recreate that pedestrian village experience, the City of Mound and HKGi developed Mound Visions as a plan to revitalize
Downtown Mound. Mound Visions draws inspiration from the Lake's resort-era history.
Lost Lake Canal and Greenway is a key element of that revitalization vision. Lost Lake Greenway winds through restored wetlands along
the north shore of Lost Lake. Its focal is the Central Green, ahistorically-inspired boardwa-k and pier structure specially designed by
HKGi. Featuring garden plantings, engraved pavers, crosshatched brickwork and a circular boardwalk and pier structure, the Central
Green will become the town plaza, a Mound landmark connecting the canal from Lake Minnetonka, wetlands and the adjacent mixed-
usedevelopment in Downtown.
~ ~a
~.~^ Y+r
,e' ~*„
•w:: ,
e:vi^
~. ~~~
~l: +;~... ..
h9d.~"~7~aa~
~; ~ ~ r
g'.; }
~{
Yx.u4, ' . "'t
Mt:~i)i~~C~~ ~,'F~TFRANS MEMCRiAL 'ARK
MOUND, MINNESOTA
The Mound Veterans Memorial Park is an important public focal point of the downtown located prominently along County Road ~5.
This park is a pivotal point between amulti-modal transit hub (park and ride ramp, bus hub, future light rail line (exists now as regional
trail) and the Mound Greenway. The plan incorporates features desired by Veterans community, flags, granite memorial, benches,
circular paver walking path, lush plantings and shade trees. A construction company volunteered the installation.
MINNEAPOLIS PARK AND RECREATION BOARD
~~~
=fir
~'~;
..
~,.-.
~'~_.-
HKGi is currently working on improvements to Levin Triangle Park, a small park within the Minneapolis park system. The park is
bordered by residential streets with high traffic demand making park safety a top priority for the improvements. The existing playground
equipment is outdated and does not meet current standards for accessibility and playground safety. The goal for the project was focused
on recommending improvements that provide safety, accessibility and diversity within the play environment.
The project kicked-off with a series of public meetings and on-line surveys for community members to share their ideas and preferences.
HKGi lead the public participation process and coordinated design feedback from the community and park board staff. The final park
design includes a unique custom playground design, an open lawn area for community gatherings and picnics, a series of site amenities
including an accessible path connecting all play areas with the least amount of impact to existing trees.
HKGi is also leading the construction documentation process and will be managing the construction administration phase until project
completion. The park improvements are expected to be completed in late spring of 2012.
HKGi
a~rv t•„
:S~W1"Yb
CIRCLE PINES, MINNESOTA
HKGi completed a concept plan for redevelopment of the Lake DrivelLexington Avenue area of Circle Pines. The redevelopment area
covers approximately 50 acres of aging commercial, decaying residential, wetland and forest at the intersection of two busy county
roads. The final plan established a denser, more urban development for the project area and includes a continuous parkway offering a
better connection across Lake Drive; a new pedestrian trail circling an expanded water quality improvement pond; a network of interior
greenways; and an overall streetscape and landscape pattern that recalls natural patterns throughout the City.
The Comprehensive Urban Master Plan developed by HKGi helped attract a developer to the site and provided the foundation for the
Village at Circle Pines development. While private developers constructed the housing and commercial portions of the project, HKGi
provided the design and construction administration for the streetscaping and public amenities, including a lakeside gazebo and the
central plaza and clock tower.
PF{~,IECT'
BLOOMINGTON, MINNESOTA
.~
During the 1960s and 70s, the Old Shakopee Road/France Avenue intersection was a bustling commercial area. Changing economic
conditions, however, have made many of the facilities obsolete and unable to compete with newer, more modern facilities such as the
Mall of America, which sits only six miles to the east.
Responding to the community's vision statement and to the input provided by the public and the development community, HKGI
was employed to craft a redevelopment concept that reinvents the study area as a more pedestrian-friendly neighborhood. As an
outcome of this study, when it was time for the County to upgrade the intersection, HKGI was employed to design the streetscape
package to ensure the expansion enhanced the district with amore-pedestrian friendly design, minimized the negative effects on the
neighborhood that is being built around it.
Identity features at the four intersections define a unique district that has details at a pedestrian scale, helping to calm traffic and
offer refuge for residents walking in the revitalized district. Landscaping the wide medians with streetsmart plant materials instead of
concrete, softens the auto-orientated district and helps reduce stormwater run off and urban heat.
Li~~'~~~ . , fi
~ ~-
.,
~, .. .
- ~::,.
~ ., ~:,~~
Minneapolis Park and Recreation Board, Minneapolis, MN
After completing a series of concepts forthe south shore area of Lake Calhoun, the Minneapolis Park and Recreation Board asked HKGi to
develop and implement the design. The first phase of the south shore area, located at the confluence of Calhoun Parkway and William
Berry Parkway, includes the redesign ofthe parking lot and realignment of the bicycle trail. The focus ofthe design is to showcase Best
Management Practices related to sustainability including:
Minimizing stall and drive aisle size
Permeable paver stalls
Permeable turf stalls
Rainwater gardens -
Efficient lighting
The parking lot site sits at a very popular intersection of the park system. It is between Lake Calhoun and Lake Harriet, two of the most
used recreational areas in the Twin Cities. The Park Board intends to use this highly visible space to educate and bring environmental
awareness to its visitors. HKGi prepared construction drawings and specifications for public bid and Oversaw the Construction
Administration during the construction period. Phase two improvements to the west of the parking lot will evolve further as funding
j~~ught.
o~~~ , . _. ~ n..,_o -, ,. ~ .~_~ ~ -~~„-«. _. ~~,_„~„- ou~r,~,~.~.
PROJECT EXPERIENCE
..Q-~D
ViLL/~6E OP BROOKI.'M PARK
CRY
BROOKLYN PARK, N9INNESOTA
In 1998 the City of Brooklyn Park asked HKGi to develop park plans for two underutilized parcels of land abutting Shingle Creek. The
project evolved through schematic design into a connected greenway that integrated the two parks, improved the stream and shoreline,
and designed a creek side trail and crossing via a new pedestrian bridge.
Fronting Zane Ave and a key redevelopment area of the City, the eastern park space integrates a specially designed arbor to celebrate
the gateway to the creek from Brooklyn Boulevard. The western section is a more passive park that invites leisurely strolling including
an entrance garden planted with native prairie plants and flowering perennial species to welcomes visitors. Connecting the parks is a
meandering series of trails, sited to minimize creek and tree disturbance while celebrating the natural features within the greenway.
As part of the project, HKGi worked collaboratively with Barr Engineering in developing a series of improvements to Shingle Creek.
The creek improvements have provided more consistent creek flow, reduced erosion issues and sedimentation buildup, stabilized the
shoreline, created natural habitat, and established a preservation plan for significant trees along the creek.
~..:x
..~.. ~..
>le: Project Manager
:.~
:,~
YEARS OF EXPERIENCE: zt
EDUCATION:
B.L.A., University of Minnesota
4WARDS
1988 ASLA Honor Award for Student Work
REGISTRATION
Landscape Architect, Minnesota
MEMBERSHIPS
Elk River Parks and Recreation Commission -former
Sensible Land Use Coalition
PROJECT EXPERIENCE
Elk River, MN
Rivers Edge Commons Park
YAC Renovation
Woodland Trails and Hillside Park Master Plans
Baxter, MN
Potlatch Corporation -Land Holdings Study
Potlatch Corporation -Conservation and
Entitlement Stragegies
Blooininftor~, MN
Normandale Lake Bandshell
France Avenue/Old Shakopee Road Streetscape
Bush Lake Beach
Brooklyn Park, MN
Brooklyn Boulevard Streetscape
Village Creek and Arbor Plaza
~arrihridge, MN
MetroPlains Development -Southwest
=ambridge Master Plan
BRYAN HARJES, ASSOCIATE
RLA LEED AP
Role: Project Landscape Architect
YEARS OF EXPERIENCE: tt
EDUCATION:
Masters of Landscape Architecture -University of
Minnesota
Bachelors of Environmental Design -University of
Mimnesota
AFFILIATIONS
Urban Land Institute (ULq
REGISTRATION
Licensed Landscape Architect, Minnesota #42954
PROJECT EXPERIENCE
Arden Hills. MN
Ryan Companies -Twin Cities Army Ammunition
Plant (TCAAP) Master Plan
Bloomirgion, MN
Landscape/Screening Ordinance Revisions
Cambridge, MN
MetroPlains Development -Heritage Greens
Carver, i~~N
Klingelhutz Development -Carver Bluff
Klingelhutz Development -Hidden Bluff
Chaska, MN
Chevalle Development Company -Chevalle, A
Country Estate: Conservation Subdivision Design
Klingelhutz Development -Riverwoods
Cologne, MN
Hans Hagen Homes -The Village at Cologne
Concept Planning
Cottage Grove, Mf~~
East Ravine Neighborhood Pre-Design
GABRIELLE GRINDE
Role: Landscape Architect
YEARS OF EXPERIENCE: z
EDUCATION
Master of Landscape Architecture-University of
Minnesota, 2008
Port Cities Study Abroad-Portugal, Spain and Italy,
Univ. of Minn. Dept. of Architecture, 2007
Bachelor of Arts, Political Science-University of
Wisconsin-Madison, 2003
International Summer School-University of Oslo,
Norway, 2003
PROJECT EXPERIEi~lCE
Dakota County, MN
Minnesota River Greenway Master Plan
North Creek Greenway Master Plan
Saint Paul, MN
Great River Park Master Plan, Saint Paul, MN
Greenway Collaborative Guidebook, Dakota
County, MN
1Nahpeton, ND
Comprehensive Plan Update, Wahpeton, ND
Hcnnel~in County, MN
Minnehaha-Hiawatha Investment Framework
.iahnston, Iowa
Johnston 2030 Comprehensive Plan Update,
Johnston, Iowa
Chanhassen, MN
Lake Ann Hillside Restoration
Lake Ann Hillside Restoration
Albert Lea, MN
2030 Comprehensive Plan
Duluth, MN
Park and Trail System Master Plan
O R M
• •
• •
•
~ •
City of Elk River
H RA Downtown
Parking Lot
~r.~ ~ ~: .~..
.,--=
February 27, 2012
Prepared for:
Annie B. Deckert
Director of Economic Development
City of Elk River
13065 Orono Parkway
t 0 ~ t E l i 1 Elk River, MN 55330
~~~~~ Phone: 763.635.1042
Email: adeckert@ci.elk-river.mn.us
Prepared by:
Kendra Lindahl, AICP
Landform
~ a F o R M 105 South Fifth Avenue, Suite 513
_, Minneapolis, MN 55401
Phone:612-252-9070
Email: klindahl@landform.net
Landform®, Sensibly ~' and Site to Finishes are registered service marks of Landform Professional Services, LLC.
Table of Contents
Proposal Approach to Community Design
Work Plan
Project Team
Experience & Design Examples
Project Fee
Firm Profile
SensiblyGreen° Philosophy 10
Professional References 12
Attachments Resumes
Additional Experience
Approach to Project
It is vital to address the
community's past trends,
successes and issues to better
establish an area plan and
prioritize plan development into
phases for current and future
development needs.
You will gain a team
experienced in both the public
and private sectors - a design
team that has in-depth and
successful experience with the
policy portion of community
plans and studies as well as
the development realities of the
plans.
Landform is excited about working with the City of Elk River to develop options for
the HRA parking lot, including a minimum of 25 parking stalls, a shared trash/recycling
enclosure, benches, kiosks/signage and other streetscape amenities.
Landform is pleased to provide a team, led by Kendra Lindahl and Darren Lazan, with
a full range of planning and development experience and skills.
Landform is dedicated to interweaving the broader issues of the urban landscape with
the intimate scale of your community, downtown spaces and natural environment
so that your outcome in the design process is a well defined and implementable
plan. We understand the value of design and planning on any scale and the need
for a thoughtful, innovative and sustainable process. In order to ensure the long-
term success of a master plan, your project needs to be led and coordinated by an
experienced team. We have created unique, community-derived visions and plans that
emerge from a well organized process. We also have the private sector experience to
ensure that the outcome is a viable plan.
We know that for a plan to be accepted and adopted, it needs the full support of
the key stakeholders, including the downtown business owners and residents. We
also know that for a plan to be usable in the downtown area, it needs to be flexible
enough to respond to the marketplace, budget and retain the guiding principles of the
vision. We will provide a concept for the parking lot improvements with additional
improvements that can be added as budget allows.
Since we frequently partner with developers, architects and builders as well as various
forms of government, you gain a team experienced in both the public and private
sectors - a design team that has in-depth and successful experience with the policy
portion of community plans and studies as well as the development realities of the
plans. Our experienced team can help you make your vision into reality!
Work Plan
Task 1
Our proposed work plan for this project is based on our previous discussions and our
understanding of your goals for the development area. Each task is outlined below
with an estimated number of anticipated meetings and task deliverables. For clarity
purposes we have divided this work into 5 major tasks and have included additional
task options at the end of this work plan (although some tasks will overlap):
Task 1) Site Investigation
Task 2) Concept/Schematic Design (including Cost Estimates)
Task 3) Construction Administration (Optional)
Site Investigation of Existing Conditions and Past Studies.
We will work with city staff to determine the boundaries of our study area, which
will generally focus on the area where the two buildings were removed but will
include an analysis of the entire public parking area. We will analyze the property
and the community needs to develop concepts that meet the needs of the community,
including the City, HRA, Downtown Businesses and residents. We will work with
staff to define goals, objectives and help you build on the downtown vision that
you've discussed in order to address existing parking needs and plan for optional
improvements.
Establishing the vision is integral to the design process and your concept plan options.
A well informed plan is created when a design team and project leaders understand
and set a vision for the project. The main goal of this task is to understand the history
of the site, the goals of the community and ultimately lead to preparation of concept
plan alternatives. Landform will:
a) Contact City and other relevant parties to gain an understanding of the
application process, overall site development issues and site constraints.
Collect data to identify development issues and to provide background
information.
b) Review applicable zoning, subdivision, and Watershed regulations.
c) Prepare site analysis maps or diagrams of adjacent local and regional
land use, context, site orientation, transportation patterns, etc.,
illustrating influences on site development.
d) Gather plans, maps and aerial photos as needed to gain an
understanding of the site and influences on its development.
e) Prepare a project approval schedule.
We will work with you to define
goals, objectives and help you
build on the vision that you've
discussed in order to articulate
and guide the design toward a
successful plan far the future.
Task 2
Our Sensibly ®design
approach means that we
will look for cost-effective,
sensible solutions for blending
development realities with
sustainable design.
Concept/Schematic Design and Cost Estimates.
We will work with city staff to determine the boundaries of our study area, which
will generally focus on the area where the two buildings were removed but will
include an analysis of the entire public parking area. We will analyze the property
and the community needs to develop concepts that meet the needs of the community,
including the City, HRA, Downtown Businesses and residents. We will prepare
development options for the area with an emphasis on the parking lot area, but our
analysis will include recommendations for the adjacent areas in our study area. We
will work with staff to define goals, objectives and help you build on the downtown
vision that you've discussed in order to address existing parking needs and plan for
optional improvements. Landform will:
a) Prepare three Concept Plans for your reference as you determine
the apparent viability of the project. The concept plans will include
at least 25 parking spaces and options will include landscaping,
benches, planters, kiosklcommunity signage, trash enclosure, aesthetic
recommendations for the east wall of Elk River Meats.
b) Meet with City staff once to address any development concerns and
revise concept drawings accordingly.
c) Meet with the HRA once to review the three concept plans.
d) Lay out the proposed site based on the preferred Concept Plan approved
by the Client.
e) Coordinate with the City to show easements on the preliminary plat.
~~><
a ~
,9j ~} S
'~ `~ • w
Our work as the development
managers for the City of Ramsey
builds on both our master
planning skills and our ability to
successfully execute plans. These
skills would translate perfectly
in to the work needed for the
City to successfully develop the
Gateway.
f) Prepare a conceptual Grading, Drainage and Erosion Control Plan
indicating existing and proposed contour intervals, erosion control
measures, and methods of collecting and draining storm water.
g) Assist you in preparing cost estimates for project based on the approved
concept design.
h) Prepare presentation materials as needed to present the Concept Plan.
Deliverables: Three Concept Plans (PDF format)
Final Concept Plan (PDF format)
Cost estimate for concept plan with alternatives
Meetings: Two meetings
Task 3 OPTIONAL -Construction Administration.
Plan options for the Mississippi
Crossings Gateway Plan in
Elk River, MN, provided the
project stakeholders with
various development phasing
ideas, including a marina and
restaurant.
We will work with city staff to determine the boundaries of our study area, which
will generally focus on the area where the two buildings were removed but will
include an analysis of the entire public parking area. We will analyze the property
and the community needs to develop concepts that meet the needs of the community,
including the City, HRA, Downtown Businesses and residents. We will work with
staff to define goals, objectives and help you build on the downtown vision that
you've discussed in order to address existing parking needs and plan for optional
improvements. Landform will:
a) Respond to contractor RFIs, compensated on an hourly basis, as
requested.
b) Provide limited on-site observation, compensated on an hourly basis, as
requested by the Client.
c) Upon substantial completion of the project, perform an on-site review
and compile a final punch list.
d) Attend progress meetings, compensated on an hourly basis, as requested
by the Client.
e) Prepare Record Drawings based upon as-built information provided by
the Contractor.
f) Review the irrigation cut-sheets and design for conformance with the
specifications and standard irrigation practice and for proper coverage.
Schedule We will complete the project according to the schedule described in the request for
proposals from the Economic Development Director.
We can provide renderings, such
as this from The COR in Ramsey,
to help Elk River visualize the
master plan.
Project
Team
Our team possesses the talent and expertise to help you realize your vision and
develop a final Master Plan for the development area. You can be assured that this
project is an important project for us and will be given our full commitment. The team
members identified will be committed to this team for the duration of this project.
Design Team Ms. Kendra Lindahl, AICP
Principal, Project Manager
Ms. Lindahl will be the project manager for the Landform team and will be leading
the master planning process. She will lead the project team and be responsible for
committing firm resources to the project as well as assuring overall performance and
client satisfaction. Ms. Lindahl's experience in both the public and private sectors has
provided her with an understanding of the big-picture concepts and the expertise to
ensure that a development plan and vision becomes a reality. Her broad design and
master planning experience includes every sector of public, residential and commercial
development. Her past and current work includes an emphasis on entitlement process
management.
Mr. Darren Lazan, RLA
President
Mr. Lazan has over 25 years of diverse experience in nearly all aspects of development,
design and engineering, in both the public and private sectors. His broad design and
master planning experience includes every sector of development and construction
campus management. His work includes retail and shopping center design and
development, managing the entitlement process, and a thorough understanding of
development business. Through development of formalized site investigation processes,
streamlined graphic delivery and a unique approach to client service, Mr. Lazan has set
the standard for site design services. He will lead our team through the Design work
outlined in Task 2 of the work plan.
Mr. Steven E. Sabraski, P.E.
Designer
Mr. Sabraski is a Designer at Landform. His attention to detail is an asset and he
demonstrates strong abilities with site design, utility coordination and AutoCAD drafting.
His valuable experience working with various governmental agencies, including work on
various airport development projects and construction staging, builds on the expertise
we invest on every project.
Shoreview Town Center master
planning design process created Full resumes for each of our team members are provided in the Attachments section.
a master plan and preliminary
design guidelines for area
redevelopment.
Highway 7 Corridor Study in
Hutchinson, MN, involved both
City staff and residents shaping
the corridor plan for area
growth due to the expansion of
Highway 7.
Experience
& Design
Examples
On many of our projects, we've
applied for and won community
grants to develop the plans.
Landform has a wide range of experience applicable to this project. Our team
members have provided planning, site assessment, site design, landscape architecture,
civil engineering and land surveying services and have assisted with project approvals,
project management and construction contract administration. We work with various
forms of government during the planning process and create a vision and plan specific
to that community. To execute the vision and plan created in the public process, we
can partner with developers to execute the area plans. Details of several of our most
relevant projects are presented below.
Mississippi Crossings Master plan for 50 acres with $6M public improvements to parks, trails, new riverside
Commons Master Plan promenade, dock and marina as part of a $24M mixed-use redevelopment plan;
Champlin, MN worked with city to gather public input and create plan options and developer to
execute vision.
Livable Communities Opportunity Grant, 2004
plan completed in 2005
The Cor Re-visioning and development management of the former "Ramsey Town Center",
Ramsey, MN a 322-acre urban mixed-use development anchored by the Municipal Center and a
commuter rail transit station.
Revisioning completed in 2009
Development management is ongoing
Mound Downtown Plan Downtown redevelopment plan for over 12 acres with transit district, mixed-use
Mound, MN including housing and retail, public open spaces, marina, ponds and trails; worked
with city to gather public input and create vision; partnered with a developer to
execute vision.
Livable Communities Development Grant, 2004
plan completed in 2006
village Master Plan Master plan for over 23 acres including public open spaces, greenway, ponds and
Mendota Heights, MN trails; completed as part of a $57M mixed-use development plan; worked with city to
gather public input and create vision; partnered with a developer to execute vision.
Livable Communities Opportunity Grant,1999
Livable Communities Development Grant, 2002
Livable Communities Development Grant, 2003
2000 - 2008 final phase
Big Lake Downtown Plan for new development and redevelopment of the downtown area to reclaim
Framework Plan historic character including pedestrian-friendly streetscapes, improved traffic flow,
Big Lake, MN access to businesses and linkages to the lake front from downtown; created
preliminary design guidelines to encourage consistent quality and design concepts for
civic-public amenities.
plan completed in 2003
Robbinsdale Transit- Created a new vision for redevelopment of an old theater, mall site and surrounding
Oriented Development area; plan located stations and pedestrian connections to the Northwest Transit
Plan Corridor BRT (Bus Rapid Transit) including a new federally funded pedestrian bridge;
Robbinsdale, MN mixed-use plan provides life-cycle housing, new townhomes, condominiums, small
neighborhood commercial and pedestrian-friendly, ground-floor retail.
plan completed in 2003
Shoreview Town Center 80-acre mixed-use Town Center district with housing, commercial, retail, extensive
Master Plan & Design public amenities, pedestrian-friendly streets, housing, park pavilion, skating pond, trails
Guidelines and open space; 180,000 sq. ft. of new retail, office and housing along Highway 96.
Shoreview, MN plan completed in 2006
Waterfront Village Master plan fora $75M mixed-use resort Village within a 336-acre, master-planned
Jeffers Pond Master Plan conservation development; includes hotel, water park and waterfront boardwalk.
Prior Lake, MN plan completed in 2006
Additional Projects Many of our corridor studies, larger mixed-use master planning and other development
projects are applicable to this project. These plans must accommodate a diverse
audience's needs for a wide range of uses including retail, residential, hospitality,
cultural/arts and recreational areas.
We have included these additional projects in the Attachments section.
Project
Fee
If our work plan does not meet Our work plan shows the tasks and the estimated time required for each, based on
your goals, we will work with previous discussions and our past experience. Using standard, hourly rates, we have
you to make the adjustments generated fees for each task.
needed to tailor our proposal to
meet your needs.
Task 1) Site investigation of existing conditions and past studies.
$800
Task Z) Prepare three concept plans for parking area and amenities, prepare final
plan based on discussions with City and prepare cost estimates for different
concept elements.
$2,500
Task 3) OPTIONAL Construction Administration
$Hourly as needed
Total Fee: $3,300
Additional Services Additional services beyond the scope of this proposal or changes to the scope of
schedule which would require additional meetings or deliverables will be billed at
our customary hourly rates. Prior to performing any additional services, written
authorization will be required.
Reimbursable Expenses Reimbursable expenses are based on our understanding of your requirements and our
past experience with similar projects. We can provide an estimate of reimbursable
expenses upon your request, and we've included our reimbursable expense rates
below:
Internal reimbursable expenses are priced as follows:
Mileage $0.50 per mile
Plotting on Bond $0.25 per square foot
Plotting on Vellum $1.10 per square foot
Plotting on Mylar $2.50 per square foot
Plotting in Color $7.00 per square foot
Color Printing $1.00 for 8.5 x 11
$2.OOfor8.5x14,11x17
Scanning $1.50 per scan
CD/DVD $10.00 per cd/dvd
External reimbursable expenses are billed at cost plus 15°/a.
Terms of Payment We will invoice monthly based on the tasks or percentage of the work completed.
Payment is normally due 30 days from the date of invoicing, and interest accrues on
unpaid balances. However, specific terms of payment can be negotiated to meet your
needs.
Firm Profile
Landform is amulti-disciplinary consulting firm, founded in 1994 and based in
Minneapolis, Minnesota. We offer a full range of site design, planning and civil
engineering services. Our professional resources include landscape architects,
planners, urban designers, civil engineers, land surveyors and water resources
professionals. We are committed to client service, design quality, principles of
sustainability and an innovative approach to site design.
our experience in the planning Landform is organized into studios, each with their own expertise and area of
and design of active, healthy specialization and experience. We shape our project design and delivery process to
places will give you a more anticipate the needs of our clients based on an in-depth understanding of their project
thoughtful, unique vision and type or market. Each studio offers a fully integrated and interdisciplinary design
plan. process from Site to Finish®. Within the studios, project teams bring together the
professionals with the specific expertise and the experience needed to meet clients'
project objectives. Professional services include:
• urban design and architecture
• planning
• landscape architecture
• LEED® design/management
Our Landform team offers you the following:
• sustainable design and administration
• environmental coordination
• civil engineering
• land survey
• A team that can draw on our wide range of experience in the planning and
design of public spaces, mixed-use development, parks, retail, commercial
and residential facilities.
• A team with both design and project management experience in urban
design, landscape architecture and community studies so that your project is
well informed and well designed.
• A team that has a strong reputation for creative approaches to planning
and design and blends development realities with the best practices of
Our team possesses the talent sustainable design.
and expertise to help you realize
your vision, organize your goals
and fully engage the City of Elk
• A team that is extremely efficient and well organized that has demonstrated
River, your residents and your success in keeping projects moving forward while maintaining a high level
visitors. of stakeholder and community involvement.
• A team that is committed to providing a plan that can be used to guide
decision-making. We believe that plans must be developed with vision and
an understanding of the marketplace. Our experience with the public and
private sectors makes Landform uniquely qualified to help you implement
your vision.
~;~ Sensibly
Philosophy
Approach
"Let us green the earth,
restore the earth, heal the
earth."
Ian McHarg
Landform is dedicated to interweaving the broader issues of the urban landscape with
the intimate scale of our community, neighborhood spaces and natural environment. We
understand the value of design and planning at any scale and the need for a thoughtful,
innovative and sustainable design process. Our work is based on an in-depth understanding of
the uniqueness of place. We believe that by uncovering and building upon the unique qualities
of a place in a restorative manner, we will ensure its long-term success.
A major component of place is the natural environment and its resources. We strive to
responsibly achieve harmony with the earth's land and resources in projects of all scales.
Our Sensibly ° initiative is the result of a focus of energy and excitement centered in
the values of resource management and environmentally sensitive design within the context
of economic viability. Our sensible approach provides economical solutions, cost-saving
opportunities, and return on investment for a positive bottom line and a sensitive use of
natural resources.
Services We employ experts from a wide range of professional disciplines and services to provide
Sensibly ° solutions to planning and design challenges. Our team focuses on many
sustainable solutions including:
• Sustainable Ordinances • Innovative Stormwater Solutions
• LEED® Certification/Facilitation Water Resources Management
• Environmental Coordination Life-Cycle Cost Analysis
Our team offers you:
• Professionals who have worked on similar, challenging projects who can draw on a
wide range of experience in the design and development of economically sensible and
memorable development projects.
• The strength of our reputation for creative approaches to water management,
planning, civil engineering and landscape architecture, blending development realities
with the best practices of sustainable design.
• A team that has demonstrated success in keeping projects moving forward while
maintaining a high level of stakeholder and community involvement.
• A project approach that is carried out by a team with a well coordinated work
process, honed on past projects.
Landform® and sensibly ~ are An excellent track record assisting communities in pursuing grants and other funding.
registered service marks of Landform
Professional Services, PLC.
10
Sensibly ~~_~~~~®
Philosophy
Sustainable We create the criteria, methods and language for municipal codes incorporating Leadership
Ordinances in Energy and Environmental Design (LEED°)", The State of Minnesota Sustainable Building
Guidelines (MSBG)*` and other innovative green building guidelines and practices. These
codes give municipalities the tools to properly shape new communities that are more efficient,
economically viable, and environmentally sensitive.
LEED® We bring our project management experience with the challenging entitlements process to the
Certification/ LEED® Certification process, guiding development teams to a successful result. Understanding
Facilitation the need for clear communication and a knowledge base built on LEED® standards allows us
to build the future with a restorative approach.
Life-Cycle Our team members research and apply the most appropriate, cost-effective solutions for
Cost Analysis each unique and challenging development issue. A thorough understanding of the life-cycle
cost benefits of using energy-efficient systems and technologies ensures a successful and
economically viable project - a concept inherent in our Sensibly ®approach to planning
and design.
Innovative Stormwater treatment has evolved from no treatment, to "pipe and pond" solutions advocated
Stormwater in the Nationwide Urban Runoff Program (NURP), to current practices encouraging low-
Solutions impact development. We support this evolution and view Stormwater as an asset to be
sensibly managed for the benefit of both the environment and the end user. Our innovative
and restorative approach to design includes capture, treatment and reuse for things such as
irrigation and non-potable toilet flushing to full treatment for drinking water supplies as is
done in many state and national parks today. Whether we are managing the containment,
treatment or recycling of water on a site or designing a system specific to your needs, our team
is experienced in all aspects of water management.
*LEED' promotes awhole-building approach to sustainability by recognizing performance In five key areas of human
and environmental health: sustainable site development, water savings, energy efficiency, materials selection and
indoor environmental quality. (Courtesy of www.usgbc.org)
**The State of Minnesota Sustainable Building Guidelines (MSBG) are design and management tools used set
sustainable design priorities and goals, develop appropriate sustainable design strategies for a particular project and
determine performance measures to guide the design and decision-making process. (Courtesy of the University of
Minnesota College of Design's Center for Sustainable Building Research)
Landform~d and Sensibly ~' are
registered service marks of Landform
Professional Services, LLC.
Professional
References
We are proud of our record of professional, quality service and our ongoing
relationships with our clients. We encourage you to speak to them about our team.
Ms. Rebecca Bowers
Director of Community, Economic, and Housing Support, Scott-Carver-Dakota CAP
Agency (Former Community Development Director, City of Hutchinson)
Ph:651-322-3513 Rebecca.Bowers@capagency.org
Mr. Mike Grochala
Community Development Director, City of Lino Lakes
Ph:651-982-2427 mgrochala@ci.lino-lakes.mn.us
Mr. Ken Guenthner
Mayor, City of Corcoran
Ph: 612-710-0734 kenguenthner@aol.com
Mr. Bryan Bear
Community Development Director, City of Hugo
Ph:651-762-6320 bbear@ci.hugo.mn.us
Mr. Kurt Ulrich
City Administrator, City of Ramsey
Ph: 763-433-9845 kulrich@ci.ramsey.mn.us
iz
Kendra Lindahl, AICP
Principal ~
;..
1
Ms. Lindahl leads the Planning and Infrastructure Studio. Ms. Lindahl's experience with both
public and private sector clients has provided her with an understanding of the big picture
concepts and the expertise to ensure that the details are addressed. This client mix keeps her
on the cutting edge which allows her to be creative and successful in managing the increasingly
complex approval process. Ms. Lindahl brings a complete understanding of the review and
permitting process and is a valuable addition to your development team. In addition to solid
writing skills, her strengths include effective presentation skills at public hearings and meetings.
Education Master of Arts in Public Administration, Hamline University
Bachelor of Arts, University of Minnesota-Morris
Registration American Institute of Certified Planners (AICP)
Municipal Landform, Planner
Experience Consulting City Planner, Hugo, Minnesota
Consulting City Planner, Corcoran, Minnesota
Hanifl Fields Athletic Park Shelter, Hugo, Minnesota
Hugo Comprehensive Plan Update, Hugo, Minnesota
Dunlop Park, Oak Grove, Minnesota
Highway 7 Corridor Study, Hutchinson, Minnesota
Shoreview Town Center Plan and Design Guidelines, Shoreview, Minnesota
Hugo Downtown Redevelopment Plan and Design Guidelines, Hugo, Minnesota
Big Lake Downtown Framework Plan, Big Lake, Minnesota
City of Plymouth, Senior Planner, Plymouth, Minnesota
City of Elk River, Zoning Assistant, Elk River, Minnesota
Skills Prepare updates to city ordinances, codes and comprehensive plans
Prepare environmental review documents (EAW, EIS, AUAR)
Coordinate development plan reviews
Organize and facilitate neighborhood, task force and public meetings and workshops
Lead strategic goal-setting sessions with City Councils and Planning Commissions
Respond effectively to public inquiries about development projects and procedures
Understand and interpret government regulations and procedures
Facilitate the development process
Affiliations American Planning Association (APA)
Minnesota Chapter of American Planning Association (MnAPA)
Sensible Land Use Coalition (SLUG) Board Member
Economic Development Association of Minnesota (EDAM)
Darren Lazan, RLA
President
Mr. Lazan has over 25 years of diverse experience in nearly all aspects of development,
design and engineering, in both the public and private sectors. His broad design and master
planning experience includes every sector of commercial development and corporate campus
management. His work includes retail and shopping center design and development,
managing the entitlement process, and a thorough understanding of development business.
Through development of formalized site investigation processes, streamlined graphic delivery
and a unique approach to client service, Mr. Lazan has set the standard for site design services.
Education Hennepin Technical College -Architectural Design
Registration State of Minnesota (Landscape Architect)
Experience Established Landform in 1994
Private Architecture/Engineering Consultant Firms, 1986-1994
City of Brooklyn Park, 1983-1986
Landform provides a full range of engineering, design and development services for private
sector clients with residential, commercial, industrial, park orquasi-public developments. Mr.
Lazan's work includes the following projects:
The COR at Ramsey, Ramsey, Minnesota
Independence, Sun Valley, Idaho
Target Stores, Multiple Nationwide Locations
Peninsula Town Center, Hampton, Virginia
16 West, Savannah, Georgia
Current Lee Vista, Orlando, Florida
The Foundry, South Strabane Township, Pennsylvania
The Marquis, Williamsburg, Virginia
Promenade Shoppes at Lakemoor, Eagle, Idaho
ADC Telecommunications World Headquarters, Eden Prairie, Minnesota
Andover Clocktower Commons, Andover, Minnesota
Bridgewater Falls, Fairfield Township, Ohio
Applebee's Restaurants, Multiple Nationwide Locations
LA Fitness Centers, Multiple Arizona Locations
Life Time Fitness and Aquatic Centers, Multiple Nationwide Locations
Affiliations International Council of Shopping Centers (ICSC)
Steven E. Sabraski, PE
Designer
~;
Mr. Sabraski is a Designer at Landform. His dedication to project success and attention to
detail is unmatched. His expertise in grading design, stormwater modeling, and drafting
provide the essential tools necessary for successful project development. The experience he
has gained through work on large projects has given him broad exposure to the complexities
related to the site development process, and has a clear understanding of what it takes to
bring a project from Site to Finish.
Education Bachelor of Civil Engineering, University of Minnesota
Registration) State of Minnesota
Certification Erosion and Sediment Control Specialist/Design of SWPPP Certification, University of Minnesota
Experience The COR at Ramsey, Ramsey, Minnesota
• COR Mass Grading/Hydrology Analysis
• The Residence at the COR
Suite Living at the COR
• COR Master Development Site Planning
Minneapolis Public Schools Headquarters, Minneapolis, Minnesota
Radisson BLU at Mall of America, Bloomington, Minnesota
Costco, Burnsville, Minnesota
Target Corporation, Multiple Nationwide Locations
The Foundry, South Strabane Township, Pennsylvania
Bridgewater Falls, Fairfield Township, Ohio
Parkway Village, Goodyear, Arizona
Church of South Mountain, Phoenix, Arizona
Applebee's International, Multiple Minnesota Locations
Chipotle, Multiple Nationwide Locations
McDonald's Restaurants, Multiple Midwest Locations
Wendy's, Multiple Minnesota Locations
Brookdale Chevrolet / BG, Brooklyn Center, Minnesota
Site to Finish°~ is a registered service mark
of Landform Professional Services, LLC.
Master planning for the
Mississippi Crossings area
extended from the Gateway, the
historic center of Champlin, to
the Commons, where four parks
come together at the river.
Proposal for park improvements
included re-routing through-
traffic, restoring a WPA dam/
weir, and adding a new marina
for greater public access to the
Mississippi River. Developer
also proposed new resort hotel,
mixed-use with new city dock
and river overlook.
City won a Livable Communities
Opportunity Grant in 2004 for
additional parks planning.
2004 plan completion
The Commons
Mississippi Crossings
Master Plan
Champlin, Minnesota
Options for new marina proposal
for City of Champlin and SpringPointe Development
a~
~~ °
~~
Study for redevelopment of the Mississippi Crossings and Commons
THE
•L s
~y~~:~~
•+ ••• •
,•
Site design deals with both
vehicular and pedestrian
movements while managing a
sensitive interaction between
surface and ground water.
The COR at Ramsey was one of
two TIF requests granted by the
Legislature after review of 100
requests.
The new energy around The
COR at Ramsey has sparked
a national interest in the
development and resulted in a
number of new projects.
The Cor at Ramsey for the City of Ramsey
Ramsey, Minnesota
Re-visioning and development management of the former "Ramsey Town Center",
a 322-acre urban mixed-use development anchored by the Municipal Center and a
commuter rail transit station. Our revisioning work included analysis of the existing
development plans created by the former developer prior to acquisition of the property
by the City, holding stakeholder meetings to gather feedback, and preparing and
presenting a revised master plan. Landform's role as the development manager
encompasses all aspects of development including administration, sales and marketing,
deal procurement and structuring, and legislative actions. The Landform team worked
with our client, the City of Ramsey, to successfully secure Tax Increment Financing (TIF)
legislation in the recent session.
Mound Harbor
Renaissance
Mound, Minnesota
for Mound Harbor Development, LLC
~,
r ~
.j t'~ ~.~
Redevelopment of three
districts comprising the core of
Downtown Mound.
Mixed-use village with retail,
office, hotel, service commercial
and residential uses within a
convenient, walkable area.
Mound's vision includes
significant community open
space; a boardwalk, green-way,
and trails to provide pedestrian
linkages, a planned Park & Ride,
and possible regional commuter
rail depot for enhanced
Downtown connections.
This project received a Livable
Communities Development
Grant in 2004.
~+.
2008 Estimated Completion
Master Plan for for City of Mendota Heights
The Village at and RMF Entities LLC
Mendota Heights
Minnesota
The City of Mendota Heights
sought a unique Town Center to
provide a civic place for citizens
of Mendota Heights to gather
together. This master plan
realized their vision.
The Village is a mix of retail,
office and residential uses
centered around the new Town
Square. Parking tucked under
the buildings serves 95,000
sq. ft. of mixed, commercial
space with front-door customer
parking for Main Street retail.
Sixty senior apartments anchor
the north end of the square,
and trails connect to Village
rowhomes and condominiums.
Landform lead the planning and
approvals process, developed
Master Plan & Design Guidelines,
and provided civil engineering for
streets, ponds and build-out.
Recipient of Livable Communities
Opportunity Grant (1999) and
Development Grants (2002, 2003)
2004 Master Plan Completion
Recipient of the
Best Mixed-Use
Project STARRY""
Award (2006)
by Minnesota
Shopping Center
Association
(MSCA).
The Village plan set aside more
than 25 percent of the total site
area as public open space. Trails
connect neighborhood open
spaces, greenways, ponds and
the town square.
The town square is the heart
of the new mixed-use village.
Modeled after Market Square in
lake forest, Illinois, this space
has been the site of several
community-wide events.
At the main entry to the Village,
there is dedicated parking for
the trail head connecting to
Lilydale Park and the Mississippi
River and Northern Regional
trails.
Landform was responsible far
the master plan, developing
design standards for the
landscaping and open space, all
civil engineering and stormwater
management.
2004 Master Plan completion
Town Square
& Greenway
Village at
Mendota Heights, Minnesota
for City of Mendota Heights
WATER
~~ .. -.
ELEVATED PERENNIAL
& SHRUB BED
CHESS TABLES
MOVABLE
TABLES,
CHAIRS
WATER RUNNELS
PERENNIAL &
ANNUAL FORMAL
FLOWER BED
. '>. ,SEAT WALL
SCULPTURAL
IDENTITY MARKER
ELEVATED PERENNIAL
& SHRUB BED
~~~ ~ ~~
~,
OPEN LAWN.
r,
No.
.~
,,
_ ~~,ery
• NATIVE . , ,'
t'i.A ~ IAI~I f1[I A\A/CDf _
Big Lake Downtown for City of Big Lake and
Framework Plan Big Lake Design Team
Big Lake, Minnesota
Plan for new development and
redevelopment of the downtown
area to reclaim historic character.
Create pedestrian-friendly
streetscapes, improved traffic
flow, access to businesses and
linkages to the lake front from
downtown.
Preliminary design guidelines to
encourage consistent quality and
design concepts for civic-public
amenities.
2003 Completion
Created a new vision for
redevelopment of the old Terrace
Theater and Mall site and
surrounding area at 36th and
France.
Plan located stations and
pedestrian connections to the
Northwest Transit Corridor BRT
(Bus Rapid Transit) on County
Road 81, including a new
federally funded pedestrian
bridge.
Mixed-use plan provides life
cycle housing, including new
townhomes and condominiums,
as well as small neighborhood
commercial, and pedestrian
friendly ground floor retail.
Project also accommodates
North Memorial renovation
of former Montgomery Wards
building with complementary
uses, including an extended stay
hotel and medical office space.
2003 Plan Completion
Robbinsdale for Hennepin County and City of Robbinsdale
Transit-Oriented
Redevelopment
Robbinsdale, Minnesota
Rendering of 36th & France (looking east) after suggested improvements
Lakeview Terrace Park for Hennepin County and City of Robbinsdale
& Crystal Lake Plan
Robbinsdale, Minnesota
Crystal Lake suffers from the
challenges of most urban
lakes -poor water quality and
challenges managing water
levels.
As part of a larger planning
effort on Highway 81, this plan
proposed improvements to both
the lake and the existing park.
Improvement of stormwater
treatment is addressed through
filtration ponds and new
wetlands.
Park layout was re-worked
to improve safety and to
accommodate a pedestrian
bridge over the highway.
2003 Plan Completion
Shoreview Town Center, for City of Shoreview
Master Plan &
Design Guidelines
Shoreview, Minnesota
Designed an 80-acre mixed-use
Town Center district comprised
of housing, commercial and
retail space as well as extensive
public amenities.
Housing planned for over
600 units -condominiums,
townhomes, rowhouses and
senior housing.
180,000 sq. ft. of new retail and
office space with good visibility
on Highway 96.
New parkway connecting to
Shoreview Commons & City Hall.
Pedestrian-friendly streets, mix of
shops, housing and recreation.
Plan opens up public access
to Lake Martha with new park
pavilion, skating pond, trails &
open space.
2006 Study Completed
Waterfront Village for Wensmann Homes, Inc.
Master Plan at
Jeffers Pond
Prior Lake, Minnesota
Master plan for amixed-
use resort Village, as part of
the 336-acre Jeffers Pond
development. This conservation
development preserves
spectacular water and wetland
habitats and provides over five
miles of public trails.
The Village would be a unique
destination with hotel, water
park, restaurants and retail.
A boardwalk lines the waterfront
so shoppers can stroll and
browse. The urban square with
campanile is ringed with cafes
and retail shops.
New luxury housing ringing the
central square offers views out
over Jeffers Pond.
2006 Plan Completed
2010 Estimated Full Completion
Gateway Master Plan
Limestone Quarry
Burnsville, Minnesota
~..
~.
!-
,.
for Ed Kraemer & Sons, Inc.
--
a
s 1~, ro~-~ s ~~~ g ~ 1a*;, -
~'`,
Y
x
Master plan for redevelopment ~ .~c~' ~~ ~ i.~"+'~ ~ ~ '"~,~ ~ ;~~ ~i-,.•~`'x
of an active quarry site relocates ~, • ~+~~ ~~~,
as=s ' ~ ~ ~»
existing industrial uses to the ~N!'~?y ~~-~ , ~,~~',. i, t.r, -'~'
southwest corner of the site. _ ~ --~-~..° -~,•-'~"-~~ . ~~ ~;^~~~:-°.~r _~•<w
Plan envisions a mix of public `~_ •--a =_ _"
r. ~-
and rivate uses The eastern _..
P
development on I-35 includes
a retail lifestyle center, office, ~; -
'"
commercial and hospitality with , r ~
~
""'
two new hotels, marina and
l
h
b
d ~
"
°~
e a
ong t
e
ur
an promena
waterfront. >
~ ~~`
Public amenities at the western .~,, ''~"'~~ ~ ~ "1ta~,"'1~
~
end of the site include a city ~'__
°^ f ~, ~ {~ ~ ;~.._.__. ~
beach with boat launch and
a golf course planned on the ,~: ~~d ct ~±°
,~ ~ s
,
l~ ~
,~i` ~'
adjacent aty land fill. Trails f ~ ~ e
would circle the 300-acre lake. '~'
~J
2004 Plan Completed ~*~~ T
2020 Estimated Full Completion ~~~~' ~~~ "
~,
~~~~ .~
,~ .
Plan for city park & beach
~ ~ ~ ; .
{ Sketch of waterfront promenade
.~ ..
' w .
1~~
.> ,
~ a"• e +K.. ~.
x ~,
a~
..tom'.::