6.1. SR 07-20-1998City of ITEM 6.1. Memorandum TO: MAYOR AND CITY COUNCIL FROM: STEPHEN ROHLF, BUILDING & ZONING ADMINISTRATOR DATE: JULY 20, 1998 "~ SUBJECT: REVISION TO SOLID WASTE FACILTY BY ELK RIVER LANDFILL, INC. CU 98-17 REQUEST The Elk River Landfill is proposing to construct a new demolition debris cell at their facility. This proposal triggers a revision to the landfill's conditional use permit and solid waste facility license with the City of Elk River. The new demolition debris cell is proposed to be 24 acres in size. Approximately 18 acres of this new cell are proposed to be located on top of the solid waste in the original cell of the landfill, which is located within the Elk River city limits. A little more than 6 acres of the requested demolition cell will be new landfill area that extends into Livonia Township as well as Elk River. In addition to the new demolition cell, the required two year renewal of the Landfill's conditional use permit and solid waste facility license is also under consideration at this time. House keeping item, such as a new site manager at the landfill, will be addressed. The demolition debris cell request also requires revisions to the Minnesota Pollution Control Agency's (MPCA) and Sherbume County's permits for the Elk River Landfill. The City of Elk River, Sherburne County and MPCA cooperated on the review of the Landfill's request. Attachments Vicinity map showing the location of the Elk River Landfill · The following selected drawings from the plans submitted by Elk River Landfill dated, April, 1998 (revised 6/98): Sheet #3 - the bold contours indicate the base grades required for the new areas that will be used for disposal. f:\shrdoc\b&z\stever\camascup.doc 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 Sheet #4 - shows the proposed finished contours of the entire demolition cell; new areas and areas previously used for disposal. The maximum height of disposal at the landfill is not proposed to be increased. Sheet #7 - shows a typical cross section for the disposal of demolition debris over the new expansion areas. Sheet #8 - shows the disposal of demolition debris over existing solid waste. Sheet #9 - shows the construction details of the liner under the expansion areas and the final cover over the entire demolition cell. · Joint comment letter from MPCA, Sherburne County, and the City of Elk River dated, June 8, 1998. · Letter from Debra McDonald of USA Waste dated, June 17, 1998. A memorandum from Matt Ledvina of B.A. Liesch dated, June 18, 1998, containing suggested changes to the landfill's current conditional use permit and solid waste facility license. · A revised conditional use permit and solid waste license for the landfill. Issues and Concerns Attached to this memo is a joint letter from MPCA, Sherburne County, and the City of Elk River, dated June 8, 1998, outlining staff's issues and concerns with the landfill's proposal. None of the government agencies listed take issue with what the landfill is requesting, but rather how it is designed. The new area of the landfill that is proposed to expand into Livonia Township is planned to have a liner underneath. This liner will add some benefits as far as the collection of landfill gas in this area. The concerns with the proposal mostly revolve around the disposal of demolition debris on top of the mix municipal solid waste in the original cell at the landfill. This cell is unlined and has contamination associated with it that is undergoing remediation. In the attached letter from Debra McDonald of USA Waste, dated June 17, 1998, Ms. McDonald indicates that the plans and specifications for the proposes demolition cell will be revised to incorporate staff's recommended changes. These revised plans have been reviewed and determined to be acceptable. The attached memorandum from Matt Ledvina of B.A. Liesch, the city's landfill consultants, lists other recommended changes that are needed to bring the landfill's current conditional use permit and solid waste license up to date. These changes are minor in nature and have been incorporated into these documents. fi\shrdoc\b&z\stever\camascup.doc Recommendation The property in Elk River proposed for the landfill's new demolition cell is already zoned Solid Waste Overlay District (SWOD) and is mostly devoted to landfilling at this time. Proper design of this proposed cell can reasonably address associated environmental concerns. The Planning Commission recommended approval of the landfill's request for a new demolition cell under the stipulations listed in the joint letter from MPCA, Sherburne County and the City of Elk River dated, June 8, 1998. These stipulations have been addressed in the landfill's revised plans and referenced in the attached permits from the city. However, there are still a couple of details regarding the revised drawings that need to be addressed. Staff will attempt to have these details worked out prior to the Council meeting. Further, the Planning Commission recommended that the proposed revisions listed in Matt Ledvina's letter dated, June 18, 1998 be incorporated into the landfill's conditional use permit and solid waste facility license. These attached documents reflect Mr. Ledvina's comments. The landfill's conditional use permit and solid waste license will receive an automatic review for renewal with public hearing in two years from the date the City Council acts on this current request (tentatively July 20, 2000). fi\shrdoc\b&z\stever\camascup.doc Minnesota Pollution Control Agency June 8, 1998 Debra McDonald USA Waste Services, Inc. 825 East 2nd Street Blue Earth, MN 56013 RE: Elk River Landfill, Application for Permit Modification Dear Ms. McDonald: The following comments are a summary of the concerns and requirements from the Minnesota Pollution Control Agency (MPCA), Sherburne County and the City of Elk River regarding your Application for Permit Modification, dated April 1998. 1. The final cover system shall be designed according the municipal solid waste (MSW) standards. It is noted that the liner and leachate collection system for the proposed demolition cell does not meet design and construction standards for MSW and/or industrial waste disposal sites. As a result, only demolition debris and new construction debris will be allowed for disposal in the proposed area. See Attachment A for definitions of allowable waste materials. o A liner system shall be required for the demolition debris horizontal expansion area and shall be required to have a minimum six inches of clay and a 40 mil flexible membrane liner. The clay shall have a maximum permeability of 104 crrdsec. See Attachment B for QA/QC requirements for liner construction. 4. The 906,300 cubic yards of air space capacity proposed for the proposed development shall be counted as a portion of the 4,926,200 cubic yards of"reserve capacity" for the site. The plan sheets shall be revised to show the development of the site in two-year phases. Development plans shall indicate the sequence of filling for each phase, access to the working face and placement of final cover. The engineering report shall be revised to include a narrative to describe how each development phase will be filled, how surface water will be managed and how vehicle access will be provided. The plan sheets and engineering report shall be revised to provide vehicle access for operation and maintenance of the new leachate management facilities, existing and future landfill gas (LFG) extraction system components and maintenance of final cover. 7. The post-closure operation and maintenance period for the proposed development shall be modified to cover 30 years. ' Page 2 June 8, 1998 o The engineering report shall be modified to include procedures which will be used to protect ihe barrier layer underlying the demolition debris during filling operations considering the physical characteristics of the waste material. 9. The plan sheets and engineering report shall be modified to indicate the management of LFG condensate in a manner consistent with that of MSW leachate. 10. The surface water management plan shall be modified to tie into existing and future surface water control features for closed portions of the west slope. Surface water ponding areas within the fill area shall be eliminated. The design of surface water control structures shall be modified t9 provide a continuous final cover system. 11. The proposed leachate management system shall be modified to eliminate potential problems with operation and maintenance. Specifically, the ieachate sump area and force main shall be designed to provide frost protection. 12. Final cover slopes shall be constructed with a maximum 4H: 1V grade in accordance with approved plans. All transition areas where slopes change grade shall not exceed 4H: IV. 13. The leachate collection and management system shall be operated to maintain a maximum head of one foot on the barrier layer for the liner. 14. A 200 foot buffer area shall be maintained between the waste and the property line. If compliance boundary wells are required beyond the property boundary, a variance from the Solid Waste Management Rules will be required. The May 21, 1998 technical memorandum prepared by Wenck Associates which provides supplemental design information shall be incorporated into the modified plan sheets and engineering report. If there are any additional comments or questions regarding this matter, please contact us. Bill Armstrong Minnesota Pollution Control Agency City of Elk River CC.' John Kellas, Elk River Landfill Matthew Ledvina, Liesch Associates Jim Simonet, EnecoTech Midwest, Inc. Rod Ambrosie, Wenck Associates \\granite\prjglfi32003\lt980603.doc USA WASTE June 17,1998 825 East Second Street Blue Earth, Minnesota 56013 (507) 526-2194 (507) 526-2195 Fax Mr. Bill Armstrong, P.E. Minnesota Pollution Control Agency 500 Lafayette Road St. Paul, MN 55155 Mr. Dave Lucas Sherbume County P.O. Box 320 Elk River, MN 55330 Mr. Steve Rohlf City of Elk River P.O. Box 490 Elk River, MN 55330 RE: Elk River Landfill - Request for Permit Modification Dear Gentlemen: I am writing on behalf of Elk River Landfill to respond to your June 8, 1998 letter which contained comments on the April 1998, Application for Permit Modification, submitted by Wenck Associates, Inc. All comments contained in the June 8, 1998 letter, have been addressed in a revised Application for Permit Modification, which was submitted to your offices on June 9, 1998. In addition, these comment responses, as addressed in the revised Permit Modifications, follow agreements reached in earlier telephone conversations and meetings where we were able to discuss your concerns. It is our understanding that all items, with one exception noted below, have been addressed in a manner which enables continued protection of the existing waste deposit and meets and exceeds regulatory requirements. Please refer to the revised Application for Permit Modification, dated June 1998 for detailed information. Comment #14 seems to reflect a misunderstanding. Comment #14 currently states the following: "A 200 foot buffer area shall be maintained between the waste and the property line. If compliance boundary wells are required beyond the property boundary, a variance from the solid Waste Management Rules will be required." From conversations and meetings with the MPCA, we believe Comment #14 was meant to have said the following: "A 200 foot buffer area shall be maintained between the waste and the property line, or beyond the property line if adequate easement(s) are in place. If compliance boundary wells are required beyond the property boundary, a variance from the Solid Waste Management Rules will be required." We understand Dave Lucas discussed this comment with Ms. Amy Hadiarus, MPCA Hydrogeologist, and she concurred with our interpretation. She indicated to Mr. Lucas she will forward a letter which will amend Comment #14 to reflect the above interpretation. Elk River Landfill is in discussions and is currently working with the adjacent northern property owner to acquire an easement beyond the property line. We are committed to obtaining this easement as part of the approval process for the proposed permit modification and believe this response satisfies the amended comment # 14. We appreciate your coordinated efforts on this project. Please call me with any questions. Sincerely, USA WASTE SERVICES, 1NC. Debra A. McDonald, P.E. CC: Rod Ambrosie, Wenck Associates Amy Hadiarus, MPCA Terry Johnson, USA John Kellas, ERL Matt Ledvina, Liesch Jim Simonet, EnecoTech Midwest, Inc. LIE CH Ju~e ] ~, 1 9~)~ LIESCH ASSOCIATES, INC. 13400 15TH AVE. N. MINNEAPOLIS, MN 55441 612/559-1423 FAX: §12/559-2202 Mr. Steve Rohlf City of Elk River 13065 Orono Parkway Box 490 Elk River, MN 55330 RE: Elk River Landfill - Review of City of Elk River License Agreement and Conditional Use Permit Dear Mr. Rohlf: This letter outlines our review of the License Agreement and Conditional Use Permit in relation to documents recently submitted and 'the demolition cell development proposal. Recommended Modification.~ to the License Page 2, 1 .) Significant Persons. The new Site Manager of Elk River Landfill is John Kellas, 22460 Highway 169 NW, Elk River, MN 55330 - 441-2464 (office), 708-2435 (mobile). Page 3., 2.) (14) The "Leachate Management Plan" was revised in December, 1997. New Item Page4.,2.) (26) "Application For Permit Modification." June 1998. Subject to the following conditions: a) The plan sheets and engineering report shall be revised to provide vehicle access for operation and maintenance of the new leachate management facilities, existing and future landfil! gas (LFG) extraction system components and maintenance of final cover. b) The plan sheets and engineering report shall be revised to indicate details for the new LFG condensate storage tank. c) The depth of burial for the leachate force main shall be increased at locations where access roads cross the pipe. Page 7.,3.) (03) (b) the document "Application for Permit Modification." June 1998 shall also be referenced. Page 3, 2.) (17) Closure, post-closure and contingency action cost estimates were revised on April 9, 1998. New Item Page 4., 2.) (27) "Post Closure Plan," March 1998 Recommended Modifications to the Conditional Use Permit Page 4.,2.) (03) (b) the document "Application for Permit Modification," June 1998 shall also be referenced. Please contact me if you have any questions or comments regarding the recommended modifications. Thank you. Sincerely, ,T s, Matthew L'a. Ledvina, P.E. cc: Mr. John Kellas, Elk River Landfill Mr. Davis Lucas, Sherburne County Mr. Bill Armstrong, MPCA Ms. Deb McDonald, Elk River Landfill w:\llL32003Wnodifications980617.doc B.A. LIESCH ASSOCIATES, l~JCl 13400 15TH AVENUE NORTH MINN~kPOLIS. MINNESOTA 55441 Sent by: DRB MINNEAPOLIS 6123405584; 07/16/98 14:31; Jet,ax #253;P?ge 2 CITY OF ELK RIVER AGREEMENT FOR ISSUANCE OF AMENDED CONDITIONAL USE PERMIT THIS AGREEMENT, made and entered into this day of ,1998 by and between the CITY OF ELK RIVER, a Minnesota municipal corporation (hereinafter referred to as the City), and ELK RIVER LANDFILL, INC., a Minnesota corporation (hereinafter referred to as the Permittee), which is owned by Sanifill, Inc., a Texas corporation that is a wholly owned subsidiary of USA Waste Services, Inc., a Delaware corporation, provides as follows: WHEREAS, the Permit'tee owns the real properties described on Exhibit A attached hereto (hereinai~er referred to as the Landfill Property), situated in the City of Elk River; and WHEREAS, Perrnittee has been operating a landfill on the Landfill Property prior to January 20, I987, and is currently operating a landfill at that location (the Landfill); and WHEREAS, the City adopted an amendment (the Amendment) to its zoning ordinance authorizing the designation ora Solid Waste Facility (SWF) district effective January 20, 1987; and WHEREAS, prior to the adoption of the Amendment, landfill use was not a permitted or conditional use in any zoning district within the City; and WHE~A$, Permittee's landfill operation on the Landfill Property was a nonconforming use prior to the adoption of the Amendment; and WI-IF_,REAS, the appropriate and lawful regulation of the use of land for landfill purposes within the City is a matter of important public need and interest; and WHEREAS, the residents of the City could be adversely affected by the unregulated operation of the Landfill; and WHEREAS, the City rezoned the Landfill Property to SWF district and issued a Conditional Use Permit and Solid Waste Facility License for the Landfill operation in October, 1988; and WHEREAS, Permittee has applied to the City for amendment and renewal of the Solid Waste Facility License and has requested that the Conditional Use Permit be amended to permit construction of additional cells au the Landfill; and Sent by: DRB MINNEAPOLIS 6123405584; 07/16/98 14:31; Jet~ #253;Page 3 WHEREAS, the City Council has determined that for reasons related to public health, safety, and welfare the final elevation of the Landfill should be limited to no more than 1120 feet above Mean gea Level (MSL); and WHEREAS, the Permittee has agreed to a final elevation of no more than 1120 MSL; and WHEREAS, the City of Elk River Planning Commission and City Council have held hearings on the request to amend the Conditional Use Permit, at which hearings all citizens of the City of Elk River and other interested parties have had the opportunity to be heard. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, that Elk River Landfill, Inc., is hereby granted an amended conditional use permit for landfi[1 and related operations on the Landfill Property described above, subject to the terms, conditions and qualifications hereinafter stated, to wit: 1.) Scope and Conduct of]~ndfill Operations. The operation of a solid waste landfill may be conducted on the Landfill Property in conformance with existing statutory and regulatory authority and requirements of the City, Sherbume County (the County), and the Minnesota Pollution Control Agency (MPCA); and in accordance with authorization and limitations contained in: (01) MPCA Solid Waste Permit No, 74 as modified and reissued in 1997 and which specifically authorizes Cells 12 and 13; (02) the current Sherburne County Solid Waste Landfill License of the Permittee; (03) the current City Solid Waste Facility License of the Permittee; and (04) this Permit. Landfill operations may be conducted on the Landfill Site only in accordance with the plans, descriptions, and reports incorporated in said permits and licenses. Provided, however, that the entire Landfill shall have a final elevation of no more that 1120 feet above MSL based on 5H: 1V slopes, and including final cover, as provided in the Long Term Development Plan submitted to the City dated March 1997, and as revised on April 15, 1997. Any changes made to the plans, descriptions, reports, permits and licenses, including MPCA Solid Waste Permit No. 74 and the County License, shall also be reviewed and approved, approved with modification, or disapproved by the City as described in the current License issued by the City. ~09~79.4 2. Sent by: DRB MINNEAPOLIS 6123405584; 07/16/98 14:32; jet,ax #253;Page 4 2.) Scone and Conduct of Related Operations. (01) Recycling Center. The operation of a recycling cenler on the Landfill Property may be conducted, [fin conformance with all applicable terms and conditions of this Permit, subject to the following conditions: (a) The operation of the recycling center shall comply in all respects with all applicable requirements of the City Code of Ordinances and all applicable federal, state, and county laws and regulations. (b) The recycling center shall be located and operated as shown on plans submitted by Permittee and approved by City staff. The recycling center may accept additional materials, including household hazardous wastes, provided that Licensee's plan for handling additional materials and any changes to the recycling center shall first be approved in writing by the City. (c) The recycling center shall be operated by Permittee. Operation of the recycling center by a different operator shall require the prior written approval of City staff. Any different operator of the recycling center must comply with all of the terms and conditions of this Permit. (d) Permittee shall place appropriate signage on the Landfill Property to direct citizens to the location of the recycling center.. (e) Used oil recycling areas shall be within an enclosed building with an impermeable floor and comainment area, as approved by staff. (0 Battery storage shall be within an enclosed building with an impermeable floor and containment area suitable for batte~ acid, as approved by staff. (g) Battery, paper and oil storage areas shall be separated to reduce fire potential, as approved by the City Fire Chief. (h) Perminee shall have a regular schedule for appliance pick-up, to be approved by City staff. (02) Yard Waste Cornposting. The operation of a yard waste composting facility on the Landfill Property may be conducted, if in conformance with all applicable terms and conditions of this Permit, subject to the following conditions: (a) The operation of the yard waste composting facility shall comply in all respects with all applicable requirements ofthe City Code of Ordinances and all applicable federal, state, and county laws and regulations. ~o~$?~.4 3, Sent by: DRB MINNEAPOLIS 6123405584; 07/16/98 14:32; Jet,ax #253;Page 5 (b) The yard waste composting facility shall be located and operated as shown on plans submitted by Permittee and approved by City staff. All plastics shall be removed from yard waste brought to the facility before composting (d) All municipal solid waste must be immediately removed from yard waste and landfilled. (e) The yard waste composting facility must be operated in such a manner as to keep odors to a minimum, Ifoflor becomes a problem staffmay require more frequent turning of compost piles and/or watering to ensure that the compost remains aerobic and breaks down as quickly as possible. (0 The maximum amount of yard waste which may be accepted is 100,000 cubic yards per year. Positive drainage away from the compost area must be implemented, as approved by City staff. (h) Yard waste and/or compost may not be used as daily cover for the landfill. (i) That Permittee is in strict compliance with all other terms, conditions and requirements of this Conditional Use Permit, including specifically, but not limited to, the operational and environmental monitoring requiremems of sections 4, 6, and 7, and the requirements ofsections 16 and 24 to make prompt payment of all fees and costs due to the City. No yard waste may be accepted at the yaxd waste composting facility if this condition is not complied with. Permittee must immediately stop accepting yard waste upon written notice from the City that there is a violation of this condition. (03) Demolition Debris. The operation ora demolition debris landfill on the Landfill Property may be conducted, if in conformance with all applicable terms and conditions of this Permit, subject to the following conditions: (a) The operation of the demolition debris landfill shall comply in all respects with all applicable requirements of the City Code of Ordinances and all applicable federal, state and county laws and regulations. The demolition debris landfill shall be located and operated as shown on the "Revised Demolition Fill Plan - Final Grades, Sheet C-2," dated February 26, 1997 submitted by Permittee and approved by City staff, Permittee's Application for Pennit Modification dated April 1998, and revised Application for Permit Modification dated June, 1998; and the S095~.4 4. Sent by: DRB MINNEAPOLIS 6123405584; 07/16/98 14:33; ~ #253;Page 6/38 conditions set forth in the June 8, 1998 letter to Permittee from the City, Sherburne County and the Minnesota Pollution Control Agency. (c) Permittee shall provide an estimated development time line for the demolition debris landfill, including an estimated closure time line, which shall be updated as appropriate. (d) Permittee shall pay the demolition debris surcharge authorized by Minn. Stat. § 115A_921, Subd. 2. The Surcharge shall be paid directly to the City on a monthly basis, and shall be accompanied by an accurate report on the amount and type of demolition debris disposed of each day during the month. The Surcharge due for each month shall be received by the City no later than the thirtieth calendar day of the succeeding month. Failure to pay the surcharge fee when due shall be cause for revocation of this Permit and shall be a violation of the conditions and requirements of this Permit for the purposes of the related operations authorized by Section 2 of this Permit. (e) That Permittee is in strict compliance with all other terms, conditions and requirements of this Conditional 'Use Permit, including specifically, but not limited to, the operational and environmental monitoring requirements of sections 4, 6, and 7; and the requirements of sections 16 and 24 to make prompt payment of all fees due to the City. No demolition debris may be accepted at the demolition debris landfill if this condition is not complied with. Permittee must immediately stop accepting demolition debris upon written notice from the City that there is a violation of this condition. (04) Other Related Operations, No other operations or activities, whether or .not related to the Landfill, shall be permitted or allowed on the Landfill Property unless this Permit is first amended to specifically allow such operations and to specify the applicable conditions except mining activities or other operations licensed or permitted separately by City. 3.) ]~Cff. e,~. A Buffer Zone shall be established within the perimeter of the Landfill Property around the waste disposal areas of not less than 200 feet. Within this Buffer Zone, no waste disposal may occur. Permittee shall place a six (6) foot high earth berm, landscaped with evergreen trees and protected from erosion within the Buffer Zone. Where the Buffer Zone contains heavily wooded areas, exception to installing the berm and landscaping shall be allowed. A plan for establishment of the Buffer Zone shall be submitted to the City no later than July l, 1997 for approval by City staffand shall be implemented as provided in the plan. 909579.4