Loading...
10.1. SR 05-06-2013City of Elk River REQUEST FOR ACTION TO ITEM NUMBER Mayor and City Council 10.1 AGENDA SECTION MEETING DATE PREPARED BY Worksession May 6, 2013 Jeremy Barnhart, Deputy Director, Community Operations & Development ITEM DESCRIPTION REVIEWED By Casey's General Store Concept Review Cal Portner, City Administrator REVIEWED BY ACTION REQUESTED Provide informal, nonbinding feedback on the proposed rezoning of the subject parcel from C -2 Office District to C -1, Central Commercial, to facilitate construction of a gas station/ convenience store. BACKGROUND /DISCUSSION Casey's is proposing to purchase the vacant land in the southwest corner of Jackson Avenue and School Street to construct a 4,300 sq. ft. convenience store with 24 gasoline stations (12 pumps). The use is classified by the zoning ordinance as "Motor Vehicle Service Station," and with the rezoning, would be allowed after obtaining a conditional use permit and splitting the property. Central Commercial is consistent with the Comprehensive Plan, where the area is designated "Old Town." Access to the site will be via a shared drive off of School Street and with a shared drive off of Jackson Avenue, although the plans do not reflect required access off of Jackson Avenue. The parcel was most recently incorporated into parking lot for the Crossing Church. The church has since scaled back their plans, eliminating the need for the parking stalls. The developer seeks Council input prior to completing engineering and architecture plans. Thus far, comments regarding access issues, building design, pedestrian access from the Elk River High School at unsafe locations, and lighting have been shared. FINANCIAL IMPACT None ATTACHMENTS • Site Plan Draft • Comment Letter Dated March 11, 2013 P a w E A E U s r N: \Public Bodies \Agenda Packets \05 -06- 2013 \10.1 sr Caseys review 5- 6- 13X£docx Na ro I I Q 7 N CANOPY - T I 1 I ti < - I vi n��N i bo a IIO ` _ / 4 I 1 _ Lyo O a}f I M.S 1 Q W I l O I I 4'_1 Q Q I 65" u 0' 264' I � I II I II I 1 II 1 I I I 1 I I 1 I N I 1 - ------ -- --- ----- ---a-- — PROPOSED49 — --- --- ------- -- -- .......... 1 I APPROACH = - - - - -- —' - - - -- - - - -- 185.0 - - - -- -- - - - - -� 7 '711"It"ll'', 11 A a • `r' - I I I I I WI �I I I I I I 185' 1 PROPOSED 40' N I _ 1 APPROACH � o I I� I 1 1 G 1 I' 1 \ 4 � cn 1 ➢� \ Q I 1 I I Q I Q� W I I I 1 'M'S `JNINNVd 0� �J f- _ I 1 I 1 � LOo O I I 1 Q Mo W 21'x174' p 1 O I ro I I Q 7 N CANOPY - T I 1 I ti < - I vi n��N i bo a IIO ` _ / 4 I 1 _ Lyo O a}f I M.S 1 Q W I l O I I 4'_1 Q Q I 65" u 0' 264' I � I II I II I 1 II 1 I I I 1 I I 1 I N I 1 - ------ -- --- ----- ---a-- — PROPOSED49 — --- --- ------- -- -- .......... 1 I APPROACH = - - - - -- —' - - - -- - - - -- 185.0 - - - -- -- - - - - -� 7 '711"It"ll'', 11 A a • `r' �r Elk River 13065 Orono Parkway Elk River, MN 55330 March 11, 2013 Brian DePrers VIA EMAIL: brian.deprezCcaseys.com Casey's General Stores, Inc. One Convenience Blvd. Ankeny, IA 50021 RE: Proposed Casey's, Elk River Dear Mr. DePrez The Elk River Planning Commission and development review staff have completed a preliminary review of your proposed project. These comments should be used in further developing your project should you choose to move forward. The City Council is currently scheduled to review your concept at their meeting on April 8�b. I'll let you know if that date changes. Access Access will need to be coordinated with the existing drive off of Jackson, to be relocated further south to line up with 8�b street in the future. Access easements for shared drives. Landscaping Headlights should be screened between the site and School and Jackson. Section 30 -931 of the city code outlines the landscaping requirements. In summary: 29 over story, evergreen, and ornamental trees will be required on site. (15 OS, 7 evergreen, and 7 ornamental). Administrative The property will need to be split, park dedication and other fees will be required. The property will need to be rezoned to C -1 where Motor Vehicle service stations are a conditional use. We can process the lot split, rezoning, and CUP at the same time. Remove the retaining wall in the NE corner of the site. Pa Parking spaces are 9 by 20 (9x18 with a 2 foot overhang) Where spaces overhang a sidewalk, as in front of the building, that sidewalk should be 8 feet. 21 spaces are required (5/1000 sl). Phone: 763.635.1000 Fax: 763.635.1090 P 0 W E R E 0 O Y www.ci.elk- river.mn.us [NAIUREJ Architecture Please provide a sketch of the building, to ensure that is satisfies section 30 -938 of the city code. Please show locations of all mechanical units. Commercial lighting must follow section 30 -937. Please provide a detail of the fuel loading apparatus in the front yard. Please let me know if you have any questions. Sincerely, Jeremy Barnhart, AICP Deputy Director, Community Operations and Development iftft W W CYft ift� cn J 0 X U y 3nN3A d NOSMO Vr ---------------------------------- - - - - -- ---------------- - - - - -- 0% L 1, �1