Loading...
8.3. SR 09-04-2012 Elk REQUEST FOR ACTION River TO ITEM NUMBER Mayor and City Council 8.3 AGENDA SECTION MEETING DATE PREPARED BY General Business September 4, 2012 Jeremy Barnhart, Planning Manager ITEM DESCRIPTION REVIEWED By Orono Parkway Median Landscaping Improvement Quotes Cal Portner, City Administrator REVIEWED BY ACTION REQUESTED Accept quote from Midwest Landscapes for Orono Parkway landscaping improvements at a cost not to exceed $10,732. BACKGROUND/DISCUSSION On August 20, the City Council directed staff to obtain quotes to complete the landscaping work along Orono Parkway. The landscaping work included plating trees along Orono Parkway. Areas disturbed by planting will be mulched. Staff requested quotes from six companies, five from the Elk River area, and the company that completed the landscaping at the parking lot downtown. Two complete quotes were received, ranging in price from $10,732 to $19,600. Staff s estimated cost was $13,805. The Council also directed staff to develop estimates to cover the prairie grasses with rock mulch. To mulch with rock,the landscape architect recommends removing the top 3-4 inches of plant material and soil and place the river rock in this void, to minimize the movement of rock due to snow plow blades. Orono median costs Wood $ 14,651.00 Limestone $ 31,395.00 River rock @ 4" $ 25,116.00 These estimates include installation. Staff does not recommend this approach.Aside from spraying for weeds,the relocation of rock will be constant. Further, '/2 mile of rock will not achieve the beautification objectives as staff understands them. FINANCIAL IMPACT Funding will come from intersection enhancements within the Street Improvement Reserve Fund. ATTACHMENTS ■ Quotes POWERED 0 N:\Public Bodies\City Council\Council RCA\Agenda Packet\09-042012\8.3Orono Medians.docx 4A f U R E �yy s LANDSCAPES City of Elk liver Orono Parkway Median August 29,2012 DATE TO Jeremy Barnhart,AICP Planning Manager City of Elk River 13065 Orono Parkway Elk River,MN 55330 QTY SIZE fEC ICON 23 2" bb Deciduous Shade Tree" 15 G" bb `Ornamental Tree 7 CY Shredded Hardwood Mulch tree rings) :1 EA `Traff"ic Control TOTAL.,., :$1£1,731€1€? NOTES: *Bid based on information and plans provided by Jeremy Barnhart via email *Proposal includes mulch rings for trees planted in medians. Mulch beds are not part of the proposal R"ECE AUG 2 9 2012 - 6221 Oakwood Ave.NE * Otsego,MN 55330 * 763-241-1320 ph 763-241-1340 fx 1 Aug, 29. 2012 3: 21f l Neterson Uompanies Inc, IVo, 4747 r,i QUOTE. / ! Peterson Companies, Inc, 1 4866 8326 Wyoming Trail Chisago City, MN 55013 Phone; (651) 257-6664 Fax: (651) 257-3393 i w,vu,w City Of Elk River To Attn; Jeremy Barnhart 13065 Orono Parkway Elk River, MN 55330 I QUOTE pAT� I VALID THRU TSALE S REP PAGE 8/29/201-2—T9/27/2012 Project 1 Parkway Median RYANPETE 1� If Both Projects Are Accepted Take $500.00 Off Each Project i i � ITEM NO QUANTITY DESCRIPTION UNIT PRICE EX7ENDED I Project 1: Orono Parkway median, i Provide and install trees and mulch as illustrated in the attached plan, within the existing prairie planting areas. There is no turf or edging. i PRICING BELOW: ; -A 1 Landscape materials include; Shade trees; 17100.00 171100,001" ) Swamp while oak, Autumn Blaze Maple, or Heritage Oak (all 2"caliper) Ornamental trees: Prairie Fire crabapple, Autumn Brilliance Service i Berry, Thorn less Cockspur Hawthorn (all 2" i call er ! 1 Work involved will Include working in public Right 2500.00 2;500,00 of Way. All proposals must include costs for temporary traffic control devices to be furnished and installed In accordance with MMUTCD and MnUOT requirements, Work proposed for must be completed by October 15th, 2012, i J I T OTAG MOUNT $191600.00 QUOTE ACCEPTANCE Your signature below personally confirms acceptance of Ihie quote, Upon acceplanca of this quote,contact your sales represenlellve.l SIGNATURE; DATE: ,you ft),t)- tfie oppol-:un.ily to 1 lvol'(e yvil 'wi"tr th'i's plote. i (AWSC c(r(('(01M nary c0771.1770171s or gtfestimis! I i I Portner, Cal )2 From: Dave Anderson <danderson @cretexinc.com> Sent: Tuesday, September 04, 2012 5:15 PM To: Portner, Cal; Hecker, Michael Subject: Orono medians Cal and Michael, This note is in response to a call that I just received from Michael that there was going to be some discussion on the Orono medians at this evenings council meeting. I will not be able to attend because I have a prior engagement for work. If I get back to town in time, I will stop at the meeting. First, I recognize the council's desire to improve the appearance of the medians in front of the City campus. While we may disagree on what looks good,the wishes of the Mayor and Council will be what is done. I do have a few specific comments that I would like to share. 1. Any design considered should be carefully thought out with regard to aesthetics when newly planted,aesthetics when mature (or old),installation costs, maintenance costs and sustainability. Initial cost may be a small part of the total cost depending on design and materials selected. 2. I have thought more about planting trees as a first phase since the last meeting. I think trees will add to the look of the medians, now and in the future. Two specifics to consider are: a. If the trees are planted to grade as it currently exists,this grade will likely not match the grade of any future plantings or landscaping. We would almost certainly raise the medians in the center as is typical to landscape design. This would mean the trees would be planted too low. This could be remedied by creating the ultimate design before planting the trees and plant them to the appropriate grade,or more simply waiting for the installation of the ultimate design. b. I have watched several plantings of trees fail at the businesses in the area during the past few years due to lack of water. Although our maintenance is is better than that,we will have to be very diligent to keep them thriving. 3. I highly recommend that do it right this time. This is the third time and I do not want those in the future redoing this again. Let's create something that we can all be proud of. 4. If this were at my house, I would not do it all at once. I would put together designs and costs for a high quality treatment of the three shorter median sections directly in front of the City campus. This will allow phasing of the project,and a bit of a look into the future when it comes to completion of later phases. We will know if we like our plan and we will know how much time and money it takes to keep it looking good. 5. With regard to the possible use of rock as a landscape treatment for the medians, personally I think this is a poor choice of materials for the location. I have experience with several rock treatments and none have withstood the test of time. All have been replace or need to be replaced. Rocks tend to fill up with both organic(leaves and weeds) and inorganic debris(sand from sand salting in the winter and litter). They also are often infested with weeds. The ones we have at our office require 5 herbicide applications a year to keep weed free and they still look poor due to the voids being full. One only needs to go to the West Bound liquors to see weed infested rock landscaping on the edges of the parking lot. 6. Leaving the larger two sections of median in native plants could certainly be the more cost effective alternative and in the opinion of some, blend in nicely with adjacent landscaping. Thanks for listening to this hastily written note. Dave Anderson 1 karia-tha Portner, Cal Q 14 - 12_ From: Mary Ernhart <mke @mr.net> Sent: Tuesday, September 04, 2012 4:26 PM To: Portner, Cal Subject: medians Mr. Portner, Below is an email that I sent to John Deitz. I would like you to also read my comments and consider them. Many times those of us who like things in the city do not raise our voices.Thanks for you time. Mary Ernhart Hi John, I read in the paper that you may be considering removing the native prairie on the medians by the city offices. I hope that does not happen.Time and money have already been invested, most seasons the medians are truly beautiful.To replace them with rock would be awful. Rock presents a very"cold," hard feeling as landscaping-certainly not friendly and eventually weeds grow through it.Add a few tress if you want but don't spend taxpayers dollars on an area that is done. A place that money could really buy trees and make a difference in our city, is the road median behind Home Depot, going towards the Northstar train depot-that really needs some trees! Or the median running on the west side of the Trott Brook addition,or the medians coming into our city from the west.Our image really could use a facelift with trees, flowers, and bushes-create a beautiful, inviting entrance to our city. Mary Ernhart 1