6.8. SR 06-15-1998Item 6~8.
Howard R, Green Company
CONSULTING ENGINEERS
June 11, 1998
File: 803520J (0240)
CO~dSULT]NG ENGIN~tS
Formerly MSA
Consulting Engineers
Honorable Mayor and City Council
City of Elk River
13065 Orono Parkway
PO Box 490
Elk River, MN 55330-0490
RE: NORWEST BANK SITE PLAN AMENDMENT
Dear Council Members:
In response to the City Council's action at a meeting last month, stating that they would
be willing to reconsider a "right-in only" off of Jackson Road for the Norwest Bank site at
the northern tip of Elk Park Center, the architect has submitted the attached proposal.
The proposal shows construction of a "right-in only" access off of Jackson Road. The
construction would consist of a short, 10-foot wide right turn lane on Jackson Road. At
the point where a vehicle would enter into the site, the maximum width shown is 12 feet.
The curb line is extended down from the north in an attempt to preclude left-turning
vehicles entering into the "right-in only". On the inside of the site "Do Not Enter" signs
are placed at the entrance to warn vehicles that this is not an exit. If a vehicle were to
look out the entrance from inside the site, because of the design of it, they would not
directly see Jackson Road, but would rather see a curb line in front of them. Hopefully,
this would preclude a vehicle attempting to exit through this entrance. If the City Council
were to consider approving a "right-in only" off of Jackson Road, we believe that this
type of design would be the most efficient at eliminating left-turning vehicles trying to
utilize this entrance off of Jackson Road, or internal vehicles trying to exit through this
entrance.
When we met with Jeff Pflipsen of H.T.G. Architects, we also discussed the potential of
the City acquiring additional right-of-way along 193rd Avenue at Trunk Highway 169. We
believe that if the City could acquire approximately 10 feet of additional right-of-way with
an additional 10-foot easement beyond the right-of-way line, it would be possible to
relocate the trail and develop a right turn lane at this intersection. This may help alleviate
some of the traffic congestion at this intersection by allowing vehicles wanting to turn
right and go south-bound on Trunk Highway 169 to make this move on a red light. The
one issue that Mr. Pflipsen and I had discussed regarding this potential right-of-way
acquisition would be the need to locate the Norwest Bank sign in the 40-foot easement
along the east side of the site. Originally, this is where their sign was shown on their site
plan. Through staff review, we asked them to move it out of the easement, however, it is
now located in the area we would like to acquire the additional right-of-way. At that time,
O:~ROJ\803520J\0240\520-1101 .june.doc
1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free 888/368-4389
City of Elk River
June 11, 1998
Page 2
it was thought that perhaps sanitary sewer and water would both be placed in this 40-
foot easement along the east side. We now know that only watermain will be necessary
to be placed there, and sanitary sewer to serve further north will come from a different
direction. Therefore, we believe that it would be possible to relocate their sign to the
spot that it was originally shown. The City could even consider vacating a small piece of
this 40-foot drainage and utility easement along the east side to allow the location of the
Norwest Bank sign. Mr. Pflipsen indicated that he would discuss this issue with his
client, Norwest Banks, and get their reaction.
I will be in attendance at Monday evening's meeting to further describe these two issues
and to answer any questions you may have.
Sincerely,
Howard R. Green Company
TJM/st
R, Green Company
CONSULTING ENGINEERS
JUN 11 '98 18:58 H. T. G. ARCHITECTS P.2/B
2
SITE] PLAN
}NE-WA
35'-9" ~
I
I
I
SEE ELEC~
IYPICAL
REPLACE & ADJUST
81TUM. WALK AS
R£QD.
SITE PLAN
'~" ='2o' -o"
NPN CURB CUT AS
PER Cll~( SfANDARDS-
),lArCH EXTG.