Loading...
RES 12-56 RESOLUTION 12 -56 IIIA RESOLUTION FOR THE CITY OF ELK RIVER ORDERING A PRELIMINARY FEASIBILITY REPORT IN THE MATTER OF THE 2013 STREET IMPROVEMENT PROJECT WHEREAS the city has determined, through its pavement management program, that it should consider improving certain property by performing pavement maintenance or reconstruction of streets (the Improvement) in the following locations: Street From To 185TH AVE NW WACO ST NW NAPLES ST NW 190 1/2 AVE NW BALDWIN ST NW XAVIER ST NW 190TH AVE NW ZANE ST NW EAST END 190TH AVE NW 190TH AVE NW ZANE ST NW 192 1/2 CT NW ELGIN DR NW EAST END 192 1/2 LN NW ELGIN DR NW MEADOWVALE RD NW 193RD AVE NW DENVER ST NW MEADOWVALE RD NW 194TH AVE NW DENVER ST NW MEADOWVALE RD NW 194TH CIR NW XAVIER ST NW EAST END 194TH CT NW WEST END XAVIER ST NW 195TH AVE NW ELGIN CT NW DENVER ST NW 195TH AVE NW CARSON ST NW EAST END 198 1/2 CIR NW IRONTON ST NW EAST END 199TH AVE NW IRONTON ST NW ELK LAKE RD NW 200TH AVE NW IRONTON ST NW GARY ST NW III 202ND AVE NW ZEBULON ST NW MEADOWVALE RD NW 3RD ST NW RAILROAD DR NW EVANS AVE NW 4TH ST NW RAILROAD DR NW GA 1'ES AVE NW BUSINESS CENTER DR NW HUDSON ST NW GARY ST NW CARSON ST NW BALDWIN ST NW 192ND AVE NW CARSON ST NW 195TH AVE NW 196TH AVE NW DENVER CT NW SOUTH END 193RD AVE NW DENVER ST NW 193RD AVE NW 195TH AVE NW DODGE ST NW NEW PAVEMENT 800'S 195TH AVE NW ELGIN CT NW SOUTH END 195TH AVE NW ELGIN DR NW 1921/2 AVE NW DENVER ST NW ELGIN ST NW 195TH AVE NW NORTH 300' EVANS AVE NW MAIN ST NW NORTH END GARY ST NW BUSINESS CENTER DR NW US HIGHWAY 10 NW GARY ST NW 198TH AVE NW 200TH AVE NW HOLT AVE NW 3RD ST NW 4TH ST NW IRONTON ST NW 198TH AVE NW MEADOWVALE RD NW IRVING AVE NW 3RD ST NW 4TH ST NW LINCOLN ST NW SOUTH END 178TH LN RAILROAD DR NW MAIN ST NW JACKSON AVE NW SERVICE RD (AVON ACRES) EDISON ST NW NORTH END VANCE ST NW 173RD AVE NW NORTH END XAVIER ST NW 190TH AVE NW 190 1/2 AVE NW XAVIER ST NW 193RD AVE NW 194TH CIR NW YALE CIR NW 190TH AVE NW NORTH END ZANE ST NW 190TH AVE NW 190 1/2 AVE NW 0 WHEREAS Council must first secure a preliminary feasibility report in order to assess the benefited property for all or a portion of the cost of the improvement,pursuant to Minnesota Statutes, Chapter 429;and • WHEREAS the level of service provided in the project approach and public communication proposed by WSB &Associates, Inc. (WSB), far exceeded the other firms. Their scope includes an expert review of all pavement sections to confirm the proposed approach to maintain or rebuild the pavement is the most cost effective method. Their proposal further described a detailed public involvement process to assure all residents are properly informed through all phases of the project. Their process was clear from the inception of the project through final construction. The fee proposed by WSB is about 6.5% of the estimated construction cost for the project. This is lower than the 9.5%we paid for the 2011 Street Improvement project and well below the 27-30% that was historically paid for engineering services on street projects before soliciting competitive bids; and WHEREAS WSB most recently completed the 171st AUAR project for Elk River in 2011.WSB delivered that project on time and nearly 10%below their approved not-to-exceed fee. Based on our review of their proposal, and past positive working history with their firm, staff is recommending award of the work to WSB &Associates, Inc.in the amount of$168,804. Upon the approval by the City Council, staff will work with WSB to finalize a contract and being work on the feasibility report immediately. NOW,THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, • Minnesota: That this matter shall be referred to WSB &Associates, Inc. at the direction of Justin Femrite, City Engineer,who is requested to provide to the City Council a report advising,in a preliminary way, as to whether the proposed improvement is necessary, cost-effective, and feasible;whether it should best be made as proposed or in connection with some other improvement;the estimated cost of the improvement as recommended;and a description of the methodology used to calculate individual assessments for affected parcels. Passed and adopted this 15th day of October 012. J 11 J. • tz,Ma ATTEST: / Tina Allard, City Clerk