Loading...
5.4. ERMUSR 03-13-2013 Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: Elk River Municipal Utilities Commission Troy Adams, P.E. —General Manager John Dietz—Chair Daryl Thompson—Vice Chair Al Nadeau—Trustee MEETING DATE: AGENDA ITEM NUMBER: March 19, 2013 5.4 SUBJECT: 69kV Substation Transformer Bids BACKGROUND: The 2013 Budget included an upgrade to the North Substation in the electrical capital improvement projects. An upgrade to the North Substation has been on the electric distribution capital projects forecast for the past 5 years. Because of the other projects having higher priority and then the downturn in the economy and load growth,this upgrade had been postponed. In 2012 the summer load on the North Substation exceeded the operational threshold and load was transferred to be served from other substations for the duration of the summer. This project was upgraded to a top priority for 2013 because of the recent load at this substation reaching the operation limits,the early signs of load growth revival, the potential for electric service territory growth, and the potential for the expansion of the Landfill Gas to Electric Generation Facility. Staff has been working with Great River Energy on the development of plans and specifications for this project. The formal notice for bids has been posted for the transformer. DISCUSSION: The bid opening was scheduled for March 18. The bid tabulation will be provided at the Commission meeting. ACTION REQUESTED: Staff will make an award recommendation at the time of the meeting. tk P O N E A E I e E Page NATURE� Reliable Public r � Power Provider P owrern To Srev