Loading...
4.1. SR 07-27-1998.~ity of iver Item #4.1. MEMORANDUM TO: FROM: DATE: SUBJECT: Mayor & City Council Pat Klaers, City Ad~rator July 27, 1998 Review 1998 Annual Evaluation and Planning System Report on the WWTP Attached for your review is a report from the MPCA regarding its 1998 annual evaluation and planning system process which is based on information provided by the city regarding the Wastewater Treatment Plant (WWTP). This report indicates that the city WWTP is in compliance with standards set by MPCA. The only issue of note in this report relates to the financing and I believe the ranking reflects the high amount of debt that we have due to the recent plant expansion. From a city audit point of view and budgeting point of view the treatment plant is in an acceptable financial condition. The City Council is requested to review this report with WWTP Superintendent Darrell Mack. Following a review by the City Council we will certify to MPCA that the report has been discussed. This report is rather timely considering that in May the City Council had a tour of the expanded treatment plant. Action Requested City Council motion indicating that the report has been reviewed and accepted by the City Council. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 Minnesota Pollution Control Agency July 13, 1998 Mr. Darrell Mack Wastewater Superintendent City of Elk River City Hall 13065 Orono Pkwy., Box 490 Elk River, MN 55330 RE: 1998 Annual Evaluation and Planning System Dear Mr. Mack: Thank you for participating in the 1998 Annual Evaluation and Planning System (AEPS) process. Your evaluation was reviewed and enclosed is a report based on your responses. We recommend the report be discussed at an upcoming municipal council/board meeting. In some cases, items identified in the report may require immediate attention. Comparing this year's data with that of past evaluations may help identify areas of concern for your wastewater system. After the meeting, the mayor/municipal chair should certify that the report has been discussed and submit this certification to the Minnesota Pollution Control Agency (MPCA). If possible, this should be done within 30 days of your receipt of the report. The certification can be in the form of a letter signed by the mayor/chair. We hope the report information will prove useful in planning for the future of wastewater treatment in your municipality. If you need any assistance or have any questions regarding the AEPS process, would like assistance in implementing suggestions from the report, or would like a copy of the summary report, please feel free to contact me at (612)296-8766 or 1-800-657-3864. Sincerely, Deb Lindlief Point Source Compliance Section Water Quality Division Enclosures cc: Hon. Hank Duitsman, Mayor(without enclosures) 520 Lafayette Rd. N.; St. Paul, MN 55155-4194; (612) 296-6300 (Voice); (612) 282-5332 (TTY) Regional Offices: Duluth · Brainerd · Detroit Lakes · Marshall · Rochester Equal Opportunity Employer · Printed on recycled paper containing at least 20% fibers from paper recycled by consumers. >>> MD/~-/CIPALITY: ~.T.K RIVER This report contains responses to questions you answered in the 1998 Annual Evaluation and Planning System form. Although you answered all the applicable questions in the form, not every answer received a response in this report. We provided a response only when an answer indicated that there is an issue which may need resolution. MPCA staff have assigned a point value to the ~-arious questions in this form, with the exception of questions in Section 8, Future Needs. Points are given to responses that indicate that there may be a problem to be addressed. Each section is worth 100 points. If your system received a score greater than 50 in any section, you should carefully re~iew the report responses for this section to determine if your system is operating effectively and efficiently. If you need assistance in impl~nenting any of the suggestions in this report or have questions concerning the report or survey process, please feel free to contact Deb Lindlief at 1-800-657-3864. >>> SECTION ONE: TREATMENT SYST~4 PHYSICAL CONDITION Score for SECTION 1: 0f WHERE 0 IS BEST AND 100 IS THE MAXIFi~. If your score is greater"than ~50, carefully review the survey you filled out and our _report responses for this section to determ/ne if your system is operating efficiently. >>> SECTION ~40: SYST~q LOAD~ AND PERFORMANCE~ (fr0~ ~our DMR's) Based on the monthly D.M.R. data you have ~hnitted Over the last calepd~r year, the following conclusions can be drawn: Score for SECTION 2: 0 WHERE 0 IS BEST AND 100 IS THE MAXIML~. If your score is greater' than 50, ex~hmine your DMR's for the last Calepdar year and note if your system is operating efficiently. >>> SECTION THREE: COLL]~.C'Iq20N SYST~4 Question 27. Review the influent flows into your treatment system to determine if infiltration and inflow are a problem and establish a plan for correcting any problem identified. Score for SECTION 3: 8, WHERE 0 IS BEST AND 100 IS THE MAX/lVi~. If your score is greater-than 50, carefully review the survey you filled out and cur report responses for this Section to determine if your system is operating efficiently. :71. ~,,~. -:~ ~-~ ~ ::* ::- /-,' 'J,?,.' '-' ',,~' ,' ~,, '~ - /X~, c4. , i)~ ./~:~' ,- i ~, /':~! ~' e .,"/,*' .' >>> SECTION FOUR: BIOSOLIDS Question 34.6. You indicated that you plan to obtain 'new landspreading sites. Be aware that the approval process takes one to three months. If you have not completed an application or need informati.on on the application process, please contact Jo~ja Dufresne at 1-800-657-3864. Score for SECTION 4: 0, WHERE 0 IS BEST AND 100 IS THE MAX//~/4. If your score is greater ~ 50, carefully review the survey you filled out and cur report responses for this section to determine if your system is operating efficiently. >>> SECTION FIVE: SEPTAGE Score for SECTION 5: 0, WHERE 0 IS BEST AND 100 IS THE MAXI~¢~4. If your score is ~reater' trmn ~U, care~±±y review the survey you filled out and our .re~ort responses for this section to determine if your system is operating efficiently. >>> SECTION SIX: TREATMENT SYST~4 OPERATION AND MA/lVffENANCE Score for_ SECTION 6: 0, WHERE 0 IS BEST AND 100 IS THE MAXIFi¢4. If your score is greater than 50, carefully review the ~urvey you~ filled out and our report responses for this section to determine if your system is operating efficiently. >>> SECTION SEVEN: FINANCIAL AND ORDINANCE STATUS The area of sewer service charge systems and sewer use ordinances is cc~plex and confusing. Munici~ities which received funding frcm the federal or state construction grants program or the State Revolving Fund (loan pro,ram) face certain requirements in the area of ordinances. We have sample ordinances and charge systems which you can use to create your own documents. If you have questions concerning ordinances, charge systems, rate setting, or whether you must meet the requirements of specific funding programs, please contact Deb Lindlief at 1-800-657-3864. Question 69. An eguipment replacement account cOntains funds set aside for replacement of eqult~ent that will wear out during the life of the system. Such an account should be part of your operation and maintenance budget. Depreciation information will provide the dollar amounts to be set aside each year for this account. This both ensures adequate funding for equit~_nt replacement and he~ps your municipality avoid ecaer~ency funding problems. Question 76.5. Your sewer use ordinance should require annual notification of cost to all userD. Users should be notified annually re~ard~ng what is enccmpassed in the user 'charge. Question 78.1. Since you have individual sewage treatment systems (such as on-site septic tanks), your sewer use ordinance should deal with such systems. As one aspect of municipal wastewater treatment, you should require inspection and maintenance plans for such systems. As of january 1, 1998, all existi.n_$ ordinances governing individual sewage treatment systems must cc~ply with Minn. R., ch. 7080 and must be sutxaitted to the Agency for review. Question 78.4. When new hc~es are constructed in your service area, you should consider what is the optimal approach to treating the resulting wastewater. Any new construction should be consistent with your municipality's long-range development plans. All new construction or replacement of an individual sewage treatment system (such as an on-site septic tank) requires a cc~pliance inspection by a firm licensed to inspect individual sewage treatment systems. Score for SECTION 7: 42, WHERE 0 IS BEST AND 100 IS THE ~. If your score is greater than 50, carefully review the survey you filled out and our report responses for this section to determine if your system is operating efficiently. >>> SECTION EIGHT:.. FUTURE NEEDS