Loading...
4.1. SR 05-18-1998Item 4.1. Howard R, Green Company CONSULTING ENGINEERS May 13, 1998 File: 803570J (0060) CONSULTING ENGINEERS Formerly MSA Consulting Engineers Honorable Mayor and City Council City of Elk River 13065 Orono Parkway PO Box 490 Elk River, MN 55330-0490 RE: SCHOOL STREET IMPROVEMENTS Dear Council Members: As directed at last Monday's City Council meeting, attached are two resolutions for the City Council's consideration. The first resolution orders the feasibility study for the School Street improvements. This will be necessary for any proposed assessments to the benefiting property. As I understand, we will likely assess 50% of the construction to the school district along the north half of the street, and assess the properties along the south side of the street for the proposed new sidewalk. The second resolution would authorize the preparation of plans and specifications to begin. As we indicated at last week's meeting, we have already initiated this work and have been working towards completing a set of plans so that the Elk River Municipal Utilities will know where to relocate their power line and anticipating a Summer 1998 construction schedule. In that regard, we have prepared a tentative schedule of how the project may proceed in order to be completed in 1998. It is as follows: · Order feasibility study and preparation of plans and specifications · Receive feasibility study and order public hearing · Submit plans to Mn/DOT for Municipal State Aid approval · Approve plans and specifications and authorize advertisement for bids · Hold public hearing · Open bids · Receive Mn/DOT Municipal State,Aid approval · Award bid · Start construction · Consider resolution to determine the cost to be assessed · Complete construction · Assessment hearing May 18, 1998 May 25, 1998 May 25, 1998 May 25, 1998 June 8, 1998 June 24, 1998 June 30,1998 July 6, 1998 July 13, 1998 August 17, 1998 September 18, 1998 September 28, 1998 O:~PROJ\803570j\570-1312. may.doc 1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free 888/368-4389 City of Elk River May 13, 1998 Page 2 It should be noted that to facilitate this project, we will need a narrow easement along the north side from the School District. This is because the widening to the north will push the power line out of the existing easement. If the School District is unwilling to give this easement in a timely fashion, it would delay construction. You will note two things about this schedule. First, it proposes that the assessment hearing be held after the project has been awarded and the construction completed. This is not the typical way that we have been proceeding with projects. This exposes the City to a slightly increased risk of an assessment appeal being sustained by District Court and the City being responsible for the cost. The second issue is that construction would not start until well after the school year is closed for the summer and would not be completed until after the next school year has begun. This will likely cause some disruption to both the school activities and the construction activities, however, the road should be constructed to a point that it can easily carry traffic in the worst weather conditions. In thinking about a 1998 construction project versus a 1999 construction project, there are a few benefits to a 1999 construction project that bear mentioning. They are as follows: Obviously, it would provide enough time for the City to go through the public hearing, bidding, and assessment hearing processes before a contract is awarded, thus eliminating any risk that the City would have by not holding the assessment hearing until after the project. It would allow more time for working with School District personnel and utilities to coordinate activities along the School Street corridor. These activities would include realigning, if possible, some of the School District's driveways, and coordinating the relocation of electrical lines and other underground utilities that may be in the way of the new construction. We may, potentially, receive a slightly inflated bid in 1998, caused by a rather short construction period with a rather late bid opening. By the middle of June, most contractors are starting to fill in most of their construction schedule. In 1999, the project would be bid early in the year, allowing a contractor to plan ahead for construction starting immediately after the school year is over, thus not having to "squeeze" the project into their 1998 schedule. The City's method of funding their portion of the cost of this project would likely be Municipal State Aid dollars. As we have discussed previously, the City has more projects planned for 1998 than there are Municipal State Aid dollars available. Moving the project to 1999 would allow one more year of allotment to be available to help in the funding scenario of all proposed projects within the City. Howard R, Green Company O:\PROJ\803570j\570-1312.may.doc CONSULTING ENGINEERS City of Elk River May 13, 1998 Page 3 If you have any questions regarding this information, I will be in attendance at your City Council meeting on Monday, May 18, 1998. Sincerely, Howard R. Green Company TJM/st Enclosures Howard R, Green Company O:~PROJ\803570j\570-1312.may.doc CONSULTING ENGINEERS RESOLUTION 98 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION OF THE CITY OF ELK RIVER ORDERING A PRELIMINARY FEASIBILITY REPORT IN THE MATTER OF THE SCHOOL STREET IMPROVEMENT OF 1998 WHEREAS WHEREAS the City has determined that it should consider improving certain property by widening School Street from just west of Jackson Avenue and reconstructing School Street west of Proctor Avenue (the improvement); and Council must first secure a preliminary feasibility study in order to consider making the improvement; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: This matter shall be referred to Howard R. Green Company, who is requested to provide to the City Council a report advising, in a preliminary way, whether the proposed improvement is feasible and whether the improvement should thus be made as proposed or in connection with some other improvement and the estimated cost of the improvement as recommended. Passed and adopted this 18 day of May 1998. ATTEST: Henry A. Duitsman, Mayor Sandra A. Thackeray, City Clerk \\SPNWFSWOL1 \DATA\PROJ\803570j\570-1313.may. Resolution .doc RESOLUTION 98 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ORDERING PREPARATION OF PLANS AND SPECIFICATIONS IN THE MATTER OF THE SCHOOL STREET IMPROVEMENT OF 1998 WHEREAS the City Council will duly consider the Feasibility Report and those matters presented at the public hearing by those persons desiring to be heard on the matter; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: Howard R. Green Company is hereby designated as Project Engineer for this improvement. The Project Engineer is directed to prepare plans and specifications for the making of the improvement and the solicitation of competitive bids. Passed and adopted this 18 day of May 1998. ATTEST: Henry A. Duitsman, Mayor Sandra A. Thackeray, City Clerk O:~PROJ\803570j\570-1314.may. Resolution2.doc