Loading...
5.0-9.0. ICESR 04-17-2012City of Elk River Records Ice Arena Commission Meeting Agenda Tuesday Apri117`h 2012 Elk River City Hall -Utilities Conference Room 6:OOpm 1. Call meeting to order 2. Consider 4/] 7/12 Ice Arena Commission Agenda 3. Consider 3/13/12 Ice Arena Commission Minutes 4. Open Mic 5. 2011 Financial Update / 2012 budget 6. Value Engineering Study's for Arena 7. Ice Rates 8. Outside Banners 9. Staff Updates 10. Adjournment MEMORANDUM TO: Ice Arena Commission, Members FROM: Rich Czech, Arena Manager DATE: Apri] 12, 2012 SUBJECT: Agenda Memo -April 17`~ 2012 5.2011 Financial Update / 2012 Arena Budget Attached for your review is the budget information for the years 2009 - 2012. Tim Simon, the city's Finance Director, will be in attendance to discuss in detail the 2011 final budget numbers. 6. Value Engineering Study's for the Arena I have been working with the engineers that are performing the value engineering studies to get their reports by the Arena Commission meeting. Unfortunately at the time of the mailing of the packet I do not have all the studies in hand and the studies I do have I just received and have not fully read them. I will have my comments ready by the time of the meeting on Tuesday. Along with these studies I have included abreak -out of costs and expenditures between the Bam and the Olympic rink using the budget numbers for 2011. I excluded the capital improvements to provide the operations of each rink however I have included the ten Year Capital Improvement work sheet that was developed in the spring of 2011 to give an idea of the improvements to be performed over the next decade. 7. Ice Rates Last season the Arena Commission raised the hourly primetime ice rate to $180.00 an hour. Attached for your review are projected hourly prime time ice rates for the 2012 - 2013 season from neighboring Arenas. Prime *Andover $175.00 Brooklyn park $200.00 *Buffalo $165.00 Champlin Park $185.00 Fogerty Arena $165.00 Maple Grove $185.00 Non Prime $140.00 $150.00 $125.00 $145.00 $145.00 $150.00 Moose Sheritt (Monticello) $180.00 $140.00 *NewHope $191.00 $165.00 *Plymouth $180.00 $165.00 Rogers $185.00 $140.00 St. Michael $185.00 * Super Rink $195.00 $195.00 Average $181.60 $15].00 *= 2011 - 2012 Rates. 8. Outside Bam~ers Last month I received a quote for the outside banner from Franklin Outdoor Advertising for the price of $500.00 each, which includes the hardware for the installation of materials. The installation itself would be an estimate of $1,400.00, which includes the installation of four banners and the removal of the existing three. Cal Portner, the City Administrator, suggested to help pay for the banners we possibly could allow the Economic Development Authority, (E.D.A.) advertise their "Power By Nature" campaign on the banners. This led me to think that if we could find an advertiser for each banner we could possibly pay for the replacement of each banner now, as well as pay for the next set of banners that will be needed in four years when the banners need to be replaced. Even if we could receive $1,000 a year for each banner, which I believe is low, we would receive well above the cost of replacing the banners and would generate revenue for future banners and other general needs. I have attached a copy of a banner that shows how the advertising would look. With Commission approval, I would like to move forward with this proposal to the city staff, to make sure we are not violating any city codes, and to the city council for final approval. 9. Staff Updates A. Hiring process for the Lead Arena Worker By Tuesday, April 17`h a decision will have been made regarding an offer to the selected candidate for this position. However, city council is the only one that has the authority to hire, so the position cannot be officially filled until the next council meeting in May. B. Summer Activity's May 5`h and 6`h =Spring Craft Fair May 10`h -13`h =Just Between friends (Kids Consignment show) May 18`h - 19`h =Skate Show (Northwest side story) May 19`h - 20`h =Gun Show Elk River Ice Arena 2011 Revenue and Expenditure Summary Between the Barn and Olympic Rink Figures used to calculate revenues and expenditures come form the 2011 final year-end numbers. 2011 2011 Total Barn Olympic REVENUES Ice Rental 232,995 260,703 493,698 Recreation Programs 16,147 73,199 89,346 Admissions - 25,630 25,630 Sign Rental 600 17,486 18,086 Dry Floor Events 19,518 129 4 - 7 667 19,518 796 11 Vending , , , Skate Sharpening 1,478 2,745 4,223 Building Rent 2,600 - 2,600 Other Mdse Sales/Misc. 912 1,937 2,849 TOTAL 278,379 389,367 667,746 EXPENDITURES , , Personal Service 58,500 207,432 265,932 Other Operating Expenditures 93,158 139,737 232,895 Vending Mdse for Resale 1,830 4,268 6,098 Other Mdse for Resale 252 588 840 Recreation Programs 7,507 26,614 34,121 TOTAL 161,247 378,639 539,886 CONCESSIONS Sales 23,331 54,437 77,768 Less: Product & Supplies 11,546 21,444 32,990 Salaries 4,197 15,887 20,084 Net Profit 7,588 17,106 24,694 OPERATING INCOME (LOSS) 124,720 27,834 152,554 Capital Outlay - - - Building Debt* - - - NET INCOME (LOSS) 124,720 27,834 152,554 * =building debt paid in full on 12/01/2011 4/13/2012 Elk River Ice Arena Revenue and Expenditure Summary For the Period Ending December 31, 2011 2012 2011 2010 2009 2008 Budget Actual Actual Actual Actual REVENUES Ice Rental 488,000 493,698 478,393 437,098 424,106 Recreation Programs 95,800 89,346 94,688 119,288 139,706 Admissions 22,900 25,630 22,573 18,530 23,354 Sign Rental 17,500 18,086 18,002 16,688 17,293 Dry Floor Events 17,400 19,518 17,442 16,038 9,034 Vending 14,000 11,796 13,012 14,215 17,212 Skate Sharpening 4,300 4,223 4,372 4,767 4,980 Building Rent 2,600 2,600 2,600 2,600 2,600 Other Mdse Sales/Misc. 2,900 2,849 2,027 1,666 2,238 TOTAL 665,400 667,746 653,109 630,890 640,523 EXPENDITURES 7 ~~3" Personal Service 294,450 265,932 266,627 267,992 253,447 Other Operating Expenditures 220,000 232,895 235,281 240,001 268,189 Vending Mdse for Resale 8,000 6,098 6,958 6,222 7,279 Other Mdse for Resale 600 840 237 1,335 1,577 Recreation Programs 53,750 34,121 40,037 47,669 55,132 TOTAL 576,800 539,886 549,140 563,219 585,624 CONCESSIONS Sales 69,000 77,768 69,132 59,510 66,500 Less: Product & Supplies 24,450 32,990 31,988 25,019 31,544 Salaries 22,700 20,084 17,655 16,225 24,430 Net Profit 21,850 24,694 19,489 18,266 10,526 OPERATING INCOME (LOSS) 110,450 152,554 123,458 85,937 65,425 Capital Outlay 20,500 42,143 - - 100,202 Building Debt' - 200,780 199,900 198,450 201,715 NET INCOME (LOSS) 89,950 (90,369) (76,442) (112,513) (236,492) Other Income Contributions/Rebates - 7,012 6,743 4,731 7,368 Grant Contribution - - (39,417) - - Transfers In Capital Outlay -Liquor Fund - - - 6,961 100,202 General Fund - 90,369 76,442 105,552 136,290 Change in Fund Balance 89,950 7,012 (32,674) 4,731 7,368 Cash balance of surcharge 13,755 $ 6,743 $ 39,417 $ 34,686 * =building debt paid on 12101/2011 4/13/2012 7 L y ~ Q. ~ U W = O `' ~_ m U v 0 0 N O O N O O O O N O N O C O O ~ O G O O O `~` N O O O ~ ~ ~ M O N O O O O O O N n r ~ ~ O N ~' O O ~ O i- o O N N O O O O O O ~ ~ LCi N O LL) O ~ N O O ~ O ~ N ~ ~ O O <' ~ M N ' N O O O M to o r N O O O N O to O r O 61 O O N N ~ to O 0 O O O Y O ~ ~ R ~ ` 'O C a> w ~ O m ~' ~ O a ~ ~ N w C C ,R m ~ 0 O 0 J O 2k N U ` O ~ L L y d ~ m 0 00 ?` ~ ~ ~ ~0 0 ~ (a U (0 > U O n+ ~ ~ : m _ ~ O (6 ~] H O O ~ C p ~ O N N -O N U 7 ~ ~, a O N c ~ ~. :o m ~ o ~ ~ E .~ 'o ~ o 0 (a w = ~ ~' O _ ;; d E w r C ~ ~ ~ w m a ' N ' d ~ 3 ~ = 0 J U C U _ N f0 m U d ~ ~ c m ~ ~ coo io U U ~ 0 i4 .U U ~ U m m m o m m - te a a m m c ~ c) ~ ~ ~~ v ~ N 3 N a N N m m m ~ ~ R ~ m m x ~ ~ o cd a ~ x w w N > w ~ z p ~ ~ 0 N O N O N O V ~ ti O O O r O V 1J O a V N CO O V O M d' ti M O O V M W m ~ V' O O O W ~ O O N ~ ~ ~ m M l0 N N O O O O N \° M N a a~ 0 U O p. C O ~--. U_ (0 (0 ~ ~` C r V .~ O ~ N ~~~ O ~-' ~ ~' U7 w ~ m o ~ ~ y U O '~- ~ N ~-=~z N_ O N M V __A ~rn~, SKYLINE BUILDING ENVELOPE CONSULTANTS ADVANCED ENGINEERING SERVICES FOR FACILITIES MANAGEMENT /CONSULTING SERVICES INCLUDE: ALL TYPES OF ROOFING & WATERPROOFING, BUILDING ENVELOPE & FACADE EVALUATIONS & RESTORATION, ASPHALT PARKING LOT RESTORATION, PARKING GARAGE EVALUATIONS & RESTORATION, FORENSIC ENGINEERING. April 12, 2012 Rich Czech Arena Manager City of Elk River 1000 School Street N.W. Elk River, MN. 55330 Reference: Exterior Building Envelope Inspection Report (with photos) on existing conditions and Leakage investigation of the 1971 Elk River Ice Arena, this report includes recommendations and are currently obtaining estimated costs for maintenance. Dear Rich, The following Exterior Building Envelope Inspection Report will show the present conditions and approximate quantities and locations of the identifiable deficiencies and distress of the roof and wall components of the Elk River Ice Arena. Defect photos have been provided. Included in this information will be a Recommendation Summary for this portion of your facility. OBSERVATION SUNIIVIARY ~, '~_ ' !~" `' ~z ~ :~~~', xzx ,c„ : 'ti'. Roof Area D (Roof Area D ' ~ a/ ~_ „~;,.. ~, r~. -~ - - .4 =. - ~ ~.~ ~t a ~~~§~~~ ~ .~~ ~ n ~ x x ~ ~ •~ T ~'a G 4 : ~ n# .e+~.. .,. .:aye. We observed temporary patches at a few locations. The patches rely solely on sealant and should be considered temporary. _ . _ ~ ., 2 Roof Area E ~ ,' . ~ ~ -. ;"~ `~~.,~ '`'~ ~~ `~ Foam closure pieces were installed at the ridge ~, ~ ... cap and at the eves to try and seal the metal x_ _. panels. ~~ ` ~ '' 'u" ,~ ~ `" ~ ~x ~_ ~ ~~ ~ ~ ~ } _ ~ ~ . < F~n,~" ~ ,. ~ F c ~3T 'Cf mss:'. " i~~~ 9 ~~ ~ ~y . . * ~~ Attempts to stop the leakage included installing sealant around the foam closure pieces and extending the ridge cap flashing. Leakage was still occurring at or near that location. ~a ~+~~ ~ x ~. .:~ 3 Open sealant was observed around an old television antenna and cable. ,;; '' ~~ : ,,~ '~' .t :~ :Y~. ~..~ ~~ 4 Physical damage of the metal panels was observed on roof Area E. We also observed mechanical saw cuts all the way through the metal panel at one location on roof Area E. Roof Executive Summary: Roof Area D & E consists of metal panels with insulation boards adhered to the underside and spray coated installed in 1971 (Area D) and 1997 (Area E). The metal roofs are in good physical condition with small areas of minor surface rust. A few of these areas have been painted. We believe that the existing metal roofs can last another 15-20 years with recommended permanent repairs and do not have to be replaced. 5 Wall Observations: 6 ~~ ~~ 7 We also observed open sealant around doors, louvers, and windows. The old sealant should be removed and replaced with foam backer rod and sealant. ~~ f w. w~=. _~ '» e } ., ~ ~ •x, ~z ~ ~ ~ j ~ i l "3 R ~ ~ k ~ JR' ~ ~u ' ~ ~ $ i ~ "sty Y ~ ~~E{kx ~ ~~ v ::~# ~ ~ d ~~ ~ V ~ ~ ~ u-S ~ 4 ~ ry # k ~:_ ~_ ~ ~ ~ ~~' a ~~ ~ S S There were many holes in the metal panels throughout the building. The holes should be repaired using appropriate materials and repair methods. >~ ~' tf. ! ~~ .4 s ., ~~ ~+ F i '^ ; y ~;. a~=~ t :y,a# ~~ ,. ,Y ~~S t`'".~, ~, ,~'u ~~~ ~ T. y~'' _.k~ .~ _ _- _~. ~~~ $', a a v ~~~ ~ ~ `~ s: ~~ ~ ~^, . ~ ~'r , ~~,~_-~~ ~~ ~~ #x ~~ '~ ~ t 'EF.,` .a. ,5 t {` ~f~ ~~~ ~ ~~ ~~ ~~~ ~ `~~ ~~~~~ t~~ <~.,x .=mss Some of the fasteners have rusted, including the underlying metal panel. This condition was most prevelant on the West elevation. The fasteners should be removed and the metal panel primed and painted and a new screw through neoprene washer installed. ~. `: ~,, ~,, ~,;: ~v~ ,. ~~ ., Other fasteners were backing out or were missing. New screws through neoprene fasteners should be installed at these locations. Some of the metal panels received physical damage, distorting the metal. The metal panels should be monitored if no leakage is ocurring or replaced to match existing if interior leakage is occurring. f. `5 - 1.. - - ~~ 4t _ ~ i., a~'6,: rt z ~~ ? ~ ~4: ~ q ~ "&.. ~ ~ ..;aY .~vs<, F ~ §i~ew :. 'k~i.: a~ 9 ~~., ~ ~~ r 3 _~ Eu- ~~ ~ t B ~ ~'a f ~. »',~.~' €~ ,~ .~. f s ~~ &~°~- ~ i~ ~ ~~ ~~ r w~. .7'• ~. A~~ ~ ~~~ ~; Y, ~. i { 3 r f j o .~ _G~ . i ~' F• ~ ,4 F 3 ~ ~Y :- ~~ n p~ r fr ` I` ~ $ ~:i. .. ~: 5 1 i ~ 1 <i ;~ ~' i . k~ ~ ~. ~ ~; ~: ~. F , ~` 4 ~+ - ;~-. ~ ~ A Y F ~ ~~ 5F ~ ~ ~:. 1 ~ '1 ~~ ~, 3„'~V, ,~ ~ M ~ Yyy 10 #. Y ~ y1Yq 4 , at mow,, ' "~ ~' ;~ 'r` ~~ ~j ~. #s .~:<, *t 11 South Elevation 1 Defect : Description: Quantity: Comments: B Physical damage to metal panels. Metal 1 lineal foot. Condition appears to be drip edge is damaged. watertight, monitor. C Deteriorated, missing, or un-bonded 11 lineal feet. Remove existing sealant. sealant at wall control joints, and light Install new foam backer rod conduit. and sealant. E Holes in metal panels. 4 each. Repair using appropriate materials and methods. 12 ~M~ ~1 ~"'~ i ~,"y - use ~' i ~ ^. s ~ r ~ ~ d~!x~ Y ' d 't .". S ~ `~ r' ~. ~ i ""?w. .u - ~`: z .. ~ ^- Sx- _.. ,_r .. •.: y ~. .:.. 5 { ~ South Elevation 2 Defect : Description: Quantity: Comments: g Physical damage to metal panels. 3 square feet. Appear to be watertight, monitor condition. C Deteriorated, missing, or un-bonded 48 lineal feet. Remove existing sealant. sealant at louvers, door, window and Install new foam backer rod wall penetrations (gas line and and sealant. electrical wire). E Holes in metal panels. 45 each. Repair using appropriate materials and methods. F Physical damage to brick. 2 each. Replace with matching brick. 13 14 -~4-~- ~'~ - - West Elevation 2 Defect : Description: Quantity: Comments: C Deteriorated, missing, or un-bonded 2 lineal feet. Remove existing sealant. sealant at pvc pipe and gas pipe. Install new foam backer rod and sealant. G Deteriorated, cracked, or un-bonded 15 square feet. Tuck point open mortar to mortar. match existing. H Cracked concrete masonry units 4 each. Replace with matching (CMU's). Holes in CMU's. CMU's. I Exposed wood at wall. 2 square feet. Adhere waterproof material to wood, cover with a color coated metal enclosure piece. 15 ~~ West Elevation 3 Defect : Description: Quantity: Comments: q Sheet metal fasteners missing or backing 9 each Install new fasteners out. through neoprene washers. B Physical damage to metal panels. 20 square feet. Monitor condition. Repair or replace damaged panels if interior leakage occurs. C Deteriorated, missing, or un-bonded 3 lineal feet. Remove existing sealant. sealant at pipe penetrations. Install new foam backer rod and sealant. G Deteriorated, cracked, or un-bonded 30 square feet. Tuck point open mortar to mortar. match existing. H Cracked concrete masonry units 3 each. Replace with matching (CMU's). Holes in CMU's. CMU's. ~ Exposed wood. Metal panels did not 15 lineal feet. Install new metal panel to extend to masonry wall. cover exposed wood. Install new foam backer rod and sealant. 16 iya. rte : . ~- ~~ ~ ~, . r t,, ;kx ~ ~ tNS~~ •s ~ ~ ~3~ ~E ~4e g3 ~ .`_'"~.,4 -w._.""4.w.-+: t~ S'S ~ k-~. ~x Y .~„~ ate. " -' 3 ~ .~ ~ ~ ~C ~~ } ~ ~ . , ; ~* q;'; ~a3a -~ ,tE e~jPT - ~ ~ ~ ~ 'k ~ ~ $ '~' y .. ~~ ~~3 tii. ~~ ~~ ~ =2 -+- - i ~ ~ ~ ~~ f at s ~~ d?c y . ~~~f ~ ~~ ' ~{~~"~ a `"~ , .. - «A ..~ . .~ ~N` c'~ t Ty S i~ ~~f ~' ~~ry-~„w'~~ ~ , ~, ~Y ~i J , y- -rY}3 ~ ~,L ~T S'~}F~afi P~~x E~~* 3 ,~s~E ~f~'~U 3~`'4 ' !~' i ' 'fir ^~ ' ~~ ,~~ F:u .. -r. _.~ ... ~~ ~~ _ 9 ~.. ~ ...~ _, ` .. 1~i ,„ ,.. . .: ~saC` :. ~. : ..s, ...ay•.si e ..,. N '':. ~ ~y ~J ~ a ~ ~. ~ n+, ~{. y -.. ~ ~ ,Y - -., f r F. ±~ West Elevation 4 Defect : Description: Quantity: Comments: ,q Sheet metal fasteners missing or backing 11 each. Install new fasteners out. through neoprene washers. E Holes in metal panels. 2 each. Repair holes using appropriate materials and repair methods. G Deteriorated, cracked, or un-bonded 20 square feet. Tuck point open mortar to mortar. match existing. 17 f~~ _~ ~~~ ~}~ ~~~-_ r~a S~. ``z~"py-k? p! .a Sri +[+~cc~'..~--,a ..,.~,,,, ..-. `~. 3 ~•~ i ~ ~T~ ~~ ~~ ~ ~ ~ ~ ~ Y ~ ~~ # ~ `h ~ ~ ~~ ~ ~_ ~ «§ ~ ~ ~ xx~~ 41'-iJF.. A§ North Elevation 1 Defect : Description: Quantity: Comments: G Deteriorated, cracked, or un-bonded 5 square feet. Tuck point open mortar to mortar. match existing. Leak Investigation: After performing a visual inspection of the roof, we performed a leak investigation at an active leak location to determine the cause of water infiltration into building space and ice arena below. The majority of leakage was occurring along the ridge at multiple locations. The following is a summary of our observations and findings: 18 ~: . ~" <: ~` ~ ~*'~` - ..' .,r ~~ ~~ ^~. F s ~~ _ ! ~ ,'~ r ~~~~~~ -: ~ ,.p ~ A ~~ f N ~~ 3~„~~ ~~ ~": . ' ~ ,~ ~ ;.~ ~ ~~ r ~;~ ; We sprayed water using a spray bar at an angle near the ridge cap onto the metal panels to simulate wind driven rain. Leakage occurred immediately with water dripping onto the ice adjacent to the west goal. This was an area that has been very active with recent leakage. 19 Leak Investigation Summary: Based on our observations and water testing, the primary cause of leakage occurring along the ridge of the 1971 ice arena is due to the open gaps between the foam closure piece and metal panels at the ridge cap. The previous attempts to stop the leakage by sealing around the foam closure piece and extending out the ridge cap have failed. Other leakage may be associated with sealant failure at the metal seams and/or fasteners. The metal roofs are in good physical condition with small areas of minor surface rust. A few of these areas have been painted. We believe that the existing metal roofs can last another 15-20 years with recommended permanent repairs and do not have to be replaced. We recommend performing long term repairs which include removing the sealant from the roof fasteners, sealing the existing seams at the metal laps between panels, installing spray foam at the ridge cap and eves to seal between the ridge cap and metal panels and the metal panels and walls at the eves, and install an Elastomeric Roofing Membrane over the entire metal roof area. This should extend the expected life of the building an additional 15-20 years with periodic maintenance. SBEC has recommended and performed these repairs on similar roofs and have been very successful in extending the service life of the existing metal roofs and saving the owners substantial amounts of money. The Transportation Building in Eden Prairie had the same repairs completed in 2005 and is continuing to perform without any issues and is expected to perform as intended for many years to come. Some of the water issues may stem from condensation due to occupancy, air flow and existing mechanical systems. Our review does not include a study of the existing mechanical systems. These issues should be looked at after the roof repairs have been completed to separate the water infiltration due to the roof itself, and possible condensation issues. Based on our observations and water test, we believe a large portion of water infiltration is related to the performance of the existing roof components and repairs should reduce the moisture issues significantly with completed repairs. Remarks: This is a summary of our visual inspection of the roof and wall systems on the 1971 original ice arena building. We recommend repairing the defects identified in the above report and to perform roof inspections once a year to extend the life of the roof systems. SBEC is currently obtaining estimated costs to perform repairs on the defects identified. We will forward the cost estimates once we receive them and will meet with the City of Elk River to go over the repair costs and discuss possible repair scopes and phased roof repairs if necessary. 20 Skyline Building Envelope Consultants continue to look forward to building a strong business relationship with you and the City of Elk River by helping to solve your roofing and waterproofing problems, by combining knowledge and experience with excellent services, along with specifying the best products and systems available in the market place. Thank you for considering us, part of your management team. Respectfully Submitted, ~_ ~ f' ,~ 1- ~_ . , <~ Rob Johnston Project Manager Skyline Building Envelope Consultants 15050 CEDAR AVENUE S. /SUITE #: 116-333 /APPLE VALLEY, MN 55124 OFFICE #: 952-303-4824 OFFICE FAX #: 952-405-6060 MOBILE: 763-229-2771 ROB.JOHNSTON(a~SKYLINEBEC.COM 1M~M/.SKYLINEBEC.COM 21 ELK RIVER ICE ARENA H A LLB E R G ENGINEERING ~b'r%hann: a; E'ect;:r~ I Con.ci.i: rrro fngrneers Project Number: R12-1311.000 Elk River Ice Arena HVAC Study R12-1311.000 The ice arena complex consists of two (2) buildings that are connected with a sheet of ice in each building. The Barn was built in 1971 and the Olympic size rink building was built in 1997. Both rinks are open 7 days a week for about 14 to 18 hours a day between September and March. During the summer the Barn Rink is shut down while the other sheet of ice is operating during the week for about 12 hours a day. Both sheets of ice are maintained between 19° F and 20° F and get turned down to 17 '/z° F for events and are resurfaced by electric Zambonis and edgers that have rechargeable wet cell batteries. Both buildings have a dry fire protection system. Barn Mechanical Systems This building currently does not have any ventilation air (outdoor air) with the exception of building infiltration or if the building wall exhaust is activated. The rink has a Dectron dehumidification unit hung from the structure and the bleachers have one (1) strip of gas fired radiant heat controlled by a dollar validator machine that the spectators can turn on by inserting dollars. The locker room areas are served by a gas fired condensing furnace that does not receive outside air. The Zamboni room is heated by gas fired unit heaters and is not ventilated. The ice plant has an electric heater in it and does not have a code required Feron evacuation system. Olympic Size Rink The rink is ventilated and dehumidified by a Munters Dry Cool AM30GG unit that was installed in 1999. This unit has a desiccant wheel that removes humidity from the rink air and is reactivated by a modulating gas burner. It also has an energy recovery enthalpy wheel. The spectator stands have gas fired radiant heaters that are controlled by a dollar validator machine that the spectators can turn on by inserting dollars. The lobby, concession, snack, office and toilet room areas are served by a gas fired rooftop unit with DX mechanical cooling. This unit brings in ventilation/make-up air for the toilet exhaust and occupants. The locker room area has in floor radiant heat served by high efficiency boilers that were installed in 2009. Ventilation for these spaces is supplied by a gas fire 100% make-up air unit that supplies air to the space and is relieved out of gooseneck ducts on the roof. The ice plant room has a gas fired unit heater and a Feron evacuation system consisting of outdoor air intake exhaust fan and Feron sensor controller by an outdoor air intake and exhaust fan. The rink Managers office on the upper level is heated, ventilated and cooled by a fan coil unit that supplies air from the rink to the office and air is reheated as required by an electric duct coil. Barn Mechanical Deficiencies and Recommendations Note: The following recommendations are assuming that the building envelope issues will be addressed. 1. The rink and spectator area does not meet current indoor air quality code because no outdoor air is being supplied to the space. The Dectron dehumidification unit is under sized for the space and year round operation. As it gets warmer outside the humidity levels raise and the space becomes foggy. The higher humidity levels have also caused damage to the building envelope. Recommendation: Provide a dehumidification unit similar to the Munters unit sized for the smaller rink. This will provide dehumidification and outdoor air that is required by code. Page 1 Mechanical/Electrical Consulting Engineers 1750 Commerce Cour• White Bear Lake, MN 55110 • Phone (651) 748-1100• Fax (651) 748-9370 is\projects\elk river, city of\r12-1311.000\correspondence\outgoing\elk river ice arena.docx Probable Cost ................................................................................................................. $275,000.00 2. The radiant heaters are ineffective and have outlived their service life. Recommendation: Remove existing radiant heaters and provide with new heaters. Probable Cost ................................................................................................................... $20,000.00 3. The gas fired furnace does not have the capacity to provide the code required ventilation make-up air for the spaces it serves. Code requires locker rooms have exhaust and make-up air. Recommendation: Provide energy recovery unit with a hot water coil and all required controls and ductwork that would supply outdoor air for the locker rooms and occupied spaces. Probable Cost ................................................................................................................... $45,000.00 4. Code requires battery charging areas to be exhausted. Recommendation: Provide exhaust and make-up air system and control. Probable Cost ................................................................................................................... $15,000.00 5. Code required Feron evacuation system. Recommendation: Exhaust and make-up air and Feron detection control panel. Probable Cost ................................................................................................................... $25,000.00 The Olympic Sized Rink 1. The Munters desiccant wheel and enthalpy wheel have significant signs of deterioration. Recommendation: Option 1: Replace desiccant wheel and all required seals. Probable Cost ................................................................................................................... $25,000.00 Option 2: Replace both desiccant and enthalpy wheels. Probable Cost ................................................................................................................... $40,000.00 OptlOp 3: Replace unit with similar unit. Probable Cost ................................................................................................................. $200,000.00 2. The Munters unit has seven (7) standard efficiency motors that are close to the end of their service. Recommendation: If Option 1 or 2 from Items ] is selected, replace motors with premium efficient motors Probable Cost ................................................................................................................... $15,000.00 3. The interior of the unit is dirty. Recommendation: If Option 1 or 2 from Item #1 is selected clean unit. Probable Cost ........................................................................................................................ $750.00 4. The radiant heaters are close to end of their service life. Page 2 Mechanical/Electrical Consulting Engineers 1750 Commerce Cour• White Bear Lake, MN SS110 • Phone (651) 748-1100• Fax (651) 748-9370 is\projects\elk river, city oflr12-1311.000\correspondence\outgoing\elk river ice arena.docx Recommendation: Replace radiant heaters. Probable Cost ................................................................................................................... $30,000.00 5. The rooftop unit condenser coils are damaged causing the cooling function to be less efficient. Recommendation: Comb out fins and clean unit. Probable Cost ........................................................................................................................ $750.00 6. One (1) of the locker relief vents is located too close per code to the make-up air units outdoor air intake. Recommendation: Extend duct away from the unit to maintain a minimum of 10'-0" from intake wall. Rotate all gooseneck away from exterior wall Probable Cost ........................................................................................................................ $750.00 7. There is not a building automation system that would maintain and control the Heating and Cooling systems from a central work station. Recommendation: Provide web based building automation system that could be accessed remotely to monitor systems and change settings. Probable Cost ............................................................................................ $50,000.00 - $150,000.00 Page 3 Mechanical/Electrical Consulting Engineers 1750 Commerce Court White Bear Lake, MN 55110 • Phone (651) 748-1100• Fax (651) 748 -9370 is\projects\elk river, city of\r12-1311.000\correspondence\outgoing\elk river ice arena.docx SKYLINE BUILDING ENVELOPE CONSULTANTS ADVANCED ENGINEERING SERVICES FOR FACILITIES MANAGEMENT /CONSULTING SERVICES INCLUDE: ALL TYPES OF ROOFING 8 WATERPROOFING, BUILDING ENVELOPE & FACADE EVALUATIONS & RESTORATION, ASPHALT PARKING LOT RESTORATION, PARKING GARAGE EVALUATIONS & RESTORATION, FORENSIC ENGINEERING. April 12, 2012 Rich Czech Arena Manager City of Elk River 1000 School Street N.W. Elk River, MN. 55330 Reference: Exterior Building Envelope Roof Inspection Report (with photos) on existing conditions and Leakage investigation of the Elk River Ice Arena, this report includes recommendations and is obtaining estimated costs for maintenance. Dear Rich, The following Exterior Building Envelope Roof Inspection Report will show the present conditions and approximate quantities and locations of the identifiable deficiencies and distress of the roof components of the various roof sections on the Elk River Ice Arena. Defect photos have been provided. Included in this information will be a Recommendation Summary for this portion of your facility. OBSERVATION SUMMARY I , _ _ I V ' ~ ~~ ~ I~ ~ t4 ri , ~.~ . ~. ~'x ~ ~ ;~ ,`' '~' '~s - 3g. .. f ~ j '3 j~`i. _ k ~ _ S ~~ d r~" t ~ Y ' Mti' C + ~ a D ~ ~ ~ `~ ~ _ ~ ~ g ~<~, :. ti ~~. 3 ~ ~s' k 3 '~" ~ src ;4 Fq~,9 ;.~ {,{~,~ ~,; ~x ~ ~ .; ~ f « ~v ~.,. ,aa, 4 w ~ ,~~ ~ 1'~ ~ '. ,~~ ~, y r.~ .ter ~ ~ ;~,~ , ~ I , . r. ~"~ q ~~ n ~ i ~ ~ ' 1 ' 4511 ~.; to ~ ~ ~ ~~k. "~x . ,.~ i.. r ~ ' y _ f ^~ ~ ~ ~`~ v, g` ~Y +n n f ~. ~ { ~ t 1_ ~ ~ ~ i f 4. s ~ ~~ _ s, . .4 ,4~~.. .,.... 2 I~ Y ~ 4 ate` M' ~.~y ~ ti Roof Area F Roof Area C I Roof Area D I Roof Area E ~? < Quantity: I each ~~, , -~ Repair Recommendation: Install new rubber patch and lap sealant over open seam. Defect No. 1: Open seam. Quantity: 2 lineal feet. Repair Recommendation: Remove existing ~r=~~ ' sealant, clean, prime, and install new foam ~- ~ . .. :~ _,~ ~- backer rod and sealant. '~ ~ _ . . Defect No. 2: Deteriorated or open sealant at metal flashing. Quantity: 1 lineal foot. ~_ . Repair Recommendation: Install new rubber x ,, :. patch and lap sealant over deteriorated rubber. ~~: ~:;; Defect No. 3: Deteriorated rubber flashing. 3 Quantity: Along South wall Area A. Defect No. 4: Ponding, underlying insulation is raised and does not have ro er to er to direct water to drains. Repair Recommendation: Install new tapered insulation along wall to move water to adjacent drains. ~, : ,~ ~ Quantity: 40 lineal feet. ~x ~,~ Repair Recommendation: Tenting can be $# ~~~`~'" g``' ~ addressed when installing new tapered ~~ "`-`~ ~ •' ~ insulation along South wall. ~5~. =; ," '`,~ ~ i.~ c:^° x ~ r ~ ~ ,~~~. Defect No. 5: Membrane is unattached at perimeter causing "tenting". r ., ~~ Quantity: 2 each. Repair Recommendation: Cut out membrane around wall brackets. Adhere a protective material over the bracket and install anew rubber patch over the protective material. Defect No. 6: Metal brackets were covered without any protective materials. Eventually the corners will cut the membrane from the rubber shrinking. 4 ~` `~ ~~"''~~ ~~ ~'~ Quantity: 3 each. ~ ~,- Defect No. 7: Mounting brackets not sealed on top. Repair Recommendation: around mounting brackets. Install sealant I Ly ~~~~ ,~ Quantity: 2 lineal feet. ~~' Ate. „~.~~.~t ~ ~ ~ Repair Recommendation: Remove existing sealant, clean, prime, and install new foam backer rod and sealant. ~.~~ t. ~:,., ~~ , , ~~~ ~.. ~,- ~. ;.~~~, ~ ~ ...~_~ .. y, .. r _,~ _, ~:: Defect No. 9: Open sealant at wall termination bar. Quantity: 207 lineal feet. Repair Recommendation: Saw cut a new reglet entire length of wall. Install new sealant at termination bar. Install new sheet metal flashing to cover termination bar. 5 Defect No. 8: Open sealant at metal cap flashing. Quantity: 1 lineal foot. :~ Repair Recommendation: Clean and prime. Install new rubber patch and lap sealant over open seam. Defect No. 10: Open seam in membrane. ~~ - ~.~ Quantity: 1 each. Repair Recommendation: Re-tighten fastener, install new rubber patch. Defect No. 11: Insulation fastener backing out. Quantity: 1 each. _ Repair Recommendation: Clean and prime. Install new rubber patch and lap sealant over open seam. 6 Defect No. 12: Open seam at roof scupper. Defect No. 13: Open seam all edge metal laps and cover plates. Defect No. 14: Hole in rubber membrane. ~~ ~ :; ~• ~,:~ Defect No. 15: Pinholes in rubber at penthouse door threshold. Quantity: 1 each. Repair Recommendation: Clean and prime. Install new rubber patch and lap sealant over open hole. Quantity: 3 lineal feet. Repair Recommendation: Remove door threshold. Install new rubber patch entire length and reinstall threshold. ~; ,, „~~ : ~ ~' ; t Quantity: 1 each. _ - .i ° x {33+ ,_ ~ ~ Repair Recommendation: Re-secure loose k :.__ ~ ~~' s ' '~i~. I Pipe. ~"^s.g ~ ~5 °~ y Defect No. 16: Heat pipe is loose, not firmly attached. T , f -'~" Defect No. 17: Pipe boot holds water. Quantity: 1 each. Repair Recommendation: Loosen draw band and pull sleeve higher onto pipe and install new sealant and tighten draw band. Quantity: 1 each. Repair Recommendation: Clean and prime. Install new rubber patch and lap sealant over open hole. 8 ~, ~ ~' ~ ~.R _ ~~.~... Defect No. 20: Open seams at EPDM laps. ~ Defect No. 21: Open hole in membrane. Quantity: I lineal foot. Repair Recommendation: Clean and prime. Install new rubber patch and lap sealant over open seam. Quantity: 1 each. Repair Recommendation: Clean and prime. Install new rubber patch and lap sealant over open hole. 9 Quantity: 1 each. Repair Recommendation: Clean and prime. Install new rubber patch and lap sealant over open hole. ~: ~<,; ~~ Defect No. 22: Hole in membrane. Quantity: 1 each. Repair Recommendation: Clean and prime. Install new rubber patch and lap sealant over open hole. ~t ~` Defect No. 23: Hole in membrane. Quantity: 1 each. Repair Recommendation: Cut out affected area and remove rock. Clean and prime. Install new rubber patch and lap sealant. Defect No. 24: Sharp rock under rubber membrane. 10 ~r-- ~`~~ ~ _ ; ~ ~ ~~~ Quantity: Typical. ~. ~ . ~ ~ . ' ` ~ :: Repair Recommendation: Turn goose necks a ~~~~3 ~ ~ away from the wall. l i c ''~ ~ ., ~ fix{ '"~ ~` ~: ~, ,, a ~ r ~ x ~ ~ ~ ~~;~. ~ ~~ ~'.- .:r.;- ~ r ; ~ w;s ~ a- ~ ,- +1 ~~., ,° ° z ~ ';~~~ :,~ ~ ;~ a, ~ Defect No. 25: Goose neck vents are up against the adjacent wall blowing air onto the wall which could affect the wall materials. h k5 {x {q f ~ ~ i` ~~ ~ ~ 1:~ ~ .. ' ti ~' '~ ~25~.,~ ,,,~ <, ~_~ ..sit .. .. ~~rr .Y' ~ ~~1: Quantity: 2 each. Repair Recommendation: Install new pipe box enclosure. Defect No. 26: Open sealant around PVC pipe. ~;... y~ ~' _~:.. F°° ~ Defect No. 27: Open seam at heat stack. Quantity: 1 each. Repair Recommendation: Clean and prime. Install new rubber patch and lap sealant over open seam. 11 Quantity: I each. Repair Recommendation: Clean and prime. Install new rubber patch and lap sealant over _, ., "` open seam. f~ .~ -}~.r s, _ may, _' Defect No. 28: Open seam at stairs. Quantity: 1 each. Repair Recommendation: Clean and prime. Install new rubber patch and lap sealant over open seam. Defect No. 29: Open seams. Quantity: 2 each. Repair Recommendation: Re-tighten fastener, install new rubber patch. Defect No. 30: Fastener on wall backing out. 12 Quantity: 15 lineal feet. Repair Recommendation: Repair using appropriate design and repair methods. Defect No. 31: Membrane not properly terminated under metal roof. ~. a ~ ~~ ~~ ~ ~~~.~ ~~.M w~ ~° .~~~ Quantity: 30 square feet. Repair Recommendation: Remove debris from roof. d f ~,_~,~, Defect No.32: Leaf debris. Def`r~ct :io.33: ~~~;;~ s~;a~,r at 1°oc~~' scupper. Quantity: 2 each. Repair Recommendation: Clean and prime. Install new rubber patch and lap sealant over open seam. 13 ~m{ -ti ~~'~ ~ ° Quantity: 7 each. ,, a.~~ ~-~{ ,~ ~ Repair Recommendation: Clean and prime. :~ ~ ° ~ Install new rubber patch and lap sealant over :_ - ~;a~"' ~ open seam. ~~ -~ fm,.- „ .~~? ~ ~ ~'~ Quantity: 1 unit. ~. Repair Recommendation: Monitor condition. ,,~~' If condition worsens, repair using appropriate materials and procedures. =~.. Defect No.36: Metal mechanical curb beginning to push up on rubber membrane. ~~ ~'~~~~"~~~,~-~~ ~.~ M,; F~~~ r= Quantity: 2 each. ~~'''~ .-.~x ~ .~' ~ ~ ~ ~t Repair Recommendation: Verify vent stacks ~ ~ ~ are obsolete. Remove obsolete pipe penetration. - - Repair roof using appropriate materials and r.-. ?~'+~. ~ repair methods. 14 Defect No.34: Open seams at metal joints. Quantity: 1 each. Repair Recommendation: Clean and prime. Install new rubber patch and lap sealant over open seam. #a Defect No.37: Upen seam. r~ Quantity: 2 square feet. Repair Recommendation: Replace existing wood to match. Adhere a waterproof membrane over wood, install new sheet metal enclosure piece to cover and match existing. Defect No.38: Exposed wood. Wood is beginning to deteriorate. y,'; Quantity: 7 each. Repair Recommendation: Clean and prime. Install new rubber patch and lap sealant over open holes. ~ ~` Defect No.39: Open holes in membrane. k .'" ~ H .. ,~, *.~~ `°Y t ~` I l l P ~I rfl 1 ~~ J.;;~.~y .. s ~ .. . g ~ ". ~ 8swe~a~~ 15 Quantity: 1 each. Defect No.41: Underlying insulation has become displaced causing the roof membrane to raise causing ponding to occur. ~ ~ ~ ~ ~ J h~,Yr;je f" .t ~+~ ~y E4~ ~~n ~ '''9 L` Y" x ., - ~;~ 16 Repair Recommendation: Clean and prime. Install new rubber patch and lap sealant over open hole. Quantity: 32 square feet. Repair Recommendation: Move displaced insulation into place. Qualified roofing contractor to determine appropriate repair. Quantity: I each. Repair Recommendation: Clean and prime. Install new rubber patch and lap sealant over open hole. Defect No.42: Open hole at roof scupper. Quantity: 1 each. Defect No.43: PVC vent pipe broken off below roof. Repair Recommendation: Remove and replace damaged PVC pipe. Clean and prime. Install new rubber pipe boot and lap sealant. -- ~ mss: .., fi ~`. ~" '~`'~ ~ ~ Quantity: 21 lineal feet. Repair Recommendation: Move displaced insulation into place. Qualified roofing contractor to determine appropriate repair Quantity: I lineal foot. ~-' Repair Recommendation: Clean and prime. Install new rubber patch and lap sealant over open seam. ~ Defect No.45: Open seam. 1~ Defect No.44: Large 6" gap in insulation at wall line between the metal roof and rubber roof. Roof Executive Summary: Roof Areas A, B, C, F & G consist of a fully adhered single ply "EPDM" roof system with tapered insulation installed in 1997. Drainage on all roof areas is accomplished with interior drains and/or scuppers. The roofs are generally in fair condition and have many high level deficiencies that will or have let water into the roof system or building interior. These defects should be repaired immediately by a qualified roofing contractor to minimize the potential of further water infiltration. These roofs should perform as intended for another 5 + years with annual roof repairs. Roof Areas D & E consist of a metal roof installed in 1971 (See separate investigation report performed by SBEC). Roof Area H consists of a single ply "TPO" roof with tapered insulation. (Roof not included in investigation). SBEC did observe temporary rubber repairs at the roof scuppers which do not meet standard roofing practices. The repairs should have been made using "like" materials and properly heat welded. The "TPO" membrane appears to be adhered to the existing scuppers. The existing scuppers do not appear to be coated to allow the "TPO" membrane to be properly heat welded to the scuppers. We were advised that the original roofing contractor had implemented the rubber repairs at the scuppers. The contractor should return and provide proper heat welded "TPO" repairs at the scuppers at no cost to the City of Elk River. We also observed some areas where the membrane has become un-adhered at the perimeter wall. These areas should be monitored to determine if the condition worsens with time. SBEC would be willing to meet with the original roofing contractor to discuss our findings. See attached photo's below for reference. f~~l, ~ ~. ~~~,~. ~ty~ n~ Rubber repairs on new "TPO" roof at scuppers. (Typical) 18 Leak Investigation: After performing a visual inspection of the roof, we performed leak investigations at multiple locations to determine the cause of water infiltration into the locker rooms and hallways between the two ice arena buildings. The majority of leakage was occurring on the North wall of the newer Ice Arena Building. The following is a summary of our observations and findings: ~} .f ~; I', Y ,~~ -~. .. ;k: 4 ~ ... .., 19 The newer Ice Arena Building consists of precast concrete panels with vertical "fins" that have a rough texture. Vertical control joints with foam backer materials were installed between the precast concrete panels to allow for movement. ~ ,` _ .- ~~ i ~ "~ ~ ~_ r ~ ,~ j ~ ; ,~: ~~ ~ !i -k, ~ ~ ',y ~~' °' * ~ ~~'~, Many cracks have travelled behind the rubber ,~ '~ roof system at the wall termination. This ~` condition allows water to enter behind the roof ", system and into the building interior. .. a .. , ~ ~ ~~ ~~' ~ ~-~ i ''~ ~t ~~ ~`` . < o~, . _ "r ~ ~----.__."_ ~ .. t F~ ~~lj 1 i i( i ~ ~, f E{tli~4t11~ ~S~tj }, 77t~{~~~t~; ;~}~ fi '3" z3;s,~ " ~ ~~',I~i~, r' <f i i'}~ ~ ~~iE~rii{ ~~~~.j~~i:~~Y ~ ~rF § r~ t. ~ G ~ The rubber roof membrane is attached to the wall using metal termination bar fastened every 12 inches. The sealant at the termination bar is un-bonded or deteriorated. 20 ~- ~ ~ We began water testing above locker room 7 by spraying water onto the roof termination at the wall. No leakage occurred after 20 minutes of spraying. 1 Z ~ ~ '~ ~ J AR ~~,. is i.. ~tt~I~~ ~ ~~ ,. i. We then proceeded to spray the wall using a spray bar to simulate rain fall. One of the spray nozzles focused on a vertical crack in the wall. Leakage occurred at the head of the door going into Locker Room 7 within 5 minutes of spraying. We opened the ceiling access panel and could see water coming out of a vertical crack located above the door. 21 Leakage was also reported in the hallway to the skating director's office adjacent to locker room number 5. , ~_r ~ ~ ~. ~.4 y y; w We sprayed water on a vertical crack located ,t. :y` ~ directly above the hallway. ~ ~ .3 -., `~ ~ }~ t yy i ~ ~ t ~ a ~~~• ~ ~ f #~ ~ ~ ~. 3..~ f a~ $ ~ d i ~ ~ .; aip 'fir b ~„ P ; 3 J ~ h ~ { ~~ ~• l . ~, i h _ ~ 'ti Y3 ~ ~ ~ ~ y e .~ ~ ~ ~~ 22 R' L . '" ~ Leakage occurred within 5 minutes of spraying a~ $ ' ~ ~.. ~ the vertical crack in the wall. ~~~" ~~ ~.~ .,~ ,~ .~w,~ ~ ,,~,~.,~.,~ Leakage was also reported below the signs near the main entrance. .~~~ ~ ~ . ,.~ ~ ~~ " ~ ~~ 1 ;i ~, ~ L ~I ker Rooms #S • #8 ~, 23 Vertical cracks in the precast concrete panels were observed throughout the entire building. Some of the vertical cracks were located above the East doors where leakage has been reported. - ~ z ~ ,~ ,w.....rf- - ~` C k i , T 1 F t V Rt ~ 3 e ,. ~ ~ ~ ~ ~ ~ }}F ~ ~ ~f Leak Investigation Summary: Based on our observations and water testing, the primary cause of leakage occurring along the North wall of the newer building is due to the vertical cracking in the precast concrete panels. We recommend performing long term repairs on all vertical cracks along the North elevation above the roof using appropriate materials and repair procedures. These repairs should also be implemented on the remaining parts of the building above windows and doors. The sealant in the existing control joints are weathered and beginning to deteriorate. It may be more cost effective to replace them when doing the crack repair rather than return in a few years to replace them. The rubber roof membrane is also surface mounted to the wall using termination bar and sealant. The sealant is the primary means to stop the water from entering at the termination bar and going behind the rubber membrane. Much of the sealant is deteriorated or un-bonded which could allow water infiltration into the building interior. The sealant should be replaced at the termination bar the entire length. A new reglet should be saw cut at an upward angle into the smooth surface of the concrete panels to allow a new two piece sheet metal counter-flashing to be installed (see attached detail). This will not only cover and protect the sealant at the termination bar but it will also allow a simple means to tie into the new roof in the future when it is replaced. Remarks: This is a summary of our visual inspection of the roof systems on the various roof sections of the rubber EPDM roofs. We recommend repairing the defects identified in the above report and to perform roof inspections in the spring and fall to extend the life of the roof systems. 24 Skyline Building Envelope Consultants continue to look forward to building a strong business relationship with you and the City of Elk River by helping to solve your roofing and waterproofing problems, by combining knowledge and experience with excellent services, along with specifying the best products and systems available in the market place. Thank you for considering us, part of your management team. Respectfully Submitted, '? ~ "~~, ,~.~ ;,~-` ,% Rob Johnston Project Manager Skyline Building Envelope Consultants 15050 CEDAR AVENUE S. /SUITE #: 116-333 /APPLE VALLEY, MN 55124 OFFICE #: 952-303-4824 OFFICE FAX #: 952-405-6060 MOBILE: 763-229-2771 ROB.JOHNSTON a(~SKYLINEBEC.COM WVWV.SKYLINEBEC.COM . 25 ~u ~ gg y m ~ F ~ 99 ~ O Q z ~ ~ D ~ YC~ ~ ~~ y /~ .. '7 ' P ~' 1 ~ ~ ~ ~ ~~ O O e P ~ Q V N ~ (n [S .._. i r Cr ~ (] ~ o a I 4 ,~. ~ W N a O a J S I O ~ } J P y ~ f '' ,, d ~ O b ~ II Z p o x~ ~ n N Q O ~ N O q V N e+ O p ~ m q C! u P u s Y u ~ ° D ~ Zm ~~ ~_ ~ ~~ x ~ $~ x D /~ O " (P~ 8 Q y 6 O D ELK RIVER ICE ARENA ~,~, ~~~ ~ - ~1. _, 1000 SCHOOL ST NW Z } SKYLINE SUILDI N(3 ENVELORE CONSULTANTS ELK F21VEft, AIrNNESOTA ,sasoc.a:a,2s.s„xGSn,sa~~wo+swurr.~+ss,aa fsszt zro-~aos 26 EXISTING PRECAST CONCRETE WALL PANEL SHEET METAL REGLET INSERT WITH REVERSE BEND (SAW-mCUT REGLET WITH POSITIVE SLOPE) FASTENERS 16"' O.C. THROUGH NEOPRENE WASHERS COTTON ROPE WEEPS MASTIC SEAL 18 GA. TERMINATION BAR FASTENED 6" O.C. SECURING EXISTING FULLY ADHERED EPDM MEMBRANE REMOVABLE KYNAR SHEET METAL COUNTERFLASHING WITH INTERLOCKING ENDS. THROUGH-WALL FLASHING DETAIL SCALE: NONE SKYLINE BUiLDtNG ENVELOPE CONSULTANTS 15050 Cedar Ave S. Suite #116-333, Apple Yafiey, MN 55124 (952}210-7803 27