6.12. SR 03-02-1998ELK RIVER ARENA 1000 SCHOOL STREET P.O. BOX 720 ELK RIVER, MN 55330 (612) 441 - 2956 FAX (612) 241 - 9432 Item ~6.12. To: Elk River City Council From: Rich Czech, Arena Manager ~ Cliff Skogtad, City Building Official Date: February 26, 1998 Re: Dehumidification, Ventilation, Heating in Arena During the spring and summer of the 1997 season the arena experienced high humidity levels. The result of the high humidity was condensation on every surface of the building that was colder than the air. Some of the problems that have risen from this are: the arena experiencing water dripping from the ceiling, which causes stalagmites on the surface of the ice; rusting of the ceiling/wet floors, making the floors slippery; pistons to the door closers rusting making it very hard to open the spectator exit doors; and speakers for the P.A. system with ice build up on them. The reason for the high humidity in the building is the ventilation and dehumidification. The two go hand in hand. When venting the air in the building, the make up air is not conditioned before introduced into the building. This basically means that the humidity level of the air outside is what is brought in. When outside air is conditioned there is less humidity in the air being brought into the building. The dehumidifiers that are installed in the arena are more or less a large air conditioner units. They are designed to operate at their highest efficiency level in warm climates (60 - 80 degrees). Since the arena is relatively a cool building this system is very inefficient. Bringing enough heat into the building to have them operate at peak efficiency would be impractical. Even if heat was added to the building the two units are not large enough to remove all the humidity out of the air. We are proposing that the city have Delano Erickson Architects conduct a feasibility study to determine what steps need to be taken to correct this problem. (Please see attached proposal). Delano Erickson Architects have worked on problems such as ours for over (30) thirty years. Recently their projects have included: Maple Grove Community Center, Edina's third sheet of ice, Eden Prairies second sheet of ice and renovation to their first sheet, and Burnsville second sheet of ice. We have requested a resume from them and should have it in the near future. The study will have recommendation of three different phases, the dehumidification, the ventilation, and the heating along with an estimated cost of each phase. If nothing is done about the current situation, the arena will continue to experience the problems in the previously stated areas, as well as possible future areas causing greater expenses to be incurred. ARCHITECTS YZATA BOULEVARD NEAPOLIS, MN 55426 612-544-8370 February 3, 1998 Mr. Richard Czech Elk River Arena 1000 School Street Post Office Box 720 Elk River, Minnesota 55330 Feasibility Study for HVAC Improvement Elk River Ice Arena Dear Mr. Czech: Please excuse the lateness of this proposal which is related to our engineer's portion which I received last Friday, a copy of which is enclosed herewith. Our services will include the engineering described and architectural services with estimated costs as follows: Overall Administration of Study Design Input and Building Analysis Concept Drawings as Appropriate Compilation of Cost Estimates and Report Estimated Architectural Services $ 800.00 500.00 400.00 500.00 $2,200.00 We propose providing services on an hourly basis with total costs estimated to be $5,500 and a not- m-exceed total of $6,150 plus reimbursable expenses. Architectural Rate Schedule: Hourly rates and expense for this project are as follows: Principal Architect Architect - Design CADD - Drafting Drafting Clerical Structural Engineering $80.00/per hour $70.00/per hour $60.00/per hour $45.00/per hour $35.00/per hour $90.00 to $120.00/per hour Reimbursable Expenses - Billed at 1.1 x Cost Mr. Richard Czech February 3, 1998 Page 2 Priming - 24 x 36 Copy - 8~ x 11 Mileage LD Telephone and Fax $2.50/per sheet $. 1 O/per sheet $.30/per mile ~ cost I have enclosed a signed copy of our engineer's agreement and provided a place for your signature below for this letter to serve as our agreement. Sincerely, DELANO ERICKSON ARCHITECTS Del Erickson, AIA DE/tit ACCEPTED: CITY OF ELK RIVER By: Dated: January 28,1998 LUNDQUIST, KILLEEN, POTVIN & BENDER, INC. Consulting Engineers 1935 W. County Rd. B2 · Suite 300 SL Paul, MN 55113-2722 (612) 633-1223 · FAX:633-1355 Mr. Del Erickson Delano Erickson Architects 7415 Wayzata Boulevard Minneapolis, Minnesota 55426 Re: Elk River Ice Arena Elk River, Minnesota JAN .,. 1998 Dear Mr. Erickson: This document shall 'serve as an agreement between Delano Erickson Architects (DEA) and Lundquist, Killeen, Potvin & Bender, Inc. (LKPB) to provide mechanical and electrical design services for the referenced project. PROJECT DESCRIPTION We understand the scope of this project consists of three phases, i.e., evaluation of the existing heating, ventilation and dehumidification systems, justification for retrofit of systems and implementation of proposed revisions. This agreement is for the first phase of evaluation of systems relating to ventilation and air quality of space, heating and dehumidification to standards established by the user. SCOPE OF SERVICE Basic Services: LKPB shall provide mechanical and electrical engineering design basic services for the following: · heating · ventilation · dehumidification · power distribution Basic services will be provided to include the following: attendance of local periodic programming and design review coordination client meetings preliminary probable cost estimates for implementation of work Mechanical feasibility report will be typed on 8-1/2" x 11" paper for inclusion architect's report. MECHANICAL · ELECTRICAL · INQUSTRIAL January 28, 1998 Mr, Del Erickson Delano Erickson Architects Elk River Ice Arena Page 2 of 4 Additional Services: Additional services consisting of the following are available, if requested: · expansion of the scope of the project CONDITIONAL; PROVISIONS This pr.0P~Sal is based on the owner providing, .thrOugh the architect in a timely.manner, owner ope[ati_ng ~standard's plus copies-of 'existing building' Plans. shOwing mechanical, and ':eleCtrical systems. ' ~ ~ ~, . - "' -'-'-i. '. ,~ .... ' ~''' -' · FEE COMPENSATION i -BaSicserVices fOr'this fi rstphase 'shall be, fee Co~'p~nsated on an, h0Utly fee basis 'not to exceea - Three ThOusand Six Hundred Fifty Dollars' ($3;650)'iPer rates contained .herein. Additional services if requested, will be provided on an' hourly basis per the rates contained hei;~in. Standard hourly .charge rates shall be as followS: Clerical I .............. $ 30.00/hour Clerical II .............. $ 45.00/hour Administrative AsSistant... $ 60.00/hour Drafter ................ $ 45.00/hour Designer I ............. $ 50.00/hour Designer II ............. $ 65.00/hour Designer III ............ $ 75.00/hour Engineer I ..... ' ........ $ 55.00/hour Engineer II ............. $ 70.00/hour Engineer III ............ $ 85.00/hour Associate .............. $ 90.00/hour SeniOr Associate ....... $100.00/hour Principal .............. $115:00/hour The term for the rates listed above shall apply through December 31, 1998, at which time they shall be subject to review and adjustment. Fee compensation shall be invoiced and paid monthly in proportion to work completed. No retainage shall be withheld from the invoiced amounts. Invoiced amounts shall be due within ten (10) days of architect's receipt of payment from the owner. Unpaid balances due shall bear interest at 12% per annum. REIMBURSABLE EXPENSES The following expenses shall be reimbursed at a 1.1 multiple of actual expenses incurred: out of town travel, lodging and subsistence long distance telephone/FAX communications delivery services January 28, 1998 Mr. Del Erickson Delano Erickson Architects Elk River Ice Arena Page 3 of 4 reproduction or plotting of drawings, specifications and other documents mileage SUSPENSIONS OR TERMINATIONS OF SERVICES The client or LKPB may suspend or terminate any or all services covered by this agreement at any time, subject to the client's giving a minimum of five days written notice to LKPB of suspension or 'termination. In the event of sUch suspension or termination by client, LKPB shall be paid for services rendered to date of the suspension or termination, including a!l unpaid Additional Services rendered and Unpaid Reimbursable Expenses incurred. (Such payment shall be an amount equal to the actual hours of'services furnished'at the standard hourly rates contained herein, not-to exceed the contract amoujnt.) DISPUTE RESOLUTION Any dispute, controversy or claim arising out of or relating to this agreement, or the breach thereof, shall first be negotiated in good faith by the parties of this agreement to reach a resolution to the dispute. If, within 30 days after such negotiation, the parties have not succeeded in negotiating a resolution to the dispute, the parties may submit the dispute to non-binding mediation in accordance with the Construction Industry Mediation Rules of the American Arbitration Association currently in effect. Requests for mediation shall be filed in writing with the other party to this agreement and with the American Arbitration Association. Such requests for mediation shall be made within a reasonable time and in no event be made after the date when institution of legal or equitable proceedings based on such dispute would be barred by the applicable statute of limitations. ASSIGNMENT Neither the client nor LKPB may assign, sublet, or transfer any rights under, interest in, or performance of this agreement including any claims for damages, breach of contract, or negligence, including, but without limitation, monies that may become due or monies that are due, without the written consent of the other. MISCELLANEOUS Printing of report will be provided by Delano Erickson Architects. It is understood that LKPB's contract will be with Delano Erickson Architects, the client. If the above conditions are acceptable, please have both copies of this proposal agreement signed, retain one copy for your files and return one copy to our office as a record of the client/engineer contract. January 28, 1998 Mr. Del Edckson Delano Erickson Architects Elk River Ice Arena Page 4 of 4 This letter contract shall form the basis of and shall remain in effect until a more formal contractual document is agreed upon and signed by both parties. Lundqu~st~ K~lleen-'~!n~&~Be~nder, !~c Delano Enckson Architects Date F:\1998~Jan~elk-river. lal.wpd