Loading...
5.4. ERMUSR 01-08-2013 Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: Elk River Municipal Utilities Commission Wade Lovelette— Superintendent of Technical John Dietz, Chair Services Daryl Thompson, Vice Chair Allan Nadeau, Trustee MEETING DATE: AGENDA ITEM NUMBER: January 8, 2013 5.4 SUBJECT: Electric Distribution System Supervisory Control and Data Acquisition Project (SCADA) BACKGROUND: In March of this year we had met with United Services Group (USG) to go over Supervisory Control and Data Acquisition (SCADA) plans and get it installed at each of our substations. This gives us real-time data and control of switching from remote locations. In other words, each of our substations can be monitored and controlled by a computer. DISCUSSION: Part of the installation costs were saved by us providing the labor to do the trenching and pulling of the wire and fiber optic cable. We had to change the controllers for the breakers at each feeder. Each controller has a fiber optic communication card that talks to the computer to gives us the information that we are requesting. SCADA can also be used as a safety tool in LockOut-TagOut. This system will be beneficial for our Outage Management System (OMS). During outages we can see if a main feeder has tripped out or if the outage is localized to a smaller area. It will also give us control of the feeders at the power plant or from a laptop computer. Today, we can see every one of our substations and what the amperages, voltages and power factors are on our computers. The affected employees have been trained in cyber security and operation of SCADA through USG. We are using it to just view only. We will eventually be able to open and close breakers, set them to non-reclosing, ground trip block and then return them to normal operations. I have set up the laptop to show what it looks like on a computer screen. ACTION REQUESTED: No action needed. 4 imii owreeo er INATUR Reliable Public P O W E R E D T o S E R V E Power Provider