MEMORANDUM
Item # 7.4.
TO:
FROM:
DATE:
Mayor and City Council
Pat Klaers, City Adm//~trator
May 11, 1998
SUBJECT: School Street Project Update
Councilmember Holmgren has requested that this item be added to the
agenda. In case you missed it, attached is the 5/6/98 Star News article on the
proposed School Street improvement project.
I have met with Dr. Flannery and he has advised me that the School Board
had some general questions regarding the cost of the project, the interest rate
on the assessment roll for the project, and the "fairness" for why no
properties on the south side of the road were being assessed. The school
understands that even if the south properties were assessed that they may
not see reductions in their assessments.
As the Council may recall, at our joint meeting with the School Board it was
suggested that the school pay half the cost of this proposed improvement
project and the City pick up the other half. If this approach would have been
acceptable to the school, then the project could have proceeded in 1998 with
no project public hearings and no assessment public hearings. If the City is
to pursue assessing property owners to the south, then these two public
hearing steps would be required and this would push completion of the
project out until the very end of the 1998 construction year. In fact, it could
even require that the project be completed in 1999 if some property owners
appealed their assessments and the City waited the 30 days to determine if
the people appealing their assessments followed up with the appropriate
filing of notices. On the positive side however, it looks like School Street will
be open and passable throughout the construction project and it may be that
construction in October would not be a major inconvenience to the School
District.
Without the agreement and support of the School District, public hearings
are required for this project and this may mean that we should be looking at
a 1999 project. If the City is to consider assessments on the south side of the
street, then we would have to look at assessments on a front footage basis for
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425
the street, storm sewer, and sidewalk. This may result in a lower cost to the
City and some assessments to the south property owners, but it may also
result in appeals and the City ending up in district court to justify the benefit
of this project.
Based on a front footage basis, the cost to the School District would seem to
be lower than the "ball park" $200,000 estimate, however we have previously
experienced an aggressive construction environment and this may result in
assessments on a front footage basis costing the School District more than an
actual 50/50 split of the project. We could offer the School District an
either/or situation, but this would require an assessment hearing after bids
are opened. It is even remotely possible that we could assess 50% of the
project to the School District, assess part of the project out on a front footage
basis for the south property owners and the City pays the balance.
This project has always been in a concept stage until recently and actually
the Council has not authorized plan and specification, but just asked staff to
start working on the project. The City Engineer has moved forward with
obtaining more detailed construction cost information and analysis. So far
all we have been working from in terms of costs for the project is our best
guess and these estimates tend to be conservative or on the high side. For
example, at this point we don't even know if the sidewalk on the north side
can be saved or will need to be replaced. The final design will help determine
the final cost estimate.
i Education ~,~, Mav G,-1~98/Elk ~iver St~r N~w$/3
Board balks at School Street Widening
by Jim Boyle
Staff writer'
The Elk River Area School
Board discussed, but did not bite
on, a proposed School Street-
widening project last Tuesday.
Instead, it directed Super-
intendent David Flannery to
meet ~vith the city of Elk River
about options to make the pro-
ject more affordable.
The city is proposing the .road
improvement and has for about
five years.
There is some support for the
project on the School Board;
however, the decision to send
the superintendent out on a
fact-finding mission is already
likely to push the project off
another year, F]annery
explained.
And while there is support for
the project in g~neral, there are
some School Board members
who seem apprehensive or ques-
tion and/or question how big an
issue School Street traffic is..
Traffic jams like this occur twice a day on School Street
when school is in session. The city of Elk River is proposing
it be widened to four lanes. (Photo by Jim Boyle)
Tom Zerwas, the Elk River
police chief, was disappointed to
hear of the School Board's inde-
cisiveness.
"It seemed like this was going
to be the year," he said. "It's real-
ly unfortunate they didn't decide
to go ahead. ~Ls far as I'm con-
cerned it's an accident waiting to
happen.".
The police direct Lraffic in
front of VandenBerge Junior
High School before school and
after school, Zerwas said.
Without the high school,
Zerwas said, there would be no
need for the road improve-
ments.
Board Member Therese
VanBlarcom questioned
whether the school district was
shouldering a responsibility fro'
road improvements for the eco-
nomic development of Elk
River. She said there needs to
be ways to get from east Elk
River to west Elk River other
than Highway 10 and School
Street.
Pat Klaers, Elk River's city
administrator, has said the city
is waiting for the school district
to petition the widening project,
unless somethinghappens that
causes the council to rethink its
position. The city could force
the project -- and the assess-
ment.
For now, the School Board
wants to know if there is a way
that the school district could
pay for the assessment interest-
free or if there were any other
options. Board members
lem~ned last Tuesday it would
cost the school district an addi-
tional $112,000 in interest to
pay for the project, if they went
with a 15-year payment plan.
The school district could pay it
all off up front, but a $200,000
.bill would be tough to swallow
all at once, members said.
City officials have wanted the
project done ever since the other
half of School Street was
widened about five years ago.
"We stopped where we did
because we didn't want to pay
another $200,000 to finish the
street," Flannery reported last
Tuesday.
The school district is coming
off another assessment on
which it pays about $20,000 per
year.
Everyone agrees that widen-
ing the road would make it
safer.
In the absence of the road
improvement, the School Board
plans to look at its high school
parking policy as means of con-
trolling the level of traffic.