Loading...
4.10. SR 08-03-1998~ity of River MEMORANDUM Item #4.10 TO: FROM: DATE: SUBJECT: Mayor & City Council Pat Klaers, City Ad~0r August 3, 1998 City Planner Applicant Update The five member interview team met with four city planner apphcants the week of July 27. We beheve we have on excellent candidate for further consideration. Councilmember Thompson will update the City Council on this individual. At this time the Committee believes that the top candidate is clearly the best and that there is no reason for the City Council to conduct an interview of the two top finalists. However, if this is desired by the City Council it certainly can be arranged. On the other hand, ff the Council supports the candidate that Councilmember Thompson will discuss at the meeting, then I would like approval to negotiate terms of employment with this individual and make arrangements for him to come and visit with the Council next Monday before the EDA meeting. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 Planning Commission July 23, 1998 Page 3 F. Project Monumentation Package The Developer's engineer has indicated that they have started to revise the project monumentation, to make the signs slightly smaller, and to analyze further which corners of intersections are appropriate for monumentation. City staff would recommend that the final decision on project monumentation be based on a review and approval by City staff at a later date. This briefly summarizes a number of the key issues that have changed since the July 14, 1998 Planning Commission meeting. Assistant City Planner Scott Harlicker, has put together a list of recommended conditions for the approval of the Trott Brook Farms proposal. Should there be any questions, both Scott and I will be in attendance at your July 28, 1998 Planning Commission meeting. Sincerely, Howard R. Green Company TJM/st Howard R. Green Company \\Elkriver~sys\SH R DOC~DMiN\EN GiN EEi~C~)~2~T(~G ENGINEERS .,y of · lver o: FROM: DATE: SUBJECT: Item #'s 5.16.-6.18. MEMORANDUM Planning Commission Steve Wensman, Planner July 28, 1998 Request by CPDC for Zone Change, Conditional Use Permit and Preliminary Plat Approval, Public Hearing Case No. ZC 97-1, CU 97-11 and P 97-8 Attachments · July 14, 1998 Memo to Pat Klaers · July 23, 1998 Memo from Phil Hals Trott Brook Trail Corridor Since the Planning Commission Workshop, the following changes have been made or discussed regarding the Prehminary Plat. In the Preliminary Plat the Trott Brook Trail is not shown to be accessible from Street 0 or County Road 12. Ed Hasek, of Westwood Engineering, says the grading plan will show how the Trott Brook Trail will be accessible from Street O. The Trott Brook Trail connection has been moved further to the East to a point visible from County Road 12 adjacent to a townhouse driveway. This trail ending does not directly connect to County Road 12 and is to be considered temporary. The developer and planning staff concur that a better connection would be to the East of the plat in future development, where the Trott Brook runs closest to the County Road 12 and where the connection is not stuck between townhomes. Eventually, the trail corridor will extend to the East and parallel County Road 12. Outlot F Outlot F is being donated to the City, however it is not considered as part of the park dedication. The area is approximately 23 acres of wetland and some upland oak forest. This area may be used as passive recreation, however it is difficult to access. This parcel will require an access corridor for pedestrians and maintenance vehicles (see Phil Hals memo). Creation of an access 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 Memo to Planning Commissionfrrottmmo Julyl 28, 1998 Page 2 corridor should be coordinated with the need for a sewer and water corridor to the East of the plat. Townhouse Open space The Planning Commission and Staff have expressed concerns about density, and lack of open space within the townhouse development in the Southwest corner of the plat. Although not considered as park land, the open space should be design such that it is a space central to the development, serving as visual relief from the density and providing a view for those near the center of the dense area Recommendation Staff recommends that the Planning Commission recommend approval of the preliminary plat with the following conditions related to the park dedication: 1. THAT THE DEVELOPER DEMONSTRATE ON THE GRADING PLAN HOW THE TROTT BROOK TRAIL IS ACCESSED FROM STREET O. o THAT THE DEVELOPER PROVIDE A PEDESTRIAN AND MAINTENANCE VEHICLE CORRIDOR TO OUTLET F FROM STREET N AS PER CITY ORDINANCE TO BE COORDINATED WITH A SEWER AND WATER CORRIDOR TO THE EAST OF THE PLAT. o THAT THE DEVELOPER WORK WITH STAFF TO CREATE A LARGER CENTRAL OPENSPACE IN THE TOWNHOUSE DEVELOPMENT IN THE SOUTHWEST CORNER OF THE PLAT. \\elkriver\sys\shrdoc\planning\scott\trottsw.doc ITEM NO.'S 3.1.-3.3. C of iver TO: FROM: DATE: SUBJECT: MEMORANDUM Pat Klaers Stephen Wensman, Planner July ~14~, 1998 Trott Brook Farms Parks Proposal Attachments A) Park and Recreation Commission Minutes Summary B) Park and Recreation Minutes C) Trott Brook Trail Corridor Memo Overview On Marchl2, 1997, John Payton, Senior Associate with Westwood Professional Services and Homer Tompkins, met with the Park and Recreation Commission regarding park requirements for the then proposed 300 acre, 500-550 single family home and townhouse development (Trott Brook Farms). At that time the Commission requested the following: · 4-6 acres of park land of which 3 acres would be neighborhood park in the center of the plat and the remainder to the East of the plat to link to future park areas when the land to the East develops. · A trail system be established through the plat connecting the park areas and pedestrian routes. · The remaining dedication requirements be collected as cash. On May 14th, 1997, Steve Ach, City Planner, informed the Commission that a 4.2 acre park was being planned with 2.2 acres on the eastern edge of the development. The Commission requested more fiat land in the park and requested the following amenities: a balLfield with backstop, tot lot, basketball hockey rink, sand volleyball court, and picnic shelter. The developers ask the Commission if all the park improvements were made "up front" by the developer, could a credit towards their park dedication be made 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 Memo to Planning Commission/Trottmmo April 28, 1998 Page 2 as the project develops. The Commission said they would consider the request. On June 11, 1997, Ed Hasek and John Payton of Westwood Professional Services, presented a revised Trott Brook Farms proposal. The proposed development encompassed 280 acres and the park increased to 8.13 acres (6.59 acres of upland). The proposed centrally located park included: a ballfield, soccer, playfield (hockey in winter), tot lot, tennis/basketball court, and picnic shelter. Three trail connections were proposed to the park. The developer again requested credit be given for park improvements with the phase 2 of the project. Also mentioned was that tot lots and other amenities would be associated with the townhomes. The Commission approved the park land dedication concept with a cash contribution to meet park dedication requirements. The Commission also moved to have staffwork with the developers to develop the Trott Brook as a linear park. Furthermore, the Commission approved the concept of park dedication credit for improvements made by the developers for Trott Brook Farms Park. On April 8, 1998, Homer Tompkins and Ed Hasek again presented changes to Trott Brook Farms Park. The proposed development increased from 280 to 360 acres with a total park dedication of 20.6 acres. The dedication included, a centrally located park area increased from 8.5 acres (6.6 acres of upland) to 13.2 acres (9.8 acres of upland) with the previously ~roposed amenities. In addition, the proposal included a 3.9 acre linear park along Trott Brook, and a 3.5 acre passive area to the North along Trott Brook. The Commission discussed whether or not 9.8 acres of park was adequate for the size of the development and expressed support for the trail along Trott Brook and felt a sidewalk should connect the Trott Brook to the central park area. On May 13, 1998, Ed Hasek of Westwood presented the proposed parks for Trott Brook Farms. The total park dedication presented was 17.2 acres including: a 11.2 acre centrally located park with amenities (8.3 acres of upland), 6 acre hnear park along Trott Brook, and cash or improvements to go towards the remaining park dedication. (See Attachment A) Park Dedication The Elk River Subdivision Ordinance requires that an amount of land equal in value to ten percent (10%) of the undeveloped land proposed to be subdivided shall be set aside and dedicated ... or .... shall contribute to the City an amount of cash equal to the fair market value of the undeveloped land .... f:\shrdoc\planning\stevewen\pcmmo\trottmmo.doc Memo to Planning Commission~rottmmo April 28, 1998 Page $ The 10% park dedication for a 360 acre development would be 36 acres of park land, or cash. Trott Brook Trail Corridor The park dedication includes a trail corridor along Trott Brook that includes Outlet E and D of the preliminary plat with a trail connection South through the townhomes to the future County Road 12 bituminous trail. In the Prehminary Plat the trail is not yet shown to be accessible from Street O or County Road 12. The trail ends at a townhouse driveway which connects to a townhouse road which connects to County Road 12. Outlot E and D, in the Preliminary Plat, provide roughly 50 feet of open space on each sides of the Brook. In the Southern half of the site this ensures some protection of the Brook and public access. In the Northern half of the site the Brook is encroached upon by large lots providing no open space or public access, with a rehance on future development for a continuation of the trail. Neighborhood Park The neighborhood park includes all the site amenities requested by the Park and Recreation Commission. Concerns of the Park ahd Recreation Commission include: amount of wetland included in the park, the close proximity of amenities to the road and to residential lots without a buffer space or landscaping and the tight nature of the park amenities in general. Outlot F Outlot F is not part of the park dedication endorsed by the Park and Recreation Commission. The area at one time was propose as a 3.5 acre passive recreation area. If this area would become part of the park dedication, pedestrian linkages would be required. Furthermore, some provision for maintenance access would need to be provided in the plat. Hillside City Park Hillside City Park, the old city dump site south of Trott Brook Farms, has been endorsed by the Park and Recreation Commission as a wooded park with rugged bike trails through out. This shall provide an alternative location for recreation for families in the area provided there is a safe crossing of County Road 12 off the County Trail. f:\shrdoc\planning\stevewen\pcmmo\trottmmo.doc Attac. ,ent A Park and Recreation Commission Minutes Summery (Trott Brook Farms) Date Development Proposed Parks Park Commission Recommendations and Comments Acres Acres 3/12/97 300 acre approx. (3 acres) Central neighborhood park 16 acres (1-3) acres east of plat with trail system Cash 5/14/97 300 acre 4.2 acre neighborhood park 6.4 Park include: a ballfield, soccer, playfield (hockey in 2.2 acres east of plat acres winter), tot lot, tennis/basketball court, and picnic shelter 6/11/97 280 acres 8.13 acres (6.59 acres of upland) Central neighborhood park. approx. Park concept with cash contribution 3 Trail Connections to park. 11.13 Develop the Trott Brook linear park. Tot lots and amenities with townhomnes acres Dedication credit for improvements made to park 4]8/98 360 acres 13.2 acres (9.8 acres of upland) Central neighborhood park. 20.6 Support for the trail along Trott Brook 3.9 acre linear park along Trott Brook acres Connect the Trott Brook to the central park area with 3.5 acre passive area to the north along Trott Brook a sidewalk 5/13/98 360 acres 11.2 acre (8.3 acres of upland) Central neighborhood park. 17.2 Accepted concept as park dedication 6 acre linear park along Trott Brook acres Cash or improvements Planning Commission Minutes May 26, 1998 Page 4 3. A LETTER OF CREDIT IN THE AMOUNT OF 100% OF THE COST OF PUBLIC IMPROVEMENTS BE PROVIDED PRIOR TO RELEASING THE PLAT FOR RECORDING. A SURETY BOND IN THE AMOUNT OF 25% BE PROVIDED TO THE CITY UPON COMPLETING PUBLIC IMPROVEMENTS FOR A ONE YEAR PERIOD TO GUARANTEE QUALITY OF WORK. 5. SURFACE WATER MANAGEMENT FEE IN THE AMOUNT OF $550.64 BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING. 6. PARK DEDICATION FEE IN THE AMOUNT OF $3900.00 BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING. 7. A SEAL COATING FEE TO BE DETERMINED BY THE CITY ENGINEER PAID PRIOR TO RELEASING THE PLAT FOR RECORDING. 8. STREETLIGHTS BE PROVIDED PER ELK RIVER UTILITIES RECOMMENDATION. 9. APPLICANT SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO ANY WETLAND DISTURBANCE. 10. THE DEVELOPER GRADE AND SEED THE PROPOSED ROAD TO THE PLAT'S WESTERN BOUNDARY AND PROVIDE THE CITY PAYMENT TO INSTALL BITUMINOUS AT A LATER DATE. 11. IF INDIVIDUAL SEWAGE DIGESTERS ARE USED, THE HOMEOWNERS MUST CONTINUOUSLY HAVE A MAINTENANCE AGREEMENT WITH PROFESSIONALS TO SERVICE THE DIGESTERS AND REMOTE MONITORING OF THE PUMP IS REQUIRED TO ENSURE IT IS OPERATIONAL. 12. OUTLOTA BE MADE PART OF LOT 8 AND OUTLOT B BE COMBINED WITH THE ADJACENT PARCEL TO THE SOUTH. 13. A DEED RESTRICTION BE RECORDED WITH THE PLAT TO PREVENT FURTHER SUBDIVISION OF THE LOTS WITHIN THE PLAT UNLESS THE ZONING IS CHANGED. COMMISSIONER MORRIS SECONDED THE MOTION. THE MOTION CARRIED 5-0. 6.4. Request by Contractor Property Deve opers Company (CPDC) Request for Zone Chan.qei Public Hearin,q Case No~ ZC 97~1 6.5. Request by CPDC for Conditional Use Permit, Public Hearin.q Case No. CU 97-11 6.6. Request by CPDC for Preliminary Plat Approval (Trott Brook Farms), Public Hearin.q Case No. P 97-8) Staff report by Scott Harlicker. Contractor Properties Development Company (CPDC) has requested the following: 1. Rezoning 361 acres from Rle (Single Family Residential) and Rlc (Single Family Residential) to PUD (Planned Unit Development). 2. Preliminary plat to subdivide 361 acres into 357 single family lots and 252 townhome lots. Planning Commission Minutes May 26, t998 Page 5 2. Preliminary plat to subdivide 361 acres into 357 single family lots and 252 townhome lots. 3. Conditional use permit request for a 361 acre residential planned unit development. The following individuals involved in the Trott Brook Farms development were introduced: Homer Tompkins - President of Contractor Property Developers Company Ed Hasek - Westwood Professional Services Terry Foreport- Lungren Bros. Builders Bill Henderson - Bright Keys Building & Development Corp. Fran Hagen - CPDC Design Engineer Mr. Ed Hasek reviewed changes since the Planning Commission's last review of the Trott Brook Farms plat. The project has increased in size from 280 acres to 360 acres. The number of lots has increased from 322 single family lots and 200 townhouse lots to 352 single family lots and 257 townhouse lots. The property contains 56 separate wetland areas with a total combined acreage of 102 acres (28% of total property); the smallest being approximately 100 sq. ft. and the largest is 40 acres. Woodland areas total 132 acres (25% of the total property). Mr. Hasek reviewed the location of the multi-family housing, the gas line easement, width of road easements and accesses to the site. He noted there will be 4, 6 and 8 unit townhome buildings. The single family lots range in size from 9,800 square feet (70'x140') to 1+ acres. Mr. Hasek explained that their intent is to preserve as many trees as possible, but he estimated there will be a loss of approximately 60% of the existing trees. It may be possible to reduce that amount by 10-15% with custom grading. They will attempt to provide some incentive to builders to custom grade the wooded lots. Mr. Hasek pointed out an area where there currently is oak wilt. Mr. Hasek explained where main collector streets will have a 7' wide bike path on both sides and 6' sidewalk on one side and the location trail connections to the park and proposed Trott Brook trail. Terry Foreport of Lungren Bros. reviewed the Heritage series homes proposed for Trott Brook Farms, ranging in base price from $130,000 - $170,000. The Heartland edition ranges from $180,000 - $250,000. He explained the attached and detached maintenance-free townhome products they offer, ranging in price from $180,000 - $230,000. Mr. Foreport noted they offer 8-9 single family home plans with 4-5 different elevations. Mr. Foreport explained the challenge of custom grading wooded lots and the fact that trees may still die years later as a result of the construction traffic. Bill Henderson of Bright Keys Building and Development Corporation, indicated they plan to construct townhomes in the development ranging in base price from $100,000 to $130,00. Plans include 140 "front-to-back" townhomes and 170 "back-to-back" townhomes. They will range in size from 1,4050 - 1,800 sq. ft. and will have 2 bedrooms with a loft upstairs. In locations where the water table will allow, some of the townhome will have basements. Mr. Henderson noted their Planning Commission Minutes May 26, 1998 Page 6 Chair Mesich expressed his concern that he does not want to see this type of "barracks" townhome construction at the gateway to the City of Elk River. He suggested that different types of plans and exterior materials be used to vary the look of the townhomes. Homer Tompkins of CPDC, suggested the Planning Commissioners visit the sites where Bright Keys has completed townhomes so that they may visualize the type and quality of construction. The Commissioners indicated it may be possible to visit the sites during a mobile workshop. Chair Mesich indicated did not support the 70' wide single family lots, nor the density of townhomes. Commissioners Thompson, Chambers, Schuster and Morris were in agreement that they were comfortable with the housing mix. Chair Mesich stated he would need to see some reason for the 70' lots, other than for the developer to sell more lots. Commissioner Thompson expressed her satisfaction with the plans for trails and sidewalks. Discussion followed regarding the accesses and entryways to the project, the number of cul-de-sacs, and creating landscaping, lighting and street themes. Fran Hagen of CPDC, explained that development of the project would begin to the south, since that is where utilities will be available first. He noted that they may build a portion of the new County Road No. 13 alignment in order for the utilities to be extended to the site. Chair Mesich expressed his concern for the impact this large development will have on the school district. Commissioner Morris questioned what happened to the sliding hill which was discussed. Mr. Hasek reviewed the park concept, and explained that there is a natural sliding hill to the east of Trott Brook that the City may wish to acquire if and when the property is developed. Commissioner Schuster questioned what the plans are for the large wetlands. Mr. Hasek explained that Outlot A may be utilized by the City as a regional storm water ponding area. He indicated that the Park & Recreation Commission was interested in Outlot B as passive nature area but they were not willing to give them any credit toward their park dedication for it. Chair Mesich opened the public hearing. Tom Christian, 10989 181st Avenue, expressed concerns for increased traffic which would be associated with the proposed plat. He stated he is most affected by this development since he is closest to the property. COMMISSIONER THOMPSON MOVED THE PLANNING COMMISSION CONTINUE THE PUBLIC HEARING FOR THE REQUEST BY CPDC FOR A ZONE CHANGE, CONDITIONAL USE PERMIT AND PRELIMINARY PLAT APPROVAL TO THE NEXT SCHEDULED MEETING. COMMISSIONER MORRIS SECONDED THE MOTION. THE MOTION CARRIED 5-0. Planning Commission Minutes July 28, 1998 Page 4 6.16. Request by Contractor Prope~ Developers Company (CPDC) for Zone Chan.qe, Case No. ZC 97-1 6.17. Request By CPDC for Conditional Use Permit, Case No. CU 97-11 6.18. Request byCPDC for Preliminary Plat Approval (Trott Brook Farms), Case No. P 97-8 Terry Maurer, City Engineer, indicated that city staff and the developers have come to an agreement on all issues except one regarding density of the townhomes in the southwest corner of the plat. The issues that have been resolved are as follows: - The number of lots less than 80' wide have been reduced from 47 to 14 - The right-of-way issue has been resolved - The 32' wide public street issue - Number and size monument signs have been reduced Terry indicated the developer has proposed to reduce the number of townhomes located in the southwest corner by 4 units (2 eight plexes reduced to six plexes). Staff proposes the total number of these units be reduced from 156 to 144 in order to create more open space. Ed Hasek of Westwood Professional Services, presented a graphic which he felt illustrated the desired increased open space and reduction in density. Commissioner Cote indicated he felt the density was still to high. A discussion followed regarding the density of the townhomes. Chair Mesich opened the public hearing. John Kuester, Planning Commission representative, expressed his concern that the proposed park should be larger, and was concerned the wetlands in the park and adjacent to it will increase in size over time. He suggested filling of some of the wetlands be considered. There being no other comments from the public, Chair Mesich closed the public hearing. Terry Maurer, City Engineer, indicated he did not feel the Wetlands Tech Panel would look favorably on filling of wetlands to create more park land. Commissioner Morris questioned why the developers have not reduced the number of townhome units to meet the Planning Commission's request. Ed Hasek indicated the developers will be working with staff between now and the City Council meeting on August 3rd to further address this issue. COMMISSIONER COTE MOVED THE PLANNING COMMISSION RECOMMEND APPROVAL OF THE REQUEST BY CONTRACTOR PROPERTY DEVELOPER'S COMPANY FOR REZONING, PUBLIC HEARING CASE NO. ZC 97-1, BASED ON THE FOLLOWING FINDINGS: RECENTLY APPROVED CHANGES TO THE ROAD NETWORK HAS IMPROVED TRANSPORTATION TO WARRANT A REZONING. A PLANNED UNIT DEVELOPMENT ALLOWS A COMPREHENSIVE REVIEW OF DEVELOPING THE PROPERTY. THE PROPOSED REZONING WILL BE CONSISTENT WITH THE CITY'S COMPREHENSIVE PLAN. A PLANNED UNIT DEVELOPMENT ALLOWS FOR FLEXIBILITY IN SUBDIVISION DESIGN. COMMISSIONER KUESTER SECONDED THE MOTION. THE MOTION CARRIED 7-0. COMMISSIONER COTE MOVED THE PLANNING COMMISSION RECOMMEND APPROVAL OF THE REQUEST BY CONTRACTOR PROPERTY DEVELOPER'S COMPANY FOR PRELIMINARY PLAT APPROVAL AND CONDITIONAL USE PERMIT FOR TROTT BROOK FARMS, PUBLIC HEARING CASE NUMBERS P 97-8 AND CU 97-11, WITH THE FOLLOWING CONDITIONS: THE NUMBER OF TOWNHOUSES IN BLOCK 2 OF THE TOWNHOUSE DEVELOPMENT IN THE SOUTHWEST CORNER OF THE SITE BE REDUCED BY AT LEAST 8 ADDITIONAL UNITS, FROM 156 TO 136 TOTAL UNITS. o THAT THE DEVELOPER WORK WITH STAFF TO CREATE A LARGER CENTRAL OPEN SPACE IN THE TOWNHOUSE DEVELOPMENT IN THE SOUTHWEST CORNER OF THE PLAT. THAT THE DEVELOPER DEMONSTRATE ON THE GRADING PLAN HOW THE TROTT BROOK TRAIL IS ACCESSED FROM STREET O. ELEVATIONS FOR THE TOWNHOUSE DEVELOPMENTS BE SUBMITTED FOR REVIEW AND APPROVAL. SIGNAGE FOR THE DEVELOPMENT SHALL BE REVIEWED AND APPROVED BY STAFF. ALL COMMENTS RAISED BY THE DEPARTMENT OF NATURAL RESOURCES SHALL BE INCORPORATED INTO THE PLAT. o EACH SINGLE FAMILY LOT SHALL RECEIVE 1 STREET TREE AND 1 FRONT YARD TREE; CORNER LOTS SHALL RECEIVE 1 STREET TREE AND 1 FRONT YARD TREE PER STREET FRONTAGE. A LANDSCAPING PLAN FOR THE TOWNHOUSE DEVELOPMENTS SHALL BE SUBMII'rED FOR REVIEW AND APPROVAL BY THE CITY. THAT THE DEVELOPER PROVIDE A PEDESTRIAN AND MAINTENANCE VEHICLE CORRIDOR TO OUTLET F FROM STREET N AS PER CITY ORDINANCE TO BE COORDINATED WITH A SEWER AND WATER CORRIDOR TO THE EAST OF THE PLAT. 10. 11. SETBACK OF 25 FEET FROM THE FRONT PROPERTY LINES ON ALL STREETS EXCEPT STREETS A, F, J, O, R AND S ALL COMMENTS OF THE CITY ENGINEER SHALL BE INCORPORATED INTO THE PLANS. 12. PRIOR TO THE ISSUANCE OF ANY BUILDING PERMITS A DEVELOPMENT PLAN BE SUBMITTED OUTLINING STYLE OF HOUSE AND FINISHED GRADES ON EACH LOT. 13. ALL STREETS BE BUILT TO CITY STANDARDS WITH THE EXCEPTION OF STREET A WHICH WILL BE LARGER. 14. ALL COMMENTS FROM THE DNR SHALL BE INCORPORATED INTO THE PLANS. 15. 16. ALL COMMENTS OF THE CITY ENGINEER BE INCORPORATED INTO THE PLANS. RECOMMENDATIONS OF TIM EDGETONOF THE SHERBURNE COUNTY TREE BOARD BE INCORPORATED INTO THE PLANS. 17. A DEVELOPERS AGREEMENT AND PUD AGREEMENT SHALL BE SIGNED AND RECORDED PRIOR TO RECORDING THE PLAT. 18. PLAT APPROVAL IS CONTINGENT UPON THE REZONING AND CONDITIONAL USE PERMIT FOR A PLANNED UNIT DEVELOPMENT BEING APPROVED. 19. 20. 21. 22. 23. 24. 25. 26. PARK DEDICATION FEES BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING. SURFACE WATER MANAGEMENT FEES BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING. HOMEOWNERS ASSOCIATION DOCUMENTS SHALL BE REVIEWED BY THE CITY PRIOR TO RELEASING THE PLAT FOR RECORDING. STREET LIGHTS SHALL BE INSTALLED PER ELK RIVER UTILITIES RECOMMENDATIONS. THE CITY ACCEPT OUTLOT F AS A CHARITABLE CONTRIBUTION FROM THE DEVELOPER. A LETTER OF CREDIT BE PROVIDED TO THE CITY IN THE AMOUNT OF 100% OF THE COSTS OF PUBLIC IMPROVEMENTS. UPON COMPLETING ALL OF THE IMPROVEMENTS AND HAVING THEM ACCEPTED BY THE CITY, A WARRANTY BOND IN THE AMOUNT OF 25 % OF THE IMPROVEMENT COSTS SHALL BE SUBMITTED TO THE CITY FOR A ONE YEAR PERIOD. WATER AVAILABILITY CHARGE BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING. 27. ALL NECESSARY PERMIT SHALL BE RECEIVED PRIOR TO COMMENCING WORK WITHIN ANY EASEMENTS. 28. ALL COMMENTS IN PHIL HALS, THE STREET/PARK SUPERINTENDENT, SHALL BE INCORPORATED INTO THE PLANS. 29. ALL MAILBOXES SHALL BE CLUSTERED. 30. LANDSCAPE EASEMENTS SHALL BE INCLUDED AROUND ALL DEVELOPMENT AND NEIGHBORHOOD SIGNS. COMMISSIONER THOMPSON SECONDED THE MOTION. THEMOTION CARRIED 7-0. 07/07/98 11:59 FAX 9375822 Westwood Prof. Services ~002 Development Summary Trott Brook Farms Elk River, Minnesota. Submitted lo: Resubmitted ~ June 1998 (Revised July 1998) City of Elk River 13065 Orono Parkway PO Box 490 Elk River, MN 55330 Submitted Contractor Property Developers Company 9110 83~ Avenue North Brooklyn Park, MN 55445 Prepared b:': Westwood Professional Services, Inc. 7599 Anagram Drive Eden Prairie, MN 55355 07/07/98 12:00 FAX 9375822 Westwood ?rof. Servlces ~,~,,~,o Table of Contents Project Summary Development Evaluation Reduced Drawings 07 07/98 12:00 FAX 9375822 Westwood Prof. Services ~004 WESTWOOD PROFESSIONAL SERVICES, INC. June 30, 1998 TROTT BROOK FARMS PROJECT SUMMARY AND NARRATIVE Elk River, Minnesota Ref. No. 96367 PROJECT SUMMARY PROJECT NA~ ]~ Trott Brook Farm5 East of County Road 13, North of County Road 12 and west of Trott Brook. OWNER Contractor Prope~ ty Developers Company (CPDC) 9110 83e Avenue North Brooklyn Park, MN 55445 Contact: Homer '['ompkins (612) 627-0823 DEVELOPER/A PPLICANT Contractor Propel ty Developers Company (CPDC) 9110 83rd Avenue North Brooklyn Park, W.N 55445 Contact: Homer Tompkkns (612) 627-0823 PROPOSED BU[LDERS BrightKEYS Bui] ding and Development Corp. Lundgren Brothe~ s SITE PLANNIN G, SIYRVEYOR, ENGINEER Westwood Professional Service, Inc. 7599 Anagram D:-ive Eden Prairie, MN 55344 Contact: Ed Has{& (612) 937-5150 PROJECT NARRATIVE TROTT BP, OOK FARMS 1 07/9~/9~ .... 12:..00 FAX 9375822 WestwooO ~roI. ~ervlces WESTWOOD PROFESSIONAL SERVICES, INC. DEVELOPMENT DATA ZONING/LAND USE Existing Zoning: Existing Land Use Guide Plan: Proposed Zoning: PrOposed Land Us,x R-lc and R-1 e - Residential Fan'n and Undeveloped Residential P.U.D. - Residential Mixed Use Residential PROPOSED DE~'ELOpMENT SLrMMARY Total Site Area: 365.4 acres Total Units Propo: ed: 630 units Townhouscs: 280 Detached SF: 350 Overall Density: Total Wetlands (5;): Total County R.O.W.: Net Upland Devel~pment Area: 2.5 units/acre 102.2 acres 11.4 acres (including proposed) 251.8 acres REQUESTED ACTION The action request ~d is for a revision of the Comprehensive Plan and P. czoning of the property to allow tae development of a residential P.U.D. generally under the R-lc and R-le zoning guide.ines of the ordinance. The approval of a C.U.P. and a Preliminary Plat for the subdivision of the property is also being sought. PROJECT NARRATIVE EXISTING CON DITIONS The 365.4 acre sit{: is currently in three main uses. The northern half is undeveloped and consists ofwetlancts, rolling wooded hills, and open meadows. The southern half generally consists )f agricultural and hog fanning operations with the western area being a large 40 acre welland. Trott Brook flows south along a significant portion of the eastern property boundary. SOILS/SLOPES Upland soils gene~ ally consist of fine to coarse, sandy loams of the Nebishand Mahtomedi series. Slopes range from 0 to an excess of 30% across the site. Approximately 39 acres of the site consist of slopes in excess of 18%. Several areas central to the site t.ave been previously excavated for sand and gravel deposits. Numerous depressions and wetlands consist of soils of the Seelyeviles and Bowstring series, and area typically mucky and flooded. Upland and wooded wetlands are characteristic of those found in maturing oak woodlands. Soil borings have been done over a significant ;~rea of the site, and the reports have been submitted to the City. PROJECT NARRATIVE TROTT BROOK FARMS 2 07/07/98 12:01 FAX 9375822 Westwood Prof. Services ~006 WESTWOOD PROFESSIONAL SERVICES, INC. VEGETATION The southern half (,f the site is generally devoid of vegetation with the exception of shelterbelts around two farmsteads, and along County Road 12. Wooded portions of the northern half of thy property consist of maturing oak woodlands with areas of planted pines, aspen grove:~, black ash and boxelder/cottonwood stands. Preliminary site inspection with thc county forester has identified one area of oak wilt in the east central part of the property. The area is rather isolated, and a program to deal with the diseased trees will be impl¢:nented. The majority of the wooded portions of the property have been previously gr ~zed as evidenced by the existing understory plaint species. WE~ With the inclusion of an additional 80 acres to the original project area, the project now includes a total of.21 separate and. delineated wetlands covering 102.2 acres. Included are small woodland pc nds, feedlot ponds, reed canary and cattail marshes, and Trott Brook. Approximately 65 acres of wetlands are contained in two large complexes in the west central and northeast comer of the site. Wetland delineation has received confirmation from the NRCS. ABUTTING LAI~ USES Surrounding land uses include undeveloped farmland to the north, residential and industrial development to the west, undeveloped and park land to the south, and agricultural land tc the east. Properties to the north and east are character/zed by numerous wetland ;, rolling wooded hillsides, and open farm fields. ACCESS Access to the prop-~rty will come from County Road 13 to the west, and County Road 12 on the south. Plans are currently underway to realign County Road I3 to the east of the natural gas facility, potentially providing an additional access location to the southern portion of the project.. County Road 12 is also being planned for an upgrade to four lanes in the near future. Trails and/or walkways are being proposed as a element of both projects. PROPOSED DEVELOPMENT This proposal is fcr the development of 630 residential mixed use units over 365 acres of generally rolling a ad wooded property motteled with numerous wetlands. The project will be phased and developed over the next 6 to 8 years, and has been designed to offer a variety of opportunities for distinctive living in the Elk River community by implementing the ?lanned Unit Development (PUD) process. PROJECT NARRATIVE TROTT BROOK FARMS 3 .. ~07~.98 12:01 FAX 9375822 Westwood Prof. Services ~007 WESTWOOD PR£ FESSIONAL SERVICES, INC. PLANNED UNIT DEVELOPMENT ~UD) The most significmtt benefit of a PUD of this type io the Elk River community is that one reputable develope.' will control the development of 365 acres of residentially zoned property. Construe tion of multiple housing types, development of neighborhoods, and , the associated infr, structure and amenities will all be planned at one lime, and will be designed to serve a large area in planned phases. The entire project will be developed as smaller neighborh¢ ods, but will be tied together by a central park area, trail systems, monumentation and signage, landscaping, etc. to create one overall mixed use residential community. The PUD allows ti:. e flexibility to manipulate and transfer allowed density to less sensitive areas of tlte project. The proposed overall density of 2.5 units per acre is significantly less titan that which could be developed within the existing zoning districts (3.1 un/ac) at the expense of the site and its amenities. The PUD also offe:s the incentive to preserve open space and other site amenities such as wetlands, woodlands, and topography by allowing less sensitive areas to be more intensely developet. While the R-lc and R-lc zoning districts require specific lot dimensions, sizes, ~etbacks, etc., the PUD provides a mechanism by which the spirit of the ordinance can l,e maintained, but the letter of the ordinance may be altered. Required lot area ranges fror.a 11,000 s.f. to12,000 s.f. by district. The average single family lot size as proposed is 20,804 s.f.. The average area per unit for the entire development is 15,245 s.f.. The required lot width by ordinance is 80ft. at the setback line. The average proposed single fmnily lot width is 93 ft.. RESIDENTIALTOWNHOME UNITS Three areas of tow ~houses (one north and two south) offer different living environments. The northern 39 urJts are set in wooded rolling hills and area accessed by a private 28 foot private drive t) preserve the wetland areas and woodlands on the site. These units will have the poter tial to be walk-outs, and will be the largest of the town_home units being proposed. The southwestern 156 units are spread across an existing open field of relatively flat property, and around a series of wetlands. These units will be accessed by a 60' public right of way with ~ 34 foot street cross section. Three to eight unit structures have been designed, and varied structural detailing and color will be employed to provide a varied building mass and character from the street frontage. Back-to-back buildings will be two story slab-on-grad,;. Row townhomes will vary from two story slab-on-grade to single story walkouts. The southeastern ~5 units are developed around a series of wetlands and ponds, and are placed to avoid a '/5 foot pipeline easement which bisects the entire property from west to east. This area of'he development will be served by a private 28 foot private street with access off County Road 12 and the projects interior collector roadway system. Unit types will be the same a2: described for the southwestern area above. PROJECT NARRATIVE TROTT BROOK FARMS 4 07/07~9{_.12:02 9375822 Westwood Prof. Services ~008 WESTWOOD PROFESSIONAL SERVICES, INC. All townhomc unit~; will be individually landscaped based on orientation and aspect. Existing vegetation and topography as well as additional berming and landscape plantings will be implemcntct to provide screening fi:om County l~oads 12 and 13. SINGL]~ FAMIL]~ The remaining type s of residential deveiopment are single family lots ranging in lot size fi:om a minimum o~'73' by 140' (10,200 sq. ft.) in the south, to in excess of one acre in the north. The size of the lots and general intensity of development is in response to the natural character of the property. Smaller lots have been proposed in areas mixed throughout the project where their impacts to natural features can be minimized. Larger lots are generally located adjacent to wetlands and where significant areas of trees and topography exist. The desire to prese:'ve thc character of thc site, the need to serve the development with utilities and paved ::oadways, and the opportunity to provide a unique residential community all leni to thc Trott Brook Farms residential development. Trott Brook Farms offers the home owner a number of amenities to consider. Winding roads cut back and forth around preserved wetlands, hillsides, and woodlands. A central collector through fl~e project offers ease of access to the various sub-neighborhoods within the development and the City's collector roadway system.. Trails and walkways will be incorporate, i to aid the hiker/biker, move between their homes and the parks, commercial areas, ..;chools, etc., in the community. A central park area of approximately 11.5 acres has been incorporated to provide neighborhood park facilities to residents of Trott Brook Farms. Facilities are planned to include a ball riel& soccer field, hockey rink, hard-court surface, picnic shelter, tot lot, and trails. The p~ also includes amenities such as woodlands, ponds and wetlands which are all repre:;entative of the overall character of thc project. Property is also being dedicated to the city for the development of a natural trail system along Trott Brook. The intent is to connect various parks and open spaces in the eastern part of the city to the system as a whole. Trott Brook Farms will provide the first link in this system. It is the intent of the developer of this project to preserve and protect the natural amenities of the site to the gr ~atest degree possible through the use of careful lot design and good construction and rnanagement practices. As the owner, Con,actor Property Developers Company intends to develop thc property once they receive c very governmental approval necessary for development to occur. As a wholly owned sub~, idiary of Schercr Bros. Lumber Co. with annual sales in excess in One Hundred Million (',; 100,000,000.00), Contractor Property Developers Company offers the financial integrity ;md resources of an industry leader with over 60 years experience. PROJECT NARRATIVE TROTT BROOK FARMS 5 07/07/98 12:03 FAX 9375822 Westwood Prof. Servlces ~009 WESTVVOOD PRC FESSIONAL SERVICES, INC, Contractor Prope~' Developers Company is synonymous with the highest quality standards of reside]~tial development in the Twin Cities. Our projects are highlighted by preserving the natu:al beauty of the land, grading pleasing contours, curving streets, saving trees, spacic us entries and enhanced park amenities within each subdivision. Contractor Property Developers Company through our other subsidiaries of Schcrer Bros. Lumber Co. provides luxury custom home builders a complete package of coordinated marketing and advc:rtising, residential construction financing, and crafted home building supplies. PI~OJ-ECT PHAS [NO Project phasing wil 1 begin in the south and will follow the extension of trunk utility systems. Phase I i; anticipated to include a portion of the townhousc and single family developments offl:oth County Roads 13 and 12 to the south, and will also include the construction of the park area central to the development. Project build out will be market driven, will follow the natural extension of services, and is anticipated to be completed in 6 to 8 years. ENVIRON1VIEN'I AL Both a Phase One :md Phase Two Environmental Site Assessment have been performed on the property, an:l a mandatory EAW is currently being reviewed by affected agencies. We have reviewed the property with the County Forester to identify potential oak wilt, and have also cont'acted a consultant to perform a cultural resources survey of the site. Clean up of the ex/sting hog feedlot has akeady commenced, and will continue until all buildings have beea razed, and all debris has been collected and removed from the site. Wetland permitting is also currently under way, and access permits will be sought from the county as required. PROJECT NARRATIVE TROTT BROOK FARMS 6 07/07/98 12:04 FAX 9375822 Westwood Prof. Servlces ~010 Westwood Professional Services, W 7599 Anagram Drive Eden Prairie, MN 55344 Phone: $12-937-5150 Fax: 612-937-5822 Toll Free: 1-888-937-5150 ~:rnaii: wps~wes~oodps.com at the Setback at the Setback 3 22 1,920 87.3 4 16 1,580 98.7 6 14 1,330 95.0 7 9 740 82.2 8 2 225 112.5 9 '~4 6,135 95.8 10 36 3~575 99.3 11 9 850 94.4 12 12 1,200 100.0 13 26 2,200 84.6 14 56 5,480 97.8 15 ...[ 70 5,950 '85.0 16[ 14 1,500 107.1 TOTALS It 350 32,685 II , 93.4 NOTE: 47 lots have a width less than 80 feet at the front setback 365.4 Acres ' 125.2 Acres 240.2 Acres (12 & 13) (12 & 13) (12)I 11.4 Acres 7.7 Acres 3.7 Acres - 102.2 Acres 48.6 Acres 53.6 Acres a 251.8 Acres 68.9 Acres 182.9 Acres -- (Area(.85)/Lot Size) (Area(.85)/11,000) (Area(.85')/12,000) 797 Units 232 Units 565 Units 3.16 Units/Acre 3.37 Units/Acre 3.08 Units/Acre Total Area County R.O.W. Wetlands Net Developable Ar~ a Potential Units Net Potential Densit:r 07/07/98 Designing the Future Today...since 1972 07/p7/~8.. 12:04 FAX 9375822 Westwood Prof. Services ~011 Liiii 3 22 373,206 16,964 4 16 254,156 15,885 6 " 14 401,676 28,691 7 9 149,997 16,664 8 2 46,345 23,172 9 64 1,748,374 27,318 10 36 685,784 19,050 li 9 137,062 15,229 12 12 199,983 16,657 13 26 414,225 15,932 -- 14 56 1,352,806 24,157 15 70 1,220,785 17,440 16 14 296,916 21,208 Total Units Density Area Per Unit (Or erall) Average Area Per Single Family Unit Average Area l'er Multiple Family Unit Lot Width 797 630 (79%) (Single Family - 167.15 Acres) (Multiple Family - 53.33 Acres) 3.16 Units per Acre 2.51 Units per Acre 11,000 - 12,000 s.f. 15,245 s.f. 11,000 - 12,000 s.f. 20,804 s.f. * 11,000- 12,000 s.f. 8,297 s.f. 80 ft. 93.4 ft.. 2 lots are smal .er than 11,000 s.f. minimum required by the R-lc Zoning District 07/07/98 0.~(09/9.8 15:23 FAX 9375822 t~:estwood Prof. Services ~001 Westwood Professional Servic ~s, Inc. MEMORANDUM To: Scott Harlicker, (;ity of Elk River Ref: 96367 From: Ed Hasek, Wesh~,ood Date: July 9, 1998 Re: Addendum 1 - T :ott Brook Farms PUD [] 7599 Anagram Drive Eden Prairie, MN 55344 612-g37-5150 FAX 612-937-5822 [] 104 Marry Drive, #3 Buffalo, MN 55313 612-682-2587 FAX 612-682-2639 I have contacted the sch(,ol district to inquire about the issue of the need for a new school based on thc Trott Brook Farms PUD project as addressed by the Planning Commission. Mr. Bruce Powers, Administrator of District Standards provk.ed the following information concerning the districts methods for evaluating need and determining the potential for new expansions. His comments are as follows; Projected student po' )ulation is estimated annually based on two methods. 1 .) Census maili: ag based on utility information. 2.) Projected res dential development (one student per household for new projects). New construction is based on three issues prioritized as follows; 1.) Tax capacity (bonding not to exceed 20% of capacity). 2.) Politics ( usually done in a major election year). 3.) Need (want t ) be to at least 80% of full capacity upon occupancy of new construction). · For Trott Brook Fan ns they would estimate 630 students and phase the development over 5 years. Therefore they project 126 students per year over the next 5 years. Based on this projec: as well as other projects either under construction or pending approval, one new school would appem to be needed in the near future. The need, type or location of any new or expanded facility has yet to be fully determined. This decision is ultimately made by the School Board. · Census, student pop, flation projections and other data are all available from the School District upon request. Westwood Professional Services -//. ~ ,.,-.~.,~pa,ges ,~ Eden Prairie, MN 55344 Ph. 612-937-5150 CoJDept. o\ctw§\96367\6367MAP 2-20-97 9~41~02 0, m CEN HUDS ST, N,W. cQNCO~ C) F- Z 3> C~NCORD NEADBWVALE RD, zig SEYMDUR AVE, RUSH AVE N.W, JACKSON < -,% YALE SI EVANS RD, LINE AVE TP-.OTT XAVIE .¥ .m ST, ST, N,W, ST,N,W, TYLER KENNEDY COUNTY I~AM~EY OOUNTY CLEVELAND AVE, N,W. DAVIS ST, N,W. 5HER~URNE ANOKA TROTT BROOK FARMS ~1~'~,~1~ ~..O~A~ll~y DATE ____ REG. NO Pe -pective Sketch Entry off County Road 12 Westwood . ?erspective Sketch View from County Roads 12& 13 :! \ \ i/ I GOPHER STA'~ 0t41~ GAU. IREVISIONS ~/~2/~ WIItwood I .... --- '' '-- ..... I~' Contractor Property Developers Company Trott Brook Farms PON~ ) 11 / (,-/ 'x 15 ~4 I t5 Trott Brook Park ~T TROTT FARMS Monument & Fencing Details Contractor ~Property Developers ~ompany )( Preliminary Details :DRAFT SPECIAL MEETING OF THE ELK RIVER PLANNING COMMISSION HELD AT ELK RIVER CITY HALL TUESDAY, JULY 14, 1998 Members Present: Members Absent: Staff Present: Chair Mesich, Commissioners Chambers, Cote, Kuester, Morris and Schuster Commissioner Thompson Scott Harlicker, Assistant Planner; Steve Wensman, Planner; Pat Klaers, City Administrator; Terry Maurer, City Engineer; Peter Beck, City Attorney; Debbie Huebner, Recording Secretary Pursuant to due call and notice thereof, the meeting of the Elk River Planning Commission was called to order at 6:30 p.m. by Chair Mesich. COMMISSIONER COTE MOVED TO APPROVE THE JULY 14, 1998 PLANNING COMMISSION AGENDA. COMMISSIONER KUESTER SECONDED THE MOTION. THE MOTION CARRIED 6-0. Terry Maurer indicated the following issues will be reviewed: 1. Land use 2. Environmental 3. Street and utility 4. Grading and drainage 5. Park and recreation 6. Miscellaneous issues Homer Tompkins, President of Contractor Property Developer's Company, provided a general overview of the proposed 365 acre mixed residential project. Bill Henderson of BrighfKEYS Homes, indicated he will be constructing the townhome/twinhomes included in the project. Mr. Henderson noted that he has been building in the Twin Cites for 9 years and his company has won several Reggie and Trillium Awards. Mr. Henderson reviewed changes made in the design Special Planning Commission Minules July 14, 1998 Page 2 plans for the townhomes as follows: 1 ) entrances for the end units have been changed to the side, canopies and rounded windows have been added; 2) the plan has been changed fo include single level row units (former plan had 2-story back to back)~ 3) the townhomes in the northwest area have been changed to single level units. Ed Hasek, Westwood Professional Services, explained that the project has grown from the original 280 acres to 365 acres. He reviewed concept and site plans illustrating wetlands, forestry, sidewalks and trails. Mr. Hasek stated a 11.5 acre park will be located in the center of the park and 6 acres of property along Trott Brook will be dedicated to the city for a trail. Amenities will be installed in the park which will be credited toward their park dedication fees. A 23 acre parcel located in the northeast corner of the property will be dedicated to the city, but he noted the Park & Recreation Commission was not willing to give any credit since the site is mostly wetland. Mr. Hasek explained that the first phase of the development will consist of 64 townhomes and 84 single family homes (approximately 32% of the construction of the site). Lungren Bros. Homes will be constructing 8 different styles of the Heartland series homes on the 85' wide and larger lots with room for a 3 car garage. Five styles of the Heritage series will be constructed on the smaller lots. Commissioner Schuster asked for clarification on the proposed phasing of the project. Mr. Tompkins indicated the Ist phase will take approximately 2-1/2 years to complete. Commissioner Schuster questioned if the project will start before the realignment of County Road 12. Mr. Tompkins indicated that they have been asked to construct a connection to the new roadway. 1. Land Use Issues Terry Maurer, City Engineer, indicated the following concerns still need to be addressed: -Density -Lot sizes (47 tots under 80' wide) -Need for future variances (decks, additions, etc.) -Environmental issues (i.e., tree loss) Scott Harlicker indicated there are two possible options to reduce the density of the townhomes; 1 ) spread the development out more along County Road 12, or, 2) reduce the number of units. Discussion followed regarding the density of the townhomes, amount of green space, distance between buildings and driveways. Jeff Beahen, Assistant Police Chief, expressed his concern that higher density means increased police calls. He suggested that more space be provided between and behind buildings, and that address information be provided on the ends of the buildings to aid them in locating a particular house number. Bill Henderson of BRIGHTKeys noted that the townhomes are not rental units and will be individually owned. Mr. Henderson indicated most of their buyers are "empty nesters" in the 45-65 years age bracket. Also, there is a growing market for single professionals who do not want the Special Planning Commission Minutes July 14, 1998 Page 3 upkeep associated with owning a home, such as mowing, snow removal, repairs. He noted that only 15% of their buyers have children. Commissioner Chambers indicated he had visited the Centerville site and felt the quality of construction was good, but was concerned about the density. Chair Mesich asked what was the density of the Centerville townhomes. Mr. Hasek indicated the density is 8.8 units per acre and they are proposing 5.8 units per acre for the southwest townhouse development. Mr. Hasek noted that the 9.8 acre site has approximately 37% of solid surface and 63% open space. The solid surface includes walkways, driveways, buildings, etc. Chair Mesich questioned whether or not the size of the project was discussed with the School District. Mr. Hasek stated he has met with Bruce Powers, Administrator of District Standards, and was told he was aware of the proposed project. Mr. Powers had indicated the District expects, at some point in the future, a school will be needed on the east side of Highway 169 but did not know what type of school it would be. Commissioner Cote expressed his concern for the smaller lots on Street A. He felt if there were fewer lots, there would not be so many driveway accesses onto the street. He anticipated the situation would become similar to an existing situation in the city with speed and increased traffic. Commissioner Kuester expressed concern that there is no off street parking for the townhomes. Commissioner Chambers noted that the Centerville project does have areas for off street parking. Mr. Hasek indicate, d there is parking on both sides of S Street, and that the townhomes will have two car garages and longer driveways for parking, which is different from the Centerville townhomes. Commissioner Morris stated he was concerned with the density of the townhomes, the number of trees which will be lost, and the number of single family tots less than 80' wide. Commissioner Cote indicated the residents of Elk River have often expressed the desire for the city to not allow densities like those found in other communities such as Maple Grove. Further discussion followed regarding creating an open space area for the townhomes by eliminating some units. A discussion followed regarding the covenants which will be enforced in the development and the type of home owner's associations which will be implemented for the single family and townhomes. Mr. Tompkins explained that potential home owners must go through an architectural review committee to have their plans approved. He indicated that the building trend is for smaller lots with larger homes on them. Chair Mesich expressed his appreciation to the developers for the changes which were made in the townhome concepts to improve the quality. Special July 14, Page 4 Planning Commission Minutes 1998 2. Environmental Issues Terry Maurer indicated a EAW has been submitted and response time for comments is open until July 29Ih. He did not anticipate any serious environmental concerns. Wetlands - Terry indicated there are 102 acres of wetlands in 52 different wetlands. He felt the developers have done an excellent job of avoiding the wetlands and will only be mitigating approximately 2 acres of wetland. He does not anticipate any problems in this area. Shoreland Ordinance - No information has been received from the DNR at this point. Oak Wilt - There is one pocket of Oak wilt which will be removed and the developer has submitted a plan to deal with the issue. Flood Fringe - Filing in the flood fringe will require a conditional use permit for lots abutting Trott Brook. Archeological survey and Phase II Environmental survey have been completed. Staff has referred the developers to the County regarding a county ditch issue. Terry reviewed the storm drainage plan for the eastern area and how it relates to this project. Street and Utility Issues Grading and Draina,qe Issues Terry indicated staff is recommending that a 70' right of way be granted for the realignment of County Road 12. He reviewed accesses onto the county roads. Terry noted staff is recommending all streets within the plat be 32' with the exception of Street A which is recommended to be 36'. Terry indicated there are 14 cul-de-sacs in the plat, noting that city ordinance does not have a restriction on the number of cul-de-sacs. He recommended a condition be included to require a connection between streets at the time of Phase Two to incorporate a northwest entry. Staff suggested the number and size of the monumental signs be reconsidered. He explained the location is important so that they do not interfere with the drainage and utility easements. Terry explained the location of the watermain connections and the concerns of the fire chief to providing looping of the watermain. Discussion followed regarding the county right of way requirements and the city's easement requirements. Terry Maurer indicated the city does not want to be in the situation where utilities would have to be run under the trail. The developers did not feel a would be problem on the north side. Fran Hagen with Westwood Professional Services, explained why it is not feasible to make the connection recommended by city staff due to the steep grade and loss of trees it would cause. He suggested the city consider a policy for allowing narrower streets based on traffic counts. Mr. Hagen also explained why the Special Planning Commission Minutes July 14, 1998 Page 5 secondary access on County Road 13 was needed and felt the right-in right-out would be adequate. Further discussion followed regarding the requested 28' street width. Mr. Hagen did not feel the extra street width was needed and the extra width would better serve as green space. Ed Hasek explained his reasons why he did not support the connection between Street F and Street S, and felt it would create more traffic than should be traveling on these streets. Scott Harlicker indicated that having a street connection on the west would also serve as a connection for pedestrians and bicyclists. Commissioner Kuester discussed how the layout of the streets affects school bus routing. Commissioner Cote expressed his support for the 32' wide streets and felt the developer must provide reasoning for the lesser right of way for County Road 12. Discussion followed regarding the possibility of a sign at the end of the two loops of Street A. Commissioner Morris stated he could not suppod the 28' street width and was concerned there was no access to the north. Terry Maurer state that he felt the drainage and tree preservation plan submitted were realistic of what will actually be happening. 5. Park and Recreation Issues Terry Maurer indicated the proposal includes a 11.2 acre centrally located park with amenities, 6 acre linear park along Trott Brook and cash or improvements to go towards the remaining park dedication. Steve Wensman, Planner, expressed concern for the trail ending at a townhouse driveway. He also expressed concern for the tight layout of the park amenities in relation to backyards. Also, he stated a maintenance access is needed for Outlot F as well as a pedestrian linkage. Discussion followed regarding parking needs for the park. Mr. Hasek indicated the Park & Rec Commission felt the off street parking would be adequate to serve the park. A discussion followed relating to a trail connection to County Road 12. The developers indicated they were willing to work with staff on this issue. Special Planning Commission Minutes July 14, 1998 Page 6 6. Miscellaneous Issues Signing - Terry Maurer indicated staff would like the developers to take a look at the quantity and size of the monument signing throughout the plat. Chair Mesich opened the public hearing at this time. Thomas Christian, owner of property near the proposed townhomes, stated he would like to see underground utilities. He expressed his concern for access to his property, increased traffic and speeding. Terry Maurer indicated the utilities have plans to run a new overhead main line along Highway 12. He noted developer plans to have underground utilities throughout the plat. COMMISSIONER KUESTER MOVED TO CONTINUE THE PUBLIC HEARING FOR THE TROI'r BROOK FARMS REZONING, PRELIMINARY PLAT AND CONDITIONAL USE PERMIT TO THE JULY 28, 1998 PLANNING COMMISSION MEETING. COMMISSIONER MORRIS SECONDED THE MOTION. THE MOTION CARRIED 6-0. There being no further business, the meeting of the Elk River Planning Commission adjourned at 10:30 p.m. Respectfully submitted, Debbie Huebner Recording Secretary Unit Cryp)--Largea! in the $eriea ,o 30' Front Yard / 8e~ack l~ar#age 8eriea 25' Front Yard Street .0 30' Front Yard I -- ~ Hampahire and P embr ook e/B eol or d Homea from the ./ IREV1SIONS / / o1998 ~ Prof~lan=l ~ / / IRE¥1SIONS O' 60' 120' 160' ~:v. xxfxx/xx OJS 7-27-98 / =1998 W~'e,~od Professlcnd ~ Inc. C C C / IREVISIONS \ '\ \ / / / I I I II / / I I I '\ / / / / / O' 60' 120' 180' .tv. x:</xx/xx 7-27-98 ICAL P~IVATE S T 0 30' OUTLOT T'd~CAL PI~VATE S1REET Tree Details Shrub Detail 7O' ROW ~ ("7 R.O.W I~ · ~ 0 I 0 Typical Parking II Concentration STREET - MulLi-Family Areas Planting Notes 5.3 3.3 PA.RKING DENSITY - ~ CARS/UNIT (,~ EX'IEEIOR) Typical Snow Storage - Cul-De-Sacs Stora Easement GOPHER STATE ONE: CAU // Contractor Property Developers Company Trott Brook Farms F:'ONID HOCKEY RINK 15 Trott Brook Park 1 ! f/ TROTT BROOK FARMS A Planned Residential Community TROTT BROOK PARK 1 Monument & Fencing Details IRE'VISiONS ]{ Contractor Property Developers Company Trott Brook Farms