MEMORANDUM
Mayor & City Council
Pat Klaers, City Admi4~or
June 15, 1998
Utilities Commission Update
Councilmember John Dietz is our city representative on the Elk River
Municipal Utilities Commission. At this June 15, 1998, City Council
meeting, John is scheduled to provide the Council with an update on May
and June Utilities activities. Attached for your review are the minutes from
the May 19 and May 26, 1998, Utilities Commission meeting, a memo on
underground versus overhead line construction, and the agenda from the
June 9, 1998, Commission meeting (minutes from this meeting were not yet
available).
The next regular Commission meeting is scheduled for Tuesday, July 14,
1998, at 4:00 p.m. at the Utilities office.
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425
ELK RIVER MUNCIPAL UTILITIES
REGULAR MEETING OF THE
ELK RIVER UTILITIES COMMISSION
HELD AT THE ELK RIVER MUNICIPAL UTILITIES OFFICE
MAY 19, 1998
Members Present: President, George Zabee; John Dietz, Trustee
Members Absent: James Tralle, Vice Chairman
Staff Present: Bryan Adams, General Manager; Glenn Sundeen, Line Superintendent;
Robert McCartney, Water Superintendent; Patricia Hemza, Office Manager
Others Present: Wade Lovelette, Line Foreman; Mark Fuchs, Lead Lineman
1. Call meeting to order at 4:00 P,M,, May 19. 1998
2. Consider Utilities Agenda
John Dietz moved to approve the Utilities Agenda as presented, with the exception
of Item 5.1, to be tabled until the June 9, 1998 meeting. The item is to Review and
consider 1998/1999 Employee Wage & Benefit Requests. George Zabee seconded
the motion. Motion carried 2-0.
3. *Consider Consent Agenda
John Dietz moved to approve the Consent Agenda as follows:
4-14-98 Minutes
5-11-98 Joint City/Utility Meeting Minutes
April Check Register
Financials
5.2 Review and award contract to construct Well #6
Bids for the construction of Well #6 were received at 2:00 P.M., Friday,
May 15, 1998. Results were presented to the Commission and discussed.
John Dietz moved to accept the low bid from Alberg Water Services for the
construction of Well #6, in the amount of $136,541.00. George Zabee seconded
the motion. Motion carried 2-0.
5.3 Update Landfill Gas Generation Pro_iect and Otsego Substation Agreement
Bryan Adams advised the Commission of the receipt of a proposed power purchase
agreement from Power Strategies concerning the landfill gas generation project. The
agreement is presently being reviewed by Ron Black.
Page 2
Regular meeting of the Elk River Municipal Utilities Commission
May 19, 1998
The final draft agreement between UPA/Wright-Hennepin/ERMU, concerning
shared substation rights at the Otsego substation will be presented at the next
ERMU meeting. The reasons for the agreement were discussed.
5.4 Up-date Power Ouality Program
Bryan Adams presented devices manufactured by Leviton, through Border States
for surge protection, along with brochures we can use to promote the products.
Questions were asked and responded to concerning the operation of the devices,
the reasons for the use and the marketing of them.
George Zabee moved to offer the Power Quality and Surge Protection Program to
our customers, and to order the brochures as presented. John Dietz seconded the
motion. Motion carried 2-0.
5.5 Review Sprinkling Restrictions
The present Water Sprinkling Restriction was discussed regarding the.necessity and
reasons for the ban. Bryan Adams advised the Commission of the number of calls by
ERMU customers. Most calls are from customers who understand the reasons for the
restrictions, but are upset because it is not enforced. It was emphasized that this is a
voluntary program, and emphasis is on education. Bryan Adams suggests that we
design a door hanger to put on violator's homes to remind them of the restrictions.
Staff also recommends that the sprinkling hours be changed to 10:00 A.M., rather than
the present 8:00 A.M. This would give customers two more hours in the morning to
water, yet still accomplish the desire to reduce peak day pumpage.
John Dietz moved to extend the sprinkling hours from 8:00 A.M. to 10:00 A.M.
George Zabee seconded the motion. Motion carried 2-0.
5.6 Items from Joint City-Utility_ meeting on 5-11-98
The Agenda from the joint meeting was discussed, with detail to Items 6 and 7.
George Zabee moved to continue the current policy of transferring to the City,
3% of the gross Elk River Electric Sales. John Dietz seconded the motion. Motion
carried 2-0.
The Utility contribution to Watermain Lateral Projects was discussed. It is generally
felt by Staff and the Commission that we should be funding some of these projects.
It was noted that the extensions are not only to service customers applying for
service, but also to loop watermains to improve water quality and improve fire flow.
Page 3
Regular meeting of the Elk River Municipal Utilities Commission
May 19, 1998
John Dietz moved to use Municipal Utility funds to finance the remainder of costs,
not covered by assessments, for the construction ofwatermain for the Orono Lake
Development. George Zabee seconded the motion. Motion carried 2-0.
6.1 Review and adopt side lot easement requirement
The Water Department has a requirement to loop watermains, to ensure good water
water quality and increase fire flow. Many new developments utilize cul-de-sacs,
requiring the looped water mains to be located in side lot easements. Current set-
back requirements are 5' feet from property line on garage side and 10' feet from
property line on house side. These requirements do not allow enough distance
between the water main and the house if a main should break. The result would be
substantial damage to the house or structure.
George Zabee moved to adopt a 40' easement, to ensure that no structure would be
built closer than 20' from the water main. John Dietz seconded the motion. Motion
carried 2-0.
Staff is directed to write a memo to City Council advising the change.
6.2 Review Inspection Report for Freeport Water Tower
The report of inspection of the Freeport Water Tower by KLM Engineering, Inc.
was reviewed and discussed. Time frames for repairs and maintenance to the
Tower were analyzed. Bryan Adams advised that it would take approximately ten
weeks to do the job, with these repairs lasting approximately fifteen years.
Specifications will be written this fall, for work to be done in the spring of 1999.
John Dietz moved to receive and file the inspection report. George Zabee seconded
the motion. Motion carried 2-0.
Further discussion took place regarding the need for inspection of the Gary Street
Tower.
Qthcr Business
John Dietz questioned the necessity of starting the re-locating of poles on School Street
before the City has the easements from the School District. Staff is directed to check
with the City and the City Engineer before moving poles.
Page 4
Regular meeting of the Elk River Municipal Utility Commission
May 19, 1998
Glenn Sundeen reported on the storm damage that occurred Friday evening, May 15,
1998. He reported that all services were on by 5:00 A.M., May 16, 1998, and that after a
brief rest, our line crews reported to AEC to assist in their efforts to restore power.
Glenn noted the eagerness with which our linemen responded to the outage.
John Dietz moved to adjourn the May 19, 1998 meeting of the Elk River Utilities
Commission. George Zabee seconded the motion. Motion carded 2-0.
The May 19, 1998 meeting of the Elk River Utilities Commission adjourned at 5:35 P.M.
The next regular scheduled meeting of the Elk River Utilities Commission will be on
June 9, 1998 at 4:00 P.M.
Respectfully submitted,
Patricia Hemza
Office Manager
SPECIAL MEETING OF THE ELK RIVER
MUNICIPAL UTILITIES COMMISSION
HELD AT THE ELK RIVER MUNICIPAL UTILITIES OFFICES
MAY 26, 1998
Members Present: President, George Zabee; Vice Chair, James Tralle; Trustee, John
Dietz
Others Present: Bryan Adams, General Manager; Glenn Sundeen, Line Superintendent,
Patricia Hemza, Office Manager
Call meeting to order at 4:00 P,M. May 26, 1998
The Special Meeting of the Elk River Municipal Utilities Commission was called to
order at 4:00 P.M. for the purpose of executing documents concerning the Otsego sub-
station. John Dietz moved to approve the Agenda. James Tralle seconded the motion.
Motion carried 3-0.
Details of the Distribution Interconnection Agreement were discussed, with response by
Bryan Adams to a question by George Zabee.
James Tralle moved approval of the Distribution Interconnection Agreement by and
among Elk River Municipal Utilities and Wright-Hennepin Cooperative Electric
Association and United Power Association. John Dietz seconded the motion. Motion
passed 3-0.
John Dietz moved approval of Supplement No. 3 to the Interconnection Agreement
between Elk River Municipal Utilities and United Power Association. James Tralle
seconded the motion. Motion carried 3-0.
John Dietz moved to adjourn the Special Meeting of the Elk River Municipal Utilities
Commission. James Tralle seconded the motion. Motion carried 3-0.
The Special Meeting of the Elk River Municipal Utilities adjourned at 4:10 P.M.
Respectfully submitted,
Patricia Hemza
Office Manager
ELK RIVER MUNICIPAL UTILITIES
322 King Avenue
Elk River, Minnesota 55330
Phone (612) 441-2020
Fax (612) 441-8099
To: Pat Klaers
Elk River City Administrator
June 4,1998
From: Bryan C. Adams
General Manager, Elk River Municipal Utilities
Subject: Underground vs. Overhead Electric Line Construction
Pat, you asked about advantages/disadvantages of underground vs. overhead electric line
construction. This was a general question in nature but asked in light of the pending School Street
project.
Elk River Municipal Utilities' unwritten policy is currently to construct all major electrical feeder
overhead. Single or three phase taps off this major feeder will be constructed underground, where
practical. This policy is not unlike many other utilities. The League of Minnesota Cities in their right-of-
way model ordinance, recommend all utilities be placed underground.
The advantage of underground electric line construction generally falls into three areas of
aesthetics, minimizing damage from Ice, wind and tree trimming. The last two areas are highly
related. Aesthetics are becoming more and more of an issue in all communities. Most people do not
have the same affinity for overhead electric wires as us in the electric field. The out of sight out of
mind mentality is becoming more popular that is understandable. Underground utility lines are less
susceptible to damage from wind and ice storms, as we experienced in July 1997 and last week in
the South Metro area. This causes a major inconvenience to businesses and resident until power is
restored.
The electric utilities response to preventing damage to overhead lines from wind and ice storms is
to do a better job of trimming nearby trees. Tree trimming is an ongoing expense and often tends to
irritate the property owner's whose trees are being trimmed. For your information, enclosed is a door
hanger we give to customers before we start trimming trees in their area. This has greatly minimized
the customer complaints.
The advantages of overhead feeder construction fall into the areas of cost, ease of repair, timing of
repairs, better sectionalizing capabilities and street lights. For major feeder lines it costs
approximately 3 times as much (approximately $15/Ift for O.H. to $45/Ift for U.G.) to construct
underground rather than overhead. The life of underground cable is 20 to 25 years where overhead
life is approximately twice as long.
It is much more difficult to repair underground cable. With overhead, you can generally see the
problem. With underground, it is much more difficult to locate, dig it up and make repairs. Four
months of the year, the ground is frozen and difficult to dig especially with other utilities (gas,
telephone, cable TV) close by. Often with failed cable in the winter, a temporary overhead line is
constructed or cable is temporarily laid on top of the frozen ground. What could be a 15 minute power
outage in an overhead system can become a 2 to 3 day affair in an underground system. What
causes underground cable to fail ? Nicked conductor from sharp rocks, gophers, installation
equipment, third party dig-ins, over voltage stress from lightening, or breakdown of cable insulation or
jacket. Gopher State One Calls helps prevent third party dig-ins, but it still happens too often.
Mishandling of cable during installation from bending cable too much, stretching or nicking from
dragging on street or over rough ground. Underground splices become critical. Any moistures
permeating into the cable causes cable failures.
Fusing electrical systems or sectionalizing is done to minimize the areas that are effected during a
power outage and also identifies more accurately geographically where the trouble may be.
Sectionalizing an underground system is much more difficult and much more expensive to do. ($50
for O.H. to $5,000 for U.G.) The fuse coordination is also more difficult. Underground systems will
have more customers without power for longer periods of time.
Problem from animal interference is about a toss-up. Gophers cause problems for underground
systems as where raccoons, squirrels and large birds cause problems for overhead systems.
Underground systems do not solve the entire aesthetic problem. Customers do not like transformers,
junction boxes or fuse cabinets in the front yards or boulevards. Overhead electrical systems provide
poles to attach Street Lights. Underground systems must use additional street light standards.
A good case can be made that overhead systems are safer than underground systems. In
overhead systems, the conductor and equipment are high in the air and are inaccessible. If a vehicle
hits a pole and breaks it off, the fuses should de-energize the line in a matter of milliseconds. With an
underground system, the equipment is more accessible to the public because it is on the ground and
the fusing is not as good if a car runs into a transformer, junction box or fuse cabinet.
Single phase or three phase taps of the main feeder line are generally buried. The cost disparity
between underground and overhead decreases and approaches zero. The sectionalization problems
are also minimized with an overhead fuse at the tap. The other arguments still apply.
In general, overhead lines are less aesthetic, less costly, and more easily maintained and quicker
to repair.
In the case of School Street, this is a main feeder. If this line were to be put underground, all of the
above arguments would apply. From an engineering perspective, it is not desirable to bury an
electrical line with an overhead line attached on each side. Installation of lightening arrestors then
becomes critical. Generally the cable will fail prematurely due to voltage stress from lightening.
Sorry To Have Missed You-
Your Trees Could Cause A Power Outage
Dear Customer:
During the past years, many of the electrical outages in the Elk River area
have been attributed to interference between electrical distribution lines and the
trees around them. These electrical outages can(~'~.e very disturbing to our cus-
tomers as some of you may have experienced.
Many of these electrical outages can be avoided if the trees around these elec-
trical lines are properly trimmed.
The Elk River Municipal Utilities or our contractors will be doing tree trimming
at no cost to you, around these electrical lines. They are instructed to remove all
limbs and brush within six feet of the wires and stay within the easement area. In
a case where the branch that must be trimmed starts from another branch or tree
trunk outside the easement line, the tree trimmers must trim this branch within the
easement area unless hetshe has prior approval from you, the land owner.
They are only authorized to trim the branches that could intedere with the elec-
trical lines.
Your trees may be trimmed in one of four ways, as shown ~elow.
Top
Side Trim
V-out
Remove
We apologize for any inconvenience this tree trimming may cause you, as we
are just trying to minimize the electrical outages to our customers. If you desire
to have the logs from your tree, let the tree trimmers know and they will leave
them for you.
If you have any questions, don't hesitate to contact the tree trimming contrac-
tor or the Elk River Municipal Utilities at 441-2020
by
Contractor Name
ITEM NUMBER
ELK RIVER MUNICIPAL UTILITIES
REGULAR MEETING OF THE
UTILITIES COMMISSION
AGENDA
JUNE 9, 1998
Elk River Utilities Offices
ACTION TAKEN
1. Call meeting to order at 3:00 P.M., June 9, 1998
2. Consider Utilities Agenda
3. *Approval of previous meeting minutes
4. *Check Register
OLD BUSINESS
5.1 Review and consider 1998/1999 Employee Wage & Benefit Request
(tabled from May 19, 1998 meeting)
5.2 Review Street Light Committee Recommendation
NEW BUSINESS
*Financials
Other Business
*Consent Agenda items are considered to be routine and will be approved by one motion.