MEMORANDUM
Item # 6.5.
TO:
FROM:
DATE:
SUBJECT:
Mayor and City Council
Steve Ach, City Planne~~
May 18, 1998
Conditional Use Permit Request by
HTG Architects (Norwest Bank),
Public Hearing Case No. CU 98-11
Request
HTG Architects is requesting a conditional use permit for site plan review to
construct a financial institution in the Elk Park Center Planned Unit
Development.
Location
Lot 1, Block 1, Elk Park Center 3rd Addition (the southwest corner of 193rd
and Highway 169).
Zoning/~and Use
PUD (Planned Unit Development) / HB (Highway Business)
Attachments
· Revised development plans dated 5/10/98
· Letter from HTG Architects dated 5/8/98
· Staff report to the Planning Commission dated 4/28/98
Overview
Norwest Bank is proposing to construct a 4,630 square foot financial
institution along with six drive-thru tel]er lanes on the south side of the
building. The construction of this financial institution will complete
development of the north end of Elk Park Center, which is that portion
between Freeport, Jackson, 193ra and Highway 169. Immediately to the
south of this proposed development is Twin City Federal Financial
Corporation site which received Council approval approximately 2 years ago.
The proposed plans by Norwest Bank complement the approved plans for
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425
Memo to Mayor and City Council/1CU 98-11
May 18, 1998
Page 2
Twin City Federal allowing the two sites to work together. Both of the bank
facilities share a driveway entrance off of Freeport Avenue.
Bank Hours
The bank is expected to have 10 - 12 employees on site throughout a typical
workday. Bank hours of operation will be as follows:
Auto bank - Monday through Friday, 7 a.m. to 6 p.m.
Saturday 8 a.m. to 12 noon
Bank - Monday through Friday, 9 a.m. to 5 p.m.
Saturday 8 a.m. to 12 noon
These hours are similar to TCF with the only exception that TCF will be open
one hour later than the hours proposed by Norwest Bank.
Project Overview/Site Plan Review
Attached is the report to the Planning Commission dated April 28, 1998,
which goes through staffs site plan review comments regarding the proposed
facility. Also attached to the Planning Commission report is a brief project
overview from Jeff Pflipson with HTG Architects. Please refer to the
Planning Commission report for detailed comments regarding the site plan
review of the proposed Norwest Bank facility.
Also attached to the report is a letter from HTG Architects dated May 8,
1998, which basically serves as a response to staffs comments in the
Planning Commission report. Staff has discussed these issues with HTG
Architects. The only staff recommendation unable to be met relates to
narrowing of the entrance and exit of the drive-thru teller lanes. As an
alternative, staff has suggested that the lanes be striped to try to control the
turning movements as vehicles leave the drive-thru lane. Norwest Bank
would prefer not to narrow the exit lanes as it may cause more conflict with
turning movements than having the vehicles drive straight out to the
driveway. Narrowing the entrance would reduce the stacking distance for
some of the drive-thru lanes.
Access onto Jackson Avenue
One of the primary issues associated with the development of this north end
of Elk Park Center is access to the site. Originally, when Elk Park Center
came before the Planning Commission and City Council, the traffic studies
recommended no access point along Jackson Road between Highway 169 and
Freeport Avenue. The original plan also included three developable lots
where there are now only two. Furthermore, the specific users have now
s:Xcouncil\cu98-11.doc
Memo to Mayor and City Council/ICU 98-11
May 18, 1998
Page 3
been identified and a more accurate trsffic study can be prepared to assess
the possibility of a driveway onto Jackson Road.
Earher concept plans for this parcel (which never got to the Council level for
review) included a convenience/gas station which was also requesting an
access point on Jackson Road. A trsf-fic study was done in support of the
access with certain conditions being met. Mainly these conditions related to
the removal of all the trees along the north end of Elk Park Center to
improve the visibility of vehicles leaving the site and acknowledging both
north and south bound traffic on Jackson. The proposed access by Norwest
Bank has been shifted further to the south than previous proposals. The
issue of maintaining adequate visibility along Jackson Road and through the
curve up to Highway 169 is still a critical issue. The removal of some of the
trees will be necessary in locations where the trees are so closely located that
they create a "wall" and obstruct the view of oncoming vehicles. Please refer
to Terry Maurer's memo for additional information regarding the proposed
driveway onto Jackson Road.
Recommendation
It is recommended the City Council approve the conditional use permit
request by HTG Architects (Norwest Bank) to construct a financial
institution along with six drive-thru lanes, with the following conditions:
With the exception of narrowing the drive-thru, ali of the comments
outlined in the site plan review section of this report be incorporated
into the revised set of plans for approval.
Comments from the City Engineer's memo dated April , 1998, be
incorporated into the revised set of plans for approval.
Signage meet the requirements of the Elk Park Center Planned Unit
Development.
Four sets of revised plans be submitted back to the City for review and
approval prior to issuance of a building permit.
s:\council\cu98-11.doc
RETAINING WALL ELEVATION
,~ ~,~.. ~ ,_
R~AININg WALL SECTION
TRASH ENCL PLAN
QTRASH ENCL ELEVATION
GGP, ADING PL-'H
A1.2
' ^2
t~ ~ ~ ~ ~ ~ ~,. ' t.~ATERIAL COLOR SELECTIONS:
NORTH EL~ATION ~ SOUTH [L~ATION
~/~ir~
' ' '.
~ ......... ~ ............................................................................................ :U: ~:~.
WEST EL~ATION
~ST EL~ATION
AROHTT£OTS
08 May 1998
Mr. Steve Ach
City Planner
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, MN 55330
Dear Steve:
The following is our response to the City's memorandum dated 28 April 1998, and Mr. Terry Maurer's letter
dated 22 April 1998, regarding the proposed Norwest Bank branch facility in Elk River. The site is located at
the southwest quadrant of the intersection at 193rd Avenue Northwest and Highway 169. The response items
are listed and numbered as noted in your memorandum and in Terry's letter.
CiW's Memorandum:
A1 NA
A2 NA
A3 Narrowing the autobank drive lane on the approach side of the canopy would reduce the number of
car stacking spaces; this could cause the cars to stack closer to the entrance at Jackson Road. Likewise,
narrowing the autobank drive lane on the exit side of the canopy would create a high potential of accidents
from cars merging into the adjacent drive lane. Striping will be provided from the autobank islands to the east
drive lane. See enclosed revised site plan.
A4 If an expansion ever occurs, the size of the expansion would comply with the required on-site parking
stalls.
A5 Agreed. See enclosed revised site plan.
A6 Agreed. We will eliminated the westerly most parking stall, adjacent to the trail and relocate the stall
at the east end of the north parking area. With thc elimination of the parking stall, the retaining wall has been
moved to the east approximately 9'-0". See enclosed revised site plan.
B 1 We will work with the City to satisfy the required tree count.
B2 The Bank requests that ornamental style deciduous trees be used in lieu of the suggested conifers,
which could create potential security issue. We would like to reduce the number of requested trees in this area
because this area could be used for additional parking, if the need arises.
C 1 The Bank will provide an easement agreement with the City for the bituminous trial that cuts into the
Bank's properly. The Legal description is; 'Lot 1, Block 1, Elk Park Center, Third Addition'. Please submit
an example of a standard easement agreement for the Bank to use.
2page
City of Ell River
08May 1998
C2
C3
C4
D1
A 5'-0" sidewalk will be provided along the east drive, west curb. See enclosed revised site plan.
Agreed. See enclosed revised site plan.
Agreed. See enclosed revised site plan.
The Bank has agreed that if the utility company or the City needs access into the utility easement, the
Bank will remove and reinstall the trash enclosure at the Bank's cost. Coordination will be required during
construction so that the utility lines be installed prior to the installation of the trash enclosure.
E 1 The Bank will be submitting a sign package for approval by the City, at which time a permit will be
paid for and pulled.
E2 The sign will be relocated 10'-0" back from any setback. See enclosed revised site plan.
Mr. Maurer's letter:
A1 NA
A2 Narrowing the autobank drive lane on the approach side of the canopy would reduce the number of
car stacking spaces; this could cause the cars to stack closer to the entrance at Jackson Road. Likewise,
narrowing the autobank drive lane on the exit side of the canopy would create a high potential of accidents
from cars merging into the adjacent drive lane.
A3 Agreed. See enclosed revised site plan.
A4 The Bank will provide an easement agreement with the City for the bituminous trial that cuts into the
Bank's property. A sidewalk will be added from the trail into the Bank's parking lot as noted on the enclosed
revised site plan.
A5 The Bank has agreed that ff the utility company or the City needs access into the utility easement, the
Bank will remove and reinstall the trash enclosure at the Bank's cost. The location of the easterly most curb
of the Bank's property was designed to align with the easterly most cud> of the access road to Freeport Avenue.
B 1 Mr. Terry Maurer has stated that the extension of the sanitary sewer from the southeast property line
to the northeast property line might not be required. The extension of the watermain will be required for the
City to have a "continuous loop". Norwest has reviewed their agreement with Kraus-Anderson, for the
purchase of the land, and there is no mention that the purchaser is required to pay for this improvement. We
feel this construction should be completed by the City or the City's developer.
B2 We will revise the grading at the entry. Thank you.
B3 The break in the curb will be approximately 5'-0" wide in lieu of the 2'-0" noted.
B4 The 16'-0" ATM and by-pass lane is sufficient, due to thc fact that it will get minimal use.
3page
City of Elk River
08May1998
B5 The grade at the access slopes into the site to the east. Pedestrian ramps will be included. See
enclosed revised site plan.
B6 Agreed. Please advise where the size should be relocated to.
B7
the site.
9'-0".
Two to three feet of fill is being provided on the site to slightly redue the steep slope at the trail, into
We will remove the westerly most parking stall and move the retaining wall to the east approximately
Feel flee to call if you have any questions or comments. Please let me know what you need for the City
Council Meeting.
Sincerely,
Jeffrey J. Pflipsen
Vice President, Architect
Robert Seeger, Norwest Properties, Inc.
Terry Maurer, Howard R. Green Company
enclosures
ty of
iver
FROM:
DATE:
Item # 6.6.
MEMORANDUM
Planning Commission
Steve Ach, City Planne~.
April 28, 1998
SUBJECT:
Conditional Use Permit Request by
HTG Architects (Norwest Bank),
Public Hearing Case No. CU 98-11
Request
HTG Architects is requesting a conditional use permit for site plan review to
construct a financial institution in the Elk Park Center Planned Unit
Development.
Location
Lot 1, Block 1, Elk Park Center 3rd Addition (the southwest corner of 193rd
and Highway 169).
Zoning/Land Use
PUD (Planned Unit Development) / HB (Highway Business)
Attachments
· Zoning map
· Memo from City Engineer dated April~1998
· Proposed development plans
· Letter From Jeffrey Pflipson (HTG Architects)
Overview
Norwest Bank is proposing to construct a 4,630 square foot financial
institution along with 6 drive-thru teller lanes on the south side of the
building. The construction of this financial institution will complete the so-
called north end of Elk Park Center, which is that portion between Freeport,
Jackson, 193rd and Highway 169. Immediately to the south of this proposed
development is the Twin City Federal Financial Corporation site, which they
13065 Orono Parkway * P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425
Memo to Planning Commission/CU 98-11
April 28, 1998
Page 2
have received a conditional use permit for and may begin construction later
this year.
Bank Hours
The bank is expected to have 10 - 12 employees on site throughout a typical
work day. The banking hours of operation will be as follows:
The auto bank - Monday through Friday, 7 a.m. to 6 p.m.
Saturday, 8 a.m. to 12 noon
Bank - Monday through Friday;, 9 a.m. to 5 p.m.
Saturday, 8 a.m. to 12 noon
These hours are similar to TCF, with the only exception that TCF will be
open one hour later than the hours proposed by Norwest Bank.
Project Overview
Attached is a letter from Jeffrey Pflipsen from HTG Architects, giving a
general overview of the proposed bank facility. Please refer to this letter for
additional information.
Site Plan Review
As with all conditional use permits in the Elk Park Center Planned Unit
Development, a complete site plan review is required. The staff review
committee has reviewed the proposed development plans and would offer the
following comments:
A. Parking and Circulation
One of the primary issues associated with this development is
the access point onto Jackson Road. When Elk Park Center was
originally presented to the City, the traffic studies at that time
suggested there be no access between Highway 169 and
Freeport Avenue along Jackson Road. The north end of the
development has changed slightly since the original plans have
been submitted and approved by the City. For example, the
number of lots has been reduced from 3 to 2. In addition, the
specific mix of tenants are now known which helps in preparing
a specific traffic study for the proposed developments. The City
Engineer will elaborate on this issue in his report to the
Planning Commission. At the time of this report a traffic study
from the architect has not been received. Staff would
s:\planning\pc\cu98-11.doc
Memo to Planning Commission/CU 98-11
April 28, 1998
Page 3
recommend the Planning Commission postpone a~ction until this
report has been submitted and reviewed.
o
The site is proposed to have two access points; one off of Jackson
Road and another off of Freeport Avenue. The access off of
Freeport Avenue will be a shared driveway with TCF
immediately to the south. The driveway's design as it intersects
with Freeport Avenue will allow for both left and right turn
movements from both these parcels onto Freeport Avenue.
Since this will be a shared driveway, a cross access agreement
will need to be executed between the two properties to allow for
ingress and egress.
As mentioned, there are six drive-thru lanes for the auto bank.
Each of these lanes provides for queuing for 5 vehicles as
prescribed in the ordinance. The one modification staff would
recommend is reducing the opening of the driveway as the cars
leave the auto bank onto the private driveway. The proposed
plans show a driveway opening of 74 feet. Staff would
recommend tapering this driveway down to a driveway opening
of approximately 36 feet to control the vehicles leaving the auto
bank. In addition, the auto bank entrance from the west could
be narrowed in a similar manner. Th~s may reduce the queuing
distance; however, with the number of drive-thru lanes, this
should not be a problem.
o
The plans show a future building expansion of 4,000 square feet
extending to the west of the proposed building. The addition
would eliminate some of the parking stalls proposed with the
first addition. The future addition will require additional
parking and based on the plan that has been submitted it is
unclear where the required parking would occur. The plan does
reflect future parking stalls, however, it doesn't appear the
ordinance requirement is being met. The first phase as
proposed meets all the City parking requirements.
o
The driveway onto Jackson Road is designed at 28 feet which
will allow for two-way traffic. As proposed, the driveway
intersects with Jackson Road at an angle which should be
adjusted by curving the driveway and creating a perpendicular
intersection with Jackson Road.
o
The retaining wall along the northern parking area is about 2
feet from the pedestrian trail. The wall is three feet high.
s:\planning\pc\cu98-11.doc
Memo to Planning Commission/CU 98-11
April 28, 1998
Page 4
Either the grade between the wall and trail should be flattened
or a greater distance between the trail and retaining wall be
achieved. This may require eliminating parking stall number
(9).
B. Landscaping
Depending upon the number of existing trees that are saved,
there may be additional landscaping required to meet the City's
ordinance. The traffic study may require some of the trees to be
removed along Jackson Road and 193rd to increase the site
distance from the driveway onto Jackson, back towards 193rd
and Highway 169. Once it is known the number of existing
trees that will have to be removed, an accurate determination of
the required landscaping can be determined.
o
Staff would recommend some additional conifers be planted
immediately west of the 10 future parking stalls to soften the
appearance from Jackson Road towards the multiple drive-thru
lanes on the south side of the building.
C. Pedestrian Circulation
An easement will need to be described for the existing
bituminous trail that cuts the northwest corner of the property
along Jackson Road.
One of the conditions for the TCF site plan approval was to
extend a sidewalk from Freeport Avenue along the west edge of
the private drive which serves the TCF and Norwest Bank site.
It is recommended that Norwest Bank also provide a sidewalk
extension to meet up with this sidewalk to encourage pedestrian
access to the site.
o
If the new access drive is constructed onto Jackson Road,
pedestrian ramps would need to be provided on both sides of the
entrance drive for the bituminous trail.
A connection from the bituminous trail along Jackson Avenue to
the sidewalk system internal to the site should be provided.
This is consistent with other developments to encourage as
much pedestrian access as possible.
s:\planning\pc\cu98-11.doc
Memo to Planning Commission/CU 98-11
April 28, 1998
Page 5
D. Refuse Collection
The proposed trash enclosure will need to be relocated so it is
further away from the property line, since the municipal
utilities has indicated they will need to use this easement for
extension of electrical service.
E. Signage
Proposed signage will need to be submitted for review prior to
issuance of a sign permit.
The proposed location of the monument sign is in a drainage and
utility easement. A location outside this easement will be
necessary.
Recommendation
It is recommended the Planning Commission recommend approval of the
conditional use permit request by HTG Architects (Norwest Bank) to
construct a financial institution along with 6 drive-thru lanes with the
following conditions:
All of the comments outlined in the site plan review section of this
report be incorporated into the revised set of plans for approval.
o
Comments from the City Engineer's memo dated April , 1998, be
incorporated into the revised set of plans for approval.
Signage meet the requirements of the Elk Park Center Planned Unit
Development.
Four sets of revised plans be submitted back to the City for review and
approval prior to issuance of a building permit.
s:\planning\pc\cu98-11.doc
LOCATION
!206_= 'S'ro~.o Pzrx'.vav · s ~- },:x _,.z¢:,
Elk R!','~r. ),[N ff2SC'
LOCATION
MAP
CASE'
Howard R, Green Company
CONSULTING ENGINEERS
April 22, 1998
File: 803520j-0240
CONSULTING £NGIN~
Formerly MSA
Consulting Engineers
Mr. Steve Ach
City Planner
City of Elk River
13065 Orono Pkwy
PO Box 490
Elk River, MN 55330-1900
RE: NORWEST BANK SITE PLAN REVIEW
Dear Mr. Ach:
As requested we have reviewed the submittal package for the proposed Norwest Bank facility at
the north end of Elk Park Center, 3rd Addition. The package was submitted by H. T. G.
Architects and consisted of a site plan, grading and utility plan, landscape plan, floor plan, and
exterior elevations. Based on our review and comments received at the staff review meeting we
would offer the following comments.
A. Site Plan
The main issue with the site plan would be the driveway access shown at the
south end of the lot onto Jackson Road. As you are aware, Elk Park Center was
approved with no access onto Jackson Road at this location. We have talked
with the architect for the project and a traffic engineer that he has retained to do
a traffic analysis relative to an access at this point. As of the date of this letter we
have seen no report from the architect's traffic engineer justifying the driveway
onto Jackson Road. We would recommend that the site plan not be approved
with the access onto Jackson Road until this data is available.
We question whether the large throat leading up to the drive thru is appropriate.
Perhaps the driveway should be narrowed slightly by bringing the curb line of the
north side of the drive thru area down into more of an island restricting the
access.
In the same regard, the 24 foot travel lane around the northwest side of the
building ought to be maintained by extending the concrete island out. This would
actually create one more parking spot in the western parking area. We believe
that this additional spot could be offset by the loss of one on the western row at
the south end. This spot, we believe, should be eliminated to allow an area for
cars to back out into when exiting the parking area.
1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free 888/368-4389
Mr. Steve Ach
April 22, 1998
Page Two
As shown on the site plan the existing bituminous trail along Jackson Road goes
onto this property at the northwest corner. This was done when the Elk Park
Center area was originally developed in an effort to save trees in this area. This
trail needs to be provided an easement for it to remain here, or needs to be
relocated into the right-of-way. It appears that the trail's current location falls
within the 25-foot building set back and the site could easily provide an easement
to cover this area. We would also recommend that some appropriate point a
sidewalk into the site be provided from the bituminous trail.
o
The trash enclosure at the southeast corner of the site is within an existing
drainage and utility easement, which is needed for electrical service. The trash
enclosure should be moved to a better location that would meet the required
setbacks. Also, the curb on the far east side of the site appears not to meet
setback requirements.
B. Grading and Utility Plan
The grading and utility plan shows the extension of sanitary sewer and
watermain from the TCF site to the south northerly along the east boundary to
193rd Avenue. This would be a public utility improvement. Therefore, plans and
specifications for this work need to be prepared, reviewed, and approved by the
City. A preconstruction meeting needs to be'held and City inspection would
occur on all of the construction activities associated with this improvement.
The building first floor elevation is indicated as 955.0, however, the 956 contour
runs into the building at two locations.
The grading plans show a break in the curb at the west edge of the building to
drain the parking lot on that side. This is not the most desirable way to provide
drainage from this area. We would suggest, that if this is the method chosen,
making the opening slightly wider will help to insure that it does not plug easily.
The drive thru lane for accessing the ATM and the bypass lane measures 16 feet
from curb line to island. This does not provide a lot of room for a vehicle to
bypass another vehicle sitting at the ATM. We question whether this should be
widened slightly or perhaps, the bypass lane is seldom used and 16 feet will work
in the case of an emergency.
The driveway access onto Jackson Road should be provided with a high point to
keep drainage internal to the site. A concrete pedestrian ramp needs to be
constructed on both sides to provide access to the bituminous trail.
The sign located in the northeast corner of the site is located within the utility
easement. This should be moved slightly to the west to keep it out of the
easement.
Howard R, Green Company
CONSULTING ENGINEERS
Mr. Steve Ach
April 22, 1998
Page Three
On the north side of the parking, there is a relatively steep slope leading from the
existing bituminous trail down to the parking area. A three foot high wall is
proposed in this location. If in fact the access road is allowed onto Jackson
Road, a few if not all of these trees may need to be removed to provide adequate
site distance. We would suggest that it may be better to relocate the bituminous
trail and get a more gradual slope into the site.
If you have any questions regarding these comments, please call me.
Sincerely,
Howard R. Green Company
TJM/ek
O:~proj\803520j\520j-2212.apr
Howard R, Green Company
OONSULTING ENGINEERS
31 March 1998
Mr. Steve Ach
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, Minnesota 55330
Norwest Bank
Elk River Office, Elk River, MN.
Mr. Ach:
Below is a brief summary of the proposed building design, image, and material selection for your use.
The requested application type is for a Conditional Use Permit. The information is based on the enclosed
site plans, floor plan, and exterior building elevations. The project is scheduled for Spring 1998
construction, with completion sometime in December 1998.
GENERAL:
Norwest Bank is planning a new branch bank facility to be located at the southwest quadrant of the
intersections of 193rd Ave. NW. and U.S. Highway 169. More specifically, the Norwest site is Lot
1/Block 1, of Elk Park Center 3rd Addition. The new 4,630 square foot building will have an entry on the
north side, with parking along the north and west portions of the site. The interior use will be for general
bank operation, with offices, conference room, work room, two toilet rooms, mechanical/electrical room,
and an employee lounge. The drive-up window/canopy are shown on the south side of the building
Site access will be primarily from an internal Elk Park Center Development access road via Freeport
Avenue; secondary site access will be from a single new curb cut onto Jackson Road (based on previous
discussions between Norwest Bank and the City of Elk River). A total of thirty-six (36) parking stalls are
planned (23 arc required). The Autobank (drive-up) has more than 120 feet of vehicular stacking space,
which equates to roughly 30+ vehicles- 5 per lane. The Autobank will have six lanes installed. The outer
or sixth lane will contain an ATM; also, thc fifth lane will be a potential location for a future ATM.
The proposed use of the site will not effect the health, safety, morals, and general welfare of the occupants
of the surrounding landS. The proposed building type should compliment the other businesses and people
of the City of Elk River. Below are criteria to assist in granting a Conditional Use Permit.
A, The use will not be injurious to the use and enj ,oyment of the other properties.
B. The establishment of the conditional use will not impede the normal and orderly development of the
surrounding property.
C. Adequate utilities, access roads, drainage, etc. will be provided for this proposed building.
H/CKE ~i THORSTEMSON. GROt:EFt L 7D 7401 Metro Bouievaf~l. Su~te 495 Mpls MN 55439 (6~ 831-8880
2page
31 March 1998
City of Elk River
II. The use is zoned P.U.D., which is consistent with the purpose of the zone.
IMAGE:
The design of the proposed building provides an image that is consumer-friendly, elegant, and warm.
The exterior material will be primarily brick with stone accents. A high curving metal roof will announce
the main entry on the north side of the building.
MATERIALS:
Building Facade
Roof
Roof Structure
Floor Structure
Windows/Doors
Brick (and stone banding) with concrete block backup.
Sloping (curving) metal roofing (entry only).
Built-up roofing (flat areas).
Steel decking and steel joist/beams.
Slab on grade.
Aluminum exterior doors and frames.
GENERAL INFORMATION:
Building Height -
Building Sq. Ft.
Autobank Canopy -
Total
16'-0" at parapet / 23'-6" at peak of sloping metal roof.
4,630 square feet.
1,435 square feet.
6,065 square feet
BUILDING CODE INFORMATION:
Building Type - VN
Group Occupancy - B
Occupant Load - 46 (4,630 s.f. / 100)
The exterior signage for the proposed building will consist of one monument sign, located at the northeast
comer of the site; and wall mounted back-lit logo and signage on the north, east, and west facades (see
elevations- sheet A3).
The bank will have between 10-12 employees on site throughout a typical work day. The banking hours
of operation will be as follows:
Autobank M-F 7:00 am - 6:00 pm Sat. 8:00 am - 12:00 noon
Bank M-F 9:00 am - 5:00 pm Sat. 8:00 am - 12:00 noon
Please contact me if you have any questions or need any clarifications or additional information.
Sincerely,
Vice President, Architect
cc Mr. Robert Seeger, Norwest Properties Inc.
.ity of
TO:
FROM:
DATE:
SUBJECT:
Item # 6.6.
MEMORANDUM
Mayor and City Council
Steve Ach, City Planner~~
May 18, 1998
Request by the City of Elk River for
Rezoning, Public Hearing Case
No. ZC 98-4
Request
The City of Elk River is requesting to consider a rezoning application of
approximately 45 acres from Rlc (Single Family Residential) to BP (Business
Park) (Area #3).
Location
The northeast corner of County Road No. 13 and County Road No. 12
Attachments
Ordinance No. 98-__
Reports to the Planning Commission dated February 24, 1998, and April
28, 1998.
Overview
The proposed rezoning is one of four areas that has been presented to the
City Council for consideration along the new road corridor proposed in East
Elk River. This Area #3 along with the others along this corridor have been
identified in the Economic Development Strategic Plan as potential sites for
business park development opportunities. The criteria that was applied to
consider parcels for rezoning included the following:
· located within the urban service district
· proximity to city utilities
· transportation (including rail access)
· topography
· property owners
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425
Memo to Mayor and City CounciYZC 98-4
May 18, 1998
Page 2
natural features/wetlands
· adjacent land uses
highway visibility and access
Rezoning to Business Park
In previous meetings there has been some discussion on whether the
appropriate zoning for the selected industrial sites should be BP (Business
Park) or I1 (Light Industrial). Staff believes this corridor will lend itself
better to the business park standards, given its proximity to some of the
highway corridors and the configuration of the land as it will allow for larger
sites for development. The Economic Development Authority has discussed
the business park and light industrial zoning standards at their two previous
meetings. The Economic Development Authority has recommended business
park as the appropriate zoning for the areas identified along the new East
Elk River corridor.
Attached Memos to the Planning Commission
Attached to this report are two memos to the Planning Commission
discussing further the rezoning request and analysis that has gone along
with that application. Please refer to those memos for additional
information.
Planning Commission Recommendation
The Planning Commission discussed how this area may ultimately be
developed and the likely access to serve the industrial area. Although the
transportation system for this area has not been finalized the Commission
has expressed a concern about access and the impact on the residential
immediately to the west. Staff will continue to study this area to come up
with the best solution given the existing constraints.
The Planning Commission recommended approval of the rezoning to BP
(Business Park) by a 6-1 vote.
Recommendation
It is recommended the City Council approve Ordinance No. 98-__, rezoning
approximately 45 acres from Rlc (Single Family Residential) to BP (Business
Park) based on the following findings:
f:\shrdoc\council\zc98-4x.doc
Memo to Mayor and City CounciYZC 98-4
May 18, 1998
Page 3
1. The land use plan and rezoning will be consistent with the
Comprehensive Plan and Economic Development Strategic Plan to
expand the industrial tax base in the City.
With the realignment of County Road No. 13, conditions have changed
to warrant a change in the land use and zoning designations.
o
The subject property is planned to have adequate access including a
signalized intersection to accommodate the expected traffic to serve the
future industrial sites.
The area is included within the urban service district which is a major
criteria for identifying available industrial opportunities.
The area to be rezoned is bordered on three sides by roadways which
will provide both a measurable distance and opportunity for buffering
from adjacent land uses.
f:\shrdoc\council\zc98-4x.doc
ORDINANCE 98-__
CITY OF ELK RIVER
AN ORDINANCE AMENDING THE
CITY OF ELK RIVER ZONING MAP TO REZONE CERTAIN PROPERTY
FROM RIC (SINGLE FAMILY RESIDENTIAL) TO BP (BUSINESS PARK)
CASE NO. ZC 98-4
(Area #3)
The City Council of the City of Elk River does hereby ordain as follows:
Section 1. The duly adopted Zoning Map of the City of Elk River is hereby
amended to rezone the property described as:
See Attached Exhibit A
Section 2.
findings:
The rezoning is being approved based on the following
THE LAND USE PLAN AND REZONING WILL BE CONSISTENT WITH THE COMPREHENSIVE
PLAN AND ECONOMIC DEVELOPMENT STRATEGIC PLAN TO EXPAND THE INDUSTRIAL
TAX BASE IN THE CITY.
o
WITH THE REALIGNMENT OF COUNTY ROAD NO. 13, CONDITIONS HAVE CHANGED
TO WARRANT A CHANGE IN THE LAND USE AND ZONING DESIGNATIONS.
THE SUBJECT PROPERTY IS PLANNED TO HAVE ADEQUATE ACCESS INCLUDING A
SIGNALIZED INTERSECTION TO ACCOMMODATE THE EXPECTED TRAFFIC TO SERVE
THE FUTURE INDUSTRTIAL SITES.
THE AREA IS INCLUDED WITHIN THE URBAN SERVICE DISTRICT WHICH IS A MAJOR
CRITERIA FOR IDENTIFYING AVAIILABLE INDUSTRIAL OPPORTUNITIES.
THE AREA TO BE REZONED IS BORDERED ON THREE SIDES BY ROADWAYS WHICH WILL
PROVIDE BOTH A MEASURABLE DISTANCE AND OPPORTUNIITY FOR BUFFERING FROM
ADJACENT LAND USES.
Section 3. That this Ordinance shall take effect and be in full force from
and after the date of its publication.
Passed and adopted this
of the City of Elk River.
day of
,1998 by the City Council
ATTEST:
Henry A. Duitsman, Mayor
Sandra A. Thackeray, City Clerk
s:\document\ordinanc\zc98-4.doc
LOCAtiON
/.
~ MR
178TH ~
177"~{
176TH
LI
HB/
OS
LAND US ~
/
~,~ o~ MAP /~
E 1 . iver
EXHIBIT A
s:\document\ordinanc\zc98-4.doc
178T~
17T~
176TH
174~M
175TH
175RD
LOCATION
f'
City of
iver
13065 Orono Parkway · RO. Box 490
Elk River, MN 55330
ZONING
MAP
CASE:
ZC 98-4 (Area #3)
.y of
River
MEMORANDUM
Item#,s 5.4.
TO:
FROM:
DATE:
SUBJECT:
Planning Commission
Steve Ach, City Planner.~t~
February 24, 1998
Request by the City of Elk River
for Amendment to the Land Use
Plan and Rezoning, Public Hearing
Case No.'s LU 98-1, LU 98-2, LU 98-3,
ZC 98-1, ZC 98-2, ZC 98-3 and ZC 98-4
5.10.
Request
The Planning Commission is asked to consider the following applications:
A. Amending the land use plan map of approximately 25 acres of property
lying south and east of Elk Terrace Mobile Home Park and east of
Highway 169 from HB (Highway Business) to LI (Light Industrial)
(Area #5).
B. Rezoning of the same property described above from PUD (Planned
Unit Development) to BP (Business Park) (Area #5).
C. Land use plan amendment of approximately 40 acres of property lying
at the northeast corner of the Burlington Northern Railroad tracks and
Highway 169 from MR (Medium Density Residential) to LI (Light
Industrial) (Area #6).
D. Rezoning of the 40 acres described above from Rlc (Single Family
Residential) to BP (Business Park) (Area #6).
E. Land use plan amendment of approximately 70 acres of property
located along Burlington Northern Railroad tracks between 177th and
173rd, from MR (Medium Density Residential) to LI (Light Industrial)
(Area #7).
F. Rezoning of the 70 acres described above from Rle (Single Family
Residential) to BP (Business Park) (Area #7).
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425
Memo/Planning Commission/ZC 98-1
February 24, 1998
Page 2
Go
Rezoning of approximately 45 acres from Rlc (Single Family
Residential) to BP (Business Park) (Area #3).
Location
All of the areas considered for rezoning are located along the new
realignment of County Road No. 13 as it extends from the 186th Avenue
alignment south to the 173ra Avenue alignment.
Attachments
· Zoningfland use maps for all areas.
· Map of the new corridor with proposed land uses and zoning designation.
· Business Park Zoning Ordinance
Overview
Over the past couple years there has been a great deal of planning of East
Elk River in anticipation of the extension of sewer and water. The first major
issue which received a lot of discussion centered around the realignment of
County Road No. 13. This realignment of County Road No. 13 was necessary
to alleviate the traffic problems projected at the current intersection of
County Road No. 13 and County Road No. 12. Furthermore, when the
property at the southeast corner of County Road No. 12 and Highway 169 is
developed, additional traffic will be generated adding to the existing
problems at the current alignment.
The realignment of County Road No. 13 was further examined as it continued
south of County Road 12 towards 173ra Avenue and eventually 171st. This
new road alignment will provide accessibility to properties in eastern Elk
River for both development purposes and alternative transportation needs.
The corridor is being designed as a four lane divided roadway with pedestrian
systems on both sides along with desired street lighting. Based on the
projected traffic volumes, limited access will be necessary.
The location of this transportation corridor had seve.ral challenges in defining
its exact alignment including crossing a Northern Natural Gas line,
providing proper intersection geometrics with existing County Road No. 12,
avoiding wetlands, and respecting other natural features. Now that the road
alignment has been fine tuned a complete land use analysis may proceed
forward. Staff will be prepared to present the Planning Commission exhibits
illustrating a vision for this new corridor.
f:\shrdoc\planning\pc\zc98-1.doc
Memo/Planning Commission/ZC 98-1
February 24, 1998
Page 3
General Land Use Pattern
As mentioned above there were several constraints which need to be
considered in designing the new road corridor's alignment. One of the goals
staff wanted to achieve with this new road corridor is to draw a strong
distinction between land use patterns as they would develop along this
corridor. Therefore, as the road meandered around the various physical
boundaries and natural features, there appeared to be a logical land use
pattern occurring. Because of the existing trees and varying topography, the
residential zoning on the east and proposed commercial and industrial
development west of the new road corridor achieved the goal of creating
consistent land use pattern. Anytime a roadway can be used as a means of
land use transition it provides opportunity to aesthetically separate two land
uses with various landscaping treatments and also add in the physical
distance between land uses.
Criteria Considered for Rezonings
One of the Economic Development Strategic Plan components was to identify
possible industrial opportunities within the City. The criteria to locate these
opportunities included the following:
Located within the urban service district
Proximity to city utilities
Transportation (including rail access)
Topography
Property owners
Natural features/wetlands
Adjacent land uses
Highway visibility
Considering these criteria, the east Elk River project seemed like a natural
fit to adjust the land use and rezoning to allow industrial and commercial on
the west side of the road. The east side would remain residential because of
its strong natural characteristics and planned residential further to the east.
Below is a list of criteria and an explanation how the criteria apply to the
arras proposed for rezoning:
Transportation - One criteria used to support the rezoning related to the
areas was ability to gain access to the new roadway and ultimately, to the
existing highway system. Not only did the area allow for convenient
truck/vehicle access, but also provided an opportunity if a company
demanded rail access from the Burlington Northern Railroad.
f:\shrdoc\planning\pc\zc98-1.doc
Memo/Planning CommissionFZC 98-1
February 24, 1998
Page 4
Wetlands/Water Table - The area south of the trailer park extending down
to 173ra has existing ditches and wetlands throughout the property. Some
of these wetlands may be mitigated to allow for further development and
the ditch abandoned, allowing the storm water to be placed into storm
sewers. In some cases the water table may be high, which would allow for
slab on grade construction of industrial buildings.
Natural Features - For the most part, the property included in the
rezoning requests is relatively fiat and contains a considerable amount of
open space. One the other hand, the areas lying east of the roadway have
varying topography and are heavily wooded. The fiat open land is much
more conducive to industrial development, whereas the rolling topography
would require considerable grading to allow for large structures to be
built.
Land Use Compatibility - As mentioned above, the new roadway serves as
a strong physical separation between land uses. A continuation of
industrial land use along the west side of the corridor allows for a linear
industrial park and compatible uses, while the east side can still maintain
its residential character.
Economic Development Strategic Plan - This plan, along with the
Comprehensive Plan, target industrial development as a top priority. The
goals are to diversify the land use mix in the City, expand the industrial
inventory, broaden the City's tax base, provide additional tax base and
compliment the residential and commercial growth.
Economic Development Strategic Plan
The applications presented to the Planning Commission this evening are all
areas identified as part of the Economic Development Strategic Plan. The
Economic Development Strategic Plan was approved by the City Council on
May 19, 1997. The rezoning and land use plan apphcations are brought
forward to implement the plan.
Proposed Zoning and Land Use Designations
All of the areas presented this evening would propose the rezoning of
properties to a BP (Business Park) zoning designation accompanied by a LI
(Light Industrial) land use. Together, these two designations will allow for
industrial development under the business park zoning guidehnes (see
attached for additional information). The business park zoning district is
designed to allow for a more upgraded type of industrial environment with
f.'\shrdoc\planning\pc\zc98- l.doc
Memo/Planning Commission/ZC 98-1
February 24, 1998
Page 5
greater attention given to the architectural, landscaping and other physical
design components.
Recommendation
It is recommended the Planning Commission recommend denying the
following applications:
Area #5 - Amending the land use plan map from HB (Highway Business) to
LI (Light Industrial) and rezoning from PUD (Planned Unit Development) to
BP (Business Park) based on the following:
THE SUBJECT AREA IS CURRENTLY BEING CONSIDERED AS PART OF AN OVERALL
COMMERCIAL PLANNED UNIT DEVELOPMENT.
e
THE AREA IS NECESSARY TO BE INCLUDED INTO THE COMMERCIAL PLANNED UNIT
DEVELOPMENT TO MAKE FOR A VIABLE AND CONTIGUOUS COMMERCIAL
DEVELOPMENT.
o
DUE TO WETLANDS ALONG THE SOUTH PROPERTY LINE, THE AREA MAY BE
PHYSICALLY SEPARATED FROM THE PROPOSED INDUSTRIAL AREAS FURTHER TO THE
SOUTH. THIS WILL INTERUPT THE CONTINUITY OF A CONTINUOUS LINEAR INDUSTRIAL
PARK.
e
THE CURRENT LAND USE DESIGNATION OF HIGHWAY BUSINESS IS STILL CONSISTENT
WITH THE CITY'S COMPREHENSIVE PLAN TO ENCOURAGE COMMERCIAL
DEVELOPMENT ALONG THE HIGHWAY 169 CORRIDOR, AND PARTICULARLY AT THE
INTERSECTION OF MAIN STREET AND HIGHWAY 169.
It recommended the Planning Commission recommend approval of the
following applications:
Area #6 - Land use plan amendment from MR (Medium Density
Residential) to LI (Light Industrial) and rezoning from Rlc (Single Family
Residential) to BP (Business Park).
Area #7 - Land use plan amendment from MR (Medium Density
Residential) to L! (Light Industrial) and rezoning from Rle (Single Family
Residential) to BP (Business Park).
· Area #3 - Rezoning from Rlc (Single Family Residential) to BP (Business
Park), based on the following findings:
THE LAND USE PLAN AMENDMENT AND REZONING WILL BE CONSISTENT WITH THE
COMPREHENSIVE AND ECONOMIC DEVELOPMENT STRATEGIC PLANS TO EXPAND
THE INDUSTRIAL TAX BASE IN THE CITY.
f:\shrdoc\planning\pc\zc98-1.doc
Memo/Planning CommissionfZC 98-1
February 24, 1998
Page 6
2. WITH THE REALIGNMENT OF COUNTY ROAD NO. 13, CONDITIONS HAVE CHANGED
TO WARRANT A CHANGE IN THE LAND USE AND ZONING DESIGNATIONS.
THE PROPERTY SUBJECT TO THE PROPOSED REZONING IS PLANNED TO HAVE ACCESS
TO A ROADWAY CONSTRUCTED TO ACCOMMODATE THE EXPECTED TRAFFIC WHICH
ACCOMPANIES INDUSTRIAL DEVELOPMENT.
o
THE AREA IS INCLUDED IN THE URBAN SERVICE BOUNDARY WHICH IS A MAJOR
CRITERIA FOR IDENTIFYING AVAILABLE INDUSTRIAL OPPORTUNITIES.
THE PROPERTIES TO BE REZONED ARE BORDERED BY EITHER A STATE HIGHWAY,
COUNTY ROAD OR BURLINGTON NORTHERN RAILROAD TRACKS.
f:\shrdoc\planning\pc\zc98-1.doc
;y of
ver
FROM:
MEMORANDUM
Item # 6.8.
Planning Commission
Steve Ach, City Planner~t~
DATE: April 28, 1998
SUBJECT:
Request by the City of Elk River for
Rezoning, Public Hearing Case No.
ZC 98-4
Request
The Planning Commission is asked to consider a rezoning application of
approximately 45 acres from Rlc (Single Family Residential) to BP (Business
Park) (Area #3).
Location
The northeast corner of County Road No. 13 and County Road No. 12
Attachments
* Report to the Planning Commission dated February 24, 1998
· Concept plan for subject area
Overview
This item was presented to the Planning Commission two months ago at
which time the Planning Commission postponed action to further review the
requested zoning. The primary concerns at the last meeting involved traffic
and access to the proposed business park area. Directly west of the existing
County Road No. 13 is an existing residential area which the Commission
was concerned would be impacted by the traffic for the industrial area.
Analysis of Area
Included in the packet is one of many concepts that could be generated for
this proposed industrial area. The plan also shows some of the existing
residential and industrial areas surrounding the property. Under the concept
included in the packet, a significant amount of the traffic to the proposed
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425
Memo to Planning CommissionfZC 98-4
April 28, 1998
Page 2
business park area would use the current County Road No. 13 alignment
north of County Road No.12 to a possible cul-de-sac which would serve three
of the four new lots in this business park area. This cul-de-sac is
immediately opposite 5th Street and south of the single family homes which
are west of County Road No. 13. There could be one additional new lot along
with the existing industrial business (Industrial Hardfacing) north of the cul-
de-sac which would involve traffic passing by the single family homes to gain
access to those sites.
Access to the site is an issue staff has been reviewing as we learn more about
the subject area. Certainly, the impact to the residential area immediately to
the west will be of concern, so considerations will need to be taken to
minimize this. However, under the current conditions, the single family
homes are fronting onto an existing County road. If the City was not
proposing to reroute County Road No. 13 further to the east, the current
alignment of County Road No. 13 would have to be upgraded to accommodate
the additional traffic funneling down from the northeast part of town to the
intersection at County Road No. 12. All of this traffic would be passing by
the single family homes. With the realignment of County Road No. 13, a
significant number of vehicles will be routed east of the single family homes.
Long Term Plan
As discussed at the last Planning Commission meeting, there is a tight mix of
land uses within this general area. Everything from single family residential
to highway commercial, multi-family and industrial exists within a very
short distance. Certainly, there is nothing wrong with achieving land use
patterns of this nature as long as appropriate transition (buffer) areas are
accomphshed. The one area which seems to raise the most concern is
between 5th Street on the north, Highway 169 on the west, County Road No.
12 on the east, and County Road No. 13 on the south. This area includes the
existing single family homes, apartments, Ron's Foods and the City's former
liquor store site. Although it is difficult to pinpoint what exactly may happen
in the future, the changes in the vicinity of this area suggest that there may
be some type of redevelopment in the future. Under that scenario, the
proposed business park zoning would be an acceptable complimentary use.
Recommendation
It is recommended the Planning Commission recommend approval of the
requested rezoning from Rlc (Single Family Residential) to BP (Business
Park) based on the following findings:
f.'\shrdoc\planning\pc\zc98-4.doc
Memo to Planning CommissionFZC 98-4
April 28, 1998
Page 3
1. The land use plan and rezoning will be consistent with the
Comprehensive Plan and Economic Development Strategic Plan to
expand the industrial tax base in the City.
With the realignment of County Road No. 13, conditions have changed
to warrant a change in the land use and zoning designations.
The subject property is planned to have adequate access including a
signalized intersection to accommodate the expected traffic to serve the
future industrial sites.
o
The area is included within the urban service district which is a major
criteria for identifying available industrial opportunities.
o
The area to be rezoned is bordered on three sides by roadways which
will provide both a measurable distance and opportunity for buffering
from adjacent land uses.
f:\shrdoc\planning\pc\zc98-4.doc
COMPARISON OF ZONING/DEVELOPMENT STANDARDS
BUSINESS PARK (BP)
LIGHT INDUSTRIAL (I-1)
PERMITTED USES
CONDITIONAL USES
LANDSCAPING
EXTERIOR FINISH
SIGNAGE
Light Manufacturing
R & D Laboratories
Gov~t, Business & Professional Offices
Mail Order Operations
Telecommunication Operations
Personal Service Establishments
Health Athletic Clubs
Restaurant (Class I)
Hotels/Motels
Licensed Daycare
Vocational, Technical Trade Schools
Motor Vehicle Specialty Service Stations
Multiple Buildings on Above Ground
Storage Tanks
Any Permitted Use Involving 30%
Warehouse Space
Retail Shops Which Compliment the
Business Park
* Up to 25% landscaping credit for exterior
sculptures, fountains, ponds
All Walls Consist of Face Brick, Stone, Glass, Stucco,
Architecturally Treated Concrete Panels, Decorative
Block or Architectural Metal
All Freestanding Signs Must be Monument Style,
Maximum Height 8 Feet/Maximum Size 64 Square
Feet
Wall Signa~
Offices
Warehouses
R & D Facilities
Wholesale Business
Medical, Dental, Optical Labs
Light Manufacturing
Outdoor Storage
SFR as an Accessory Use
Recycling Processing Center
Bottling and Distribution
Mini Storage
Water/Sewage Treatment
Auto Repair Shop
Grain and Feed Elevators
Multiple Principle Structures
Sexually Oriented Land Uses
Temporary Structures
Government Building Facilities
Broadcast Studios
Truck and Implement Sales
Commercial Kennels (Indoors)
25% of Exterior Consists of Face Brick, Stone, Glass,
Stucco, Architecturally Treated Concrete Panels,
Decorative Block or Architectural Metal, Aluminum
Siding, Vinyl, Wood, Masonite
Pylon Signs Allowed, Maximum Height 20
Feet/Maximum Size 64 Square Feet
e the Same
LOT SIZE/SETBACKS
PARKING SETBACKS
1 ½ Acres
Front 35' or Half Building Height
Side 20' or Half Building Height
Rear 20' or Half Building Height
25' Front
20' Side
20' Rear
1 Acre
Front 30'
Side 25'
Rear 20'
lO'Any Property Line
16. B-P Business Park
STATEMENT OF PURPOSE: The Business Park District is established
to encourage a planned, integrated environment for certain
industrial, office, and limited commercial uses which are
compatible with and compliment each other as well as the
surrounding land uses.
It is the intent of this ordinance that development reflects
common themes using compatible architectural design and
consistency in signage, landscaping, and lighting. It is also
the intent to encourage businesses which generate a high nuraber
of jobs per square foot rather than predominately warehouse type
uses.
A. Permitted Uses
i. Light manufacturing
ii. Research and development laboratories
iii. Governmental, business, and professional offices
iv. Mail order operations
v. Telecommunication operations
vi. Financial institutions
vii. Personal service establishments
ix. Health athletic clubs
x. Restaurants (Class I)
9.40
B. Accessory Uses:
i. Off-street parking lots or facilities
ii. Private recreational facilities
iii. Public shelters and essential services
C. Conditional Uses:
i. Any permitted use which involves more than 30%
warehouse space
ii. Hotels and motels
iii. Licensed day care facilities
iv. Retail shops and stores which compliment and
serve the Business Park subject to the standards set
forth in 2(j) below.
v. Vocational, technical, and trade schools
vi. Motor vehicle specialty service stations
vii. Multiple buildings on a lot
viii. Above ground storage tanks
STANDARDS:
A. Minimum lot size - one and one-half (1 1/2) acres
B. Building setbacks (minimum)
i. Front Yard - Thirty-five (35) feet, or one-half
(1/2) the total building height whichever is greater.
ii. Side Yard - Twenty (20) feet, or one-half (1/2)
the total building height, whichever is greater.
iii. Rear Yard - Twenty (20) feet, or one-half (1/2)
the total building height, whichever is greater.
iv. All setbacks shall be determined from the planned
right-of-way (ROW), as designated in the City, County,
or State Transportation Plan, and normally defined in
the subdivision regulations.
C. Parking Lot Setbacks (minimum)
i. Front Yard - Twenty-five (25) feet.
9.41
Do
Zo
Go
ii. Side Yard - Twenty (20) feet.
iii. Rear Yard - Twenty (20) feet.
iv. Ail setbacks shall be determined from the planned
right-of-way (ROW), as designated in the City, County,
or State Transportation Plan, and normally defined in
the subdivision regulations.
Loading Spaces/O~erhead Doors
i. Loading spaces/overhead doors shall be located
primarily in designated rear yards and secondarily in
designated side or front yards as approved by the
Zoning Administrator.
ii. Loading spaces and overhead doors should be
designed to be compatible with the principle building.
Architectural techniques should be employed to reduce
visual impacts from adjacent properties and roadways.
Dumpsters/Refuse Enclosures
i. Ail dumpsters shall be completely screened from
public view by using enclosures constructed of similar
material as the principal building.
ii. Refuse enclosures shall include gates and be
located in designated rear or side yards.
Roof-Top/Ground Electrical Equipment
Ail utility equipment shall either be:
i. Screened from the eye level view of adjoining
properties by use of exterior wall(s) and/or
landscaping; or,
ii. Painted to match or complement the building
structures; or,
iii. Incorporated in~o an architectural design, as
approved by the Zoning Adminissrator.
Architectural Standards
i. Major exterior surfaces of all walls shall be
face brick, stone, glass, stucco, architecturally
treated concrete cast in place or pre-cast panels,
decorative block, or architectural me~al, or approved
equivalent, as determined by the Zoning Administrator.
Landscaping
9.42
Ko
i. Not withstanding the provisions of Section
900.30, the following requirements shall be met:
a. Of the total number of overstory trees
required, a minimum of twenty-five percent (25%)
shall be ornamental trees and twenty five percent
(25%) shall be conifer trees.
b. A landscaping credit of up to twenty-five
percent (25%) may be given to a site plan which
contains exterior sculptures, fountains, ponds
beyond those required for storm drainage and
other site enhancements as approved by the Zoning
Administrator.
c. Underground irrigation shall be installed
within the front yard and all landscaped areas
adjacent to a public right-of-.way.
Signage
Not withstanding the provisions of Section
900.22, the following requirements shall be met:
a. Ail freestanding signage shall be of a
monument style sign and have a maximum size of
sixty-four (64) square feet and height of eight
(8) feet.
b. One (1) on-premise business wall sign per
occupancy, not to exceed two (2) square feet in
sign area for each linear foot of the building
frontage up to a maximum of one hundred and
twenty-eight (128) square feet per occupancy is
permitted.
Standards for Retail Sho~s and Stores
i. Freestanding retail shops and stores shall be
limited to those which compliment other uses within
the business park, provide a service to those other
businesses, and shall not exceed 20,000 square feet in
size.
ii. Retail/wholesale sales incidental to products
manufactured, assembled, or warehoused on the
premises, may be permitted as an accessory use
provided no more than ten percent (10%) of the
building is used for retail/wholesale sales.
Hazardous Material
i. Any business which involves the handling or
storage of hazardous material shall provide data
9.43
information sheets to the City for review and receive
appropriate permits from applicable agencies.
LAN~USE/ZONING
PROPOSED TRANSPORTATION AND
UTIUTY CORRIDOR
EAST ELK RIVER
U T1LITY ALIGNMENTS
AREAS FOR
:~EZONING
" I
AREA 3
COUNTY ROAD NO. 17
AREA 6
PROPOSED TRANSPORTATION AND
UTILITY CORRIDOR
UTILITY ALIGNMENTS