7.4. SR 05-13-2002Howard R, Green Gompany Item ~ 7.4. May 8, 2002 File: 230000M-325 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330-0490 RE: MISCELLANEOUS STREET PROJECTS Dear Council Members: In addition to the other specific items on your May 13, 2002 City Council agenda I would like to update you on various miscellaneous street issues. These include the following: 2002 SEAL COATING PROJECT Phil Hals is preparing a list of streets to be seal coated in 2002. I will have that list prepared on a map for presentation at the May 13th City Council meeting. KING AVENUE King Avenue between Trunk Highway 10 and Main Street is in very poor condition. This is a relatively heavily traveled roadway in the downtown area, which accesses parking, the school district offices, the Elk River Municipal Utilities Offices, and the rear of the new bank facility at King Avenue and Main Street. As you are aware the Elk River Municipal Utilities are planning to move to the expanded City Hall facility in spring of 2004, therefore it will be at least two years before anything significant happens with the King Avenue area. Staff has discussed maintenance efforts, which could be undertaken to continue to have King Avenue a functioning street for the next two to five years. What we are planning on doing is obtaining quotes from a bituminous contractor to mill a small portion of the blacktop off and put on a thin overlay. We are planning on undertaking this as a maintenance operation paid for with street funds. EVANS AVENUE Phil Hals and I, together with Pat Klaers have taken a look at Evans Avenue south of Main Street. As you will recall, this road is in the proposed Pavement Management Plan but is not anticipated to be included in the first year's project. Phil Hals is well aware of the issues in this area of town and has agreed to undertake some maintenance efforts, to redirect drainage, and to patch the bituminous surface, again with the plan of keeping the street in an acceptable condition for the next few years until a total reconstruction can be undertaken with the Pavement Management Plan. Ltr 05-08-02 Council[I] 1326 Energy Park Drive · St. Paul, MN 55108 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 Honorable Mayor and City Council May 8, 2002 Page Two 193RD AVENUE AND EVANS STREET This is the intersection near the City's Northbound Liquor Store. Recently this intersection has shown some significant signs of wear and tear under the traffic load. The southbound lanes of Evans Street as it comes by the liquor store approaching 193rd Avenue have shown severe rutting. This is likely caused by heavily loaded vehicles applying their brakes for the stop condition. Also on 193rd Avenue, drainage flowing down the gutter line is missing the cross gutter at Evans Street due to some settlement of the bituminous surface near the concrete cross gutter. It is staff's intent to undertake a maintenance project in this area, resulting in some milling of the rutted and settled bituminous surfaces and reapplying a bituminous overlay in these areas. ASSESSABLE OVERLAY IMPROVEMENT Just to inform the City Council it is staff's intent to not recommend the undertaking of any assessable bituminous overlays in 2002. We will, however, propose an assessable overlay improvement project in the 2003 construction season. I will be available to discuss any of these items with the City Council on Monday, May 13, 2002. Sincerely, Howard R. Green Company TJM:tk Ltr 05-08-02 Council[I] Howard R, Green Company CONSULTING ENGINEERS