5.0. ECCSR 03-20-2013 Energy Design Building tIV—HGYCIIY
T;; Components -....... ••..^�
�i� at__
River
As a service to the Elk River Building Community,the Elk River Energy City Commission has put together this list of Energy
Efficient Building and Healthy Home Components to be considered for your next building project. The Energy City Commission
can direct you to technical assistance to help build more energy efficient buildings In Elk River.If you are interested in this
service,please call 763-635 4000 and ask to speak with Rebecca Haug or e-mail her at rhaua(e ElkRiverMN.aov.
ll'/
Roofing Insulati. " ,"
Metal Roof �Arm,/
r;:ll Insulated Panels
SIP . .,. :, Y Panels)
Photovoltaic shingles / ay Foam I ,1
on
Green roof , Lighting •!/,,
Recycled Tire shingles ///�Jt a (lig .'pitting diode f//f1 •
White Roof g
/� C L i; , pact fluorescent lights)
./fin ?y /�%/
Foundation ° .',j f/Natural /.-.1';',: g .
ICF(insulated concrete form�/% / �4 v�, if , s //� i
Pre-cast Concrete with in c'`i< %f�ow E ��f'
f
Conventional Foundation with /vai.c .�y ./ riple Pane
insulation `4 / i,`% /�,
.:4';„.// /�, / ,!;j Indows with insulated frames
i j -4, ��� '��, Flooring-Renewable$
HVAC Systems !/%j, �'.�' �
� � f Bamboo •
Geothermal ''/
/
,4,/,� ' ' Cork
High efficient HVAC-90+ °�/ .
y� Recycled Content(carpet,tile)
Mass Heat Storage Systems
Sustainable wood flooring
In-Floor Heating Systems
Cabinets
Solar Water Heating
Wheat
Air Source Heat Pumps
Corn Stalk
Geothermal Heat Pump
Reclaimed Timber
HRV(Heat Recovery Ventilation)
•
Countertops Positive grading
Solid Surface(quartz and granite) Low or no mow grasses(with approval)
Recycled Glass Native vegetation(with approval)
Concrete Wastewater Heat Recovery Units
Appliances—Energy Star® Other
Refrigerator Clothes line
Stove Charging sty 'on
k/
i
Dishwasher Rado t
on
j/
Dryer •' '"
L +0+C g 4, solvents and paints
Washing Machine 6ide/Outside <'1;o sensors
Water Heater ,tprogrammable therm/"!-
i
AC—SEER 14+ �� •! ration for Solar Gain
44.///f /
High Efficiency Gas Equipment(Furnace, Doi , ./,, Certi i r't ns
Tankless Water Heater / // J. �!fv3�/rgy Sta
•%�//'v f% '%/i� 4
Water Conservation 45' s: r / p,le
Sink aerators f/ % sr
/ ,,, Green Star
Pressurized toi 3�. /
r;`/;//� r i/ Been Globe
Low flow s /rheads r/! �4:,,, j Good Building Practices
Dual flush toile�„/'44> '/�/� Clothes line
Rain gardens ,/f
%7 Sealing attic bypasses
SMART irrigation ej* l Insulated windows
Cisterns / Flashing
Rain Barrel Blower Door/Infrared Scan option
Permeable Pavers
Rebates-Check with your local utility for rebates:
Elk River Municipal Utilities Con nexus Energy Centerpoint Energy
(763)441-2020 (763)323-2650 (800)245-2377
http://www.centemointenerRy.co
htto://www.elkriverutilities.com/ htto://connexusenergy.com/ m/home/
Elk River Energy City "Demonstration Project Information Form
Behavior Change EN=RGYCITY
4pry3 THE POWEq p/EFFIQ9dT 4
•
P^ E
Date of Application: <mm/dd/yyyy>
Date Project will Commence: <mm/dd/yyyy> Interim Date: <mm/dd/yyyy>
Date Completed: <mm/dd/yyyy>
Name of Project: <Name of Project>
Company/Organization(s): <Company/Organization(s)>
Addresss: <Address>
Contact Person: <Contact Person>
Phone Number: <Work> <Cell>
E-mail: <E-mail>
Sector(please check the appropriate box):
❑ Agriculture
❑ Institutional
❑ Commercial
❑ Industrial Residential
Brief Description of the project and technoiogy(ies) (attach any pertinent
What resources are your Behaviors) anticipated to change?
❑ Water ❑ Transportation(Fuels)
❑ Decbidty ❑ Waste Reduction
❑ Natural Gas
Project Location
Anticipated Project Cost
Expected or known results(ex. Measurements of air emissions,
reduced water usage, energy consumption reduction,etc.)
How will you prove your measurements?
Anticipated benefits of the project(for whom)?
How can this project help Elk River achieve its vision of being the
most energy responsible city in Minnesota?
Contact Person to implement and
promote the service or project(if not
the person listed as contact above): <Contact Person>
As a representative for the company/organization(s) listed above,I am authorized to
give permission to Elk River Energy City to use project information or publicize the
project as an Energy City Demonstration Site:
Approved by: <Approver>
Title: <Title>
Date Approved: <mm/dd/yyyy>