8.1. SR 12-17-2012 fi
City of
Elk REQUEST FOR ACTION
River
TO ITEM NUMBER
Mayor and City Council 8.1
AGENDA SECTION MEETING DATE PREPARED BY
General Business December 17,2012 Justin Femrite,P.E., City Engineer
ITEM DESCRIPTION REVIEWED By
Policy Change Associated with Highland Road Sewer and Water Cal Portner, City Administrator
Connections REVIEWED BY
ACTION REQUESTED
Approve changes to the policy as it relates to collection of sewer and water assessments from properties
with services along Highland Road.
BACKGROUND/DISCUSSION
On December 10,2012, the City Council reviewed and approved two ordinance amendments as it relates
to the connection and financing of service connections to the public sewer and water system. The first
ordinance amendment approved allows for existing home owners,who have availability to public sewer
and water,to make connection to those systems and have the costs assessed to their property. This
ordinance was passed to assist property owners,who are required to be connected to the public systems,
with the costs of making the connections. This financing option for property owners will be in place
until December 31,2015.
The second ordinance amendment that was considered and adopted related to the connection of existing
homes to the sanitary sewer and water system. Previously,Chapters 78-21 and 78-97(d) of the Elk River
City Code detailed that all properties with access to sewer and water services be connected to the public
systems within two years of said utility being made available. The ordinance was amended to remove and
replace the two year requirement with a requirement for a property with public services available to be
connected to the municipal services at the time of failure of either the existing septic system or well or
when the property is sold,whatever comes first.
Highland Road Sewer and Water Assessments
At the August 21,2006,meeting,the City Council approved a policy to charge the properties along
Highland Road for the sewer and water systems that were installed as part of the 2006 improvement
project. These utility improvements resulted in providing individual sewer and water services to 25
properties along Highland Road. The 2006 policy stated the properties would be assessed$15,000 for the
cost of the city to provide the services. Those properties that did not connect to the new services in 2006
would still be required to pay the assessment at the time of hook up in the future but the principle
amount would be increased by 3% annually thereafter to cover inflation. Of the properties that received
services,no property owners elected to connect to the system in 2006 and none have connected since
that time.
P O 11 E u E 0 1
I! 1ATU1I
In an effort to incentivize the connections be made,the City Council discussed changes to the policy.
The direction was to hold the amount of the assessment at$15,000 for all connections made within the
next three years. The details of the changes are as follows:
A Highland Road property owner,upon petition to the city,can connect to the sanitary sewer and water
systems before December 31,2015, and assume a flat assessment of$15,000 for the principal on the
sewer and water assessment. Those properties delaying connection past December 31, 2015,will be
charged the $15,000 assessment with accrual of an annual 3%inflation charge to be calculated starting
back in 2006. This would result in a principle assessment amount for properties choosing to connect in
2016 of$20,163.
The above described policy change does not affect the requirement of all properties to also pay the
current year fee for both the Sewer and Water Access Charges. Those charges and the costs to connect
the building to the new services located at the right-of-way will still be costs that need to be covered as
part of making the connection. Per the ordinance amendment described above, all of the costs qualify
for being assessed to the property if the owner chooses to connect within the next three years.
Upon the approval of the policy change by the City Council, staff will prepare and send a letter to each of
the property owners along Highland Road detailing the policy and ordinance changes.
FINANCIAL IMPACT
There is no financial impact associated with this change in policy because the City Council and Elk River
Municipal Utilities have already made the financial commitment to provide these services. Any financial
impact would be in a positive direction as residents decide to hook up and agree to begin paying an
assessment for the sanitary sewer and water system.
ATTACHMENTS
• Staff report and Council minutes from August 21, 2006
Action Motion by Second by Vote
Follow Up
r IEREII ATURE
[:)
tor
River
City of Elk River Item Number
REQUEST FOR COUNCIL ACTION 5.11.
Agenda Section Meeting Date Prepared by
Engineering August 21,2006 Terry Maurer,City Engineer
Item Description Reviewed by
Highland Road Sanitary Sewer and Water Assessment
Introduction
The Highland Road Project is proceeding and will be substantially complete this fall. As you are
aware,sanitary sewer and water are part of the construction. We have received a number of
inquiries about the cost to hook up to the City sanitary sewer and water system.
Discussion
We have reviewed the costs for sanitary sewer installation and the costs for the modifications to
the existing water system with the current bid. In addition,we have taken a look at the
investment the Elk River Municipal Utilities have made in the trunk line connecting the two high
pressure zones via the Highland Road corridor. We have measured that against the number of
properties that could be served by it,keeping in mind that some of the properties will be able to
be subdivided in the future with sanitary sewer and water available. Also,there is a larger area
included in the City's Urban Service District which will be someday be served through these
facilities.
With this analysis as a backdrop,we are recommending that existing properties that want to hook
up to sanitary sewer and water be charged a$15,000 assessment. This would be in addition to the
already levied street assessment. Properties wanting to hook to sanitary sewer and water would
have to sign a Petition and Waiver,accepting the$15,000 assessment. The assessment would be
charged against their property at 5.5%interest,which was the interest rate used on the street
assessment. In an effort to recover the City's time value of the money expended to place these
facilities in 2006,we are recommending that each subsequent year,the$15,000 assessment value
be increased by 3%. This is the same inflation factor that has been utilized for several years in the
trunk sewer and water assessment rates.
In addition to accepting the assessment,anyone wishing to hook up to sewer and water will need
to pay a Sewer Availability Charge(SAC)and Water Availability Charge(WAC),as well as
physically make the connection from the property line to their home.
It would be staff's recommendation that once the City Council has had an opportunity to discuss
and review this issue,that an informational mailing detailing all of these issues be sent to each of
the property owners along Highland Road.
•
•
Financial impact
There is no financial impact as the City Council and Elk River Municipal Utilities have made the
decision to expend the monies to extend sanitary sewer and modify the existing water systems
along Highland Road. Any financial impact would be in a positive direction if residents decide to
hookup and agree to begin paying an assessment for the sanitary sewer and water system.
Attachments-None
Action Requested
Discussion of this issue at a Council level and direction to staff to send an informational mailing
to Highland Road residents.
Council Action Motion by Second by Vote
Follow Up
•
•
S_\EngineerImprovProj\2006 Improvement ProjectAI3ighland Road\08 21 06 cc memo.doc
II
City Council Minutes Page 10
August 21,2006 •
MOVED BY COUNCILMEMBER FARBER AND SECONDED BY
COUNCILMEMBER GUMPHREY TO MOVE FORWARD WITH THE TH 169
GEOMETRIC STUDY, MOTION CARRIED 5-0.
Councilmember Farber stated he would like federal/state legislators contacted informing
them of the issue Elk River is facing and to introduce a bill in order for Elk River to be
refunded for this Study.
Mayor Klinzing directed staff to discuss with Council how to carry out a lobbying effort for
the city.
5.8. Resolution Approving the Plans and Specifications and Ordering the Advertisement for
Bids in the Matter of the CSAH Watermain Extension Improvement
Mr.Maurer stated the city has agreed to finance the water improvement's and to use future
watermain assessments for the repayment for the CSAH 12 improvement.
MOVED BY COUNCILMEMBER FARBER AND SECONDED BY
COUNCILMEMBER GUMPHREY TO ADOPT RESOLUTION 06-101
APPROVING THE PLANS AND SPECIFICATIONS AND ORDERING THE
ADVERTISEMENT FOR BIDS IN THE MATTER OF THE CSAH 12
WATERMAIN EXTENSION IMPROVEMENT OF 2006.MOTION CARRIED
5-0.
5.9. Consider Agreement for Improvemento County Highway 40
Mr.Maurer stated Sherburne County will be upgrading County Highway 40.He discussed
the bids received for the project,the city's cost,and funding sources.
MOVED BY COUNCILMEMBER MOTIN AND SECONDED BY
COUNCILMEMBER FARBER TO APPROVE THE AGREEMENT FOR THE
IMPROVEMENT OF COUNTY ROAD 40 IN THE CITY OF ELK RIVER,
MINNESOTA(S.P.71-596-04).MOTION CARRIED 5-0.
5.10. Consider Agreement for Improvement to County Road 33
Mr.Maurer stated Sherburne County will be upgrading County Road 33. He discussed the
bids received for the project,the city's cost,and funding sources.
MOVED BY COUNCILMEMBER GUMPHREY AND SECONDED BY
COUNCILMEMBER FARBER TO APPROVE THE AGREEMENT FOR THE
IMPROVEMENT OP COUNTY ROAD 33 IN THE CITY OF ELK RIVER,
MINNESOTA(S.P.71-633-01).MOTION CARRIED 5-0.
5.11. HighlancjSewer and Water Connection Charges,
Mr.Maurer reviewed the progress of the Highland Road Improvement.He stated he has
- received inquiries from residents regarding the cost of hooking up to city sewer and water.
Mr.Maurer recommended the city assess$15,000 for the hookup charge with an inflationary
percentage added each year.He reviewed how he arrived at this amount.
I
City Council Minutes Page 11
August 21,2006
Mr.Maurer stated the Boston/Concord Improvement assessment was required at$17,500
• but the residents in the Highland Improvement would not be required to hookup.
Councilmember Farber questioned what would happen if the actual cost came in lower than
the estimated.
Ms.Johnson stated the city tried to reach a reasonable assessment number.She stated if the
number is too low,the city would be subsidizing the project.
Councilmember Gumphrey stated the$15,000 was too high for an assessment and it should
be Iowered.
MOVED BY COUNCILMEMBER GUMPHREY TO RECOMMEND $12,000 BE
ASSESSED TO HIGHLAND ROAD IMPROVEMENT RESIDENTS FOR
HOOKING UP TO SEWER AND WATER.Motion failed for lack of a second.
MOVED BY COUNCILMEMBER MOTIN AND SECONDED BY
COUNCILMEMBER DIETZ TO RECOMMEND$15,000 BE ASSESSED TO
HIGHLAND ROAD IMPROVEMENT RESIDENTS FOR HOOKING UP TO
SEWER AND WATER WITH A THREE PERCENT RATE INCREASE PER
YEAR.
MOTION CARRIED 34.Councilmember Gumphrey opposed. Councilmember Farber
abstained because his property is included in the Highland Road Improvement.
• Councilmember Motin stated if the cost is too prohibitive the Council could consider
lowering the rate and the residents who paid the higher rate would be reimbursed.
5.12. School Street/Jackson Avenue Intersection Analysis Update
Mr.Maurer explained several alternatives for improving the intersection operations at
School Street and Jackson Avenue.
Councilmember Motin expressed concerns with using MSA funds for this project due to the
account being low.
Councilmember Dietz questioned if there were other alternatives for funding this project.
Ms.Johnson stated the city could use reserves but there is competition for these funds.
It was the consensus of the Council to move forward with this project and to have staff
bring back more detail regarding costs and to ask the School District for right-of-way for a
right turn lane onto School Street.
6.1. Resolution Giving Preliminary Approval for the Issuance of General Obligation Capital
Improvement Plan Bonds in an Amount Not to Exceed$5 Million and Adopting the City of
Elk River,Minnesota Capital Improvement Plan,Public Hearing
Ms.Johnson stated a public hearing is needed to consider the city's Capital Improvement
Plan for the purpose of issuing Capital Improvement Bonds for construction of a new
• library. She discussed the bond amount and modifications on the Capital Improvement
Plan.