SR 05-06-2002MEMORANDUM TO: FROM: DATE: SUBJECT: Mayor and Council Pat Klaers, City Administrator May 6, 2002 Special City Council and Sherburne County Board Meeting There are a variety of agenda items to jointly discuss with the City Council and thc Sherburne County Board at our meeting on Monday, May 6, 2002. This meeting will be held at 6:00 p.m. in the Elk River Training Room. Most of the agenda items will be of an "update" nature. There will be only be a few attachments included with this City Council packet and my agenda comments are brief. Agenda Item e Northstar Corridor Funding/Project Update Commissioner Betsy Wergin is scheduled to provide an update on the status of the Northstar project. GIS City Engineer Terry Maurer and County Engineer Dave Schwarting can provide an update on the status of the GIS project. I understand the work by Howard R. Green is essentially finished and the county will complete future updates of the mapping system. e Legislative Update At this time there is nothing to report. Serious meetings are anticipated after the Democratic Caucus this weekend. As of May 6, 2002, there ~vill only be two weeks left in the 2002 legislative session. The city and county both want a veto proof budget to be adopted rather than providing the Governor with a free hand to cut state aids to local units of government. Se Gravel Audit Sec attached memo from Building and Zoning Administrator Steve Rohlf. County Fair/Fairgrounds Status County Administrator Brian Benson is scheduled to provide an update on the short and long range plans of the Fairboard. e Streets/Roads No action is being requested on any of the items listed under the Streets section of the agenda. Attached is a county map showing the county roads in Elk River. Regarding County Road 40, it should be noted that federal funds are available for a project in 2003. Questions regarding this project include the status of ROW and any realignment in the northern part. 7.6. CR 77 and Schools...Crossings and Pathways This issue is related to children crossing County Road 77 to get to the schools. Councilmember Kuester requested this item to be on the agenda. Solid Waste/Environmental Building and Zoning Administrator Steve Rohlf will be in attendance at this meeting to participate in this discussion. Regarding Item 8.4., RDF Contract, it should be noted that the contract with the county expires in 2009 but the commitment to enter into serious negotiations with NRG and Great River Energy needs to be made by 2004. The city ~vants to be part of these discussions as these facilities are within the city limits and also the city has a strong desire to continue receiving its host fee for having the RDF operation in the city. MEMORANDUM Item ~ 5 TO: Mayor and City Council FROM: Stephen Rohlf, Building and Zoning Administrator DATE: May 6, 2002 SUBJECT: Gravel Audit At last year's joint City Council/Sherburne County Board meeting, both bodies asked staff to consider how to conduct an audit of the various gravel companies mining within the city limits. The purpose of the audit is to check that the appropriate amount of gravel tax is being paid. The County Auditor, County Surveyor and myself pondered how to conduct such an audit for quit a while before agreeing on what we think is the only feasible scheme. We propose developing two sets of contour maps of the seven most active pits in Elk River, which includes at least one pit from ev~'ry current operator. One contour map will show the elevation of each of the seven pits in 1997 and the second will show their elevations in 2000. From these two sets of contour maps the volume of what has been removed during those years can be estimated. These estimated volumes can then be compared to the volumes the gravel companies reported for tax purposes during those same years. A proposal by Howard R. Green Company to conduct this work is attached. The cost projections in the proposal include purchasing the aerial photos needed to develop the maps. The city and county agreed to share the cost of the audit in an amount proportional to the percent of the tax each receives from gravel. The total estimated cost of the project is $30,460. The city's portion will be $9,138. If the Council agrees to go ahead with this project they need to identify a funding source. The most logical source of funds is Council Contingency. Even though staff believes the proposal as outlined above is the best way of checking reported volumes versus actual volume, there are some inherent problems. One problem is that exact volumes cannot be accomplished using just contour maps. A margin of error will have to be factored in, which will probably be at least 10%. In other words, the gravel companies will have had to under report their volumes by a lot before we can confidently call them on it. Another complicating issue staff ran into is that several gravel mines have had previous owners. Staff decided to only go back as far as 1997 with the first contour map to avoid the issue of multiple miners in the same pit and the inevitable argument regarding which one under reported the volume. A large volume of unreported gravel will have to be found during this relatively short time frame (1997-2000) to recoup the cost of the audit. Staff has no reason to have an opinion one way or the other regarding the accuracy of the volumes reported by the gravel companies. An audit does place the miners on notice that the volumes they report are being monitored, which will hopefully act as a deterrent to under reporting. However, the $30,000 price tag makes it an expensive message. Staff is not recommend for or against the proposed audit. We are prepared to go ahead with this project, if the Council chooses to do so. 5th 231st ~d%v !32 5 ;hi Rd 214th Av Av 205d 211th 8 2O 196da Av > 2~ 5 Otsego Albertville M 33 221sts~v [6 21 lth Av Watson St 21 o.~ Rush St 94th School St £[k R~'ver ~@ N 34 225th Av 3 217th Av 10 208th Av 207th Av 190th 35 35 'l:I3rd I Ay 11 St 12 < 9 213th Av 1300 93rdAv 209th Av ~3 18: AO , 10 25 ~m20500~ - '~ 11 : 12 O 12 ve:~,,H Kel : S ~24 :i 14 Co-. P