Loading...
6.1. SR 04-09-2012REQUEST FOR ACTION TO ITEM NUMBER Ma or and Ci Council 6.1 AGENDA SECTION MEETING DATE PREPARED BY Work Session A ri19, 2012 Cal Portner, Ci Administrator ITEM DESCRIPTION REVIEWED By Joint Session with the Sherburne County Board of Commissioners REVIEWED BY ACTION REQUESTED Meet jointly with the Sherburne County Board and discuss items of mutual interest. BACKGROUND/DISCUSSION The Elk River Ciry Council and Sherburne County Board last met in a joint session on August 10, 2010. Participants: County of Sherburne City of Elk River Larry Farber, Board Chair, District 1 John Dietz, Mayor Ewald Peterson, District 2 Nick Zerwas, Ward 1 John Rieble, District 3 Jerry Gumphrey, Ward 2 Felix Schmiesing, District 4 Matt Westgaard, Ward 3 Rachel Leonard, Board Vice Chair, District 5 Paul Motin, Ward 4 The following topic areas have been identified for updates and potential discussion: 1) ERMU Check Presentation for Landfill-to-Gas Project (Mr. Adams) 2) Data Center Progress (NIr. Bensen) 3) Government Center Site Update (Mr. Bensen) 4) Road Projects (Mr. Menter/Mr. Femrite) 5) GRE Location for Household Hazardous Waste (Ms. Haug) 6) Means to Increase Fuel to GRE Plant (Ms. Haug) 7) Potential City/County Collaboration Opportunities 8) Other Items of Mutual Interest FINANCIAL IMPACT N/A ATTACHMENTS Public Works Collaboration with Sherburne County Memo Means to Increase Fuel to GRE Plant POi~EI;E® 81' AU' ACtloll Motion by Second by Vote Follow Up N:\Public Bodies\Ciry Council\Administntor\2012\Ciry County Board Joint Meeting.docx MEMORANDUM TO: Mayor and City Council FROM: Justin Femrite, P.E., City Engineer DATE: April 9, 2012 SUBJECT: Public Works Collaboration with Sherburne County This memo has been prepared to identify ways the Elk River Public Works Department is already successfully collaborating with Sherburne County Public Works Department. This list highlights the positive working relationship between the two departments and shows our continued commitment to working together. 1) GIS MaP.ping Sherburne County continues to maintain the base line work behind our newly created city GIS mapping application. The Sherburne County staff updates parcel lines and other layers that are used by our mapping application. The Elk River Engineering Division works directly with the Sherburne County GIS staff to obtain these updates. The County GIS staff also serves as a great resource for our GIS questions and our more advanced mapping needs. Most recently, the Sherburne County GIS staff assisted the Engineering Division in getting set up with the proper program to complete the redistricting mapping project. 2) Pavement Management We are currently partnered with Sherburne County to have a new pavement management program developed. Neither Elk River nor Sherburne County staff was satisfied with the existing program that was being used for pavement management. The existing programs were too complex and created much inefficiency in the data collection and reporting procedure. We are currently working together with RT Vision, to develop atablet/smart phone based system that will create efficiencies moving forward. By collaborating on this project we will have a new program that better meets the needs for both organizations while splitting the costs for system development. Staff also anticipates that having both the county and city on the same pavement management program, we can serve as technical N:\Public Bodies\Ciry Council\Council RCA\Agenda Packet\0409-2012\49-12 County Collaboration.docx resources for each other in troubleshooting issues or just answering questions. 3) Counter Road 77 Turnback In 2011, we worked with Sherburne County to accept a turnback of County Road 77/Proctor Road, from County Road 1 to County Road 33. The County completed a resurfacing improvement project to this segment prior to the turnback. The turnback benefited the city a couple of ways. First it allows us to increase our state aid mileage thus increasing the state aid allocation we receive every year. Secondly, allows the city the opportunity to review the traffic control, lane striping, and speed limits along the segment in accordance with our standards to best serve the needs of the residents. It also gives the city control of the right-of--way along this corridor allowing us to plan for and provide utility and street network to the north if the gravel mining area were to be developed. 4) Intersection Enhancements We have discussed the idea of adding a right turn lane at the intersection of Proctor Road (CR 1) and TH 10 with Sherburne County. A number of constraints including limited right-of--way, driveway locations, and the intersection of 6`~ Street make this turn lane construction challenging. We are continuing to discuss options to help with the turning movements in this intersection. Our next step, working with Sherburne County, is to talk with the adjacent property owners and meet with MNDOT to discuss potential modifications that could be implemented. 5) Traffic Signal SXstem Inventorv In 2011, Sherburne County completed a comprehensive traffic signal system inventory and inspection for all 18 systems within the city. We have since used this information to complete a needed maintenance and painting schedule. 6) Public Works Building Expansion On various occasions Sherburne County staff took the time to show the City of Elk River staff around their newly constructed Becker Public Works maintenance facility. This experience assisted during the design process to better understand which components of the facility should be included or excluded from our facility. John Mentor, Sherburne County Public Works Director, also sat in on our interviews of Construction Managers. John's insight and opinion were helpful due to his experience having just gone through a similar project in Becker. Please call with questions. N:\Public Bodies\City Council\Council RCA\Agenda Packet\0409-2012\4-9-12 County Collabontion.docx MEMORANDUM TO: Mayor and City Council FROM: Rebecca Haug, Environmental Administrator DATE: April 9, 2012 SUBJECT: Means to Increase Fuel to GRE Plant Over the past few years, the volumes of waste being processed at Great River Energy's (GRE) facility have decreased. It has come to staff's attention that the Minnesota Pollution Control Agency (MPCA) has delayed enforcement of MN Statute, 473.848, which requires metropolitan area waste haulers to bring mixed municipal solid waste (MSS to a resource recovery facility before sending it to a landfill. Staff is concerned about continued operation with GRE's Elk River Resource Recovery Project and is interested in discussing options to bring more fuel to the facility. N:\Public Bodies\City Council\Council RCA\Agenda Packet\04-09-2012\GRE.docx A~~ GREAT RIVER. E! ER~Y~ A IMPACT OF DELAYED ENFORCEMENT OF MN STATUTES, 473.848 The delay could mean the loss of 100 jobs and 30 megawatts of controllable baseload renewable energy. Further study is not necessary. MN Statutes, section 473.848 requires metropolitan area waste haulers to bring mixed municipal solid waste (MSW) to a resource recovery facility before sending it to a landfill. Implementing the 2007 law can be accomplished with simple communication tools for haulers, landfills and resource recovery companies. Waste flow forecasts, email updates, websites, hauler contracts and other tools can be used to ensure that enforcement is conducted fairly, reasonably, efficiently and with minimal MPCA resources. An implementation plan also could include input from a roundtable discussion between haulers, landfills and processing companies. Resource recovery has the potential to compete with landfilling now and into the future. Great River Energy's goal is to have our tipping fees at market (i.e., landfill) prices by 2016. We have stable pricing for long-term hauler contracts through 2024. We have made significant improvements to our resource recovery project. We have already significantly reduced tipping fees by recycling more and producing higher-value recyclables. We can continue to operate acost-effective project and possibly expand our separation equipment to recover different types of materials. For instance, plastic recovery will increase recycling in the metro area and provide a revenue source. The cost gap between resource recovery and landfilling is getting smaller and will continue to shrink. Even with significant efficiency improvements, Great River Energy's Elk River Resource Recovery Project is unable to produce competitively priced electricity at less than full capacity. This valuable resource recovery option may not be available if the Legislature delays enforcement of MN Statutes, section 473.848. This would mean the loss of 100 highly skilled, good-paying jobs and 30 MW of controllable, baseload renewable energy. There is enough waste in the metro area to support an integrated solid waste management system. Great River Energy's resource recovery facility needs an additional 100,000 tons of MSW per year to operate at capacity. Currently, more than 2 million tons of non-recycled MSW is generated in the metropolitan area each year. About 1 million tons of MSW is sent to landfills annually. After the state's resource recovery facilities are at capacity, landfills will receive the remaining material. If resource recovery facilities close, haulers will have no option other than disposal at monopoly landfills. In this case, Minnesota will go back to a time when the majority of its waste was managed at the very bottom of the solid waste management hierarchy and with a marketplace void of competition. Enforcing MN Statutes, section 473.848 will prolong the life of metro area landfills, ensuring safe and effective waste management for years to come, and delay the need to site, permit and construct a new metro area landfill. Efforts to site and construct landfills in or near the metro area have been extremely challenging. Costs associated with implementing MN Statutes, section 473.848 are manageable and will amount to only pennies for each household. The consumers' cost to dispose of waste is approximately 80 percent collection and 20 percent disposal. As a result, the additional $20/ton in tipping fees to send MSW to recovery facilities will have a minimal impact on consumers. Contact: Stacey Fujii, Great River Energy, 612-309-5404, sfujii@grenergy.com March 5, 2012 C,reat Ricer Ener~~ • 7'?3QQ EIm Creek Boulevard • Maple Crove, MN 55369-4718 • 7b3-445-5000