Loading...
10.4. SR 08-06-2012REQUEST FOR ACTION TO ITEM NUMBER Mayor and City Council 10.4 AGENDA SECTION MEETING DATE PREPARED BY Work Session August 6, 2012 Bob Pearson, IT Manager ITEM DESCRIPTION REVIEWED By Discuss Opportunity for Fiber Optic Network Partnership Cal Portner, City Administrator REVIEWED BY ACTION REQUESTED Council discussion and direction regarding a potential fiber optic network partnership with Sherburne County and Elk River Municipal Utilities (ERMU). BACKGROUND /DISCUSSION The IT Division set a 2013 goal to create a plan for a city fiber optic network. The plan would be a blueprint to connect city facilities with fiber. IT scheduled a meeting with ERMU, city departments, and a consulting group, Elert and Associates, specializing in fiber projects. At the meeting, ERMU Line Superintendent Mark Fuchs shared with the group that he was working with a company that was installing a fiber loop in the city that would closely approximate what the city would eventually build. In a meeting with the contractor building the fiber network, Michel's, we were informed that they are installing a 288 strand overhead and underground fiber network. Eric Graning of Michel's indicated we would have a significant cost savings if we were to pull fiber cable at the same time. We were given a quote of $241,000 for a loop in the city with an additional charge of $2,000 to connect each of the identified locations. Staff has met with ERMU and county IT staff to discuss a 3 -way partnership to share the network and the $241,000 cost. The network would only be government use for interconnectivity between city, county and utilities facilities. Currently, each entity uses DSL or T1 networks which do not have the bandwidth or reliability of a looped fiber network. The main benefits of fiber are its ability to provide high bandwidth over long distances. It would give us the ability to provide the same speed at off campus locations that we have on campus. Immediate benefits: • Elimination of approximately $600 in monthly operating expenses • Ability to install local software at off campus locations • Eliminate poor phone voice quality problems at off campus locations • Ability to provide faster Internet speeds at remote locations • Ability of off campus locations to take web training POWERED By N: `,Public Bodies City ( omlial Counal RCA Agenda Packet o8-o6-2o12 ,Fiber Staft Repo ctdoch INAMIRE1 Long term 1. Ability to either acquire or provide technology /IT services to or from others: a. An example would be for us to share in the county phone system (we currently have identified $150k to replace our system in 2014) b. We could provide services to either the county or the school district c. We could jointly purchase and implement technology 2. Ability to connect in to school district fiber network 3. Ability to provide video conferencing to off campus locations 4. Ability to video conference between city and county Emergency Operation Centers 5. Ability to provide backup facilities with the county 6. Ability to grow the network to touch other city facilities like substations Michel's is obligated to start the project by August 16. If the Council is interested, staff would work immediately on: • Assurance of significant cost savings of doing it now, comparison to State contract pricing • A 3 -way cost sharing Memorandum of Understanding FINANCIAL IMPACT The anticipated total cost shared by the three entities for the entire 8 mile fiber loop is $233,033.47 plus $8,000 engineering for a total of $241,033.47. After the initial loop each location connection would be $2,000. The city share could be split between the Liquor and Wastewater Enterprise Funds. ATTACHMENTS ■ Map of the proposed fiber loop ■ 2012 -2016 Capital Improvement Plan (Page 69) Action Motion by Second by Vote Follow Up N:APublic Bodies \City Council \Council RCA \Agenda Packet \08 -06- 2012 \Fiber Staff Report.docx Capital Improvement Plan City of Elk River, Minnesota Project# TC -01 Project Name Annual Technology Upgrades 2012 thr, 2016 Type Equipment Department Technology Communications Useful Life 5 years Contact IT Coordinator Categor} TechnologyiCormnuniciations Priority na Description 2012 - Hardware /enterprise switch, UPS hardware/Virtualization payback/Laptops Council/Security Camera replacements 2013 - 2004 -Phone System Replacement /Virtualization payback/Fiber project /Security Camera replacements 2014 - Hardware /enterprise switch, UPS hardware/Virtualization payback/Virtual Desktop 2016 - Virtualization refresh hardware /soffivare 2016 - Hardware /enterprise switch/LTPS hardware Justification Annual replacement and upgrade of information technology software /hardware Expenditures 2012 2013 2014 2015 2016 Total Equipment 68,400 200,900 162,900 70,000 52,000 554,200 Total Funding Sources 68,400 2012 200,900 2013 162,900 2014 70,000 2015 52,000 2016 554,200 Total Capital Outlay Reserve General Fund Operating 57,500 10,900 170,000 3D,900 152,000 10,900 70,000 52,000 431,500 122,700 Total 68,400 200,900 162,900 70,000 52,000 554,200 2012 -2016 CAPITAL IMPROVEMENTPLAN Page 69