Loading...
6.15. SR 03-16-1998Item 6.15. Howard R, Green Company CONSULTING ENGINEERS March 5, 1998 File: 801210j-0030 Formerly MSA Consulting Engineers Mr. Pat Klaers City of Elk River 13065 Orono Parkway P. O. Box 490 Elk River, MN 55330-0490 RE: BOSTON STREET FEASIBILITY STUDY Dear Mr. Klaers: As directed by the City Council at their last regularly scheduled meeting, I have revised the assessment portion of the Boston Street Feasibility Study. As you are aware, the financing section of the Feasibility Study recommends that two of the parcels be assessed two (2) units each. The change I have made in the assessments is that the street for both of these units is assessed immediately along with the sewer and water for one of the units. The sewer and water for the second unit is proposed to be deferred. I have calculated the cost of this street assessment per unit to be $4,500. Therefore, the deferral for each of these units for the sewer and water results in $6,154 for a total of $12,300. This results in a total deferral for this proposed project of approximately 26%%. Attached are amended copies of the Feasibility Study and a Resolution for the City Council's consideration. The Resolution will accept the Feasibility Study and order the public hearing for this project. I have tentatively set the public hearing date as April 6, 1998. If you have any questions regarding any of this information, please call. Sincerely, Howard R. Green Company Terry J. ,rvl~urer, P.E. TJM/et Attachments O:~proj\801210~ 10-2010.feb 1326 Energy Park Drive · St. Paul, MN 55108 ° 612/644-4389 fax 612/644-9446 toll free 888/368-4389 RESOLUTION 98 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION RECEIVING THE FEASIBILITY REPORT AND ORDERING A PUBLIC HEARING ON THE IMPROVEMENT IN THE MATTER OF THE BOSTON STREET IMPROVEMENT OF 1998 WHEREAS, WHEREAS, the Feasibility Report ordered by the Council in Resolution 97-77 has been prepared with reference to the Boston Street improvement and was received by the City on March 16, 1998; and the Feasibility Report recommends that the proposed improvement is feasible; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: o The City Council will consider the Boston Street improvement as described in the Feasibility Report and the assessment of the property abutting this proposed improvement for all or a portion of the cost of the improvement pursuant to Minnesota Statutes, Section 429 at an estimated total cost for the improvement of $58,600. A public hearing shall be held before the City Council on the proposed improvement on the 6th day of April, 1998, at 6:00 o'clock p.m. at Elk River City Hall. The City Clerk shall provide two published notices (one week apart) in the official newspaper with at least three days between the last publication date and the hearing, and mailed notice ten days prior to the hearing as required by law. Passed and adopted this 16th day of March, 1998. ATTEST: Henry A. Duitsman, Mayor Sandra A. Thackeray, City Clerk O: \proj \80 ! 210\210-1604 .j an. Re solution