Loading...
4.6. SR 03-04-2013 Elk REQUEST FOR ACTION River TO ITEM NUMBER Mayor and City Council 4.6 AGENDA SECTION MEETING DATE PREPARED BY Consent March 4, 2013 Rich Czech,Arena Manager ITEM DESCRIPTION REVIEWED By Rebuild Olympic Dehumidifier Michael Hecker, Parks &Recreation Director;Tim Simon,Finance Director REVIEWED BY Cal Portner, City Administrator ACTION REQUESTED Approve by motion to accept the quote from Midwest Mechanical Solutions for$65,416.81 to rebuild the Olympic Rink dehumidifier. BACKGROUND/DISCUSSION The dehumidifier for the Olympic rink was installed in 1998. Due to its age, some of the major components in the system are worn to the point where they no longer operate,which impacts the quality of the ice surface and decreases the efficiency of the ice-making plant. The wet,warm air speeds the thaw of the ice which makes for a bad ice surface and creates the need for the ice plant to work harder and longer to hold proper ice temperature,using more electricity. FINANCIAL IMPACT $64,000 was budgeted in the Arena's 2013 budget to rebuild the dehumidifier. Per state statute,we sought and received two quotes,the lowest being from Midwest Mechanical Solutions for $65,416.81. ATTACHMENTS • Price quote - Midwest Mechanical Solutions • Price quote -American Industrial Refrigeration Mechanical Contractors Action Motion by Second by Vote Follow Up N:\Public Bodies\City Council\Council RCA\Agenda Packet\03-04-2013\4.6.docx 4�-- ffq� wqwm !!!IWW SZZS Lewis Road C'o er-a \/aIIey_ MN 55427 From Dan Wieting - Midwest Mechanical Solutions To: Dennis Walker- Elk River Ice Arena Description Parts Cost Labor Item 1 Direct Fired Air Makeup Burner & Pilot Assembly $844.31 $570.00 Qy(1) Burner Part#P0033200 (to replace Cracked Burner) Item 2 Desiccannt Wheel $21,054.38 $5,700.00 Qty(1) DH Wheel Ass'y, (4) Rollers, (1) Belt & (2) Seals added Qty(1) DH Wheel Motor Drive/Gearbox Item 3 Supply Fan Motor, Fan Bearings, Sheaves and Belts $4,659.75 $950.00 Qty(1) 25 HP Motor, Prem-Eff, Constant Speed Sheaves, and 5VX Belts, and (2) Bearings. *Fan should be inspected closer to verify there are no other issues. A dynamic balance would be a good idea $400.00 Item 4 Replace Reznor NG Heaters $17,057.25 $855.00 Qty(2) Reznor Heaters modified to original design spec. Item 5 Clean Enthalpy Wheel, Bearings, belt and clip $1,261.13 $2,850.00 (2) Bearings, *this may not be needed, optional in my opinion. Item 6 Clean Munters Unit and Duct Work $3,800.00 Item 7 Verify that all limits and controls are working and sequencing $1,140.00 Item 8 ITruck Crane and Delivery Charges $2,775.00 Item 9 Final Inspection and startup with Munters Represetative $1,500.00 Quote good for 60 days. $49,151.81 $16,265.00 Terms; 10% Down, 40%at completion, balance in 30 days. $0.00 F-- IFOB Factory, includes State Sales Tax on Parts Total 65416.8125 Parts warranty would be 1 year** from the date of shipment. 0 ** DH Wheel has a 5 yr warranty&the Motor a 3 Year. All Parts warranty is against "manufactures defects" Labor would be included in anything directly related to 0 failure of a part that was replaced. Notes: Items 1 & 2 are direct OEM replacements to the original: Item 3 equal to originals but of currect Fan Manufactures Design. Item 4 as noted. All or part or the Labor maybe subcontracted out to local contractors, specific to the scope of the related work overseen by Munter Representative. Quote includes, labor to remove and install above materials, discarding of items removed, receiving items to the jobsite. Normally delivery of quoted items is 4 weeks, work could be started in about 6-8 weeks. PROPOSAL AIR American Industrial Refrigeration Mechanical Contractors 14322 21St Ave. No. • Plymouth, MN •55447 *Phone(952) 470-9610 *Fax (952) 470-9617 Company Name Phone/Fax Date Elk Rive Ice Arena 763.635.1142 2/28/13 Street Address Quote number 1000 School St. N.W. 0213-03-BLREV2 City,State,Zip Project Location Elk River, MN 55330 Munters Unit Attention: Project Description Dennis Walker Repairs Dear Dennis, AIR is pleased to offer this proposal to make the needed repairs on your munters unit. The following will be performed: • Duct and air unit cleaning • Dessicant wheel replacement with new belt and seals • Gear box and motor replacement for dessicant wheel • New rollers, shafts and spacers for dessicant wheel • New belts and Sheeves for blower wheel • New 25 HP motor for supply fan • 2 New Reznor furnaces • Replace the direct fired makeup burner and pilot assembly • Check operation and sequencing of controls • Final inspection with Munters factory representative Elk River Ice Arena price............................................................................$66,067.24 Freight is not included or any other repairs and parts that may come up. Fence removal not included. Parts will have warranty for one year from Munters for date of install. 14322 21st Ave. N. • Plymouth, MN 55447 • TEL: (800) 310-9610 • FAX: (952) 470-9617 215 Pleasant Ave. • PO Box 460 • Atwater, MN 56209 • TEL: (800) 279-9031 • FAX: (320) 974-8080 All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will become an extra charge over and above the estimate. American Industrial Refrigeration will not be held liable for agreements contingent upon strikes, accidents or delays beyond our control. Building owner will carry fire,property and other necessary insurance. Our workers are covered by workmen's compensation insurance. American Industrial Refrigeration will not be responsible for, nor will bid on this project, any work or cost of asbestos abatement. Building owner will provide safe work area with free access to carry out above work. As part of this Proposal, if it is required by the Contract,American Industrial Refrigeration will provide commercial general liability coverage for the scope of AIR'S work on the project to the fullest extent of its current insurance coverage. American Industrial Refrigeration will not assume any insurance obligations beyond that included in its current insurance policy. Upgrading of existing systems to meet the most current codes is limited to scope of work detailed above. All work to be performed during normal workday(lam to 3:30 pm,M-F)on straight time unless otherwise noted.Drain down and refilling of piping systems by others unless noted above. On all accounts over 30 days, customer agrees to pay all reasonable collection fees and/or attorney fees. Note: Proposal may be withdrawn by us if not accepted within 30 days. If you have any questions, please feel free to contact me. Bob Lind—Service/ Project Sales Phone 651.357.1274 E-mail blind @airefrig.com Cell 612.991.1645 ACCEPTANCE OF PROPOSAL -The above prices,specifications and conditions are satisfactory and hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Date of Acceptance Authorized Signature P.O. # 14322 21st Ave. N. • Plymouth, MN 55447 • TEL: (800) 310-9610 • FAX: (952) 470-9617 215 Pleasant Ave. • PO Box 460 • Atwater, MN 56209 • TEL: (800) 279-9031 • FAX: (320) 974-8080