Loading...
6.1. - 6.3. SR 08-03-1998~ity of MEMORANDUM Item #6.1. - 6.3. TO: Mayor and City Council FROM: DATE: Pat Klaers, City Ad~~t~or August 3, 1998 SUBJECT: Trott Brook Farms Proposal The Trott Brook Farms residential project has been discussed and reviewed at numerous Planning Commission and Park and Recreation Commission meetings over the past year. The developers received a Planning Commission recommendation on the project (rezoning, plat, and CUP) on July 28, 1998. Most of the issues of concern between the city and the developers had been reviewed, analyzed, compromised, etc. in the last month, and I believe that everyone is reasonably satisfied with the recommendation from the Planning Commission. One issue that always comes up with large residential developments is whether or not enough park land is being dedicated to meet the needs of the neighborhood. It appears that the Park and Recreation Commission is comfortable with the proposal (see attached material from Planner Steve Wensman.) The only real issue of disagreement between the city and the developer has to do with the number of townhouse units in the southwest quadrant of the proposal. The Commission is recommending a total of 20 fewer townhouses than what was proposed and the developers have requested only 4 fewer than proposed. The Commission has some sound reasons for recommending the 20 unit reduction. Please see the attached material from Assistant City Planner Scott Harlicker and City Engineer Terry Maurer on this issue. There should be no mistake about this proposal being a '%ig deal" for the city. We have never seen a project of this scope and magnitude submitted to the city all at once. This project contains over 600 living units built on 360 gross acres, and will be butt out in 5 to 7 years. Approval of this planning project requires a commitment from the city to provide sewer and water to the site. The city is beginning the State Statute 429 assessment process with a September 28, 1998, pubhc hearing on the trunk sewer and water improvement project. The question for the City 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 Trott Brook Farms Proposal August 3, 1998 Page Two Council this fall (assuming the Trott Brook Farms project is approved) is not if a trunk sewer and water project in east Elk River is going to happen, but what size of a project is going to happen. Even the small project is bigger than anything we have ever done and is going to require assessments to landowners who are not interested in receiving municipal services, or paying the costs for these services. The Trott Brook Farms proposal is complex and took a number of meetings to be comprehended at the Planning Commission level. It is appropriate for the first City Council presentation on this project to be given in a worksession environment (in the training room) where we can better display and use maps and graphics. On Monday it is planned that the developers will make a 20-30 minute presentation on their proposal. Following this presentation staff will review the project with the City Council in "broad categories." These broad categories include: 1.) land use issues 2.) environmental issues 3.) street and utility issues 4.) grading and drainage issues 5.) park and recreation issues 6.) miscellaneous issues. Staff and developers need to get some Council reaction to the proposal and direction for any necessary changes. It is anticipated that staff and developers will receive Council feedback on Monday and that the project will move forward for formal consideration on August 17, 1998. The developers hope to have models available for the spring Parade of Homes event. (They will have to use satelhte facilities until utilities are available later in the summer.) After Council approval of the plat there is still a lot of work that needs to be done before a developers agreement is signed and building permits are obtained for the construction of model homes. In general, staff is in support of the Trott Brook Farms proposal as recommended by the Planning Commission and Park and Recreation Commission, and also supports extension of trunk utilities to this site in 1999. \\elkriver\sys\shrdoc\council\trottpro.doc ~ity of iver TO: FROM: DATE: SUBJECT: Item # MEMORANDUM Mayor and City Council Scott Harlieker, Planning Assistant August 3, 1998 Request by CPDC for Zone Change, Conditional Use Permit and Preliminary Plat Approval, Public Hearing Case No. ZC 97-1, CU 97-1 and P 97-8 Planning Commission Recommendation The project consists of developing 361 acres into a residential development with a mixture of townhouses and single family homes. The Planning Commission has reviewed this project 3 times in 1998 and 2 times in 1997. The issues raised by staff and the Commission have been worked out with the exception of density in a portion of one of the townhouse developments. Attached are copies of the development summary and development plans submitted July 7th. Since these were distributed, the project has been revised to address concerns raised by the Planning Commission. Those changes are summarized in the attached memo from the City Engineer dated July 23, 1998. Also attached for your review are minutes from the Planning Commission meetings and Steve Wensman's memo on parks and trails.. At the July 28th Planning Commission meeting the Commission's discussion centered on the issue of density of the townhouse development in the southwest corner of the site. The Commission felt the amount of open space needs to be increased and the design modified. Commissioner Cote suggested the density for the central portion of that townhouse development be reduced to 6.5 units per acre. The Commission recommended approval of CPDC's request for a rezoning from Rlc (Single Family Residential) and Rle (Single Family Residential) to PUD (Planned Unit Development), approval of the preliminary plat request 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 Memo to the Mayor and City Council/P97-8 August 3, 1998 Page 2 and approval of the conditional use permit for the PUD. The recommendations included the following conditions: The Planning Commission recommended approval of the proposed rezoning from Rle (Single Family Residential) and Rlc (Single Family Residential) to PUD (Planned Unit Development) based on the following findings: 1. Recently approved changes to the road network has improved transportation to warrant a rezoning. 2. A planned unit development allows a comprehensive review of developing the property. 3. The proposed rezoning will be consistent with the City's Comprehensive Plan. 4. A planned unit development allows for flexibility in subdivision design. The Planning Commission recommended approval of the preliminary plat and conditional use permit for the PUD with the following conditions: Land Use The number of townhouses in Block 2 of the townhouse development in the southwest corner of the site be reduced by 16 additional units, from 152 to136 total units. Note: Commissioner Cote set the number of units in this condition by multiplying the number of acres in this townhouse development (21 ac.) by a desired density (6.5 units per acre). 2. That the developer work with staff to create a larger central open space in the townhouse development in the southwest corner of the plat. 3. That the developer demonstrate on the grading plan how the Trott Brook trail is accessed from Street O. 4. Elevations for the townhouse developments be submitted for review and approval. 5. Signage for the development shall be reviewed and approved by staff. 6. All comments raised by the Department of Natural Resources shall be incorporated into the plat. \\elkriver\sys\shrdoc\planning\scottktbpcrec.doc Memo to the Mayor and City Council/P97-8 August 3, 1998 Page 3 o Each single family lot shall receive I street tree and 1 front yard tree; corner lots shall receive 1 street tree and I front yard tree per street frontage. 8. A landscaping plan for the townhouse developments shall be submitted for review and approval by the City. o That the developer provide a pedestrian and maintenance vehicle corridor to Outlet F from street n as per city ordinance to be coordinated with a sewer and water corridor to the East of the plat. 10. Setback of 25 feet from the front property lines on all streets except Streets A, F, J, O, R and S Engineering 1. All comments of the City Engineer shall be incorporated into the plans. 2. Prior to the issuance of any building permits a development plan be submitted outlining style of house and finished grades on each lot. 3. All streets be built to City standards with the exception of Street A which will be larger. Environmental 1. All comments from the DNR shall be incorporated into the plans. 2. All comments of the City Engineer be incorporated into the plans. 3. Recommendations of Tim Edgeton of the Sherburne County Tree Board be incorporated into the plans. Miscellaneous 1. A Developers Agreement and PUD agreement shall be signed and recorded prior to recording the plat. 2. Plat approval is contingent upon the rezoning and conditional use permit for a planned unit development being approved. 3. Park dedication fees be paid prior to releasing the plat for recording \\elkriver\sys\shrdoc\planning\scott\tbpcrec.doc Memo to the Mayor and City Council/P97-8 August 3, 1998 Page 4 4. Surface water management fees be paid prior to releasing the plat for recording. 5. Homeowners Association documents shall be reviewed by the City prior to releasing the plat for recording. 6. Street Lights shall be installed per Elk River Utilities recommendations. 7. The City accept Outlot F as a charitable contribution from the developer. 8. A letter of credit be provided to the City in the amount of 100% of the costs of public improvements. o upon completing all of the improvements and having them accepted by the City, a warranty bond in the amount of 25 % of the improvement costs shall be submitted to the City for a one year period. 10. Water availability charge be paid prior to releasing the plat for recording 11. All necessary permit shall be received prior to commencing work within any easements. 12. All comments in Phil Hals, the Street/Park Superintendent, shall be incorporated into the plans. 13. All mailboxes shall be clustered. 14. Landscape easements shall be included around all development and neighborhood signs. \\elkriver\sys\shrdoc\planning\scott\tbpcrec.doc Howard R, Green Company CONSULTING ENGINEERS July 23, 1998 File: 800111J-0240 I'0~[LTI~I~ BGIXEEILN Formerly MSA Consulting Engineers Chairman and Planning Commission City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: TROTT BROOK FARMS Dear Planning Commission Members: Since the Planning Commission meeting on July 14, 1998 to review the Trott Brook Farms proposal, staff has had an opportunity to meet with the Developer's engineer to discuss a number of the issues raised that evening. This memo will only touch on a few of the main issues that the Developer has changed or. convinced staff to change its position on. These are as follows: A. Lot Width The proposal reviewed by the Planning Commission on July 14th had 47 of 350 single-family lots not meeting an 80-foot width at the building setback line. The Developer has revised the layout and reduced the number of lots not meeting 80 feet from 47 to 14. These fourteen lots consist of five lots, 19 through 23, located in Cul-de-sac T, five lots, 17 through 21, located in Cul-de-sac U, and four lots, 7, 8, 14, and 15, located on Street O. Eleven of these fourteen lots are pie-shaped cul-de-sac lots, substantially larger in square footage than the minimum required by the ordinance. Three of the lots, one in Cul-de-sac T and two on Street O are approximately rectangular, with lot widths of 73 feet to 75 feet. These lots can be easily dealt with in the development plan by restricting the type and style of houses permitted. One other point worth mentioning is that Lots 7 and 8 are narrower because Lot 6 has a slightly larger width, allowing for a landscape screening area along the east side to screen the views from Street A. Staff would recommend approval of the new concept as it relates to lot widths. B. Setback Variance As indicated in the Developer's submittal, they are asking for a setback variance from 30 feet to 25 feet, in an effort to save trees. The setback variance is not being requested on Streets A, F, J, O, R, or S. These streets would be 1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free 800/888-2923 Planning Commission July 23, 1998 Page 2 considered the main routes within the development. The other streets where the setback variance is being requested are either cul-de-sacs or lesser-traveled streets. Staff can support this request for setback variance from 30 feet to 25 feet on the streets mentioned. C. Southwest Area Townhouse Density The Developer has proposed removing four units from the 156 total. These four units would come out of the block of 8-plexes formed by StreetS. This helps to open up the green space between buildings. Staff would recommend that an additional eight units for a total of twelve be taken out of this same block. Staff feels that with twelve less units, the entire block could be reconfigured to give the perception of green space tying into most of the units in this area. No reduction in the number of units is proposed by the Developer for the 85-unit townhouse development in the southeast corner. Staff feels that this total number of units is acceptable because of the open space distribution among the buildings. There are two wetlands and a pipeline easement that are spread throughout this development, giving the feeling of more openness to each of the units. D. County Road 12 Right-of-Way Sherburne County has requested 70 feet of additional right-of-way, measured from centerline along County Road 12. In addition to this, the City would receive a 10-foot drainage and utility easement. The Developer has indicated willingness to provide a 60-foot right-of-way and a 20-foot drainage and utility easement, with the easement allowing the placement of the detached pedestrian trail. Dave Schwarting, County Engineer, was unable to attend the meeting with City staff, and the Developer's engineer. City staff believes that this proposal of a 60-foot right-of-way with up to a 20-foot drainage and utility easement is a workable solution and will coordinate with the County Engineer to verify whether it meets th~ County's needs as well. E. Connecting Cul-de-sacs Previously, staff had recommended eliminating Cul-de-sac F by connecting it to Street S. At the last Planning Commission meeting, the Developer had indicated a desire not to do this for the loss of the neighborhood concept. His engineers had indicated the difficulty of making this connection. We have had an opportunity to look at this further with the Developer's engineers, and would concur with their analysis that it is a difficult connection to make, due to the vertical differences in elevation. Therefore, staff would recommend that this not be pursued any further. Howard R, Green Company \\Elkriver~sys\S H R D O C,¢,D Mi N\E N Gl N E E ik~p,~[2~(~.[DT~J e ENGINEERS