Item ~6.12.
To: Elk River City Council
From: Rich Czech, Arena Manager ~
Cliff Skogtad, City Building Official
Date: February 26, 1998
Re: Dehumidification, Ventilation, Heating in Arena
During the spring and summer of the 1997 season the arena experienced high humidity
levels. The result of the high humidity was condensation on every surface of the building
that was colder than the air. Some of the problems that have risen from this are: the arena
experiencing water dripping from the ceiling, which causes stalagmites on the surface of
the ice; rusting of the ceiling/wet floors, making the floors slippery; pistons to the door
closers rusting making it very hard to open the spectator exit doors; and speakers for the
P.A. system with ice build up on them.
The reason for the high humidity in the building is the ventilation and dehumidification.
The two go hand in hand. When venting the air in the building, the make up air is not
conditioned before introduced into the building. This basically means that the humidity
level of the air outside is what is brought in. When outside air is conditioned there is less
humidity in the air being brought into the building. The dehumidifiers that are installed
in the arena are more or less a large air conditioner units. They are designed to operate at
their highest efficiency level in warm climates (60 - 80 degrees). Since the arena is
relatively a cool building this system is very inefficient. Bringing enough heat into the
building to have them operate at peak efficiency would be impractical. Even if heat was
added to the building the two units are not large enough to remove all the humidity out of
the air.
We are proposing that the city have Delano Erickson Architects conduct a feasibility
study to determine what steps need to be taken to correct this problem. (Please see
attached proposal). Delano Erickson Architects have worked on problems such as ours
for over (30) thirty years. Recently their projects have included: Maple Grove
Community Center, Edina's third sheet of ice, Eden Prairies second sheet of ice and
renovation to their first sheet, and Burnsville second sheet of ice. We have requested a
resume from them and should have it in the near future. The study will have
recommendation of three different phases, the dehumidification, the ventilation, and the
heating along with an estimated cost of each phase.
If nothing is done about the current situation, the arena will continue to experience the
problems in the previously stated areas, as well as possible future areas causing greater
expenses to be incurred.
ARCHITECTS
YZATA BOULEVARD
NEAPOLIS, MN 55426
612-544-8370
February 3, 1998
Mr. Richard Czech
Elk River Arena
1000 School Street
Post Office Box 720
Elk River, Minnesota 55330
Feasibility Study for HVAC Improvement
Elk River Ice Arena
Dear Mr. Czech:
Please excuse the lateness of this proposal which is related to our engineer's portion which I received
last Friday, a copy of which is enclosed herewith. Our services will include the engineering described
and architectural services with estimated costs as follows:
Overall Administration of Study
Design Input and Building Analysis
Concept Drawings as Appropriate
Compilation of Cost Estimates and Report
Estimated Architectural Services
$ 800.00
500.00
400.00
500.00
$2,200.00
We propose providing services on an hourly basis with total costs estimated to be $5,500 and a not-
m-exceed total of $6,150 plus reimbursable expenses.
Architectural Rate Schedule:
Hourly rates and expense for this project are as follows:
Principal Architect
Architect - Design
CADD - Drafting
Drafting
Clerical
Structural Engineering
$80.00/per hour
$70.00/per hour
$60.00/per hour
$45.00/per hour
$35.00/per hour
$90.00 to $120.00/per hour
Reimbursable Expenses - Billed at 1.1 x Cost
Mr. Richard Czech
February 3, 1998
Page 2
Priming - 24 x 36
Copy - 8~ x 11
Mileage
LD Telephone and Fax
$2.50/per sheet
$. 1 O/per sheet
$.30/per mile
~ cost
I have enclosed a signed copy of our engineer's agreement and provided a place for your signature
below for this letter to serve as our agreement.
Sincerely,
DELANO ERICKSON ARCHITECTS
Del Erickson, AIA
DE/tit
ACCEPTED: CITY OF ELK RIVER
By:
Dated:
January 28,1998
LUNDQUIST, KILLEEN, POTVIN & BENDER, INC.
Consulting Engineers
1935 W. County Rd. B2 · Suite 300
SL Paul, MN 55113-2722
(612) 633-1223 · FAX:633-1355
Mr. Del Erickson
Delano Erickson Architects
7415 Wayzata Boulevard
Minneapolis, Minnesota 55426
Re:
Elk River Ice Arena
Elk River, Minnesota
JAN .,. 1998
Dear Mr. Erickson:
This document shall 'serve as an agreement between Delano Erickson Architects (DEA) and
Lundquist, Killeen, Potvin & Bender, Inc. (LKPB) to provide mechanical and electrical design services
for the referenced project.
PROJECT DESCRIPTION
We understand the scope of this project consists of three phases, i.e., evaluation of the existing
heating, ventilation and dehumidification systems, justification for retrofit of systems and
implementation of proposed revisions. This agreement is for the first phase of evaluation of systems
relating to ventilation and air quality of space, heating and dehumidification to standards established
by the user.
SCOPE OF SERVICE
Basic Services:
LKPB shall provide mechanical and electrical engineering design basic services for the following:
· heating
· ventilation
· dehumidification
· power distribution
Basic services will be provided to include the following:
attendance of local periodic programming and design review coordination client meetings
preliminary probable cost estimates for implementation of work
Mechanical feasibility report will be typed on 8-1/2" x 11" paper for inclusion architect's report.
MECHANICAL · ELECTRICAL · INQUSTRIAL
January 28, 1998
Mr, Del Erickson
Delano Erickson Architects
Elk River Ice Arena
Page 2 of 4
Additional Services:
Additional services consisting of the following are available, if requested:
· expansion of the scope of the project
CONDITIONAL; PROVISIONS
This pr.0P~Sal is based on the owner providing, .thrOugh the architect in a timely.manner, owner
ope[ati_ng ~standard's plus copies-of 'existing building' Plans. shOwing mechanical, and ':eleCtrical
systems. ' ~ ~ ~, . - "' -'-'-i. '. ,~ .... ' ~''' -'
· FEE COMPENSATION i
-BaSicserVices fOr'this fi rstphase 'shall be, fee Co~'p~nsated on an, h0Utly fee basis 'not to exceea -
Three ThOusand Six Hundred Fifty Dollars' ($3;650)'iPer rates contained .herein.
Additional services if requested, will be provided on an' hourly basis per the rates contained hei;~in.
Standard hourly .charge rates shall be as followS:
Clerical I .............. $ 30.00/hour
Clerical II .............. $ 45.00/hour
Administrative AsSistant... $ 60.00/hour
Drafter ................ $ 45.00/hour
Designer I ............. $ 50.00/hour
Designer II ............. $ 65.00/hour
Designer III ............ $ 75.00/hour
Engineer I ..... ' ........ $ 55.00/hour
Engineer II ............. $ 70.00/hour
Engineer III ............ $ 85.00/hour
Associate .............. $ 90.00/hour
SeniOr Associate ....... $100.00/hour
Principal .............. $115:00/hour
The term for the rates listed above shall apply through December 31, 1998, at which time they shall
be subject to review and adjustment.
Fee compensation shall be invoiced and paid monthly in proportion to work completed. No retainage
shall be withheld from the invoiced amounts. Invoiced amounts shall be due within ten (10) days of
architect's receipt of payment from the owner. Unpaid balances due shall bear interest at 12% per
annum.
REIMBURSABLE EXPENSES
The following expenses shall be reimbursed at a 1.1 multiple of actual expenses incurred:
out of town travel, lodging and subsistence
long distance telephone/FAX communications
delivery services
January 28, 1998
Mr. Del Erickson
Delano Erickson Architects
Elk River Ice Arena
Page 3 of 4
reproduction or plotting of drawings, specifications and other documents
mileage
SUSPENSIONS OR TERMINATIONS OF SERVICES
The client or LKPB may suspend or terminate any or all services covered by this agreement at any
time, subject to the client's giving a minimum of five days written notice to LKPB of suspension or
'termination. In the event of sUch suspension or termination by client, LKPB shall be paid for services
rendered to date of the suspension or termination, including a!l unpaid Additional Services rendered
and Unpaid Reimbursable Expenses incurred. (Such payment shall be an amount equal to the actual
hours of'services furnished'at the standard hourly rates contained herein, not-to exceed the contract
amoujnt.)
DISPUTE RESOLUTION
Any dispute, controversy or claim arising out of or relating to this agreement, or the breach thereof,
shall first be negotiated in good faith by the parties of this agreement to reach a resolution to the
dispute. If, within 30 days after such negotiation, the parties have not succeeded in negotiating a
resolution to the dispute, the parties may submit the dispute to non-binding mediation in accordance
with the Construction Industry Mediation Rules of the American Arbitration Association currently in
effect. Requests for mediation shall be filed in writing with the other party to this agreement and with
the American Arbitration Association. Such requests for mediation shall be made within a reasonable
time and in no event be made after the date when institution of legal or equitable proceedings based
on such dispute would be barred by the applicable statute of limitations.
ASSIGNMENT
Neither the client nor LKPB may assign, sublet, or transfer any rights under, interest in, or
performance of this agreement including any claims for damages, breach of contract, or negligence,
including, but without limitation, monies that may become due or monies that are due, without the
written consent of the other.
MISCELLANEOUS
Printing of report will be provided by Delano Erickson Architects.
It is understood that LKPB's contract will be with Delano Erickson Architects, the client. If the above
conditions are acceptable, please have both copies of this proposal agreement signed, retain one
copy for your files and return one copy to our office as a record of the client/engineer contract.
January 28, 1998
Mr. Del Edckson
Delano Erickson Architects
Elk River Ice Arena
Page 4 of 4
This letter contract shall form the basis of and shall remain in effect until a more formal contractual
document is agreed upon and signed by both parties.