6.3. SR 12-10-2012 Elk REQUEST FOR ACTION River TO ITEM NUMBER Mayor and City Council 6.3 AGENDA SECTION MEETING DATE PREPARED BY Work Session December 10, 2012 Justin Femrite,P.E., City Engineer ITEM DESCRIPTION REVIEWED By Quiet Zone Discussion Cal Portner, City Administrator REVIEWED BY ACTION REQUESTED Consider quiet zone implementation,associated costs and funding options. BACKGROUND/DISCUSSION The idea of establishing a Quiet Zone along the BNSF rail line through Elk River continues to be brought up by numerous concerned residents. The concerns are not limited to residents in the downtown area,but are coming from along the entire rail corridor through Elk River. Additional background information on the subject of Elk River Quiet Zones is contained in the attached staff memo that was presented to the City Council on April 8, 2011. The most frequently raised opinion is that the cost estimate for a Quiet Zone in Elk River is too high. Reference is generally made to other communities being able to implement Quiet Zones for far less cost. We have had the previous plan reassessed by an engineering firm,which has experience with implementing Quiet Zones and they generally concur with past estimates and the improvements required based on the geometric layout and type of infrastructure currently in place at the 10-crossings in Elk River. The improvements and costs detailed in 2011 are for implementing a Quiet Zone at all of the crossings with the installation of Supplemental Safety Measures or SSMs. SSMs are recognized standard safety improvements. These improvements include adding 100-foot long raised medians or installing four quadrant gate systems at a crossing. SSMs have been proven,through the Federal Rail Administration,to reduce the Risk Index of the crossing and thus are standard treatments that can be implemented to make a crossing Quiet Zone eligible. There are alternative options to installing SSMs that can be considered that would reduce the soundings along the line. Staff will be prepared to discuss the potential option at the Council meeting. With the understanding that train horns are a concern the questions to be discussed are as follows: 1. How"quiet"is a Quiet Zone? a. Federal warning requirements b. Locomotive horn vs. Locomotive engine and car noise c. Locomotive horn vs. Wayside horn 2. What are the Options? a. Status Quo b. Full Quiet Zone c. Phased-in Quiet Zone P a w I R E a a T NA URA 3. Cost of a Quiet Zone? a. Initial capital improvements b. Ongoing operational and maintenance 4. Who should pay? a. Citywide property tax (ad valorem) b. Benefitting property owners c. Citywide or improvement area fee With no formal City Council direction on this subject, staff has not reopened formal discussion with any agencies that would be affected by this project. FINANCIAL IMPACT Funding opportunities for any type of quiet zone improvements are not available from State,Federal or Rail sources because the establishment of a quiet zone is not classified as a safety improvement. ATTACHMENTS ■ April 8, 2011, Staff Report Action Motion by Second by Vote Follow Up paw IaIa 0 NAT- URA ECitylk MEMORANDUM liver TO: Honorable Mayor and Members of the City Council FROM: Justin Femrite, P.E., City Engineer DATE: 4-18-11 SUBJECT: BNSF Quiet Zone Update Over the last month I have reviewed the feasibility study and estimated costs that were presented in December of 2007 for establishment of a quiet zone along the BNSF railroad through Elk River. Mayor Dietz contacted me with information that Anoka is currently establishing a quiet zone for far less cost than estimated in our 2007 study. I spoke to the City of Anoka who directed me to TKDA, the consultant they hired to complete the quiet zone work through Anoka. TKDA has expert staff with comprehensive understanding of the required improvements in establishment of quiet zones. Anoka is working at establishing a quiet zone at two crossings. TKDA indicated the improvements required to establish a quiet zone in Anoka were very minor. The street crossings in Anoka had sufficient width to accommodate the required median improvements,without need to widen the roadway or relocate the existing crossing arms. In addition,the controls for the existing crossing gate systems are already upgraded and in place. The cost for improvements at each intersection on Anoka's project is estimated at$50,000 for a total project cost of$100,000. TKDA attended a meeting with me to review the proposed improvements and associated costs from the Elk River 2007 study. This review found the costs presented in the 2007 study were accurate for that time period but have since increased due to current pricing structures of the BNSF. The 2007 study estimated the full establishment of a quiet zone through Elk River would cost about$4.3 million. These costs are now estimated at$5.0 million. The cost increase reflects the higher price BNSF currently charges for the work they would be responsible to complete including all controls work,gate installations and relocations,crossing surface extensions and installation of vehicle presence detection systems. As detailed in 2007,funding for the improvements would be 100% from local funds. TKDA indicated funding opportunities for these improvements are not available from State,Federal or Rail sources because the establishment of a quiet zone is not classified as a safety improvement. In 2007 Sherburne County indicated they would not participate in funding the quiet zone improvements. With no formal City Council direction on this project,we have not reopened any discussion with the County of any other agencies that may be affected by this project. Our work to this point has been limited to the review of our 2007 study and the estimated project costs. No costs have been incurred for this review. If you have any questions or would like additional work be completed on this issue please call. N:ADepartments\Public Works\Engineering\$IMPROVEMENT PROJECTS\2011 Improvement Projects\$General Engineering\418- 11 Memo on Quiet Zones.doc uiet Zone Discussion December 10,, 2012 aty of Nb t..; � �• El Elk River Zone y • What is the concern? • What are the options? • What are the costs? • What are the steps to implementation? • How to fund the improvements? 10 ■ Crossings Crossing Type Controlling Entity Zebulon Street Public County Ogden Street Public City Meadowvale Road Public County Proctor Avenue Public County Jackson Avenue Public City Main Street Public City Great River Energy Private Great River Energy 171st Avenue Public City 165th Street Public City Jarvis Street Public City 1 I • Excessive decibel level • Re uired by Federal rules a • The concern is not new .rr The Impact7. Train Horn Decibel (a3A) Contour Map iG •, s 0. :r 1 500' 1000' `0• f 0-d ' 500' V t Train Direction 4., Train Horn ' 90 Decibels and above .. 0 80 - 90 Decibels 'Over 80 Decibel ' area larger than 40 acres per crossing Options? 1 . Status Quo 2 . Establish a citywide Quiet Zone 3 . Phase-in a full Quiet Zone Option 1 Status Quo Results No reduction to the soundings or affected area Anticipated Costs • Initial Investment - $0 .0 Million • Yearly Maintenance - $0 .0 Million • Yearly Insurance - $0 .0 Million Option 2 Full Quiet Zone Improvements • Install SSM "s at all 10 crossings • Similar as recommended in 2007 & 2011 including : o Full Quadrant Gates at 4 crossings o Install medians and modify existing gate systems at 6 crossings Option 2 Full Quiet Zone Results • Reduce number of horns up to 98% • Reduce "Over 80 decibel ' area up to 98% • Commuter required to sound horn at station • No guarantee that all trains will quiet • Stopped trains must sound to start moving Option 2 Full Quiet Zone Anticipated Costs • Initial Investment - $5 - OM — $5 - 5M • Yearly Maintenance - $30K - $50K ( BNSF) w .,.p- .e•� d .r r i NNW- ,. R ' Ogden Street Crossming 192ND AVENUE "'ErIAN (B618 CURB AND WTTER, EX GUADRAMT GATE-N,", BITUMINOUS EDGE BlTummau5 EDGE wmp� ` Proctor Avenue Crossing �I IJ r—N�-•J—"-V i,'NTAH.E I:CF,_,"l-[E MEDIRh I _ E.�.0 .T ='"E. i 1 i 71 _--RELQ.-A.iE CUI: _TE E7a:mr, COAO —�.MIST0.LL C41' gE"a51NG SURFACE INSTALL.PEQESTRIM GATE .. .R MDAI : TABLE CUFM 8818 —'CCN'RETE WALK x�PEDESTRIAN C—BOSSING i1 •.,1" F SUR`Aa F Y —REPLACE E)QSTrMG Q.JADRRNT GATE � IN:TALL RED ESTd21ANl ,t - - _ N L5Q[1N"TJ4lJ.E CONCRETE AIEQIMI 18 CURB ANN QUTrFR 100 F ain Street Crossming r j'ECIC�}iR��.T# �,I T f. '.'IC � •�� F � _ I S 411 ?' f L{*}y11T.'AIT ti _ 81T)MN ' t� k 1 fREPLK:EM E +1 _ t k 1 C ANDN h` I1hl fIL1�dT� LE CPACRETE . m °.av (w �uFs kvr CCi7ZEP) hky(7� 1F `1, 2- ry, r �CHANTiE Z14 'DEVICES ' ,•�.Y ., SPACE AT 70/—, . t BITUWINCIU& PAt'olLt1LNi _ ! ,:• - � —� �y.lel}.:^off •::A� is b Option 3 Implement Quiet Zone Using Alternatives Improvements • Install SSM "s at: 0 171St Avenue ' 0 165thAve o Jarvis St. • Install wayside horns at 7 crossings • Upgrade to SSMs as streets are reconstructed What are Waysmide Horns . A stationary horn located at a ra i I crossing, designed to provide, upon the approach of a train, audible warnin to oncomin g g motorists. Train Horn - Automated I om Sysfi .......... DeciGt ap decibel WRA)Guntour Map ' 1 f+ •'� 504' 1004' 1500" 1, 50 1000' 5':i t <Traiin Defection it f: Train Horn i 1 - 1 90 Decibels and above i 80-90 Decibels � Option 3 Implement Quiet Zone Using Alternatives Results • Reduce soundings up to 98% . • Reduces total soundings by 39% • Reduce 'Above 80 decibel ' area by up to 95% o Commuter trains will sound at station o Conductors may sound o Stopped trains will sound as they start Option 3 Implement Quiet Zone Using Alternatives Anticipated Costs • Initial Investment - $ 1 . 5M — $ 1 .75M • Yearly Maintenance - $0 .0 (BNSF) Replace Wayside Horns with SSM's as roadways are upgraded Implementation 1 . Decide on approach/option to implement 2 . Determine funding approach 3 . Hire a railroad consultant o Conduct a field diagnostic o Refine plans, schedule, and costs. 4. Final Council approval of plans & funding . Install Quiet Zone Improvements Funding Options 1 . General Tax Levy 2 . Assessment 3 . Franchise Fee 4. Fundraising Drive 5 . Other Options? Funding Options -- General Tax Levy • Bonds • Referendum Pros • Paid for by all property owners • May finance debt over many years Cons • Higher value property pays greater share • Not all properties see same benefit Funding Options -- Assessment Pros • Costs attributed to benefitting property • Not tied to property tax levy • Paid by benefit, not property value Cons • Legislative change • Large lump sum payment Funding Options -- Franchise Fee Pros • Fee correlates to benefit • Payable over longer period of time • Billing flexibility to match degree of benefit Cons • Utility companies pass on • Payment tied to utility payment • Capital payment received over life of fee Funding Options -- Fundraising Pros • City not involved — not a government program • Voluntary participation, no required payments • No taxes or fees Cons • May take a long time to raise funds • Requires nongovernmental organization • City at risk for payment if fundraising fails Discussion Credits: BNSF: http://www.BNSF.com Quiet Zone Technologies: http://www.guietzonetech.com City of Fridley City of er1 • Nb