Loading...
6.10. SR 05-18-1998~..~ty of iver TO: FROM: DATE: MEMORANDUM Item # 6.10: Mayor and City Council Scott Harlicker, Planning Assistan~--- May 18, 1998 SUBJECT: Update on Northstar Corridor Development Authority Current Studies There are two studies currently underway which are looking at the feasibility of commuter rail systems along the Highway 10 corridor. The Department of Transportation is conducting a metro wide study which looks at the total system including the role of the Northstar Corridor, from Minneapolis to Elk River, within that system. The Northstar Corridor Development Authority (NCDA) hired a consultant to study the Northstar Corridor. The NCDA study includes the corridor from Minneapolis to St. Cloud. DOT Study Phase I of the DOT study examined the feasibility of commuter rail along 19 corridors in the metro area and identified 7 for expanded analysis. The Northstar Corridor from Minneapolis to Elk River was one of the 7 picked for further analysis. Phase II, which involves a more detailed analysis, will be completed by February 1,1999. At that time a report will be made to the legislature. Northstar Study The NCDA hired BRW to do a major investment study (MIS) for the corridor. The MIS is required for major projects that are to receive federal funding and is a higher level of analysis than the DOT study. The purpose of the MIS is to build a consensus for actions to address transportation issues and meet transportation needs of the corridor. The work plan will include review existing and on-going studies, public involvement, defining transportation problems and evaluating current conditions, defining and examining alternative transportation improvements and a commuter rail alternative report. The MIS is scheduled to be completed in 1999. 13065 Orono Parkway · P.O. Box 490 ° Elk River, MN 55330 ° TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 Memo to Mayor and City Council May 18, 1998 Page 2 Fundinz Status The NCDA has received $350,000 from the federal government as part of an appropriations bill for 1998. The state has approved $1.5 million as federal matching funds. There is $6 million included in an appropriations bill currently working its way through congress. The NCDA is expecting funding to be continued through ISTEA re-authorization. Congressman Oberstar is seeking full funding authorization for the corridor; a decision on re- authorization is expected within a couple of months. Location of Train Stations It is likely that the number of train stations between Anoka and St. Cloud will be 5 or less. The location of these stations will be based on factors such as population, accessibility and distance from other stations. Suggested locations for stations will be a product of the MIS that is being completed. The NCDA will be the body that decides where the stations will be located. Communities picked to have a station will then have to determine what would be the best site within their community. Design criteria for the station will be made available to communities to assist in determining a specific location for the station. Funding for the construction of the stations is likely to be included as part of the overall funding for the corridor. Time Line The proposed schedule of work on the project is as follows: 1997 Establish Authority / Develop scope of MIS 1998 MIS with draft Environmental Impact Statement 1999 Complete MIS / Begin preliminary engineering / Final EIS 2000 Complete preliminary engineering and develop final design 2001 Implementation \ \elkriver \sys \shrdoc \p lanning\scott \ncda updt.doc What is the Northstar Corridor? The Northstar Corridor is a 60-mile long transportation corridor that runs between St. Cloud and Minneapolis along U.S. Highway 10 and includes the Burlington Northem Santa Fe mil line. Why is the Northstar Corridor important? The area between St. Cloud and Minneapolis is the fastest growing region in the state, the third fastest in the nation. There are no plans to expand U.S. Highway 10 in the next 20 years. Without transportation alternatives, congestion will grow to a critical level. What transportation alternatives are being considered? A "multi-modal" system that may include: · Commuter mil · Improved freight mil · Enhanced highways · New recreation and bike trails · Safety improvements · Intelligent Transportation System Who is studying the Northstar Corridor? The Northstar Corridor Development AUthority, of which Anoka County is a member, is a joint powers board made up of counties, cities, townships and regional railroad authorities along the corridor. What is the Authority doing? The Authority has secured $350,000 in federal funding to study the potential of a commuter mil system that will connect with other planned mil projects. It will provide connections with the entire metropolitan area including the Minneapolis-St. Paul International Aixport, the Mall of America and downtown Minneapolis and St. Paul. What are the benefits of improved transportation in the Northstar Corridor? An improved transportation system will shorten your commute to work or school and provide better access to shopping, restaurants, entertainment and recreation oppommifies. Improved transportation will keep this region economically vital by giving residents better access to job opportunities and making it easier and more efficient to move people and goods in any weather. It also will give persons who do not drive - young people, the eldefly, the disabled and those on fixed incomes - safe, economical transportation alternatives. Where can I get more information? Call Tun Yantos, Anoka County, at (612) 323-5692 or David Loch, Sherbume County, at (612) 241-2701. How can I help? Call your state and federal elected officials to voice your support. "The Northstar Corridor's transportation system in its current state simply can't accommodate the increasing demand to move people and goods~ " Congressman Jim Oberstar T.H. 10 Multi-Modal Transportation Corridor Development Study