Loading...
8.4. SR 05-21-2012REQUEST FOR ACTION TO ITEM NUMBER Ma or and Ci Council 8,4 AGENDA SECTION MEETING DATE PREPARED BY General Business Ma 21, 2012 Tina Allard, Ci Clerk ITEM DESCRIPTION REVIEWED By Resolution Supporting Passenger Rail Service From Chicago to Cal Portner, Ci Administrator St. Cloud REVIEWED BY ACTION REQUESTED Council should discuss whether they would like to adopt the attached resolution of support for passenger rail service from Chicago to St. Cloud. BACKGROUND/DISCUSSION Mayor Dietz received a letter from Sherburne County asking fox a resolution of support in regards to passenger rail service from Chicago to St. Cloud. Attached is some background information provided by Sherburne County. If you would like to read more about passenger rail around the state, visit the Mn/DOT website at: http://www.dot.state.mn.us/passen erg rail/ ATTACHMENTS ^ Resolution Letter from Sherburne County Commissioner Felix Schmiesing Along with Background Material Action Motion by Second by Vote Follow Up N:\Public Bodies\City Council\Council RCA\Passenger Rail.docx ~~ RESOLUTION 12- A RESOLUTION OF THE CITY OF ELK RIVER A RESOLUTION SUPPORTING THE ADDITION OF A STATE- SPONSORED PASSENGER RAIL SERVICE BETWEEN CHICAGO AND THE TWIN CITIES, EXTENDING TO ST. CLOUD WHEREAS, MNDOT, through its Office of Passenger Rail, is engaged with the National Railroad Passenger Corporation (AMTRAK) in a feasibility study of the provision of additional state-sponsored intercity passenger rail service in the Chicago-Minneapolis-St. Cloud Corridor; and WHEREAS, according to the MNDOT State Rail Plan, the St. Paul/St. Cloud corridor has the highest ridership numbers of any corridor in the state, and is exceeded only by the St. Paul to Chicago Corridor; and WHEREAS, the addition of service to St. Cloud would be of direct benefit to the City of Elk River and its residents and businesses; and WHEREAS, the St. Cloud terminus would provide similar benefits to the region, to Northstar ridership, and to airport service. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Elk River, Minnesota is strongly in support of this service extending to St. Cloud. Passed and adopted this 215L day of May 2012. John J. Dietz, Mayor ATTEST: Tina Allard, City Clerk N:\Public Bodies\Ciry Council\Resolutions\Resolution Support for Passenger Rail.docx ~F,VRNE CD ea. y r'~1 ! L1./ 1 "d ~ '~ ~ ' . `. . . May lo, zolz John Dietz, Mayor City of Elk River 13065 Orono Parkway Elk River, MN 55330 Dear Mayor Dietz, 13550 r~iigrrw~y 10 ]Nest 13330 Business tenter Drive ~tk F,'iver, il/i,~l155330-4501 (753) 241-270 9 ,~ 1-800-433-5223 (763) 241-2707 FaX (Within Minnesota) Wehsite: www. co. Sherburne. rnn. c;s Currently the MNDOT office of Passenger Rail and Amtrak are undertaking a feasibility study for the addition of state-sponsored passenger rail service between Chicago and the Twin Cities, possibly extendng_to_St._Cloud. There is no guarantee however-, that this run would-extend to St. Cloud.-T-he- support of the St. C]oud area is critical to this conversation. I am enclosing the resolution passed by the Sherburne County Board of Commissioners on May 8, 20] 2 and some background information for your reference. I am asking if each of your respective boards would consider passing a similar resolution of support within the next few weeks. Should you wish to support this effort, please forward a copy of your resolution to Luci Botzek at 13880 Business Center Drive NW, Elk River, MN 55330 or email to luci.botzek@co.sherburne.mn.us. Thank you for your consideration of this matter of most importance to our part of the state. Sincere] , Felix chmiesing Commissioner, District 4 Enclosure cc: Brian Bensen, Administrator -Sherburne County Luci Botzek, Deputy Administrator- Sherburne County Dave Craning, Mayor -City of Becker Monty Headley, Administrator-Benton County Lori Kampa, Mayor -City of Big Lake Dave Kleis, Mayor -City of St. Cloud John Kramer, CEO -Greater St. Cloud Development Corp. DeWayne Mareck, Board Chair -Stearns County Scott Mareck, AICP, Executive Director - St. Cloud Area Planning Organization Warren Peschl, Board Chair -Benton County George Rindelaub, Administrator -Stearns County Bill Winter, Board Chair - St. Cloud Area Chamber of Commerce Distr'sct 1 District 2 District 3 LARRY FARBER EWALD PETERSEN JOHN RIEBEL 19404 Norfolk St. NW 18040 Mwy. 10 18866 - 75th Street Etlc River, MN 55330 Big Lake, MN 55309 Becker, MN 55308 (763) 913-8809 (763) 263-307$ (763) 263-2056 District 4 FEL(X SGMMlES1NG 5672 - 115th Avenue Clear Lake, MN 55319 (320) 743-2441 District 5 RACHEL LEONARD 27655 - 112th Street Zimmerman, MN 55398 (763) 856-2497 EXHIBIT 1 SCOPE OF WORK The National Railroad Passenger Corporation ("Amtrak") will conduct a feasibility study of the provision of additional state-sponsored intercity passenger rail service in the Chicago, IL -Milwaukee, Wl - St. Paul, MN -Minneapolis, MN - St.Cloud, MN corridor for the Minnesota Department of Transportation (hereinafter referred to as "MNDOT") as follows. A. Potential Routes: The potential routes for study were selected by the STATES and included herein as Table 1. With a few moderate exceptions, the routes to be studied essentially follow that of Amtrak's current Empire Builder trains between Chicago, IL and St. Cloud, MTI. The study assumes that east of St. Paul, MN station stops for all four alternative routes will be the same as those of the Empire Builder service. However, within the Twin Cities area and beyond to St. Cloud, each alternative route will reflect a different combination of station stops. Exhibit 2, attached, provides maps of the four alternative routes. TABLE I ALTERNATIVE ROUTE l HOST RAILROAD STATION STOP AMTRAK Chica o Union Station METRA Glenview, IL Canadian Pacific CP Milwaukee Ai ort Rail Station Canadian Pacific (CP Milwaukee, Wl CP Columbus, W] CP Porta e, W l CP Wisconsin Dells, W1 CP Tomah, W1 CP LaCrosse, Wl CP Winona, MN CP Red Win , MN CP St. Paul Union De t BNSF Minneapolis Transportation Interchange TI BNSF St. Cloud, MN Page 1 TABLE 1 (continued) ALTERNATIVE ROUTE 2 HOST RAILROAD STATION STOP AMTRAK Chica o Union Station METRA Glenview, IL Canadian Pacific CP Milwaukee Ai ort Rail Station Canadian Pacific (CP Milwaukee, Wl CP Columbus, WI CP Porta e, WI CP Wisconsin Dells, WI CP Tomah, W 1 CP LaCrosse, W1 CP Winona, MN CP Red Win , MN CP St. Paul Union De of BNSF Fridle , MN BNSF St. Cloud, MN Page 2 TABLE 1 (continued) ALTERNATIVE ROUTE 3 HOST RA.II.ROAD STATION STOP AMTRAK Chica o Union Station METRA Glenview, IL Canadian Pacific (CP Milwaukee Ai ort Rail Station Canadian Pacific CP Milwaukee, Wl Cp Columbus, Wl CP Porta e, W1 Cp Wisconsin Dells, Wl Cp Tomah, W 1 Cp LaCrosse, W 1 Cp Winona, MN Cp Red Win , MN CP St. Paul Union De of BNSF Minneapolis Transporlaiion Interchange (MTl Page 3 TABLE 1 (continued) ALTERNATIVE ROUTE 4 HOST RAILROAD STATION STOP AMTRAK Chica o Union Station METRA Glenview, IL Canadian Pacific CP Milwaukee Ai ort Rail Station Canadian Pacific (CP Milwaukee, W1 CP Columbus, W1 CP Porta e, WI CP Wisconsin Dells, Wl CP Tomah, W1 CP LaCrosse, W1 CP Winona, MN CP Red Win , MN CP St. Pau) Union De of B. Frequency and Schedule: This study will evaluate the feasibility of adding one daily frequency, 7 days per week, each way between Chicago and a Twin Cities area station at times that complement existing Empire Builder and Hiawatha Service departure and arrival times. Approximate proposed departure/arrival times at terminal stations: Departure City Departure Time Arrival City Arrival Time Chicago 8:00-9:00 AM Twin Cities 4:00-5:00 PM St. Cloud 6:30-7:30 PM St. Cloud 9:30-] 0:30 AM Twin Cities 1 l :00 AM -Noon Chicago 7:00-8:00 PM Page 4 C. Operating Assumptions: 1. Due to the inability to tum equipment consists at certain of the proposed Minnesota terminal stations, Alternative Routes I and 3 will require a "push-pull" locomotive configuration. This arrangement provides for a locomotive unit on each end of the train. 2. For each of the four alternative routes, schedules, infrastructure requirements, operating costs, rolling stock, ridership and revenue forecasts will be developed based on current timetable speeds up to 79 mph, where practical. 3. -T#is study assumes the proposed new frequencies will not accommodate checked baggage. 4. The equipment consist will include a food service car (cafe, lounge or bistro car) with food and beverage. service but will not include a full diner. 5. This study assumes .the train consist will-utilize bi-level Superliner-type equipment, Simi-tar to the Empire Bvifder-consist. A~ntralrrecommends-the evaiuaton~f-sirrgte- level or non-Superliner equipment be set aside for a more in-depth study in the future. 6. The equipment consist will be coaches plus food service car, but no sleeper cars. 7. Locomotive costs will be based on the use of P42 locomotives. if multiple or push- pull power consists are required, the equipment will be locomotives only, assuming there is no availability of Amtrak NPCU (Non-Powered Control Unit) equipment for use in this service. 8. Assuming the proposed second frequency running time is similar to the current Empire Builder running time, the study will examine the effects on trip schedule with the elimination of the extended rest stop in Winona, the addition of a Milwaukee Airport stop, no multiple stops at a single station, and no checked baggage. D. The Study To conduct the study, Amtrak will perform an analysis of the existing railroad infrastructure along the potential routes and will: 1. Gather background information, review prior studies, and collect demographic information from available sources for the purpose of providing an overview of the alternative routes and proposed station stops. 2. Coordinate, schedule, and conduct a field inspection of the potential routes to assess the existing railroad infrastructure, freight railroad operations, freight railroad traffic volumes, capacity issues, and local yard and terminal operations. 3. Assess the impact of proposed route station stops on existing freight and passenger operations and on infrastructure in the vicinity of the stations. 4. Coordinate with host railroads to identify specific issues related to operations, infrastructure and capacity. 5. Consult with host railroads to determine the need for RTC modeling and the extent of a capacity analysis. Based on host railroad input and. field inspections, identify specific required infrastructure improvements along the various alternative routes. Page S 6. Include in the lump sum study price the costs of any required capacity analysis. 7. Amtrak wil) provide study progress updates on a monthly basis for the stakeholders. 8. Amtrak, working with its consultant, AECOM, shall provide passenger rail ridership and revenue projections for each alternative route. E. The Report Amtrak shall prepare and deliver a report that includes all of the following, and any other information Amtrak deems appropriate: 1. An assessment of the existing route infrastructure, condition, and railroad operating and capacity issues for the potential routes. 2. Results of the capacity analysis for each potential route. 3. An estimate of capital and infrastructure regt~irements for each .alternative route. 4. Provisional train schedules, upon which all study analyses are base, _ £or----each alternative route; these schedules will be reasonable and feasible but not necessarily optimized due to the limited capabilities of this study. 5. Ridership and revenue forecasts for the proposed service, including the selected stations, and including the key assumptions used to derive the estimates. 6. Estimated annual operating costs and expense items for the proposed service, including the key assumptions used to derive the estimates. 7. Estimated annual operating support for the proposed service. 8. Required crewing needs and expenditures for crew costs for the initial start-up. 9. Equipment and train consist requirements and cost estimates, based on results of the ridership analyses. 10. Required equipment mechanical maintenance and support facilities and assessment of potential sites for train maintenance. F. Report Preparation and Review Process Within 120 calendar days of receipt of an executed contract and study parameters from MNDOT and background information, such as track charts and employee time tables, from the host railroads, and upon completion of field inspection trips, AMTRAK will complete the analysis of data, the preparation of train schedules, the analyses of track capacity, the identification of infrastructure improvements, and the preparation of ridership/revenue/cost estimates. Upon completion of tasks described in the previous paragraph, AMTRAK will require approximately 30 days to prepare and provide to the host railroads an initial Draft Report for review and comment. Only those sections of the report that are relevant to the host railroads will be provided to them. The study schedule assumes comments from the host railroads will be provided to AMTRAK within 30 calendar days of receipt of the Draft Report. Page 6 Following receipt of comments from the host railroads, and, subject to AMTRAK review and approval, the comments will be incorporated into an updated Drafl Report, which Amtrak will then provide to MNDOT for review and comment. It is estimated that AMTRAK will need approximately 30 calendar days to review host railroad comments and update the Draft Report before forwarding it to MNDOT. MNDOT shall review the Drafl Report and provide written comments to AMTRAK within 30 calendar days of receipt of the Drafl Report. AMTRAK shall provide a Final Report to MNDOT within 30 ealendar days of receipt of written-comments- from MNDOT, incorporating all relevant comments into the Final Report. Should AMTRAK or MNDOT take exception to any contents of the Drafl Repor[, both parties agree to work in an expeditious manner to resolve all issues prior to the release of the Final Report. A timely completion of the feasibility study and report will be dependent on the cooperation of the host railroads as well as completion of all necessary route capacity analyses, if any. Page 7