Loading...
6.11. SR 03-02-1998~,ty of iver MEMORANDUM Item ~6.11. TO: Mayor and City Council FROM: Darrell Mac~ Waste Water Treatment Superintendent DATE: February 24, 1998 SUBJECT: Approval For A New Roof The 1998 budget includes $40,000 for a new roof on the main building located at the Waste Water Treatment Facility. During our facility upgrade we did get a quote from Gridor's roofing contractor, N.W. Waterproofing, thinking we would do it as a change order, but because of the change order markup we decided to wait. However, the contractor is willing to honor the price he quoted in February of 1997, minus Gridor's markup. After doing some checking, I have found N. W. Waterproofing's quote of $20,105.00 to be the lowest. Attached for your review is the quote received from N. W. Waterproofing. Action requested: Council approval to allow N. W. Waterproofing to replace the roof on the main building of the Waste Water Treatment Facility for the price of $20,105.00 as quoted. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 rthwestern nc. Office: 612-420-3731 Fax: 612-420-3736 20400 Hackamore Road - Corcoran, MN 55340 WAI'ERPROOFING-ROOFING-COATINGS February 24, 1998 Darryl Mack Elk River Waste Water Treatment Plant 13065 Orono Parkway Elk river, Minnesota 55330 Re: Elk River WWTF Garage Re-roof; Alternate System Dear Darryl, Per your request: Remove existing asphalt plys and gravel; leaving existing insulation. Replace wet areas of insulation with new insulation. Install additional wood blocking to outside edges. Install new EPS insulation over existing. -Roof insulation will have a total of R-23.5. Install new 45 mil ballasted roof system. Install new prefinished edge metal, 4 scuppers and 4 down spouts. 5 year Contractors Warranty. TOTAL $19,410.00 · For 10 year Manufactures Warranty ADD 695.00 Ifyou have any additional questions or concems, please call meattheabove number. Sincerely, Michael R. Fore