Loading...
4.10. SR 05-20-2013 �i Oty of A _ REQUEST FOR ACTION River TO ITEM NUMBER Mayor and City Council 4.10 AGENDA SECTION MEETING DATE PREPARED BY Consent May 6, 2013 Matt Stevens,Wastewater Lead Operator ITEM DESCRIPTION REVIEWED By 2013 Wastewater Slip Lining Project Suzanne Fischer,Director, COD Tim Simon, Finance Director REVIEWED BY Cal Portner, City Administrator ACTION REQUESTED Approve by motion the quote from Visu-Sewer for sewer lining services. BACKGROUND/DISCUSSION Staff has identified a number sewer lines blocked by of tree roots causing backups at some residences. ■ The areas requiring immediate attention include: ■ 1,330 lineal feet (LF) along 1901'Ave NW and the service road parallel to Jackson Ave NW ■ 860 LF in the Proctor,Main, and 4 h Street NW vicinity ■ 200 LF along Irving Ave NW and 6 h Street NW See attached maps for greater detail. The following quotes were received to line the pipes and restore flow: Company Bid Amount Visu-Sewer $52,851.50 Insituform 63,104.20 FINANCIAL IMPACT The 2013 WWTP budget includes $65,000 for the slip lining project. The above lowest quote is below the budget estimate. Attachments • Quotes • Drawings N:APublic Bodies\Agenda Packets\05-20-2013\X4.10 SR RFA Sewer Slip Lining.docx Visu-Sewer '1 Inspect. Maintain. Rehabilitate. Proposal To: Matt Stevens From: Todd Stelmacher City of Elk River Visu-Sewer,Inc, 248 Railroad Drive 3155 104th Lane NE Elk River,MN 55330 Blaine,MN 55449 (753)635-1170 763-252-0004 Date: 5/13/2013 Project: 2013 Sewer Lining Visu-Sewer is pleased to provide the following quotation for sewer lining: (1) Installation of 2,2491.£of 8"National Liner a $23.50/1.f. $52,851.50 The above listed prices are based on our visual inspection and include: - Labor,material and equipment. - Mobilization and Traffic Control - Cleaning and televising of sewers prior to installation of liner. - Bypassing of existing flow. - Installation of National Liner per manufactures instructions,ASTM 1216. - Reinstatement of active service connections - Televising of sewers after installation of liner. The City of Elk River will need to provide access to all manholes,water from nearby hydrants (without charge)a dump site for captured debris,and traffic control beyond cones and signs. If needed,removal of protruding taps,grouting of active leaks,and heavy cleaning will be quoted separately. Thank you for the opportunity to quote on this project. Please do not hesitate to call if you have any questions. All material guaranteed to he as specified All work to be completed in a substantial workmanlike manner according to standard practices or specifications submitted Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders,and will become an extra charge over and above the estimate All agreements contingent upon spikes,accidents or delays beyond our control owner to carry fire,tornado and other necessary insurance If a oollapse of the original pipe results during the lining process.Visu-Sewer will not be held liable for costs associated with excavation,repairs or restoration- Our workers are fully covered by Workmeds Compensation insurance This proposal maybe withdrawn if not accepted within 30 days of issue Terms-Net M days Acceptance of Proposal The above prices/conditions are satisfactory and are hereby accepted. Visu-Sewer is authorized to do the work as specified. Bate: Signature: www.visu-sewer.com WISCONSIN - ILLINOIS- MINNESOTA- IOWA- MISSOURI insituform 1177 Birch Lake Blvd.N Tel: 651 253-0236 White Bear Lake,MN 55110 Fax: (651)344-0806 www.insituform.com April 11, 2013 (updated 4.25 13) Mr.Matt Stevens City of Elk River 13065 Orono Parkway Elk River,MN 55330 RE: Insituform®Rehabilitation of approximately 2402 If of 8" Sanitary sewer Elk River,MN Dear Mr Stevens: Insituform Technologies USA,LLC. (ITUSA) is pleased to submit to you a proposal to CIPP line approximately 2402 If of 8" sanitary sewer. Over the past 35 years, ITI has rehabilitated over 75 million feet of sewer and drainage piping worldwide. The Insituform®process consists of installing a specifically designed resin saturated polyester felt tube into the exiting sewer and curing it in place. The result is a seamless,jointless durable composite pipe within the old pipe, improving its structure and minimizing leakage. The piping is returned to service in a fraction of the time required by conventional methods. As a result,the Insituform®process is faster,cleaner, safer, and performed at less cost than other repair alternatives. Following is a cost proposal for installation of approximately 2402 if of 8"Insituform® Cured-in-Place Pipe designed as a fully structural pipe once installed. Tom. 1 CIPP 81, 2402 LF $ 2510 $ 60,290.20 2 Lateral Reinstatements 33 EA $ 93.80 $ 2,814-00 3 Protrucing Tap Removal 0 EA $ 500.00 $ - 4 Foot cutting - HR $ 500.00 $ - Total I 1 1 $ 63,104.20 This proposal serves as an estimate for completion of the work and can be adjusted to take into consideration any unforeseen circumstances that may arise. 3. •� _� ��• aid;, >y�; \ � r - � �,., • ^ . Fir.v W I- lzk y9 0 ► �' i ',fit, `a •air • 'V` Im low - ffr'i�i ...._ ob .. - -- �, . r Elk JiJARM 4._ p , !r .1 F A J. , u .. . - �. i a • �� - tears r N-r • 30b C� hf r16 10` HNb(�yl061 �N Jq c 9 U' y os'�s4 40tIL � a Z jJ x c „!t)Y,06S 1 4 t'8_R CL w` 2706 t b£261. 09IILL' - MN-JAV ISd6C N - a