Loading...
8.2. SR 09-04-2012 Elk REQUEST FOR ACTION River TO ITEM NUMBER Mayor and City Council 8.2 AGENDA SECTION MEETING DATE PREPARED BY General Business September 4, 2012 Jeremy Barnhart, Planning Manager ITEM DESCRIPTION REVIEWED By Highway 169 and Main Street Intersection Landscaping Cal Portner, City Administrator Improvement Quotes REVIEWED BY ACTION REQUESTED Accept quote from Midwest Landscapes for Main Street and Highway 169 landscaping improvements at a cost not to exceed$19,737. BACKGROUND/DISCUSSION On August 20, the City Council directed staff to obtain quotes to complete the landscaping work at Main Street and Highway 169. Staff requested quotes from six companies, five from the Elk River area, and the company that completed the Main Street Parking Plaza landscaping. Two complete quotes were received, ranging in price from $19,737 to $25,000. The architects estimated cost was $21,995. FINANCIAL IMPACT Funding will come from intersection enhancements within the Street Improvement Reserve Fund. ATTACHMENTS ■ Quotes Action Motion by Second by Vote Follow Up N:APublic Bodies\City Council\Council RCA\Agenda Packet\09-042012\8.2SR to CC select bid 9-412.docx 4A f U R E i r LANDSCAPES City of Elk River Intersection at Main/Hwy 169 August.30,2012 DATE TO Jeremy Barnhart,AICP Planning Manager City of Elk River 13065 Orono Parkway Elk River,MN 55330 SIZE &dki - i0-*- , 48 42 cont. Red Gnome Dogwood 163 #1'cont. AutumnJoy°Sedum . 28 CY Shredded Hardwood Mulch 360 I: . LF Vinyl'Edger 95 SY Sod 7,2C '_" Topsoil 1 LS Traffic Control 650 SF " =`Concrete 1 EA Box Culvert TOTAL. $19,737.00 NOTES: •Bid based on landscape plans provided via email •Bid excludes: irrigation,hardscapes(retaining walls,pavers,etc.),maintenance,bonds or permits unless specified above s`Midwest Landscapes will receive the site clean,weed free,free of construction debris and at required subgrade elevation ready to receive sod or mulch layer .CV AUG 29 2012 BY o i i 6221 Oakwood Ave.NE * Otsego,MN 55330 * 763-241-1320 ph 763-241-1340 fx 1 Aug, 29, 2012 3 ; 2/FM Peterson Companies Inc, No, 4�4h N,: 3 I i i i 9 / Peterson Companies, Inc. QUICITE 6326 Wyoming Trail 4665 Chisago City, MN 55013 Phone: (651) 257-6864 i Fax: (651) 2573393 I City Of Elk River i To Attn; Jeremy Barnhart 13065 Orono Parkway i Elk River, MN 55330 i I QUOTE OATS I VAUD THRU FOR SALES REP PAGE 6/29/2012 9/27/2012 Project 2 Intersection Plan RYANPETP 1 If Both Quotes Are Accepted Take $500.00 Off Each Quote j ITEM NO -QU--AWT—Iffj DESCRIPTION UNIT PRIGS EXTENDED 1 Project 2: Intersection plan at Main and Hwy 169 22500,00 221,500,004 Provide and install all plant materials, mulch, hardsoape, culverts, edging, grading, soil I preparation as illustrated In the attached i Intersection plans, This work must be in coo eration with the City's irrigation contractor. 1 Work involved will include working In MnDOT 2500.00 2:,500.00" Right of Way. All proposals must include costs for temporary traffic control devices to be j furnished and installed in accordance with MMUTCID and MnDQT requirements, Work proposed for must be completed by October 15th, 2012, I TOTAL AmOUNT $257,000.00 i i i QUOTE ACCEPTANCE ' I Your signature below personally confirms acceptance of(his quote. Upon Acceptance of INS quote,contact your sales representative, SIGNATURE: DATE: I i Tia-nbou fol'tf.e 01)P0rtintY:ty to pm,Mfe you 'with th-l's quote. (Keane carr,(ol.th any com-ments ar questions!