8.2. SR 12-13-2012 El REQUEST FOR ACTION
River
TO ITEM NUMBER
Mayor and City Council 8.2
AGENDA SECTION MEETING DATE PREPARED BY
General Business December 17,2012 Tim Simon, Finance Director
ITEM DESCRIPTION REVIEWED BY
2013-2017 Capital Improvement Plan Cal Portner,City Administrator
REVIEWED BY
ACTION REQUESTED
Consider adoption of the 2013-2017 Capital Improvement Plan (CIP).
BACKGROUND/DISCUSSION
Over the past several months, city staff and the Council have been reviewing the proposed 2013-2017
CIP leading up to its adoption. During various work sessions,we reviewed the costs, funding sources,
cash flow analysis (5-year projections),and the general purpose of the projects. The CIP is a revolving
document that is re-evaluated on an annual basis;upon each annual update some projects will be deleted,
added,or even delayed,reflecting community needs and financial ability to fund the project.The CIP is a
long-term planning tool and all purchases will come back to Council for approval.
This update to the CIP does continue to address the beautification goal with monument signs and
boulevard improvements. In addition,the Comprehensive Plan and Park Master Plan updates are
planned for 2013.
Two projects that will be discussed further in the future CIP updates are the Ice Arena and Pinewood
Clubhouse projects. Both items are under review by the park and recreation director.
One project planned for 2012 was the E-timekeeping,the committee working on it has asked for it to be
carried over to 2013 (see page 76).
FINANCIAL IMPACT
See various funding sources identified in the 2013-2017 CIP.
ATTACHMENTS
• 2013-2017 Capital Improvement Plan
• 2013 equipment listing purchases (funded out of Equipment Replacement Fund)
Action Motion by Second by Vote
Follow Up
r-- BY
tNATURE
City of
Elk
fiver
CAPITAL IMPROVEMENT PLAN
2013 - 2017
City Of Elk River
CAPITAL IMPROVEMENT PLAN
2013 —2017
Enclosed is the City of Elk River's Capital Improvement Plan (CIP) for the years 2013-
2017. The document has been prepared for the City Council and Community to
anticipate major expenditures in advance of the year they may become budget requests.
The CIP is a planning tool that forecasts the City's capital needs over a five-year period
based on the City's long-range plans, goals, and policies. City staff estimates the amount
of funding that is needed for projects to be completed in the next five years. Projects
listed in the first year are included in the budget and upon each annual update of the CIP
some projects will be deleted, added, or even delayed reflecting community needs and
financial ability to fund the project.
Approval of the CIP by Council does not authorize spending or initiation of a given
project nor allocate funding for any of the projects; it simply states that the Council's
support and acknowledgement of the Capital Improvement Plan as a planning tool.
Capital improvements to streets, parks, buildings, equipment, software, and vehicles are
included in the CIP. This plan shows the estimated project costs and the anticipated
funding source. Specific information is shown on each project within this document.
The CIP does not put specific designation on the priority of the projects. This uniqueness
of the type of project generally is associated with a funding source. Cash flow estimates
are done frequently to review cash reserve levels associated with the project funds.
City of Elk River, Minnesota
Capital Improvement Plan
2013 thru 2017
PROJECTS BY FUNDING SOURCE
Source Project# Priority 2013 2014 2015 2016 2017 Total
(Capital Outlay Reserve I
Annual Technology Upgrades TC-01 n/a 50,000 352,000 120,000 52,000 30,000 604,000
Timekeeping Software TC-03 n/a 75,000 75,000
Capital Outlay Reserve Total 125,000 352,000 120,000 52,000 30,000 679,000
(City Development Fund I
Comprehensive Plan Update Plan-02 n/a 56,000 56,000
City Development Fund Total 56,000 56,000
[Developer Fees I
Annual Sealcoat Program SC-03 n/a 14,100 14,100
Developer Fees Total 14,100 14,100
[Equipment Certificates I
Fire Truck Replacement-Other FD-05 n/a 950,000 950,000
Equipment Certificates Total 950,000 950,000
,Equipment Replacement Fund i
Annual Equipment Replacement 101 n/a 42,500 60,000 47,000 27,000 176,500
Vehicle Replacement BZ-01 n/a 26,000 26,000 26,000 26,000 26,000 130,000
Vehicle Replacement FD-01 n/a 25,000 45,000 45,000 115,000
Fire Truck Replacement-Engines FD-03 n/a 500,000 500,000
Fire Department-Other equipment FD-07 n/a 25,000 25,000
Marked Squad Replacement&Additions PD-01 n/a 105,000 70,000 140,000 70,000 105,000 490,000
Unmarked Squad Replacement&Additions PD-02 n/a 34,000 25,000 50,000 50,000 0 159,000
CSO Vehicle Replacement&Additions PD-03 n/a 34,000 34,000 34,000 102,000
Police Department-Other Equipment PD-04 n/a 27,000 6,000 12,000 12,000 57,000
2013 Park Maintenance Equipment PK-13 n/a 186,250 186,250
2014 Park Maintenance Equipment PK-14 n/a 154,500 154,500
2015 Park Maintenance Equipment PK-15 n/a 150,950 150,950
2016 Park Maintenance Equipment PK-16 n/a 215,950 215,950
2017 Park Maintenance Equipment PK-17 n/a 218,950 218,950
Vehicle Replacement-pickup trucks ST-01 n/a 73,000 28,000 73,000 174,000
Dump Truck Replacement ST-02 n/a 205,000 205,000 410,000
Heavy Equipment Replacement ST-03 n/a 343,000 343,000
Other Equipment Replacement ST-04 n/a 130,000 95,800 117,200 104,800 447,800
Equipment Replacement Fund Total 682,750 704,300 641,150 777,750 1,249,950 4,055,900
2013-2017 CAPITAL IMPROVEMENT PLAN Page I
Source Project# Priority 2013 2014 2015 2016 2017 Total
:Federal Grants
1
Eastern Area Trail&Mobility Imp. 11-32 n/a 320,000 320,000
Federal Grants Total 320,000 320,000
General Fund Operating I
Website upgrade/refresh AD-04 n/a 19,000 19,000
Upgrade Radio Communications(EOC) EP-02 n/a 12,000 12,000
Commercial building keybox replacement program FD-08 n/a 20,000 20,000
Vehicle extrication equipment FD-09 n/a 16,000 16,000
Annual Sealcoat Program SC-03 n/a 73,029 71,276 50,958 74,156 112,549 381,968
GPS salt controllers ST-16 n/a 20,000 20,000
Annual Technology Upgrades TC-01 n/a 25,900 10,900 7,500 44,300
General Fund Operating Total 185,929 82,176 58,458 74,156 112,549 513,268
Government Buildings Reserve
Activity Center BL-07 n/a 127,370 32,470 11,040 170,880
Fire Station#1 projects BL-11 n/a 116,250 48,000 164,250
Lions Park Building BL-13 n/a 7,000 7,000
Fire Station#3 FD-06 n/a 2,533,865 2,533,865
Floor repair/replacement projects PS-03 n/a 5,000 54,120 33,122 92,242
Annual Sealcoat Program SC-03 n/a 15,000 15,000 15,000 15,000 15,000 75,000
Government Buildings Reserve Total 138,250 147,370 149,590 59,162 2,548,865 3,043,237
GRE reserve
I
Land Acquisition(previous commitments) PF-90 n/a 747,300 747,300
GRE reserve Total 747,300 747,300
Ice Arena I
Ice Arena Equipment IA-01 n/a 120,000 120,000
Ice Arena Major Building Repair IA-02 n/a 357,300 357,300
Ice Arena Total 357,300 120,000 477,300
Liquor Fund I
Northbound Building Maintenance LS-01 n/a 100,000 100,000
Westbound Liquor Store LS-02 n/a 15,000 15,000
Liquor Fund Total 15,000 100,000 115,000
Municipal State Aid
I
193rd Avenue Extension to CR13 I1-18 n/a 505,542 505,542
Pavement Management Program PM-01 n/a 1,720,000 1,000,000 2,720,000
Annual Sealcoat Program SC-03 n/a 287,621 293,374 299,241 305,226 311,331 1,496,793
Signalization of 193rd Avenue&Evans Street ST-12 n/a 250,000 250,000
Municipal State Aid Total 793,163 293,374 2,019,241 305,226 1,561,331 4,972,335
2013-2017 CAPITAL IMPROVEMENT PLAN Page 2
Source Project# Priority 2013 2014 2015 2016 2017 Total
Park Dedication I
Land Acquisition(previous commitments) PF-90 n/a 747,300 747,300
Park Dedication Total 747,300 747,300
[Park Improvement Fund
II
2013 park improvement projects PIF-13 n/a 417,200 417,200
2014 park improvement projects PIF-14 n/a 260,000 260,000
2015 park improvement projects PIF-15 n/a 258,000 258,000
2016 park improvement projects PIF-16 n/a 258,000 258,000
2017 park improvement projects PIF-17 n/a 258,000 258,000
Park Improvement Fund Total 417,200 260,000 258,000 258,000 258,000 1,451,200
Sewer Fund
Comprehensive Plan Update Plan-02 n/a 4,000 4,000
Lift Station Rehabilitation WW-02 n/a 86,000 60,000 60,000 206,000
Jet/Vacuum truck WW-03 n/a 400,000 400,000
Buildings WW-05 n/a 500,000 500,000
Vehicle Replacement WW-06 n/a 30,000 70,000 100,000
Upgrade Boiler WW-14 n/a 125,000 125,000
Replace Generators WW-15 n/a 110,000 110,000
Plant Expansion Master Plan WW-17 n/a 4,400,000 4,400,000
Upgrade TF,Controls&Pumps WW-19 n/a 150,000 150,000
Bio solids disposal handling WW-24 n/a 2,000,000 2,000,000
SCADA System WW-25 n/a 450,000 450,000
Effluent Reuse Project WW-26 n/a 285,750 285,750
Phosphorus Monitoring System WW-28 n/a 30,000 30,000
Sewer Fund Total 405,750 3,040,000 620,000 60,000 4,635,000 8,760,750
Special Assessments
Pavement Management Program PM-01 n/a 1,430,000 1,780,000 1,770,000 4,980,000
Special Assessments Total 1,430,000 1,780,000 1,770,000 4,980,000
State grants
Effluent Reuse Project WW-26 n/a 285,750 285,750
State grants Total 285,750 285,750
Street Improvement Reserve I
Intersection Enhancements 11-00 n/a 150,000 100,000 250,000
Eastern Area Trail&Mobility Imp, II-32 n/a 80,000 80,000
Intersection Improvements I1-33 n/a 30,000 30,000 30,000 30,000 30,000 150,000
Monument Signs I1-34 n/a 40,000 40,000 40,000 120,000
Boulevard Improvements /1-35 n/a 80,000 100,000 80,000 260,000
Comprehensive Plan Update Plan-02 n/a 8,000 8,000
Pavement Management Program PM-01 n/a 1,420,000 1,420,000
Signal Light Painting SL-09 n/a 30,000 12,000 42,000
Transportation Plan Update ST-14 n/a 50,000 50,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 3
Source Project# Priority 2013 2014 2015 2016 2017 Total
Street Improvement Reserve Total 1,608,000 310,000 170,000 142,000 150,000 2,380,000
Tax Supported Bond Issue
Pavement Management Program PM-01 n/a 500,000 1,560,000 2,060,000
Tax Supported Bond Issue Total 500,000 1,560,000 2,060,000
To Be Determined I
Ice Arena Remodel/Expansion 1A-04 n/a 300,000 7,800,000 8,100,000
To Be Determined Total 300,000 7,800,000 8,100,000
[Trunk Utility Fund
I
185th Ave Road Rebuild 11-36 n/a 185,000 185,000
South West Pressure Zone 11-37 n/a 40,000 40,000
Well#7 Filter 11-38 n/a 280,000 280,000
Proctor Ave water main /1-39 n/a 250,000 250,000
Highland Ave.Water Maint. 11-40 n/a 150,000 150,000
Phase II Natures Edge Business Park 11-41 n/a 500,000 500,000
Trunk Utility Fund Total 225,000 280,000 900,000 1,405,000
Water Fund
I
Comprehensive Plan Update Plan-02 n/a 4,000 4,000
Water Fund Total 4,000 4,000
GRAND TOTAL 8,237,792 7,139,220 14,116,439 1,848,294 14,775,695 46,117,440
2013-2017 CAPITAL IMPROVEMENT PLAN Page 4
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# AD-04
Project Name Website upgrade/refresh
Type Technology Department Administration
Useful Life 5 years Contact City Clerk
Category Technology/Communiciations Priority n/a
Description
Upgrade City website
Justification I
The last website upgrade was in 2007. As communication needs are constantly changing,it is recommended the website be updated every 4
years. The website upgrade will offer more engagement and self-assistance tools,thereby enhancing the end-user's navigational experience.
Expenditures 2013 2014 2015 2016 2017 Total
Planning/Design 19,000 19,000
Total 19,000 19,000
Funding Sources 2013 2014 2015 2016 2017 Total
General Fund Operating 19,000 19,000
Total 19,000 19,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 5
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# BZ-01
Project Name Vehicle Replacement
Type Vehicle Department Building&Environmental
~
Useful Life 10 years Contact Building&Env.Admin.
Category Vehicles Priority n/a V- .,
Description
Replacement vehicles for building inspectors/code enforcement/environmental division based on 10 year useful life,mileage and general condition.
2013-2002 Dodge pickup
2014-2001 Chevy pickup
2015-2003 Chevy Tahoe(Transferred in 2012 from the Fire Department)
2016-2004 Ford Explorer
2017-2005 Ford Explorer
Justification
The building safety department is looking at replacing the vehicle with a hybrid/smaller SUV type replacement. The 2015 vehicle replacement is
the 2003 Chevy Tahoe which will be transferred from Fire in 2012.
Expenditures 2013 2014 2015 2016 2017 Total
Vehicles 26,000 26,000 26,000 26,000 26,000 130,000
Total 26,000 26,000 26,000 26,000 26,000 130,000
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Replacement Fund 26,000 26,000 26,000 26,000 26,000 130,000
Total 26,000 26,000 26,000 26,000 26,000 130,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 6
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# EP-02
Project Name Upgrade Radio Communications (EOC)
Type Equipment Department Emergency Management
Useful Life 10 years Contact Fire Chief
Category Equipment Priority n/a
Description
Upgrade radio communications equipment in emergency operations center.
Justification
Current equipment in the emergency operations center is not compatible with the new state-wide ARMER radio system. Upgrade will enable
interoperability between city departments in a large-scale disaster/emergency.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 12,000 12,000
Total 12,000 12,000
Funding Sources 2013 2014 2015 2016 2017 Total
General Fund Operating 12,000 12,000
Total 12,000 12,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 7
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# FD-01
Project Name
Vehicle Replacement . �1
Type Vehicle Department Fire
Useful Life 9 years Contact Fire Chief
Category Vehicles Priority n/a
Description
Replace inspector vehicles as follows:
2015-Fire prevention pickup(2001 F350)
2016-Duty Officer/command vehicle(2005 Ford Expedition)
2017-Inspector 2(2006 Ford Explorer)
Justification
Fire Prevention Truck originally received on a FEMA grant to be used with the FEMA trailer. Replacement truck will be more of a multi-purpose
vehicle.
Duty Officer vehicle is the primary response vehicle and first on the scene to assess the additional vehicles to follow. This vehicle will be 11
years old in 2016.
Expenditures 2013 2014 2015 2016 2017 Total
Vehicles 25,000 45,000 45,000 115,000
Total 25,000 45,000 45,000 115,000
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Replacement Fund 25,000 45,000 45,000 115,000
Total 25,000 45,000 45,000 115,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 8
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# FD-03
Project Name Fire Truck Replacement-Engines i%Type Vehicle Department Fire
Useful Life 20 years Contact Fire Chief „war( _ snow
- t
Category Vehicles Priority n/a
Description
Fire Engine replacements as follow
2017-1997 Engine 1
Justification
Primary front-line response unit out of Station#1
Expenditures 2013 2014 2015 2016 2017 Total
Vehicles 500,000 500,000
Total 500,000 500,000
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Replacement Fund 500,000 500,000
Total 500,000 500,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 9
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# FD-05
Project Name Fire Truck Replacement- Other
Type Vehicle Department Fire
Useful Life 25 years Contact Fire Chief
Category Vehicles Priority n/a
Description
Other Fire Truck replacement as follows:
2014- 1990 Aerial Ladder
Justification
As the only aerial ladder in the fire department's fleet,it is an essential resource utilized at commercial and large residential fires in addition to
technical rescue incidents. The established replacement cycle of 25 years takes into consideration the vehicles typical usage and age,which after
25 years is requiring more regular and costly service.Advancements in aerial technology have also made newer model vehicles safer and more
versatile to better meet the needs of today's fire service.
Expenditures 2013 2014 2015 2016 2017 Total
Vehicles 950,000 950,000
Total 950,000 950,000
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Certificates 950,000 950,000
Total 950,000 950,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 10
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# FD-06
Project Name Fire Station#3
Type Building Department Fire
Useful Life 50 years Contact Fire Chief
Category Buildings Priority n/a
Description
Construct Fire Station#3 to decrease call time for eastern part of City.
Justification 1
Based on current population growth,a station will be needed in the Eastern area as an enhancement for response time.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 750,000 750,000
Buildings 1,783,865 1,783,865
Total 2,533,865 2,533,865
Funding Sources 2013 2014 2015 2016 2017 Total
Government Buildings Reserve 2,533,865 2,533,865
Total 2,533,865 2,533,865
2013-2017 CAPITAL IMPROVEMENT PLAN Page 11
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# FD-07
Project Name Fire Department-Other equipment
Type Equipment Department Fire
Useful Life 5 years Contact Fire Chief
Category Equipment Priority n/a
Description
In-truck computers(4 computers)
Justification
The computers will allow for an interface with the County's dispatch system and provide Hazmat data and dispatch applications.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 25,000 25,000
Total 25,000 25,000
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Replacement Fund 25,000 25,000
Total 25,000 25,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 12
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# FD-08
Project Name Commercial building keybox replacement program
Type Equipment Department Fire
Useful Life Unassigned Contact Fire Chief
Category Equipment Priority n/a
Description
Beginning in 2013,the Elk River Fire Department will be launching an incentive program with the goal of upgrading existing commercial key
boxes with in the fire district.
Justification
The intent of the program is to replace aging key boxes with newer,weather resistant boxes manufactured by the Knox-Box company. The new
boxes will be compatible with the new master key system that is scheduled to be deployed in 2013.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 20,000 20,000
Total 20,000 20,000
Funding Sources 2013 2014 2015 2016 2017 Total
General Fund Operating 20,000 20,000
Total 20,000 20,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 13
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# FD-09
Project Name Vehicle extrication equipment
Type Equipment Department Fire
Useful Life Unassigned Contact Fire Chief
Category Equipment Priority n/a
Description
Upgrade vehicle extrication equipment
Justification
Continue replacement of hydraulic rescue equipment. In 2010,the equipment on Rescue 1 was upgraded. 2013 goal is to upgrade equipment on
Engine 3.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 16,000 16,000
Total 16,000 16,000
Funding Sources 2013 2014 2015 2016 2017 Total
General Fund Operating 16,000 16,000
Total 16,000 16,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 14
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# IA-01 �
Project Name Ice Arena Equipment
Type Equipment Department Ice Arena - .
Useful Life 10 years Contact Park&Rec.Director
Category Equipment Priority n/a
tom tag
Description
2016- 1999 Electric Ice Resurfacer
Justification
The existing electric machine was purchased in 1999 and will have over 5,000 hours of use on it.By establishing an ice resurfacer replacement
plan the Arena will operate smoothly without unexpected problems arising.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 120,000 120,000
Total 120,000 120,000
Funding Sources 2013 2014 2015 2016 2017 Total
Ice Arena 120,000 120,000
Total 120,000 120,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 15
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# IA-02
Project Name Ice Arena Major Building Repair •
Type Building Department Ice Arena
Useful Life 20 years Contact Ice Arena Manager
Category Building Maintenance Priority n/a
Description
2013 projects include:
Replace Barn roof($113,300)
Barn dehumidifier($180,000)
Desicant wheel on olympic dryer($64,000)
Justification I
The Barn's roof was installed in the early 70's and is well past its life expectancy. The arena is starting to experience several leaks on the south
end.
The interior of the Barn structure will continue to deteriorate without a dehumidifier that is sized correctly for the Barn.
The desiccant wheel on the dehumidifier is starting to deteriorate and is falling apart.
Expenditures 2013 2014 2015 2016 2017 Total
Building Maintenance 357,300 357,300
Total 357,300 357,300
Funding Sources 2013 2014 2015 2016 2017 Total
Ice Arena 357,300 357,300
Total 357,300 357,300
2013-2017 CAPITAL IMPROVEMENT PLAN Page 16
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# IA-04
Project Name Ice Arena Remodel/Expansion
Type Building Department Ice Arena
Useful Life 25 years Contact Ice Arena Manager
Category Buildings Priority n/a
I Description
Renovation of Ice Arena which includes reconstruction of the barn and front lobby/zamboni room and a centralized ice plant with two new
concrete ice sheets.
Justification
The barn was built in 1972 and the facility and ice making equipment is close to its life expectancy.Facility usage has outgrown the existing
lobby. In addition,the refrigerant currently used in the existing refrigeration systems is R-22, a CFC(Chlorofluorocarbon)refrigerant. The
mandate of the Montreal Protocol phases out the manufacture of CFCs,which will eventually make R-22 refrigerant obsolete.
Expenditures 2013 2014 2015 2016 2017 Total
Planning/Design 300,000 300,000
Buildings 7,800,000 7,800,000
Total 300,000 7,800,000 8,100,000
Funding Sources 2013 2014 2015 2016 2017 Total
To Be Determined 300,000 7,800,000 8,100,000
Total 300,000 7,800,000 8,100,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 17
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# II-00
Project Name Intersection Enhancements
Type Infrastructure Department Infrastructure Improvements
Useful Life 25 years Contact Engineer
Category Street Construction Priority n/a
Description
Complete enhancements of underperforming intersections within the City of Elk River. Improvements will be considered on a yearly basis and
may include costs for right-of-way acquisition and construction of intersection enhancements. Such enhancements may include the extension or
addition of turn lanes,restriping,modifications of medians,or drainage.
Justification
These proposed enhancement projects are relatively small in size and cost for the benefit they will provide to the overall transportation system.
Expenditures 2013 2014 2015 2016 2017 Total
Construction/Maintenance 150,000 100,000 250,000
Total 150,000 100,000 250,000
Funding Sources 2013 2014 2015 2016 2017 Total
Street Improvement Reserve 150,000 100,000 250,000
Total 150,000 100,000 250,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 18
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# 11-18
Project Name 193rd Avenue Extension to CR13
Type Infrastructure Department Infrastructure Improvements
Useful Life 25 years Contact Engineer
Category Street Construction Priority n/a
Description
Extend 193rd Avenue to connect to CSAH 13 to create East/West corridor including land acquisition. Future MSA will be used to repay the
transportation revolving loan over the next couple of years.
Justification
Needed connection according to Transportation Plan Aug 2004
Funding Sources 2013 2014 2015 2016 2017 Total
Municipal State Aid 505,542 505,542
Total 505,542 505,542
2013-2017 CAPITAL IMPROVEMENT PLAN Page 19
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# II-32
Project Name Eastern Area Trail&Mobility Imp.
Type Unassigned Department Infrastructure Improvements
Useful Life 15 years Contact Engineer
Category Trail Improvements Priority n/a
Description
Construct the missing pieces of trail along the east side of Twin Lakes Road from the Northstar commuter rail station to Trott Brook Parkway.
Also provide ADA compliant sidewalks and pedestrian ramps along Line Avenue from Main Street to 3rd Street.
Justification I
This trail/sidewalk project will provide safe connectivity of our existing off street trail and sidewalk systems in the area.
Expenditures 2013 2014 2015 2016 2017 Total
Construction/Maintenance 400,000 400,000
Total 400,000 400,000
Funding Sources 2013 2014 2015 2016 2017 Total
Federal Grants 320,000 320,000
Street Improvement Reserve 80,000 80,000
Total 400,000 400,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 20
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# 11-33
Project Name Intersection Improvements
Type Improvement Department Infrastructure Improvements
Useful Life 15 years Contact Planning Manager
Category Landscaping/Boulevards Priority n/a
Description
I
Improve major intersection with landscaping
Justification
I
Beautification of School/169,Jackson/169,Proctor/10,Main/10,and 171st/10 intersections
Expenditures 2013 2014 2015 2016 2017 Total
Construction/Maintenance 30,000 30,000 30,000 30,000 30,000 150,000
Total 30,000 30,000 30,000 30,000 30,000 150,000
Funding Sources 2013 2014 2015 2016 2017 Total
Street Improvement Reserve 30,000 30,000 30,000 30,000 30,000 150,000
Total 30,000 30,000 30,000 30,000 30,000 150,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 21
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# II-34
Project Name Monument Signs
Type Improvement Department Infrastructure Improvements
Useful Life 25 years Contact Planning Manager
Category Landscaping/Boulevards Priority n/a
Description
I
Add entrance monument signs at southbound 169,westbound 10,and northbound 169/101
Justification I
Beautification goal:
add large monument signs at city entrances to satisfy beautification goals.
Expenditures 2013 2014 2015 2016 2017 Total
Construction/Maintenance 40,000 40,000 40,000 120,000
Total 40,000 40,000 40,000 120,000
Funding Sources 2013 2014 2015 2016 2017 Total
Street Improvement Reserve 40,000 40,000 40,000 120,000
Total 40,000 40,000 40,000 120,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 22
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# II-35
Project Name Boulevard Improvements
Type Improvement Department Infrastructure Improvements
Useful Life 15 years Contact Planning Manager
Category Landscaping/Boulevards Priority n/a
Description
To achieve beautification goal for boulevard improvements
Justification
Several improvements to existing boulevards are planned:
Twin Lakes Road(north of 171st)
193rd(west of County Road 13,east of Xavier)
Expenditures 2013 2014 2015 2016 2017 Total
Construction/Maintenance 80,000 100,000 80,000 260,000
Total 80,000 100,000 80,000 260,000
Funding Sources 2013 2014 2015 2016 2017 Total
Street Improvement Reserve 80,000 100,000 80,000 260,000
Total 80,000 100,000 80,000 260,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 23
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# II-36
Project Name 185th Ave Road Rebuild
Type Infrastructure Department Infrastructure Improvements
Useful Life 20 years Contact Engineer
Category Street&Utility Construction Priority n/a
Description
185th Ave Road Rebuild project
Justification
Add new water main connecting deadends during City road reconstruction project.
Expenditures 2013 2014 2015 2016 2017 Total
Construction/Maintenance 185,000 185,000
Total 185,000 185,000
Funding Sources 2013 2014 2015 2016 2017 Total
Trunk Utility Fund 185,000 185,000
Total 185,000 185,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 24
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# II-37
Project Name South West Pressure Zone
Type Maintenance Department Infrastructure Improvements
Useful Life 20 years Contact Engineer
Category Street&Utility Construction Priority n/a
Description
South West Pressure zone change
Justification
Change the area on the South West of the City from low pressure zone to high pressure zone. Project needed to increase pressure to new Nature's
Edge Business Park.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 40,000 40,000
Total 40,000 40,000
Funding Sources 2013 2014 2015 2016 2017 Total
Trunk Utility Fund 40,000 40,000
Total 40,000 40,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 25
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# II-38
Project Name Well#7 Filter
Type Infrastructure Department Infrastructure Improvements
Useful Life 20 years Contact Engineer
Category Street&Utility Construction Priority n/a
Description
Add new water main connecting the well#7 filter plant to water main at Co.Rd. 12.
Justification
This project will direct water to the south including Nature's Edge Business Park increasing system capacity.
Expenditures 2013 2014 2015 2016 2017 Total
Construction/Maintenance 280,000 280,000
Total 280,000 280,000
Funding Sources 2013 2014 2015 2016 2017 Total
Trunk Utility Fund 280,000 280,000
Total 280,000 280,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 26
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# II-39
Project Name Proctor Ave water main
Type Infrastructure Department Infrastructure Improvements
Useful Life 20 years Contact Engineer
Category Street&Utility Construction Priority n/a
Description
Add new water main connecting Highland Road to Proctor Ave near the public works building.
Justification I
Increase system capacity to the north.
Expenditures 2013 2014 2015 2016 2017 Total
Construction/Maintenance 250,000 250,000
Total 250,000 250,000
Funding Sources 2013 2014 2015 2016 2017 Total
Trunk Utility Fund 250,000 250,000
Total 250,000 250,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 27
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# II-40
Project Name Highland Ave.Water Maint.
Type Infrastructure Department Infrastructure Improvements
Useful Life 20 years Contact Engineer
Category Street&Utility Construction Priority n/a
Description (
New water main during City road reconstruction project for Oxford Street,Norfolk Street, 192nd Ave,Lowell Circle.
Justification
Increase system capacity.
Expenditures 2013 2014 2015 2016 2017 Total
Construction/Maintenance 150,000 150,000
Total 150,000 150,000
Funding Sources 2013 2014 2015 2016 2017 Total
Trunk Utility Fund 150,000 150,000
Total 150,000 150,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 28
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# II-41
Project Name Phase II Natures Edge Business Park
Type Infrastructure Department Infrastructure Improvements
Useful Life 20 years Contact Engineer
Category Unassigned Priority n/a
Description I
Implementation of sewer lines for phase II of the Nature's Edge Business Park.
Justification I
No existing sanitary sewer.
Expenditures 2013 2014 2015 2016 2017 Total
Construction/Maintenance 500,000 500,000
Total 500,000 500,000
Funding Sources 2013 2014 2015 2016 2017 Total
Trunk Utility Fund 500,000 500,000
Total 500,000 500,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 29
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# PM-01
Project Name
Pavement Management Program �.
Type Improvement Department Infrastructure Improvements
Useful Life 25 years Contact Engineer
Category Street&Utility Construction Priority n/a
giro's
Description
Replace,overlay or rehabilitate aged and deteriorated streets,water mains,sewer mains,storm drainage,and pedestrian pathways. Projects will be
completed every other year.
Justification
Individual street pavement conditions will dictate what pavement management technique will be utilized to extend the life of that specific street
segment. These techniques may range from a full reconstruction of the surface and aggregate base to simply overlaying the existing pavement.
As they are implemented,the prescribed techniques will continually be gauged to assure their performance is proper in extending the life of our
pavements.
Expenditures 2013 2014 2015 2016 2017 Total
Construction/Maintenance 2,850,000 4,000,000 4,330,000 11,180,000
Total 2,850,000 4,000,000 4,330,000 11,180,000
Funding Sources 2013 2014 2015 2016 2017 Total
Municipal State Aid 1,720,000 1,000,000 2,720,000
Special Assessments 1,430,000 1,780,000 1,770,000 4,980,000
Street Improvement Reserve 1,420,000 1,420,000
Tax Supported Bond Issue 500,000 1,560,000 2,060,000
Total 2,850,000 4,000,000 4,330,000 11,180,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 30
F
B
- 1
RECONSTRUCTION
OVERLAY WITH EDGE MILL
FULL DEPTH RECLAIM WITH CURB PATCHING
WEAR COURSE PAVING ON
UNFINISHED DEVELOPMENT STREETS
River x I
M
2013 DATE: SHEET
8.2.20,2
DRAWN BY:
1 STREET IMPROVEMENTS CML
1
.��, SCALE:
River NOT TO SCALE
i
R
s
a
3
k
g
I
I
a
RECONSTRUCTION
OVERLAY WITH EDGE MILL
FULL DEPTH RECLAIM WITH CURB PATCHING
■ WEAR COURSE PAVING ON
UNFINISHED DEVELOPMENT STREETS
7
2015 DATE: SHEET
E
8.2.2012
I DRAWN BY:
_ STREET IMPROVEMENTS CML
River NOTE
NOT TO SCALE
1
in
b
E
3
F
q
r
RECONSTRUCTION
OVERLAY WITH EDGE MILL
FULL DEPTH RECLAIM WITH CURB PATCHING
WEAR COURSE PAVING ON
UNFINISHED DEVELOPMENT STREETS
20 OATS.
8.2.2012 17
El 4iver STREET IMPROVEMENTS CMLN a. 1
7�
"' SCALE:
R NOT TO SCALE
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# SC-03
Project Name Annual Sealcoat Program
Type Improvement Department Infrastructure Improvements
Useful Life 7 years Contact Street Supt.
Category Street Maintenance Priority n/a
Description
Sealcoat city streets and parking lots as identified by Street Superintendent.
Justification
Method of maintaining the surface condition of the city public facilities and streets
Expenditures 2013 2014 2015 2016 2017 Total
Construction/Maintenance 389,750 379,650 365,199 394,382 438,880 1,967,861
Total 389,750 379,650 365,199 394,382 438,880 1,967,861
Funding Sources 2013 2014 2015 2016 2017 Total
Developer Fees 14,100 14,100
General Fund Operating 73,029 71,276 50,958 74,156 112,549 381,968
Government Buildings Reserve 15,000 15,000 15,000 15,000 15,000 75,000
Municipal State Aid 287,621 293,374 299,241 305,226 311,331 1,496,793
Total 389,750 379,650 365,199 394,382 438,880 1,967,861
2013-2017 CAPITAL IMPROVEMENT PLAN Page 31
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# SL-09
Project Name Signal Light Painting
Type Improvement Department Infrastructure Improvements
Useful Life 20 years Contact Engineer
Category Street Maintenance Priority n/a
Description
Paint signal systems
Justification
According to MNDOT/City signal agreements it is the responsibility of the City to repaint signal systems as needed.With the age of the remaining
signal systems,repainting of 5 will be required in 2013. The last 2 systems will be scheduled for painting in 2016 or as their condition requires.
Expenditures 2013 2014 2015 2016 2017 Total
Construction/Maintenance 30,000 12,000 42,000
Total 30,000 12,000 42,000
Funding Sources 2013 2014 2015 2016 2017 Total
Street Improvement Reserve 30,000 12,000 42,000
Total 30,000 12,000 42,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 32
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# ST-12 ,
Project Name Signalization of 193rd Avenue&Evans Street
Infrastructure Department Infrastructure Improvements
Useful Life 20 years Contact Engineer
Category Street Construction Priority n/a
•
Description
Install a signal system including EVP at the intersection of 193rd Avenue and Evans Street.Because of the proximity to TH169,the signal system
must be interconnected with the existing highway signal system.
Justification
The construction of 193rd Avenue(2009)street improvement opens 193rd to CSAH 13 allowing another route to and from TH169. In
anticipation of the increased traffic flow the intersection of 193rd Avenue and Evans Street was constructed to accept a signal system.
Expenditures 2013 2014 2015 2016 2017 Total
Planning/Design 250,000 250,000
Total 250,000 250,000
Funding Sources 2013 2014 2015 2016 2017 Total
Municipal State Aid 250,000 250,000
Total 250,000 250,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 33
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# LS-01
Project Name Northbound Building Maintenance
Type Maintenance Department Liquor Fund
Useful Life 20 years Contact Liquor Store Manager
Category Building Maintenance Priority n/a
Description
Roof replacement at Northbound Liquor Store
Justification
The original roof from 1997 is starting to experience several leaks a year. We continue to perform minor roof patches,but frequency seems to be
increasing.
Expenditures 2013 2014 2015 2016 2017 Total
Building Maintenance 100,000 100,000
Total 100,000 100,000
Funding Sources 2013 2014 2015 2016 2017 Total
Liquor Fund 100,000 100,000
Total 100,000 100,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 34
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# LS-02
Project Name Westbound Liquor Store
Type Building Department Liquor Fund
Useful Life 20 years Contact Liquor Store Manager
Category Buildings Priority n/a
Description
Replace sales floor lighting at Westbound Liquor Store
Justification
Original lighting is fixtures(32)that have eight compact fluorescent bulbs in each. Increased maintenance time to replace the fluorescent bulbs.
Expenditures 2013 2014 2015 2016 2017 Total
Building Maintenance 15,000 15,000
Total 15,000 15,000
Funding Sources 2013 2014 2015 2016 2017 Total
Liquor Fund 15,000 15,000
Total 15,000 15,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 35
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# PF-90
Project Name Land Acquisition(previous commitments)
Type Land Department Park Development&Improv
Useful Life Unlimited Contact Park&Rec.Director
Category Land Priority n/a
Description
2006-Pinewood Golf Course-Contract for Deed
Justification
Expenditures 2013 2014 2015 2016 2017 Total
Pinewood Property 1,494,600 1,494,600
Total 1,494,600 1,494,600
Funding Sources 2013 2014 2015 2016 2017 Total
GRE reserve 747,300 747,300
Park Dedication 747,300 747,300
Total 1,494,600 1,494,600
2013-2017 CAPITAL IMPROVEMENT PLAN Page 36
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# PIF-13
Project Name 2013 park improvement projects
Type Improvement Department Park Improvement Fund
Useful Life Unassigned Contact Park&Rec.Director
Category Park Improvements Priority n/a
Description
2013 projects include:
Trail repairs&connections($72,000)
Orono playground($250,000)
Bailey Point-amenities($40,000)
park master plan($30,000)
dog park irrigation($10,000)
playground safety($5,000)
Orono boat landing dock($5,200)
Oak Knoll well($3,000)
park property lines($2,000)
Justification
Annual maintenance/repairs of our park system.
Expenditures 2013 2014 2015 2016 2017 Total
Park Improvements 417,200 417,200
Total 417,200 417,200
Funding Sources 2013 2014 2015 2016 2017 Total
Park Improvement Fund 417,200 417,200
Total 417,200 417,200
2013-2017 CAPITAL IMPROVEMENT PLAN Page 37
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# PIF-14
Project Name 2014 park improvement projects
Type Improvement Department Park Improvement Fund
Useful Life Unassigned Contact Park&Rec.Director
Category Park Improvements Priority n/a
Description
2014 projects include:
trail repairs&connections($100,000)
park property lines($2,000)
parks master plan update($35,000)
smart irrigation system($14,000)
YAC complex well($39,000)
Deerfield playground replacement($65,000)
playground safety($5,000)
Justification
Annual maintenance/repairs of our park system.
Expenditures 2013 2014 2015 2016 2017 Total
Park Improvements 260,000 260,000
Total 260,000 260,000
Funding Sources 2013 2014 2015 2016 2017 Total
Park Improvement Fund 260,000 260,000
Total 260,000 260,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 38
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# PIF-15
Project Name 2015 park improvement projects
Type Improvement Department Park Improvement Fund
Useful Life Unassigned Contact Park&Rec.Director
Category Park Improvements Priority n/a
Description
2015 projects include:
trail repairs and connections($100,000)
Orono park playground($30,000)
downtown parking lot landscape($45,000)
park property lines($3,000)
flush toilets in parks($25,000)
althletic field amenities($50,000)
playground safety($5,000)
Justification
Annual maintenance/repairs of our park system.
Expenditures 2013 2014 2015 2016 2017 Total
Park Improvements 258,000 258,000
Total 258,000 258,000
Funding Sources 2013 2014 2015 2016 2017 Total
Park Improvement Fund 258,000 258,000
Total 258,000 258,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 39
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# PIF-16
Project Name 2016 park improvement projects
Type Unassigned Department Park Improvement Fund
Useful Life Unassigned Contact Park&Rec.Director
Category Park Improvements Priority n/a
Description
2016 projects include:
playground safety($5,000)
trail repairs and replacement($100,000)
park property lines($3,000)
flush toilets in parks($25,000)
althletic field amenities($50,000)
splash pad @ Orono($75,000)
Justification
Annual maintenance/repairs of our park system.
Expenditures 2013 2014 2015 2016 2017 Total
Park Improvements 258,000 258,000
Total 258,000 258,000
Funding Sources 2013 2014 2015 2016 2017 Total
Park Improvement Fund 258,000 258,000
Total 258,000 258,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 40
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# PIF-17
Project Name 2017 park improvement projects
Type Unassigned Department Park Improvement Fund
Useful Life Unassigned Contact Park&Rec.Director
Category Park Improvements Priority n/a
}
Description
2017 projects include:
playground safety($5,000)
trail repairs and replacement($100,000)
park property lines($3,000)
YAC football field lights($75,000)
flush toilets in the parks($25,000)
althletic field amenities($50,000)
Justification
Annual maintenance/repairs of our park system.
Expenditures 2013 2014 2015 2016 2017 Total
Park Improvements 258,000 258,000
Total 258,000 258,000
Funding Sources 2013 2014 2015 2016 2017 Total
Park Improvement Fund 258,000 258,000
Total 258,000 258,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 41
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# PK-13
Project Name 2013 Park Maintenance Equipment
Type Equipment Department Park Maintenance
Useful Life Unassigned Contact Park&Rec.Director
Category Equipment Priority n/a
Description
2004 Holder sidewalk machine$186,250
Justification
Annual replacement of parks equipment based on usage,age,and reliability.
Fleet committee will make a recommendation in the summer of 2013.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 186,250 186,250
Total 186,250 186,250
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Replacement Fund 186,250 186,250
Total 186,250 186,250
2013-2017 CAPITAL IMPROVEMENT PLAN Page 42
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# PK-14
Project Name 2014 Park Maintenance Equipment
Type Equipment Department Park Maintenance
Useful Life Unassigned Contact Park&Rec.Director
Category Equipment Priority n/a
Description
Replace 2005 Chevy HD$30,000
Replace 2006 Toro 328 Groundsmaster$34,500
New tanker/trash truck$75,000
Skid steer attachments$15,000
Justification I
Annual replacement of parks equipment based on usage,age,and reliability.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 154,500 154,500
Total 154,500 154,500
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Replacement Fund 154,500 154,500
Total 154,500 154,500
2013-2017 CAPITAL IMPROVEMENT PLAN Page 43
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# PK-15
Project Name 2015 Park Maintenance Equipment
Type Equipment Department Park Maintenance
Useful Life Unassigned Contact Park&Rec.Director s
Category Equipment Priority n/a
Description
2007 Toro zero turn mower$34,500
2007 GMC one-ton w/plow and liftgate $60,000
2009 Ski-doo Scandic$9,950
2009 Kromer ballfield maintenance machine$26,000
Tractor attachments$20,500
Justification
Annual replacement of parks equipment based on usage,age,and reliability.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 150,950 150,950
Total 150,950 150,950
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Replacement Fund 150,950 150,950
Total 150,950 150,950
2013-2017 CAPITAL IMPROVEMENT PLAN Page 44
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
' �
PK
Project# 1- ��
Project Name -16 # 3 � �,#:,i, ».-
2016 Park Maintenance Equipment �t11 g
Type Equipment Department Park Maintenance . r I
Useful Life Unassigned Contact Park&Rec.Director "1,
Category Equipment Priority n/a - r
Description
2007 1-ton with plow$56,000;2008 F250 with plow$35,000
2010 Ski-doo Scandic$9,950
2008 Kabota utility vehicle with drag$28,000
2011-Toro groundsmaster 16ft mower$87,000
Justification
Annual replacement of parks equipment based on usage,age,and reliability.
Expenditures 2013 2014 2015 2016 2017 Total
Vehicles 215,950 215,950
Total 215,950 215,950
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Replacement Fund 215,950 215,950
Total 215,950 215,950
2013-2017 CAPITAL IMPROVEMENT PLAN Page 45
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# PK-17
Project Name 2017 Park Maintenance Equipment
Type Equipment Department Park Maintenance
Useful Life Unassigned Contact Park&Rec.Director
Category Equipment Priority n/a
Description
2008 F250 Crew Cab,$29,000;2010 2-ton,$51,000;2009 Chevy$35,000
2011 Ski-Doo Scandic$9,950
2010 Toro groundsmaster,$87,000
2006 Mower trailer,$7,000
Justification
Annual replacement of parks equipment based on usage,age,and reliability.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 218,950 218,950
Total 218,950 218,950
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Replacement Fund 218,950 218,950
Total 218,950 218,950
2013-2017 CAPITAL IMPROVEMENT PLAN Page 46
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# 101
Project Name Annual Equipment Replacement
Type Equipment Department Pinewood Golf Course
Useful Life Unassigned Contact Park&Rec.Director
Category Equipment Priority n/a
Description
2013-Replace 1996 Toro GM-3100,$25,000;2003 Cub Cadet Tractor,$17,500
2014-Replace 2006 Toro Sidewinder,$40,000;2000 Toro Greens Aerator,$20,000
2015-Replace 2006 Toro 5200-D,$40,000;Club car utility cart,$7,000
2016-Replace 2006 Toro GM-3150,$27,000
Justification
Annual replacement based on age and condition of equipment at the Golf Course.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 42,500 60,000 47,000 27,000 176,500
Total 42,500 60,000 47,000 27,000 176,500
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Replacement Fund 42,500 60,000 47,000 27,000 176,500
Total 42,500 60,000 47,000 27,000 176,500
2013-2017 CAPITAL IMPROVEMENT PLAN Page 47
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# Plan-02
Project Name Comprehensive Plan Update
Type Study Department Planning
Useful Life Unassigned Contact Planning Manager
Category Unassigned Priority n/a
Description
Update to the Comprehensive Plan
Justification
The Comprehensive Plan has not undergone a comprehensive update since 2004. It is good planning practice to update this plan every 10 years,
at most,especially as the City Council has turned over,and the market has substantially shifted.
An up-to-date plan aids all city departments in their prospective future planning.
Expenditures 2013 2014 2015 2016 2017 Total
Planning/Design 72,000 72,000
Total 72,000 72,000
Funding Sources 2013 2014 2015 2016 2017 Total
City Development Fund 56,000 56,000
Sewer Fund 4,000 4,000
Street Improvement Reserve 8,000 8,000
Water Fund 4,000 4,000
Total 72,000 72,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 48
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# PD-01
Marked Squad Replacement&Additions
Name
are acemen ons
Type Vehicle Department Police
Useful Life 3 years Contact Police Chief fi _�
Category Vehicles Priority n/a
� a
Description
Routine replacement of vehicles at or near 100,000 miles. Includes all equipment and setup.
2013 2 replacement; 1 new
2014-2 replacement
2015-4 replacement
2016-2 replacement
2017-3 replacement
Justification
I
Annual replacement(3-4 years)of vehicles with over 100,000 miles or high miles and excessive maint.cost.
Expenditures 2013 2014 2015 2016 2017 Total
Vehicles 105,000 70,000 140,000 70,000 105,000 490,000
Total 105,000 70,000 140,000 70,000 105,000 490,000
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Replacement Fund 105,000 70,000 140,000 70,000 105,000 490,000
Total 105,000 70,000 140,000 70,000 105,000 490,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 49
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# PD-02
Project Name Unmarked Squad Replacement&Additions
Type Vehicle Department Police . ..
Useful Life 7 years Contact Police Chief
Category Vehicles Priority n/a
Description I
2013-1 replacement
2014- 1 replacement
2015-2 replacement
2016-2 replacement
2017-None
Justification
Annual replacement of high mileage unmarked vehicles.(100,000 plus or over 7-years old) Starting in 2012,these vehicles are being replaced
with the 2wd Chevy Tahoe's to provide more space for the Sergeant's equipment.
Expenditures 2013 2014 2015 2016 2017 Total
Vehicles 34,000 25,000 50,000 50,000 0 159,000
Total 34,000 25,000 50,000 50,000 0 159,000
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Replacement Fund 34,000 25,000 50,000 50,000 0 159,000
Total 34,000 25,000 50,000 50,000 0 159,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 50
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# PD-03 `.
Project Name CSO Vehicle Replacement&Additions _„
Type Vehicle Department Police
Useful Life 6 years Contact Police Chief V o i f
Category Vehicles Priority n/aT� ,
Description
I
CSO vehicle replacement and additions as follows:
2013- 1 replacement
2014- 1 replacement
2016- 1 replacement
Justification
Annual replacement of vehicles with over 100,000 miles or over 6-years old.
Expenditures 2013 2014 2015 2016 2017 Total
Vehicles 34,000 34,000 34,000 102,000
Total 34,000 34,000 34,000 102,000
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Replacement Fund 34,000 34,000 34,000 102,000
Total 34,000 34,000 34,000 102,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 51
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# PD-04
Project Name Police Department-Other Equipment
Type Equipment Department Police
Useful Life Unassigned Contact Police Chief
Category Equipment Priority n/a
Description
2013-3 Mobile Computer replacement and other equipment;ATV replacements
2014-2 Mobile Computer replacement and other equipment
2015-3 Mobile Computer replacement and other equipment
2017-3 Mobile Computer replacement and other equipment
Justification I
Annual replacement of computers that are over 5-7 years old.
Replacement of the 2003 Suzuki ATVs(transferred to Parks department)with one utility vehicle
Expenditures 2013 2014 2015. 2016 2017 Total
Equipment 27,000 6,000 12,000 12,000 57,000
Total 27,000 6,000 12,000 12,000 57,000
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Replacement Fund 27,000 6,000 12,000 12,000 57,000
Total 27,000 6,000 12,000 12,000 57,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 52
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# BL-07
Project Name Activity Center
Type Maintenance Department Public Buildings
Useful Life Unassigned Contact Park&Rec.Director
Category Buildings Priority n/a
Description I
2014 projects include replacing the roof replacement,ventilation system,carpet,boilers,AC unit replacement.
2015 projects include replacing doors and interior lighting/ceiling tiles.
2016 project include replacing the exterior lighting with LED.
Justification
The activity center was built in 1975 and functioned as a library prior to it becoming the activity center.
Expenditures 2013 2014 2015 2016 2017 Total
Building Maintenance 127,370 32,470 11,040 170,880
Total 127,370 32,470 11,040 170,880
Funding Sources 2013 2014 2015 2016 2017 Total
Government Buildings Reserve 127,370 32,470 11,040 170,880
Total 127,370 32,470 11,040, 170,880
2013-2017 CAPITAL IMPROVEMENT PLAN Page 53
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# BL-11
Project Name Fire Station#1 projects
Type Maintenance Department Public Buildings
Useful Life 25 years Contact Fire Chief
Category Building Maintenance Priority n/a
Description
Roof repair at Fire Station#1 (2013)
Furnace and water heater replacement at Fire Station#1 (2013)
Concrete floor repairs at Fire Station#1 (2015)
Justification
Roof Repair-The roof is over 27 years old and the building maintenance department has been repairing leaks quite often lately and the roof is
beyond its life expectancy.
Furnace Replacement-The furnace is several years old and starting to have maintenance and mechanical issues.
Concrete Floor Repairs- The concrete floor around the drains is in need of repair.
Expenditures 2013 2014 2015 2016 2017 Total
Building Maintenance 116,250 48,000 164,250
Total 116,250 48,000 164,250
Funding Sources 2013 2014 2015 2016 2017 Total
Government Buildings Reserve 116,250 48,000 164,250
Total 116,250 48,000 164,250
2013-2017 CAPITAL IMPROVEMENT PLAN Page 54
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# BL-13
Project Name Lions Park Building
Type Maintenance Department Public Buildings
Useful Life Unassigned Contact Park&Rec.Director
Category Building Maintenance Priority n/a
Description
Remodel Lion's Park Center to include a warming hourse.
Justification
Park maintenance need to replace a trailer rented as a warming house at Lion's Park skating rink. A remodel to Lion's Park Center provides a long-
term solution to the trailer rental.
Expenditures 2013 2014 2015 2016 2017 Total
Building Maintenance 7,000 7,000
Total 7,000 7,000
Funding Sources 2013 2014 2015 2016 2017 Total
Government Buildings Reserve 7,000 7,000
Total 7,000 7,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 55
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# PS-03
Project Name Floor repair/replacement projects
Type Maintenance Department Public Safety Building
Useful Life 15 years Contact Building Maintenance Supv.
Category Building Maintenance Priority n/a
Description
Floor repair(2014)
Carpet replacement in the Police department(2015)
Floor tile replacement in the Police department(2016)
Justification
I
The Public Safety building was built in 2002 and the traffic volume from staff and visitors has started to wear on the carpet and tiles.
Expenditures 2013 2014 2015 2016 2017 Total
Building Maintenance 5,000 54,120 33,122 92,242
Total 5,000 54,120 33,122 92,242
Funding Sources 2013 2014 2015 2016 2017 Total
Government Buildings Reserve 5,000 54,120 33,122 92,242
Total 5,000 54,120 33,122 92,242
2013-2017 CAPITAL IMPROVEMENT PLAN Page 56
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# WW-02
Project Name Lift Station Rehabilitation
Type Improvement Department Sewer Department
Useful Life 15 years Contact Chief Wastewater Operator
Category Utilities Priority n/a
Description
2013,2014&2016 Rehab oldest lift stations this is a ongoing maintenance item.
2013 rehabs will be at Evans,City Hall,&Westwood lift stations.
Justification
I
Preventative maintenance on our oldest lift stations.
Expenditures 2013 2014 2015 2016 2017 Total
Construction/Maintenance 86,000 60,000 60,000 206,000
Total 86,000 60,000 60,000 206,000
Funding Sources 2013 2014 2015 2016 2017 Total
Sewer Fund 86,000 60,000 60,000 206,000
Total 86,000 60,000 60,000 206,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 57
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# WW-03
Project Name Jet/Vacuum truck
Type Equipment Department Sewer Department
Useful Life 10 years Contact Chief Wastewater Operator
Category Heavy Equipment Priority n/a
Description
Replace the current JetNac truck for the sewer division
Justification I
In 2013 the sewer division jet/vac truck will be 10 years old and have reached its planned replacement age. Given the miles of sewer lines that
need to be cleaned each year it is important to have dependable equipment for the sewer division to perform one of its key functions.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 400,000 400,000
Total 400,000 400,000
Funding Sources 2013 2014 2015 2016 2017 Total
Sewer Fund 400,000 400,000
Total 400,000 400,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 58
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# WW-05
Project Name Buildings
Type Building Department Sewer Department
Useful Life 20 years Contact Chief Wastewater Operator
Category Buildings Priority n/a
Description
Sludge Storage Tank expansion
Justification
The facility plan update will provide more direction on the timing of this project. The existing sludge storage capacity needs to be expanded
otherwise we will start hauling two times a year thus increasing operating costs. Each hauling is about$40,000 per land application.
Expenditures 2013 2014 2015 2016 2017 Total
Buildings 500,000 500,000
Total 500,000 500,000
Funding Sources 2013 2014 2015 2016 2017 Total
Sewer Fund 500,000 500,000
Total 500,000 500,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 59
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# WW_06
Project Name Vehicle Replacement
Type Vehicle Department Sewer Department
Useful Life 10 years Contact Chief Wastewater Operator
Category Vehicles Priority n/a
Description
2014- 1998 pickup replacement
2015- 1-ton with hoist replacement
Justification
Annual replacement of vehicles after approximately 10 years and is adjusted based on maintenance costs and condition of vehicles.
Expenditures 2013 2014 2015 2016 2017 Total
Vehicles 30,000 70,000 100,000
Total 30,000 70,000 100,000
Funding Sources 2013 2014 2015 2016 2017 Total
Sewer Fund 30,000 70,000 100,000
Total 30,000 70,000 100,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 60
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# WW-14
Project Name Upgrade Boiler
Type Equipment Department Sewer Department
Useful Life 15 years Contact Chief Wastewater Operator
Category Equipment Priority n/a
Description I
Replace current boiler for primary digester
Justification
I
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 125,000 125,000
Total 125,000 125,000
Funding Sources 2013 2014 2015 2016 2017 Total
Sewer Fund 125,000 125,000
Total 125,000 125,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 61
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# WW-15
Project Name Replace Generators
Type Equipment Department Sewer Department
Useful Life 10 years Contact Chief Wastewater Operator
Category Equipment Priority n/a
Description
Replace 5 mobile generators.
Justification
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 110,000 110,000
Total 110,000 110,000
Funding Sources 2013 2014 2015 2016 2017 Total
Sewer Fund 110,000 110,000
Total 110,000 110,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 62
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# WW-17
Project Name Plant Expansion Master Plan
Type Improvement Department Sewer Department
Useful Life Unassigned Contact Engineer
Category Plant Expansion Priority n/a
Description
Modification to the existing WWTF. These modifications will increase the treatment capacity in order to meet the growth of the City and limits of
our MPCA discharge permit. The precise improvements required will be based on growth projections,permit requirements and findings of the
Facility Plan that is currently being completed.
Justification I
In addition to the increased flow projections expected as the City grows,treatment limits of our reissued MPCA permit continue to require
additional equipment and treatment processes to meet the MPCA requirements. As stated above,the exact improvements are not fully understood
at this time because they will depend on growth of the City and limits of our permit.
Expenditures 2013 2014 2015 2016 2017 Total
Construction/Maintenance 4,400,000 4,400,000
Total 4,400,000 4,400,000
Funding Sources 2013 2014 2015 2016 2017 Total
Sewer Fund 4,400,000 4,400,000
Total 4,400,000 4,400,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 63
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# ww_19
Project Name Upgrade TF, Controls&Pumps
Type Equipment Department Sewer Department
Useful Life 15 years Contact Chief Wastewater Operator
Category Equipment Priority n/a
Description
Upgrade from 1.6 to 2.2 mgd.
Justification
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 150,000 150,000
Total 150,000 150,000
Funding Sources 2013 2014 2015 2016 2017 Total
Sewer Fund 150,000 150,000
Total 150,000 150,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 64
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# WW-24
Project Name Bio solids disposal handling
Type Improvement Department Sewer Department
Useful Life 25 years Contact Engineer
Category Unassigned Priority n/a
Description
Implementation of improvements at the WWTP to change the sludge(Bio Solids)handling as the sewage flow grows.
Justification
The current method of sludge(Bio Solid)storage and land application on 150 acres of City owned property will not be economically feasible long
term as the WWTP flow grows from 1.2 MGD currently to 3.6 MGD ultimate capacity.
Expenditures 2013 2014 2015 2016 2017 Total
Construction/Maintenance 2,000,000 2,000,000
Total 2,000,000 2,000,000
Funding Sources 2013 2014 2015 2016 2017 Total
Sewer Fund 2,000,000 2,000,000
Total 2,000,000 2,000,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 65
Capital Improvement Plan 2013 that 2017
City of Elk River, Minnesota
Project# WW-25
Project Name SCADA System
Type Technology Department Sewer Department
Useful Life 10 years Contact Chief Wastewater Operator
Category Technology/Communiciations Priority n/a
Description
Remote monitoring of lift stations throughout the City sewer system.
Justification
The SCADA system will allow for reporting of alarms quicker and quicker response time. The system will be tied in with the different alarm
systems at the treatment plant. The current system is monitoring 64 alarms and starting to meet capacity.
Expenditures 2013 2014 2015 2016 2017 Total
Software/Hardware 450,000 450,000
Total 450,000 450,000
Funding Sources 2013 2014 2015 2016 2017 Total
Sewer Fund 450,000 450,000
Total 450,000 450,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 66
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# WW-26
Project Name Effluent Reuse Project
Type Improvement Department Sewer Department
Useful Life Unassigned Contact Engineer
Category Buildings Priority n/a
Description
This project involves the study of reusing the effluent water from the City WWTF by Great River Energy in some of their plant processes. The
project costs include the preliminary engineering work and associated construction costs to pump the water from our facility to Great River Energy.
Justification
Reuse by product which would other wise be a waste output from the WWTF
Expenditures 2013 2014 2015 2016 2017 Total
Construction/Maintenance 571,500 571,500
Total 571,500 571,500
Funding Sources 2013 2014 2015 2016 2017 Total
Sewer Fund 285,750 285,750
State grants 285,750 285,750
Total 571,500 571,500
2013-2017 CAPITAL IMPROVEMENT PLAN Page 67
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# WW-28
Project Name Phosphorus Monitoring System
Type Unassigned Department Sewer Department
Useful Life Unassigned Contact Chief Wastewater Operator
Category Equipment Priority n/a
Description
Phosphorus meter that adjusts the ferric feed rate to level of phosphorus entering the treatment plant.
Justification
This system will measure the appropriate amount of phosphorus to our ferric pumps thus reducing our operating costs.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 30,000 30,000
Total 30,000 30,000
Funding Sources 2013 2014 2015 2016 2017 Total
Sewer Fund 30,000 30,000
Total 30,000 30,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 68
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# ST-01 �`°
Project Name Vehicle Replacement-pickup trucks
Type Vehicle Department Streets � ����'
Useful Life 10 years Contact Street Supt. '��
Category Vehicles Priority n/a .
No ,.
A
Description
Street department pickup truck replacements.
2013- 1-ton truck$73K(replaces 1996)
2014-Pick up$28K(replaces 1997 pickup)
2015- 1-ton truck$73K
Justification
Annual replacement of streets equipment based on usage,age,and reliability.
Expenditures 2013 2014 2015 2016 2017 Total
Vehicles 73,000 28,000 73,000 174,000
Total 73,000 28,000 73,000 174,000
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Replacement Fund 73,000 28,000 73,000 174,000
Total 73,000 28,000 73,000 174,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 69
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# ST-02
Project Name Dump Truck Replacement
Type Equipment Department Streets t �`
Useful Life 15 years Contact Street Supt.
Category Heavy Equipment Priority n/a
Description
Dump truck replacement and additions.Includes all plow equipment.
2014- 1 Tandem Axle with plow,(Replaces 227),2000
2016- 1 Tandem Axle with plow,(addition to fleet)
Justification
Annual replacement of streets equipment based on usage,age,and reliability.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 205,000 205,000 410,000
Total 205,000 205,000 410,000
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Replacement Fund 205,000 205,000 410,000
Total 205,000 205,000 410,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 70
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# ST-03 ' ¢
Project Name
Project Heavy Equipment Replacement
Type Equipment Department Streets
ti
Useful Life 15 years Contact Street Supt. `'
Category Vehicles Priority n/a
Description
Heavy Equipment replacements&additions as follows:
2017-sweeper(replaces 2005,unit#316),front-end loader(replaces 2003,unit#313)
Justification
Annual replacement of streets equipment based on usage,age,and reliability.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 343,000 343,000
Total 343,000 343,000
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Replacement Fund 343,000 343,000
Total 343,000 343,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 71
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# ST-04
Project Name Other Equipment Replacement
Type Equipment Department Streets
Useful Life Unassigned Contact Street Supt. �
Category Equipment Priority n/a
a .ate
Description
Replace other Street Department equipment as follows:
2013-loader attachments$50,000; Track Backhoe$50,000;rapid response trailer$30,000
2014-crack router$11,550;loader attachments$20,000,Backhoe$50,000,Graco easy liner$6,500
2015-2004,Skid-steer$52,200;trailer replacement$15,000;2000,Brush chipper$50,000
2016-2005,Roller$15,000;pavement cutter$11,550;loader scale$10,000;Shoulder machine$68,250
2017-None
Justification
Annual replacement of streets equipment based on usage,age,and reliability.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 130,000 95,800 117,200 104,800 447,800
Total 130,000 95,800 117,200 104,800 447,800
Funding Sources 2013 2014 2015 2016 2017 Total
Equipment Replacement Fund 130,000 95,800 117,200 104,800 447,800
Total 130,000 95,800 117,200 104,800 447,800
2013-2017 CAPITAL IMPROVEMENT PLAN Page 72
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# ST-14
Project Name Transportation Plan Update
Type Study Department Streets
Useful Life 10 years Contact Engineer
Category Unassigned Priority n/a
Description
Update City's Comprehensive Transportation Plan to include all new transportation information from MnDOT,Sherburne and Anoka Counties
and the City of Elk River.
Justification
Since the transportation plan was adopted in August 2004 there have been MnDOT studies of TH169 and parts of TH10. The City has worked on
the FAST study area and Sherburne and Anoka Counties have undertaken transportation discussion that affect Elk River. This City
Transportation plan will include all of this new information.
Expenditures 2013 2014 2015 2016 2017 Total
Planning/Design 50,000 50,000
Total 50,000 50,000
Funding Sources 2013 2014 2015 2016 2017 Total
Street Improvement Reserve 50,000 50,000
Total 50,000 50,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 73
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# ST-16
Project Name GPS salt controllers
Type Equipment Department Streets
Useful Life 7 years Contact Street Supt.
Category Equipment Priority n/a
Description
Install GPS salt controllers on 5 more street department plows.
Justification
We anticipate significant salt savings due to more accurate spreading and salt control. The GPS will provide instant feedback on salt applied on
routes.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 20,000 20,000
Total 20,000 20,000
Funding Sources 2013 2014 2015 2016 2017 Total
General Fund Operating 20,000 20,000
Total 20,000 20,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 74
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# TC-01
Project Name Annual Technology Upgrades
Type Equipment Department Technology/Communications
Useful Life 5 years Contact IT Coordinator
Category Technology/Communiciations Priority n/a
Description I
2013-Fiber network connections/enhancements/Security Camera replacements/Campus-wide Wireless Network/Virtualization repayment
2014-2004-Phone System Replacement/Virtualization payback/Hardware/enterprise switch,UPS hardware/Virtual Desktop
2015-Virtualization refresh hardware/software/Ipad replacements
2016-Hardware/enterprise switch/UPS hardware
2017-Security Camera replacements
Justification
I
Annual replacement and upgrade of information technology software/hardware.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 75,900 362,900 127,500 52,000 30,000 648,300
Total 75,900 362,900 127,500 52,000 30,000 648,300
Funding Sources 2013 2014 2015 2016 2017 Total
Capital Outlay Reserve 50,000 352,000 120,000 52,000 30,000 604,000
General Fund Operating 25,900 10,900 7,500 44,300
Total 75,900 362,900 127,500 52,000 30,000 648,300
2013-2017 CAPITAL IMPROVEMENT PLAN Page 75
Capital Improvement Plan 2013 thru 2017
City of Elk River, Minnesota
Project# TC-03
Project Name Timekeeping Software
Type Technology Department Technology/Communications
Useful Life 7 years Contact Human Resource Rep
Category Technology/Communiciations Priority n/a
Description (
Electronic Timekeeping software
•
Justification
The ability to record work time electronically has many benefits. Electronic timekeeping saves paper,rather than printing 170+timesheets every
two weeks,employees record their time on a computer or through a punch-in type system.
Supervisors would have the ability to continually monitor time usage and approve time worked with the click of a button. Once approved,the
system automatically feeds the time records directly to the payroll system:thereby eliminating hours of data entry every payroll.
Electronic timekeeping systems provide enhanced reporting and a greater ability to track work time based on tasks. Most systems also allow for
employees access to information like leave balances and tax exemptions and provide automated processes for requesting time off from work.
Recent State contract pricing may decrease the amount.
Expenditures 2013 2014 2015 2016 2017 Total
Software/Hardware 75,000 75,000
Total 75,000 75,000
Funding Sources 2013 2014 2015 2016 2017 Total
Capital Outlay Reserve 75,000 75,000
Total 75,000 75,000
2013-2017 CAPITAL IMPROVEMENT PLAN Page 76
2013 Equipment Purchases
Est.Cost
No. Unit# Old Description Rpl.Cycle Age Disposition Department Primary Division New Vehicle Description 2013
1 'N/A N/A 4 N/A Auction Fire Admin. Mobile Computers(4) 25,000
2 601 2009 Crown Victoria patrol car 3-4 4 Auction Police Patrol Patrol car(To be determined) 35,000
3 623 2010 Crown Victoria patrol car 3-4 3 Auction Police Patrol Patrol car(To be determined) 35,000
4 626 N/A N/A N/A N/A Police Patrol Patrol car(To be determined) 35,000
5 610 2006 Chevy Hummer 7 7 Forfeiture Police Patrol Chevy Tahoe 2wd 34,000
6 645&646 2003 Suzuki ATV's 10 10 Transfer Police Patrol UTV(Utility Vehicle) 15,000
7 611 2006 Chevy Colorado 6 7 Transfer Police CSO Chevy Tahoe 4wd 34,000
8 N/A Mobile Squad Computers(3) 4 4 Auction Police Patrol Mobile Squad Computers(3) 12,000
9 N/A N/A N/A N/A N/A Public Works Streets Track Backhoe 50,000
10 222 1996 Chevy 3500 10-12 17 Auction Public Works Streets Chevy 1 ton 73,000
11 N/A 1985 Loader attachments 28 N/A Public Works Streets Updated Loader attachments 50,000
12 N/A N/A N/A N/A N/A Public Works Streets Rapid response unit 30,000
13 526 2002 Dodge Ram Pickup 10 11 Transfer Fire Building Safety Smaller size SUV 26,000
14 786 1996 Toro 3100 10 16 Auction Parks and Recreation Pinewood Toro Mower 25,000
15 787 2003 Cub Cadet Tractor 7-8 10 Trade-in Parks and Recreation Pinewood John Deere Tractor 17,500
16 754 2004 Holder(sidewalk machine) 10 9 Trade-in Parks and Recreation Park Maintenance Municipal Sidewalk Machine** 186,250
Total $682,750
Notes:
Rpl Cycle=per our adopted policy on useful lives.
**= Item 16(Sidewalk Machine)will be re-evaluated by the fleet committee after the next snow season.