8.1. PRSR 10-10-2012 44h klk REQUEST FOR ACTION
River
To ITEM NUMBER
Parks and Recreation Commission 8.1.
AGENDA SECTION MEETING DATE PREPARED BY
Action Items October 10, 2012 Michael Hecker, Parks and Recreation
Director
ITEM DESCRIPTION REVIEWED BY
Parks and Facilities Naming Policy Cal Fortner, City Administrator
REVIEWED BY
ACTION REQUESTED
Approve the attached Naming Policy for City Council to review and approve.
BACKGROUND/DISCUSSION
At the September 10, 2012 Parks and Recreation Commission work session meeting, the proposed parks
and facilities naming policy was discussed. Based on that discussion, minor changes to the proposed
policy have been made and are indicated in yellow highlights. The reason for the policy is to establish a
consistent approach for the official naming of parks and recreational facilities.
As a reminder, staff researched the current City policies and found that no official policy exists. Due to
the absence of an official policy, staff did some research and benchmarking of municipalities' best
practices. Staff was then able to draft a sample parks and facilities naming policy for the Commission to
review and eventually make recommendations to City Council.
ATTACHMENTS
• Parks and Facilities Naming Policy Draft
Action Motion by Second by Vote
Follow Up
1P a R D tat BY
NATURE
I
Parks & Facilities Naming Policy
DRAFT
Purpose:
The purpose of this policy is to establish a systematic and consistent approach for the official naming of
parks and recreation areas and facilities.
Objectives:
Ensure that parks, recreational areas and facilities are easily identified & located.
Ensure that given names to parks, recreational area and facilities are consistent with the values and
character of the area or neighborhood served.
Encourage public participation in the naming, renaming and dedication of parks, recreation areas and
facilities.
Encourages the dedication of lands, facilities, or donations by individuals and/or groups.
Definition:
Parks, recreation areas and facilities—includes all property assets under the City's ownership and the
Parks and Recreation Department control including buildings, structures, open spaces, public parks,
natural areas, wetlands, environmental habitat and land.
Naming Criteria
Priorities to be considered in naming all City facilities, including parks and recreation facilities (in order
of importance) shall be as follows:
A. Historic Names. Names of historic events, groups organizations, or persons at the local,
regional, or national level of major significance with special consideration given to Elk River's
own history.
B. Places and Feature Names.
1. Recognizable area or neighborhood. Names that aid in locating a facility are
acceptable. If the facility is located on a park or school site,the facility need not
share the name of the park or school site.
2. Assumed Names. Assumed names should be used only if the area has been known
by that assumed name for an extended period of time. For example the parcel of
land known for decades as "Bailey Point". This is located near downtown at the end
of Morton Avenue at the confluence of the Mississippi and Elk Rivers.
3. Natural Phenomena. Natural phenomena, such as rivers, creeks, and terrain.
4. Horticultural Features. Horticultural features characteristic of a particular area.
C. Individual, Groups, or Organizations.
The following criteria will be used in evaluating the use of names of persons (whether living or
deceased), groups, and organizations.
1. General Criteria. Names of persons, groups, or organizations having a longstanding
affiliation with the City of not less than ten (10) or more years of significant
community service, involvement,or contributions beyond the ordinary interest level
whose efforts have:
a. Enhanced the quality of life and well-being of City residents;
b. Contributed to the preservation of the City's history or culture;
c. Made exemplary or meritorious contributions to the City or its residents; or
d. Contributed to the acquisition, development, or conveyance of land, buildings,
structures, or other amenities to the City or community.
2. Deceased Persons. To be considered for a naming opportunity, the individual must
have been deceased for at least two (2)years. Such individuals may include:
a. Historic persons.
b. National and/or local heroes. Those who have given outstanding service to
mankind or who have worked over and above any ordinary interest level. An
• area resident of Elk River, who has attained local, state, or national recognition
for parks and recreation work or work in the areas of public safety or public
health, as appropriate to the facility, would be highly acceptable.
3. Living Persons. Facilities may be named after living persons only after a study has
been completed relative to the individual's background and qualifications pursuant
to the criteria in this policy.
4. Groups and Organizations. Facilities may be named after groups or organizations
pursuant to the criteria set forth in this policy.
Procedure:
A. Naming of Parks, Recreation Areas and Facilities
1. A request for naming of a park, recreation area or facility shall be submitted in
writing to the Parks and Recreation Commission, through the Parks and Recreation
Department.
2. Those submitting a naming request should show how the proposed name is
consistent with the criteria stated in this policy. When naming after a person or
persons,the application will describe the contributions to the City. Written
documentation of approval by next of kin to be honored (if available/possible) is
required as part of the proposal. City staff will review the proposal for adherence to
the stated criteria and authentication of statements relative to contributions in the
case of an individual before forwarding to the Parks and Recreation Commission. If
the request is incomplete, staff will contact the applicant, in writing, and provide
them with the opportunity to resubmit a revised request.
3. The Parks and Recreation Commission will offer the opportunity for public input on
the proposed naming.
4. The Parks and Recreation Commission shall forward their recommendation to City
Council for final decision.
5. The Parks and Recreation Commission can initiate the naming process whenever
deemed necessary and/or in the best interest of the City.
6. In the absence of any naming requests, the Parks Recreation and Commission shall
adhere to criteria stated in this policy in recommendation of name.
B. Renaming of Parks, Recreation Areas and Facilities
Renaming of parks, recreation areas and facilities carries with it a much greater burden of
process compared to initial naming. Tradition and continuity of name and community
identification are important community values. Each application must meet the criteria in this
policy, but meeting all criteria does not ensure renaming.
1. A request for renaming of a park, recreational area or facility shall be submitted in
writing to the Parks and Recreation Commission, through the Parks and Recreation
Department.
2. The request shall include the proposed name change,the purpose of the change,
and how the proposed name change is consistent with the criteria established.
When renaming after a person or persons, the application will describe the
contributions to the City. Written documentation approval by next of kin to be
honored (if available/possible) is required as part of the proposal. City staff will
review the proposal for adherence to the stated criteria and authentication of
statements relative to contributions in the case of an individual before forwarding to
the Parks and Recreation Commission. If the request is incomplete, staff will contact
the applicant, in writing, and provide them with the opportunity to resubmit a
revised request.
3. The recognized Neighborhood Association will be notified of the proposal when the
Parks and Recreation Department receive a complete application.
4. The Parks and Recreation Commission will offer the opportunity for public input on
the proposed naming.
5. The Parks and Recreation Commission shall forward their recommendation to City
Council for final decision.