Loading...
7.1. SR 07-15-2013 City of Elk - Request for Action River TO ITEM NUMBER Mayor and City Council 7.1 AGENDA SECTION MEETING DATE PREPARED BY Public Hearings July 15, 2013 Rebecca Haug, Environmental Administrator ITEM DESCRIPTION REVIEWED By Conditional Use Permit: Aggregate Industries to Amend Jeremy Barnhart,Deputy Director Existing Permit Hours of Operation, Case No. CU 13-09 CODD REVIEWED BY Cal Portner, City Administrator ACTION REQUESTED Hold a public hearing regarding Aggregate Industries' request for extended business hours. Approve by motion the Conditional Use Permit (CUP) to extend the hours of operation to 24 hours per day,Monday through Saturday with the following conditions: 1. Operation does not cause a nuisance to surrounding properties as defined by Sec. 46.36 of the City Code. 2. Process and practice remain the same as outlined in 1994 Environmental Impact Study (EIS). 3. Traffic generation remains consistent with previous years. 4. Dust continues to be controlled via water suppression. BACKGROUND/DISCUSSION Aggregate Industries has requested an amendment to their CUP to extend operational hours to 24 hours per day,Monday through Saturday. The amendment will allow Aggregate to operate during off peak (electrical) times. Aggregate will continue to be responsive to issues identified by the city and its residents. The Planning Commission held a public hearing at which no one spoke and voiced no concerns with the request of their own recommending unanimously. ATTACHMENTS ■ Planning Commission Memo dated July 9, 2013 POWERED BY N:\Public Bodies\Agenda Packets\7-15-2013\Fina1\x7.1 sr Aggregate Industries.docx aAURE Elk REQUEST FOR ACTION River TO ITEM NUMBER Planning Commission 4.1 AGENDA SECTION MEETING DATE PREPARED BY July 9, 2013 Rebecca Haug, Environmental Administrator ITEM DESCRIPTION REVIEWED By Request by Aggregate Industries for an amendment to a Jeremy Barnhart, Community Conditional Use Permit for mineral extraction to amend hours Operations and Development-Deputy of operation to 24 hours per day,Monday through Saturday Director Case No. CU 13- 09,Public Hearing REVIEWED BY ACTION REQUESTED Staff recommends approval of the Conditional Use Permit (CUP) to extend the hours of operation to 24 hours per day, Monday through Saturday with the following conditions: 1. Operation does not cause a nuisance to surrounding properties as defined by Sec. 46.36 of the City Code. 2. Process and practice remain the same as outlined in 1994 Environmental Impact Study (EIS) 3. Traffic generation remains consistent with previous years 4. Dust continues to be controlled via water suppression BACKGROUND/DISCUSSION Aggregate Industries operates its Elk River Sand and Gravel facility to process raw materials into commercial aggregates. These aggregates are then incorporated into various products which are utilized for ready mix concrete, asphalt and the construction of highways and buildings in the Twin Cities metropolitan area. It is anticipated that mining at this site will continue for another 8 to 11 years. This is an estimated time frame and is subject to market trends and geologic conditions. The Elk River Plant is currently permitted to mine,process, and sell product from 6:00 a.m. until 2:00 a.m. and to maintain equipment 24 hours a day. Aggregate Industries is proposing to amend their Conditional Use Permit to extend their current hours of operation to 24 hours per day, Monday through Saturday. No activities will take place on Sundays without prior permission from the City's Environmental Administrator, and for limited periods. Several noise reduction measures have been put in place. If complaints are received, staff will work with Aggregate Industries to rectify the noise or require the applicant to amend their permit to revert back to the previous hours of operation. Allowing this change in the hours of operation will allow the applicant to participate in Elk River Municipal Utilities' (ERMU) "electric conservation"program. Participating in this program will help P I E 1 E I I r C:\Users\dhuebner\AppData\Local\Nlicrosoft\Windows\Temporary Intemet [NAR)REI Files\Content.Outlook\Q7RBTRKC\Action Requested for PC(2).docs reduce the amount of overall electricity required by ERMU's customers during"peak" consumption hours and they will receive a cost savings benefit. Traffic will continue to be close to the same volume as the past several years and trucks will continue hauling to Highway 169. Dust will continue to be controlled by spraying water. Aggregate Industries will continue to stay in compliance with all of their environmental permits. Property The subject property is 457.68 acres in size. The average distance to the nearest neighboring residential properties is 1,500 feet. Zoning The property is zoned single family residential (R1 a)with Mineral Excavation Overlay. Hours of Operation The City Code states:All extraction operations shall be conducted between 7.00 a.m. and 7.00 p.m.,Monday tbmugh Saturday only. Other facilities have amended their ordinance to operate at various times. With the new technologies in noise reduction equipment, staff has not received noise complaints for several years. ATTACHMENTS • Location Map • Applicants Narrative • Amended CUP Action Motion by Second by Vote Follow Up C:\Users\dhuebner\AppData\Local\Microsoft\WindOWs\T'emporary Internet Files\Content.Oudook\Q7RB'IRKC\Action Requested for PC (2).docx P 5 [/7 LLi W Q LSJ a r C x Y a s Y 9 � Y Q 591 Cd P i 34 �7 f"+7 r� V n -0 E k u F L� w AGGREGATE INDUSTRIES AGGREGATE INDUSTRIES ELK RIVER Conditional Use Permit/Land Use Permit Amendment May, 2013 a i Aggregate Industries — Elk River Plant 21700 Highway 169 Elk River, MN 55330 (763) 441-3227 Property Legal Description: The Southeast Quarter and part of the Southwest Quarter of Section 9, the East Half and part of the Northwest Quarter and Southwest Quarter of Section 16, all in Township 33 North, Range 26 West, Elk River, Sherburne County, Minnesota. Parcel ID: 75-109-4100 75-116-1106 75-109-4200 75-116-1200 75-109-4400 75-116-4100 75-116-1100 75-116-4200 75-116-1105 Aggregate Industries operates its Elk River Sand & Gravel facility to process raw material into commercial aggregates. These aggregates are then incorporated into various products which are utilized for ready mix concrete, asphalt and the construction of highways and buildings in the Twin Cities metropolitan area. Once extracted, the aggregate is transported to the plant via conveyor, where it is crushed, washed, sorted by size, stockpiled and transported off site via Highway 169. No explosives are used at this location. The Elk River Plant is currently permitted to mine, process and sell product from 6:00 a.m. until 2:00 a.m. and to maintain equipment 24 hours a day. Please refer to the attached 2013 Operations Plan which depicts the current operations. This Conditional Use Permit Amendment Request is respectfully submitted to amend the operating hours at Aggregate Industries' Elk River facility to 24 hours per day, Monday through Saturday; provided that the operation does not constitute a nuisance to surrounding properties, as may be determined by City Staff. The last complaint received from the City which was attributed to noise generated from the Company's facility was in 2003. In the last several years, several noise reduction measures have been put in place at the Elk River facility, which include the installation of"white noise" back-up alarms on the equipment and the installation of a "noise suppression" hood on the jaw crusher at the Plant itself. In the event any complaints are received regarding operations, they will continue to be immediately addressed by Aggregate Industries in conjunction with City Staff. This permit flexibility will allow the Company to conduct operations during additional "off peak" hours and will also allow participation in Elk River Municipal Utilities' "electric conservation" program. By participating in the electric conservation program, Aggregate Industries will help to reduce the amount of overall electricity required by Elk River Municipal Utilities' customers during"peak" consumption hours and they will receive a cost savings benefit as well. The processes and practices for the facility, as outlined in the 1994 EIS will remain the same. The traffic generated by the mining operation will continue at roughly the same volume as the past several years and includes aggregate trucks hauling on Highway 169. Erosion and runoff will be controlled during the mining process by the excavation itself. The excavation will be sloped towards the interior of the property, causing runoff and any potential erosion to flow towards the center and floor of the mine. Dust will be controlled by the ambient moisture content of the aggregate deposit itself, which is a very effective suppressant of airborne dust. In addition,the mine floor and internal haul roads will be sprayed with water to further reduce dust. Chloride may also be applied to the haul roads, if necessary. The Company presently operates the Elk River facility under the following environmental permits: Aboveground Storage Tank License Air Permit Hazardous Waste License Sara Title III and Tier II Spill Prevention, Control and Countermeasures Plan Storm Water Permit Water Appropriations Permit The Company employs a rigid Environmental Management System at all of its sites. The risk of chemical or petroleum pollution is very small. Diesel fuel, motor oil and gasoline will be present in the equipment and vehicles on site. A designated employee will conduct daily, weekly and monthly environmental inspections during active operations to ensure that all environmental procedures are being followed. Each site maintains a "site" specific Storm Water Pollution Prevention Plan, as well as "operational" specific environmental site procedures which include a spill response procedure. Site personnel are trained on these procedures, and spill response materials are readily accessible on-site in the event of a spill. AN • any 1� •e�s.'� •.,!l . w' ey � � �.+q'��^yL s % CD bw Mi.Ca..,�.: t�°•_fir.; �� � y P. �* . •'fib 1r.,_ R, .- ._ ---�.�—'' 1 CITY OF ELK RIVER AGREEMENT FOR ISSUANCE OF CONDITIONAL USE PERMIT FOR MINERAL EXCAVATION THIS AGREEMENT, made and entered into this day of , 2006, by and between the CITY OF ELK RIVER, a municipal corporation organized under the laws of the State of Minnesota (City), and Aggregate Industries-North Central Region, Inc., a Minnesota corporation, hereinafter referred to as (Operator); WITNESSETH: WHEREAS, Operator has made application to City for approval of a conditional use permit to operate a gravel mining operation within the City on property legally described as follows: The Southeast Quarter of Section 9, and the East Half of Section 16, all in Township 33, Range 26, Sherburne County, Minnesota. (the Property); and WHEREAS, the City of Elk River Planning Commission and City Council have held hearings on Operator's request for a conditional use permit, at which hearings all citizens of the City of Elk River and other interested parties have had the opportunity to be heard on the application; and WHEREAS, the City Council by motion adopted on this _ day of , 49902013, an amended conditional use permit for the operation of a gravel mining operation (the Operation) on the Property, subject to certain conditions, including that Operator enter into a conditional use permit agreement with City so as to fully comply with the City's Mineral Excavation, Zoning, and other applicable ordinances; and WHEREAS, the City's Zoning Ordinance requires that a conditional use permit be issued and that a conditional use permit agreement for mineral excavation be entered into. Page 2 NOW, THEREFORE, in consideration of the premises and the mutual promises and conditions hereinafter contained, it is hereby agreed as follows: 1.) Entire Agreement- Except as otherwise provided herein, this Agreement shall constitute the Conditional Use Permit for the Property and, to be executed by City and Operator, shall govern the iesparties' rights, responsibilities, and obligations with respect to the operation, subject to the compliance by all parties with applicable city ordinances and state and federal laws. 2.) Warranty of Operator- Operator hereby warrants and represents to the City, as inducement to the City's entering into this agreement, that the Operator is the fee owner of the subject property or has a valid lease for the operation and the fee owner of the subject property shall also enter into this agreement. 3.) Conditions- The following general conditions shall apply to the Operation: (01) This Conditional Use Permit authorizes mineral excavation (gravel) from the Property. (02) All mineral excavation and processing operations on the property shall comply with the City's Mineral Excavation, Zoning and other applicable ordinances; with the terms of this Conditional Use Permit agreement and the license agreement to be executed by the City and Operator; with the City of Elk River's Environmental Impact Statement on Mineral Excavation; and with the application materials and plans submitted by the Operator, which plans and materials are the basis for the City's approval of the Conditional Use Permit. (03) The Operator shall orally notify the City of any violations of this permit within 24 hours and follow this with notification in writing within four (4) working days of the violation. The Operator shall notify the City annually in writing of the total area and amount of material mined and projected estimates of area and amount of material to be mined in the following year. This is to be done at time of license renewal. (04) The license shall be renewed annually and shall run from June 18t through May 31st. The annual license fee is that which is specified by the Elk River City Council at time of renewal. This license fee is not in lieu of gravel tax collected by the County, a portion of which the City receives. C\Users\dhuebner\rlppData\Local\hlTCrosoft\Windows\Iemporan Intemet bile.\L ontent Out look\(�7RB'IRKC\GRINV(- Page 3 (05) Violations of this Conditional Use Permit may result in suspension or revocation. (06) The City Environmental Administrator and/or his/her agents shall be permitted to inspect the Operation for compliance with the conditions of this permit during normal hours of operation. (07) The City's approval of this Conditional Use Permit is subject to the approval of appropriate permits by other governmental agencies. (08) No explosives shall be allowed for this operation. (09) Reclamation a. Reclamation shall be implemented on an annual basis pursuant to the reclamation plans submitted by the Operator. b. Each year a plan for that year's reclamation shall be approved by the Environmental Administrator prior to issuance of the mineral excavation license. C. The reclamation shall include topsoil from the site being preserved and put back into place after mining. d. Revegetation of the property shall include seeding with a mixture approved by city staff accompanied by a nurse crop or approved mulch. The vegetation established for the reclamation must be maintained until it is self- sufficient. e. Contours, finished grades, details of erosion control methods, and settling ponds, shall comply with the plans submitted and the City ordinance at the time of reclamation. Additional measure as determined by city staff may be required. (10) Traffic a. Except for localized jobs, traffic through Elk River associated with the Operation shall be limited to U.S. Highway 10 and 169. The Operator will route traffic from the Operation to the County Road #33 and Highway 169 interchange as soon as their operation moves from the t;AUser,Adhuchner\\ppDataA Local\Microsoft\\C'indoix�s\Icmporan Intemet file,VC ontent.Outl ooh'Q7liB'I'RKCVGRA\'CLP Page 4 Nemeth site or onto 213th Avenue and then onto Hwy 169, unless it is directed by the Minnesota Department of Transportation or the City of Elk River. (11) Dust Control a. A permit from MPCA regarding air emissions shall be obtained when required and particulate emission standards shall be met by the Operation. This permit and all other correspondence between the Operator and MPCA shall be copied to the City. b. All equipment shall be located as to reduce dust to adjacent properties. C. A water truck shall be on site at all times when mining activities are taking place to control dust as necessary. Chemicals shall not be use for dust control. d. The City reserves the right to require additional measures to be taken, if warranted by dust problems, including but not limited to reducing stock pile heights. (12) Hours of Operation The operator will be allowed to mine, process and sell product on the site from 6.00 a.m. until 2!00 a.m. an4 and maintain equipment 24 hours a day, as long as the Operation does not constitute a nuisance to surrounding properties as determined by city staff. If complaints can not be resolved, the Environmental Administrator may, as a remedy, adjust the hours during which mineral excavation activities are conducted, ultimately reverting back to the normal hours of 7:00 a.m. to 7:00 p.m., Monday through Saturday. Upon approval of the Environmental Administrator, or his/her designee, sale (hauling product off site) may occur outside of the permitted hours (on a temporary basis not to exceed seven (7) days) to address an unique situation. Alternatives to back-up alarms will be used from dawn to dusk. (13) Noise a. As deemed necessary by city staff, noise from screening and crushing associated with this Operation shall be controlled by equipment location on site, the erection of C\l scrG\dhucbntr\1ppllataV,ocal\Microsoft\\'K"indov�Ts\Icmporar Internet l,ile\(ontent.Outloo h\07RB'1'RK(;AGRAVCL':P Page 5 sound barriers, the placement of stockpiles, and the type of equipment used. b. Noise levels associated with this Operation shall at no time exceed State standards. C. The City reserves the right to require additional measures be taken, if warranted by noise. (14) Li hg ting Lighting from the Operation shall be directed away from adjacent residential property. Glare, whether directed or reflected as different from general illumination, shall not be visible beyond the limits of the immediate site. All sources of artificial light shall be so fixed, directed, designed, or sized that the minimum subtotal of their illumination shall not increase the level of the illumination on nearby residential property by more than .1 foot candles in or within twenty-five (25) feet of a dwelling, or more than .5 foot candles on any part of the adjacent property. (15) The piling, storing, or keeping of old machinery, junk, debris, or abandoned motor vehicles, shall be prohibited on this site, with the exception that reusable parts may be stored on the mineral excavation site provided that it is in a location that cannot be viewed from adjacent properties or is totally screened. (16) Mining activities shall not cause excessive vibration off site. If excessive vibration becomes an issue, the City reserves the right to take appropriate measures to alleviate the problem. (17) Groundwater protection measures shall include: a. The Operator shall file with the City an Emergency Spill Prevention and Counter Control Plan and a Storm Water Pollution Prevention Plan as may be required by other governmental entities. The Operator shall adhere to these plans in the event there is a spill. b. The Operator shall provide the Fire Department with a copy of their flammable or hazardous materials. C. Fuel tanks shall be above ground, properly diked (if required by law), and registered with MPCA. (-\User\dhucbner\\ppl)ataV,ocal\h4icrosoft\Windo-,xs\Icmporary]ntemet FilcsA(ontentOudook\07RB'I'RKC\GRAN7CUP.doc::� Page 6 d. All incidences that have the potential to adversely affect groundwater, including but not limited to spills, shall be verbally reported to the City within 24 hours. This verbal notification shall be followed up in writing within four (4) working days. e. The appropriate storm water permits (NPDES) shall be obtained by the Operator from MPCA and copied to the City. f. The wells located at the site shall be monitored once a year for diesel range organics (DRO). Mining activities shall not take place closer to ground water levels than indicated in the plans submitted without amending this conditional use permit; however, if mining is proposed to occur below the water table in the future, the above referenced wells shall be monitored for DRO prior to excavation activities commencing and after their cessation each year. Further, in the event of a spill, appropriate water tests (as determined by the city) will be taken until the spill is deemed clean by the city. g. Except for minor repairs, maintenance of vehicles and equipment shall take place in the Operator's shop. The Operator shall have an approved hazardous waste license for this facility and properly dispose of all waste. h. A minimum of a two-celled system to recycle water from the wash operation shall be utilized. i. Each year, groundwater levels shall be monitored at the well located west of the plant site. A drop in water level of twelve (12) inches or more shall be immediately reported to the city. j. Water usage by mining activities shall not adversely affect adjacent wells. Mitigative measures may include, but are not limited to, curtailing of pumping activities until water levels return. (18) Signage Signage for the operation shall be that which is permitted for an industrial operation in a medium industrial zone, with the exception that billboards are not allowed. C\User-\dhuebner\kppData\Lo cal\Microsoft\XX"indows\Temporan Internet File A<ontentOutlook vQ7RBT'RKC\GRAN'CUP.doc: Page 7 (19) Fencing The Operator shall fence the entire perimeter of the site with a four (4) foot high fence with support post every ten (10) feet, except that the Operation may be open to the Julius Nemeth site while the Operation includes this property. (20) Oakwilt Cutting of trees between April 15 and July 15 is prohibited. The Operator shall take other measures deemed appropriate by the Sherburne County Forester to control oakwilt, such as, but not limited to: debarking or destroying fallen diseased trees prior to April 15th, not leaving roots exposed and avoiding mechanical damage on remaining trees. (21) Berming The Operator shall erect berms adjacent to County Road #77 as required by the Sherburne County Engineering Department. (22) Other Permits The Operator shall obtain all state and federal permits appropriate to their operation and file copies of said permits with the City. 4.) General Provisions- (01) Permits- Operator agrees to comply with all of the provisions hereof and agrees to save and hold the City harmless from any and all claims or actions arising from the operations of the Operator on the Property. (02) Binding Effect- The terms and provisions hereof shall be binding upon, and inure to the benefit of the heirs, representatives, successors, and assigns of the parties hereto and shall be binding upon all future owners of all or any part of the Operation and shall be deemed covenants running with the land. This Agreement shall be placed of record so as to give notice hereof to subsequent purchasers and encumbrances of all or any part of the Property, and all recording fees, if any, shall be paid by the Operator. (03) Severable- In the event that any portion of this Agreement shall be held invalid for any reason, the same shall not affect in any respect whatsoever the validity of the remainder of this Agreement. C\Users\dhucbner\.AppData\Local\Alicroso$\Windo-,asV"Icmporar Internet Files\C ontent.Outlook\(�7RBIRKC\GRAtrCUP Page 8 (04) Waiver- Any waiver, whether express or implied, by any party of a breach of any provision of this Agreement will not operate as or be construed to be a waiver of any subsequent breach of this Agreement. (05) Notices- All notices and demands specified herein shall be deemed appropriately and timely given when delivered personally or deposited in the United States mail to the addresses hereinafter set forth by certified mail (return receipt requested). The addresses of the parties hereto are as follows until changed by written notice given as above: If to the City at: City of Elk River ATTN: Environmental Adm. 13065 Orono Parkway Elk River, Minnesota 55330 If to the Operator at: Agoremate Industries - North Central Region ATTN: Robert Bieraugel 2915 Waters Road, Suite 105 Eagan, Minnesota 55121 (06) Incorporation by Reference- All plans, special provisions, proposals and specifications, submitted pursuant to this Agreement shall be and hereby are made a part of this Agreement by reference as fully as if set forth herein in full. (,\User,\dhucbner\\ppl)ata\Local\Microsoft\%Xindoiss\lcmporar Intemet Files\(,ontcntOutlooh\Q7RBTRKC\GIR\\,'(, docc�rn r,� �i �� ra, �muv_ x��r.nVricnxazn ._ ,. .� Page 9 IN WITNESS WHEREOF, the City and Operator have caused this Agreement to be duly executed on the day and year first above written. CITY OF ELK RIVER OPERATOR/FEE OWNER: ggr-eagat^A ggLegate Industries North-Central Region, Inc. By: By: Its: Mayor Its: By: Its: City Administrator STATE OF MINNESOTA ss. COUNTY OF SHERBURNE The foregoing instrument was acknowledged before me this day of 20062013, by Stephanie A. K4inz ngJohn J. ;Dietz, the Mayor of THE CITY OF ELK RIVER, a Minnesota municipal corporation, on behalf of the corporation. Notary Public C\Users\dhuebner\\ppt ata\Local\hficrosoft\Windows\Iemporar,Internet Files\(ontent.Oudook\Q7RB'I'RKC\GRAVCliP.doce nr r-i r..t y rnxu xy ri ny rr nc nxi z nn A a o rn 7 .._\r;o N'C m D0C Page 10 STATE OF MINNESOTA ss. COUNTY OF SHERBURNE The foregoing instrument was acknowledged before me this day of , 20062013, by Lori johnsonCal Portner, the City Administrator of THE CITY OF ELK RIVER, a Minnesota municipal corporation, on behalf of the corporation. Notary Public STATE OF MINNESOTA ss. COUNTY OF The foregoing instrument was acknowledged before me this day of , 20062013, by , the of Awregate Industries North- Central Region. Inc., a Minnesota corporation, on behalf of the corporation, fee owner of a portion of the subject property and Operator on the subject property. Notary Public This instrument was drafted by: City of Elk River Environmental Division 13065 Orono Parkway Elk River, MN 55330 C\Userti\dhucbncr\:\12pllata\1,ocal\Microsoft\�Xindows\Telworary Intcmet Fil csV(ontentoutlook\o7RB'I'RKC\GRIPCUP.doc.�;.�-'- .v _,ri _���uv_�z�rrn�r 06034399 AMegqte