Loading...
4.5. SR 05-21-2012``~°` REQUEST FOR ACTION Eli ..~.~: R..~er TO ITEM NUMBER Ma or and Ci Council 4.5 AGENDA SECTION MEETING DATE PREPARED BY Consent May 21, 2012 Gary Lore, Building Maintenance Su ervisor ITEM DESCRIPTION REVIEWED By Public Safety Building Floor Repair Tim Simon, Finance Director & Bob Kluntz, Police Ca fain REVIEWED BY Cal Portner, Ci Administrator ACTION REQUESTED Mayor and Council are asked to approve a contract with Garage Floor Coating of MN in the amount of $20,056 for the public safety building floor repair project. BACKGROUND/DISCUSSION The public safety building was built in 2002. Since that time the garage floor began to see several spots start to chip and break free over the years. Currently the floor has several large areas exposed. After meeting with a few contractors we determined that this was more than likely due to a moisture issue, or a problem with the mix. They have recommended a complete redo of the floor versus the continual repairs that have been done over the years. We have anticipated this project for several years in the Capital Improvement Plan (CIP). The floor will be finished similar to the fire station which has been holding up very well. The repair will come with a lifetime warranty from the contractor. Staff obtained several quotes ranging from $20,056 to $22,300. Staff is recommending going with the lowest quote from Garage Floor Coating of MN in the amount of $20,056 which includes a lifetime warranty. FINANCIAL IMPACT We estimated $30,000 in the 2012 CIP and the lowest quote came in at $20,056 so the project will be under budget by $9,944. ATTACHMENTS 2012-2016 Capital Improvement Plan (page 4'~ Action Motion by Second by Vote FOllow Up F U ~! E~ E 9 B'I N:\Public Bodies\City Council\Council RCA\Agenda Packet\05-21-2012\PD floor.docx ~~~~ -~~~ Capital Improvement Plan City of Elk River, Minnesota 2012 tIvu 2016 Project ~ pS-03 Project name Floor repair/replacement projects Tppe Lmassigned l seful Life 1 ~ year Category Buildins'vlaintenance Department Public Safety Buildine Contact Buildine'~laintenance Supv. Priority n a repair in the Police department garage (2012) t replacement in the Police department (201) the replacement in the Police department (2016) Justification ~ The coating on the floor in the police garage is peeling up in several places so ~Te would like to replace it with a quartz floor similar to the floor in the fire garage that is still holding up very ~~ell. The Public Safety building was built in 2002 and the traffic volume from staff and visitors has started to wear on the carpet and tiles. Expenditures 2012 2013 2014 2015 2016 Total Building Maintenance 30,000 54,120 33,122 117,242 Total 30,000 54,120 33,122 117,242 Funding Sources 2012 2013 2014 2015 2016 Total Government Buildings Reserve 30,000 54,120 33,122 117,242 Total 30,000 54,120 33,122 117,242 2012-2016 CAPITAL IMPROVEMENTPLAN Page 47