Loading...
8.2. SR 08-19-2013 Elk — Request for Action R1VeY To Item Number Mayor and City Council 8.2 Agenda Section Meeting Date Prepared by General Business August 19, 2013 Suzanne Fischer,Director, CODD Item Description Reviewed by Professional Services to Update Existing Tim Simon, Director,Finance Director Stormwater Pollution Prevention Plan (SWPPP) Reviewed by and Develop the City's Surface Water Management Cal Portner, City Administrator Plan SWMP Action Requested Approve by motion a professional services proposal and authorize a contract with WSB &Associates, Inc.,in an amount not to exceed $29,800 for services associated with updating the existing Stormwater Pollution Prevention Plan (SWPPP) and drafting the city's Surface Water Management Plan (SWMP). Background/Discussion On July 1, 2013, the Council received an update on the new storm water permit. Council consensus was to solicit RFPs to complete the work by the end of the year as required. Staff posted the RFP on the city website and on the League of Minnesota Cities website. Proposals for professional services to update the existing SWPPP as required by the MS4 General Permit and draft the City's SWMP were received on August 8, 2013. The four proposals received with cost details follow: Firm Consultant Fee HydroMethods,LLC $21,534 WSB &Associates, Inc. $26,500 - $29,800 Bolton&Menk,Inc. $56,552 HDR Engineering, Inc. $565750 A staff committee consisting of Justin Femrite, Rebecca Haug,Jeremy Barnhart and myself reviewed the proposals. Upon review and discussion the committee recommends awarding the project to WSB & Associates, Inc. Their expertise on the subject,history of successfully completing similar projects,and proposed fee,make them the best value for the project. Staff supports awarding this work to WSB & Associates, Inc. Financial Impact This action will have a total financial range of$26,500 to a not to exceed amount of$29,800. The costs for this plan were included in the 2013 Surface Water Management Fund. Attachments ■ WSB &Associates, Inc.,Proposal. P a w E A E U s r N:\Public Bodies\Agenda Packets\08-19-2013\x8.2 sr SWPP.docx Na PROPOSAL 1 PROVIDE: �� P.OFESSIONAL SERVICES FOB THE DEVELOPMENT City Of OF THE Elk -�-� .� SRFACE WATR River MANAGEMENT PLAN AUGUST 8, 2013 ymay- sJ. r } j I f J - 701 Xenia Avenue South,Suite 300 Minneapolis,MN 55416 WSB Tel:(763)541-4800 • Fax:(763)541-1700 wsbeng.com �A/A YY JB ,.,,,_,, engineering•planning•environmental•construction 701 Xenia Avenue South Suite 300 Minneapolis,MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 August 8, 2013 Suzanne Fischer, Director Community Operations and Development City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: Proposal to Provide Professional Services for the Elk River Surface Water Management Plan Ms. Fischer: We are pleased to present this proposal to complete the City's Surface Water Management Plan (SWMP) and updated SWPPP. The work plan presented focuses on creating a clear, concise, user- friendly surface water management plan and SWPPP program that will be integrated to be "one in the same" as much as possible. This will ensure that the City will have no conflicts moving forward in the future implementation of its programs, policies, and management strategies. We believe that WSB is ideally qualified to complete the project based on the following: • WSB staff has completed over 100 stormwater management plans for municipal clients in the past 18 years and have completed NPDES SWPPP documents for over 50 clients. This allows us to foresee and address issues that may be faced throughout the project, based on outcomes experienced in other communities. • WSB understands that planning efforts associated with the City's SWMP are only successful when they lead to cost-beneficial improvements to the City's surface water management programs and infrastructure. This allows the City to develop its surface water management system and meet its surface water goals at the lowest possible cost. • WSB is currently working in the City of Elk River on the design and construction of infrastructure projects, and on the development of an update to the City's Comprehensive Plan. Through this work, WSB has an understanding of the many water resources and related issues that the City faces. • WSB has strong relationships with City staff and outside agencies that have authority within the City. Based on the credentials and the work plan outlined in the proposal, we are hopeful that the City will select WSB to serve your needs. Please do not hesitate to call me at (763) 287-7188 if you would like to discuss our work plan or if you would like any additional information to help evaluate our proposal. Sincerely, WSB & Associates, Inc. Peter R. Willenbring, PE Vice President St.Cloud• Minneapolis•St.Paul Equal Opportunity Employer wsbeng.com City of Elk River PROFESSIONAL SERVICES FOR THE DEVELOPMENT OF THE SRFACE WATR MANAGEMENT PLAN r tit r $,T4 AUGUST 8, 2013 Table of Contents Project Understanding.............. 1 Proposed Project Team and . '... Experience ............................. 7 F _- �3, Estimated Cost ....................... 14 Schedule................................ 14 sk Appendix TOP Resumes r 100 LEAGUE�r IiNNESl7TA WORKPLACES � CI I IES Contact: 701 Xenia Avenue South,Suite 300 Pete Wlllenbring, PE -C/� Minneapolis,MN 55416 (763)287-7188 WS Tel:(763)541-4800 • Fax:(763)541-1700 pwillenbring @wsbeng.com &Associales,1ne. wsbeng.com AProposal to Provide Professional Services for the Development of the WSSurface Water Management Plan for the City of Elk River MOJECT UNDRSTANDING 4. VV It is understood that the City of Elk River has directed staff to develop a Surface Water Management Plan and update the existing City Stormwater Pollution Prevention Plan. Based on your RFP, conversations with your staff, and our experience completing these plans in other communities, we believe the consultant, planning process and completed plans need to provide Elk River with the following: A stormwater plan that is consistent with and as much as possible, incorporates the City's updated SWPPP documents to avoid redundancy and provide a uniform approach. The knowledge and ability to enable the submittal of the SWPPP application for Reauthorization to City staff no later than the November 1 st, so it can be reviewed and submitted to MPCA by the December 2nd, 2013 deadline that was established for Elk River. A thorough review, identification, and documentation of the water resource management needs, issues and concerns that are present in the community. A need to develop the City's stormwater land concurrent with the timeline for submittal of the SWPPP, which is an aggressive schedule. A need to bring on a consultant with extensive experience and expertise developing similar plans, knowledge of the most appropriate water resource management options that can address the unique issues within your community, and an ability to provide these services in a cost-effective manner. The work plan outlined in our proposal does include the services you listed in Section 5 of your Scope of Services along with some additional elements that we feel are necessary for inclusion into the process. We look forward to assisting you with the successful completion of this project. Project Understanding / 1 AProposal to Provide Professional Services for the Development of the WSSurface Water Management Plan for the City of Elk River Work Plan Based on our understanding of the project, we propose the following work plan. Provided herein is a scope of services to prepare a Local Surface Water Management Plan and a Stormwater Pollution Prevention program that meets the requirements of the MPCA MS4 permit Program. It is the intention of this effort, that when completed, you will have a city stormwater plan and corresponding MS4 SWPPP document that are consistent with each other, and that outline a single unified vision, approach, and implementation plan that will address stormwater concerns and identify future stormwater management activities that need to be implemented in your community. The tasks along with a proposed schedule and an estimate of cost to complete the work is outlined below. Task 1 - Collect Available Background Information and Interpret Water Resource Data This task consists of gathering relevant water resources-related information for the City. A project kick-off meeting with City staff and communication with agencies will facilitate collection of this information. We anticipate collecting the following data: Previously developed SWPPP City parks, trails, and open space plan information, plans, and annual reports FEMA's floodplain maps and Letters of Floodplain, bluff, shore land, wetland, Map Amendments erosion control, and other City City's Comprehensive Land Use Plan ordinances related to surface water and land use mapping management, as available. Water resource-related agreements County Water Plan National Wetland Inventory mapping „ Climate and precipitation data (Atlas 14 + and TP 40) Previous reports or studies related to storm water management, water quality Soils information issues, lake level, or other issues, Groundwater and well information Information related to impaired waters r List and description of known water within the City resource problem areas Monitoring and modeling data Information will also be collected from the following agencies: Minnesota Pollution Control Agency, appropriate county departments, Minnesota Department of Natural Resources, U.S. Army Corps of Engineers, U.S. Fish and Wildlife Service, and other organizations that may be applicable. The information collected will be used to develop the City's plan, as well as be used to develop a water resource library for the City's future use and reference. Yi The water resource data collected as part of the previous tasks will be analyzed, interpreted, and summarized in the plan to provide an indication of the present status and possible trends concerning surface water resources within the City and to assist in the development of surface water management policies. Project Understanding / 2 AProposal to Provide Professional Services for the Development of the WSSurface Water Management Plan for the City of Elk River y a Task 2 - Complete Public Input Process This task includes holding a public meeting to obtain input into the Plan for policies, problem areas, and implementation. Two additional meetings are anticipated to review portions of the plan with City staff and or selected stakeholders. Task 3 - Review current SWPPP and develop MPCA SWPPP Application for Reauthorization As part of this task, an internal audit of City systems will be conducted by our staff to identify gaps within the City's current SWPPP program. This analysis will include conducting interviews with City staff that are assigned MS4 responsibilities, evaluating current Practices, Stormwater Plans, Wellhead Protection Plans, and the status and completeness of system mapping. It will also include completing facilities inspections. The results from the above investigations will be used to develop a 2013 record of activities, as well as to assist in the completion of an Application for Reauthorization (SWPPP Document). 'tmq% Once complete, WSB will be in a position to specifically define the implementation activities required. Should you require WSB to assist you in the implementation of some of these activities, when the plan is complete, we will be able to specifically T identify services that we can cost effectively assist you in completing. This work would be an extra to the scope of work provided herein. These activities might include providing annual support needed ,• to keep your staff updated on program changes, assist in tracking progress on plan implementation, %y*a staff training, ordinance revisions, development of educational literature and programs, preparation of " annual reports, etc. Project Understanding / 3 AProposal to Provide Professional Services for the Development of the WSSurface Water Management Plan for the City of Elk River Task 4 - Development of Goals and Policies Based on the results of the previous tasks and associated analysis, goals and policies for the management of water resources in the City will be developed. These goals and *ft'Rv F.if_y policies will be developed to make sure the City will be in compliance with Federal, State •, (including MS4), and local requirements, but also, and perhaps more importantly, to respond to City concerns and objectives related to Water Resource Management in the Community. We will provide guidance on suggested goals and policies, and additional = input from the City staff, Council, and other stakeholders will be solicited to formulate policies that make not just sound engineering and planning sense and allow for the development of goals and policies appropriate for the community. The water resource management goals and policies will also be developed to address regulatory requirements covering the need for communication and coordination with other regulatory agencies, approach to undertaking internal operation and maintenance practices, regulation of new development and redevelopment, monitoring and reporting, and other issues. More specifically, it is also anticipated goals and policies will be developed for in the following water resource management areas with others being added as needed: Rate control Wildlife habitat and recreation Flood control Public education „ Water quality Public ditch and creek Volume control systems management Wetland protection and Groundwater protection management Erosion and sediment control These policies will provide the City with tools to address and manage its water resources in an effective, efficient, and environmentally responsible manner. Task 5 - Review Storm Water Management Ordinances This task includes reviewing and identifying deficiencies in the City's storm water management ordinances that relate to management of water quality and quantity control, erosion control, and other storm water management issues. The issues related to adoption of Atlas 14 will also be reviewed with the city and an approach will be developed that will allow the City to respond to this change. Any observed deficiencies will be identified and discussed with the City staff and attorney. If new ordinance development is needed, it will be included as an implementation component of the plan and completed at a later time as an additional item to this scope of work. r f Project Understanding / 4 AProposal to Provide Professional Services for the Development of the WSSurface Water Management Plan for the City of Elk River Task 6 - Identify Problems and Corrective actions Water resource management problems identified within the City during the public input and data collection process will be outlined and corrective actions for each problem will be developed. It is anticipated that problems may be identified, but not be limited to issues in the following areas: Lake, stream, and wetland water quality problems Flooding or rate control concerns in the City or between adjoining communities i Impacts of storm water management on recreational opportunities k Impacts of storm water management on fish and wildlife resources Erosion and sediment control problem areas Impacts of land use practices on storm water management Adequacy of the existing regulations to address storm water management Adequacy of capital improvement programs to address storm water management issues Adequacy of in place systems to generate revenue to pay for necessary improvements Identified problems will be included in the Plan. Concept level corrective actions for each problem item will be developed, which in some cases may include specifying the need for further study (particularly for complex issues), and incorporated into the implementation plan. Task 7 - Develop Implementation Plan Through this plan development process, activities that need to be completed as part of the MS4 SWPPP program or City Stormwater Plan will be developed that may range from, but not be limited to: Inspections Preparation of reports Need for annual meetings Educating or communicating with the public Training Need to complete additional water resource studies Implement programs Completing capital improvements For each activity, the implementation plan will generally provide a schedule, the cost to complete, the party responsible to complete the work, and other pertinent information so the City can budget and track progress in these areas, and staff appropriately. It is anticipated this plan will provide a plan looking forward for approximately the next ten years. Project Understanding / 5 AProposal to Provide Professional Services for the Development of the WSSurface Water Management Plan for the City of Elk River Task 8 - Prepare Final Report to include SWMP and SWPPP Application for Reauthorization This task focuses on the direct preparation of the plan documents. The Plan will be formatted as follows: Executive Summary _- The Plan shall have a section entitled "Executive Summary", which generally summarizes the content of the local plan. Introduction/Purpose The local Plan will have a section entitled "Introduction/Purpose" which outlines why the Plan was developed and how it can be used. Land and Water Resource Inventory The Plan will contain a land and water resource inventory information that is relevant to the development of this document. Establishment of Goals and Policies 1 The Plan will state specific goals and corresponding policies related to the purpose of the Plan and will be consistent with the policies and goals of the regional, state, and federal goals and programs that are currently in place. Assessment of Problems and Corrective Actions The Plan will contain a concept level summary assessment of existing and/or potential water resource related problems that affect the community along with non-structural, programmatic, and/or structural solutions to the problems. Implementation Plan The Plan will include an implementation spreadsheet and supportive documentation that outlines the implementation activities/components developed as part of Task 8. Financial Considerations The Plan will contain an analysis and discussion of the financial impact of implementation of the proposed regulatory controls and programs identified in the previous section. This analysis may also result in revisions to the implementation plan. Amendment Procedures The Plan will contain a section entitled "Amendments to Plan," which contains the year the plan shall extend to and establish the process by which amendments may be made. It is anticipated the implementation plan may need to be amended every year or two as new regulations, or water resource issues are identified. Project Understanding / 6 AProposal to Provide Professional Services for the Development of the WSSurface Water Management Plan for the City of Elk River P1C.""POSED P 1 o ECT TEAM AND EXPENENCE Project Team WSB has hand-selected this team for your project. Below are bios for each member and one page resumes follow in the appendix. Pete Willenbring, PE Project Manager-Billing Rate$142 1hour Pete is a registered professional engineer with more than 30 years of experience providing consulting services to 100+ city, county, state, and federal clients. Pete has expertise in most fields of civil engineering, but is widely recognized to have focused on and developed special expertise in the fields of water resource and environmental engineering, project management, design, and planning. Over the course of his career, Pete has managed water resource related projects or regulatory programs for more than 50 cities or watershed districts within the Twin Cities metropolitan area. He has reviewed, analyzed, designed, or managed the I:f construction of more than 1,000 projects that were built to manage stormwater runoff ;1 rates, volumes, or quality in lakes, streams, or drainage systems throughout Minnesota. r Y + Some selected experience in just the last three years highlights why Pete is the ideal 1 project manager for this project. He was the primary technical resource and author of the nationally distributed APWA white paper entitled "A Public Works Perspective on the Cost vs. Benefit of Various Stormwater Management Practices." He developed five citywide water quality/habitat management plans that outline, as part of development or redevelopment, the implementation of hundreds of projects that utilize dozens of different types of water reuse and water quality BMPs/improvements. � Jason Wedel, PE fI Quality Review-Billing Rate$133 1hour Jason will perform a quality review of this project given his institutional knowledge of the City relating to the existing infrastructure, as well as r t infrastructure needs within the community. He will report to Pete and ' + l will collaborate with Andi and Pete relating to project timeline. Jason will attend ` 14 applicable meetings with City staff and the Citizens Advisory Committee. Jason is an Associate and Senior Project Manager in our Municipal Group. He has I proven managerial expertise related to municipal engineering. Jason is serving as the consultant City Engineer for the Cities of Lino Lakes, and Long Lake, in addition to completing municipal projects in Elk River, Woodbury, Minnetonka, Prior Lake, Wayzata, and Savage. Proposed Project Team and Experience / 7 AProposal to Provide Professional Services for the Development of the WSSurface Water Management Plan for the City of Elk River Andi Moffatt, PWS Environmental Policy Specialist- Billing Rate$142 1hour Andi will serve as the Environmental Policy Specialist for this project. Jeff Peters, CPESC, CESSWI She will coordinate with Pete to ensure project deadlines Environmental Compliance Specialist are met and budgets are adhered to, and will attend -Billing Rate$101 1hour applicable meetings with City staff and the Citizens `. Advisory Committee. Jeff is a Environmental Compliance Specialist at WSB. He will be Andi is the head of WSB's Environmental and Natural responsible for the environmental Resource Group and has 17 years of experience in compliance aspects of this project. project management in planning and environmental projects. Her experience includes environmental Jeff is an Environmental Scientist with ten years assessment, comprehensive plans, wetland delineations of experience in storm water project management, and assessment, natural resource management plans, incident investigation, and permit research. He is skilled and permitting. She has successfully managed large in assisting clients with permit submittals, SWPPP projects that bring the expertise of many staff together preparation, and compliance issues. to accomplish a common goal for her clients. She is also committed to delivering outstanding customer service to Jeff has expertise in carrying out programs to eliminate her clients on a daily basis. errors and resolve issues through preventative practices. He is an experienced liaison between regulatory officials Clients have routinely stated they enjoy working with and clients. Jeff has excellent project management, Andrea for her ability to get a job done, keep them organization, communication, and problem solving skills. informed, and exceed their expectations. Andi's project Jeff has experience in assisting many municipalities, management skills and ability to communicate effectively townships, counties, and private clients submit NPDES with the project team, clients, and elected officials make Permit applications and prepare and implement Storm her an asset to any job. Water Pollution Prevention Plans (SWPPPs). r Jennifer Edison, EIT r r . Water Resource Engineer-Billing Rate . $101 1hour Jennifer is a water resource engineer r � at WSB. She will be responsible for supporting Pete throughout this project. Jennifer is a water resource engineer with nearly three years of experience in water resources design. She has worked on a variety of projects to gain experience in stormwater modeling, flood damage reduction and floodplain modeling, water quality modeling, stormwater 7 management plans, permitting, and development review. In addition to experience in water resources, Jennifer also has nearly seven year experience in municipal and site design where she gained knowledge in designing and drafting municipal infrastructure projects. Proposed Project Team and Experience / 8 AProposal to Provide Professional Services for the Development of the WSSurface Water Management Plan for the City of Elk River Ed Youngquist Technical Support- Billing Rate$110/ hour Kelsey Johnson, AICP "., Planning- Billing Rate$76 1hour Ed will be the technician, along with Ted, handling the technical design for Kelsey is a Community Planner and Land this project. Use Specialist at WSB. She will be responsible for the land use segments of Ed has more than 15 years of experience in the civil the project. engineering design field. He has extensive background in grading design, street and utility plans, SWPPP Kelsey has served as a staff planner in the City of and MPCA permits, specifications, and construction Ankeny, Iowa, and currently serves as WSB's consulting administration. Ed has managed CADD technician planner to the cities of Mahtomedi, St. Anthony Village, staffs and worked directly with clients to maintain Tonka Bay, and St. Augusta, as well as Denmark clear and thorough communications for all projects. Ed Township. Having experience as both a practicing staff has worked with both the public and private sector on planner and a consulting staff planner allows her to ensure site design, roadway reconstruction, and construction planning decisions can be practically applied, which is staging. Ed is very proficient on the use of current CADD eminently important with a critical guiding document such technology, including Autodesk Land Desktop/Civil 3D as a SWMP. Kelsey has also served as project manager and MicroStation/Geopak. and lead planner on several comprehensive plan updates, zoning ordinance updates, and small area studies, including those for Cloquet, Mahtomedi, Grey Cloud Island Township, Woodbury, and North St. Paul. She has Ted Witkowski facilitated numerous workshops, open houses, and public Water Resources Technician -Billing Rate$110 1hour input meetings. Ted will be the technician, along with Ed, handling the technical design for this project. Ted has over 21 years of experience in the field of water } resources engineering. As a Hydrologic Technician, Ted is responsible for completing hydrologic and hydraulic +r analyses of drainage systems for a wide variety of surface water management-related projects. He is also familiar with numerous water quantity and quality models that can be used to assist in hydrologic/hydraulic analysis. � I ti Proposed Project Team and Experience / 9 AProposal to Provide Professional Services for the Development of the WSSurface Water Management Plan for the City of Elk River Experience Comprehensive Water Resource Management Plan Coon Rapids, MN WSB's team worked with City staff to develop a plan that met the needs of the City as well as Reference the policies of the Coon Creek Watershed District, Lower Rum River Watershed Management Steve Gatlin Organization and Six Cities WMO. This plan included a detailed analysis of over 40 problems City Manager areas within the City with corrective actions and cost estimates. This Plan also used a GIS-based City of Coon Rapids hydrologic/hydraulic model (HydroCAD) to determine high water elevations, peak discharge rates, and flood storage within the City. WSB worked with City staff to develop a Capital Improvement (763)767-6458 Plan along with a method to prioritize construction projects to address the problem areas. A gatlin @coonrapidsmn.gov wetland management plan was also completed. HUCC) Comprehensive Storm Water Management Plan Hugo, MN _ Development of the Plan included extensive Reference yam' coordination with the Rice Creek Watershed Bryan Bear = District. A TR-20 based model was developed in '-� City Administrator conformance with RCWD standards. The goals and grater resource City of Hugo M d N A G E M E N T P L A N policies incorporated were in conformance with the policies of the RCWD. Funding mechanisms were (651)762-6300 > > also implemented as part of the development of bbear @ci.hugo. the Plan to allow the City to undertake the various mn.us projects, studies, and programs outlined in the Plan. Storm Sewer System Evaluation Richfield, MN This project consisted of evaluating the storm sewer system in approximately 60 selected areas within the City �,xi•.: of Richfield to determine the level of protection provided for structures within these selected areas. As part of the project, rainfall events were modeled having a return frequency of 1, 5, 10, 25, 50, and 100 years. WSB also Reference modeled the rainfall event that actually occurred on July Mike Eastling 20-23, 1987. Corresponding peak discharge rates and flood elevations were established. Recommendations were Director of Public Works • developed to provide the City with direction on the mostr + City of Richfield cost-effective way to deal with the problems that were (612)861-9792 "� � • " identified. The project also involved the development of a meastling@ policy that the City can now follow in the future to address cityofrichfield.org residents' concerns. Proposed Project Team and Experience / 10 AProposal to Provide Professional Services for the Development of the WSSurface Water Management Plan for the City of Elk River Please Don't Rake into the Creek! Feedm what, gecreek leaves or other yard a��s'� waste creates a bumper crop of *pith p he p _ algae Wrnmg them mto pools of /rsah et� r`ob# green sludge with too little Peopry eat"risk to asi of / oxygen for thefsh /rsa°'"-s'PecC Persg e? 6orh°wsance°rychi/dre° / To keep our waters fishable, { s imm ble,clear an //o76a�Per"rasre 1 ,�/ '■1 your leaves at leas d clean,compost n'ake pe lle'a r/g�n shoreline or °la.feet rom the o eop/e t`ak ca ck U nearest pubLcmcomadv mg, of the wares.withn r h posting fa I' c�ry Noy, rearn, sre enters t aoak Thanks! °P°ur yatryd°o lleoop a �on°OP!/ {.. _ ' `*Yarn PGrYOOr ode to/er That, x system treaonr[ne waSe tre the best k _ nc°ry�es°wIY.D u�esrn Pet wane meet Pant What's the greenest decom way to maintain asp"alt driveway? m ant Is there a sealcoat that does terms damage than others? time asphalt seal coats degrade and tut r _ k contributepollutant ewete runoRinto Wet A.lands or tiler-,-c' y xK. +i 4 To reduce these pollutant contributions,some choose r not totsecont actors Sayssealcomi gseomp etely cK .. ,. tope 9 'it ` optional and doe5yr yn¢but thaebldurabe ty protect)on a deep blacKapp TheSealcoatlndustry5ug- ,. = w. they provide istemporary gets reapplicatlon every two to three years,depend- w.� _ng on wear._ Yom,, Examples of public education articles provided to the City MS4 Permitting requirement and responsibilities between numerous Our project team prepared MS4 Storm Water City staff in multiple departments. The goal of the Pollution Prevention Programs (SWPPP) for 20 Phase ROA is to provide a simple pathway and reference to II communities throughout Minnesota. During this assist staff in navigating through a MPCA permit and time, WSB identified the needs of these MS4s to prepared for annual reports and potential audits. meet their permit compliance. WSB's MS4 team has assisted the City of Coon In response to these common needs, WSB's MS4 Rapids, Laketown Township, and Anoka County team developed and implemented the MS4 Permit during the MPCA Phase II audit process. Document Assistance program. Participants in this annual preparation, representation during the MPCA program fulfill the MS4 permit requirements of staff audit, and follow-up MPCA correspondence are training, annual reporting, regulatory mechanisms a few services WSB has provided. WSB staff is (ordinance development), facility inspection/mapping, very proud to mention that audit results did not and public education. identify any potential MS4 permit violations in these communities. In addition, WSB developed a method of inter- department collaboration for implementing the As audits continue to be mandated by the EPA (via SWPPP, known as the Record of Activities (ROA). the MPCA), the City of Elk River can be assured This multi-year reporting matrix allows the MS4 that WSB staff have the experience and expertise to to easily coordinate and keep track of each permit ensure a fair evaluation of the MS4 program. Proposed Project Team and Experience / 11 AProposal to Provide Professional Services for the Development of the WSSurface Water Management Plan for the City of Elk River Clean Water Boat Tips w,Yp,,ple�JOy using local rve+s,warerways and hk!ar dM1el F - a p sKngeeclearneQUSeyQUrbuaewsel I -Y � _ •Aj preserve our Prx QUS wager resource. .Place bl9 PSI -labasorb b 9 Sbaq candgzW g 9 f a bas y big remweo-I ti 'S �a pa bl. from YQUr til9 .AI Y b kb ba[ball ,po no[fillboNesorwnswitb D l p pell fih 9 9 p eer and ery eosnk ebem. O Y a `- aI �V - -I d b 9 Disporeof tbem pm"ly on sbore �l n 9Y b m e u d-P fhb bb-k a -f enis lkK 9 p9 9 9 a $d/e srord Y,S 1�����7q�N, .Keepa sera ban-nerf Qi be ca re�fu9l noemsP ll,raddn9 Ware en[Ing co^°^IY the flYS blecoae.Make 9`1 bag -e.wbea rnuno({ tar^i^are [step in _ Y b ac a�Qa hemicals When dsust aw 9lv 9ma9e aea .wn l 9v rowers l[hlna ,[r do'^lxing 'face l n b reevcm9 m. wr n Yro Qea ebe wamrrae. /bee Washtub sot ,.p1. .. ti r c eaealrcems I c.hem cafe ed lfy Pills - aroppetllam water,espeCallY dI^a^ _ ola asreo9lmeReuieQeaay d clew cr 9uicklY r ret,fo dis ebe wager. Parueula a,up rhespill ° surfaces. yin, [ . ^eedg✓tee Pesticides am oq -r isals cher^�y�pOr apr��s.Tir^�^9 of rs rho^Yo education articles ic ouch°urs.lfrai^isexpe°rea�lYpestiici provided to the City MS4 Permit Assistance Minnetrista, MN MS4s are conveyances for rainwater. A conveyance authorities, to offer their education programs within may include roads with curb and gutters; however, the City to interested and affected parties. This as in Minnetrista, that may also include ditches and partnership technique has been further enhanced roadways. Managing MS4 systems is variable, as is over the past five years to expand the reach of the development of programs that best benefit the environmental compliance within the City and water resources in those cities. compliment the surrounding partnerships with minimal impact to the cost of the City's MS4 program. Minnetrista is unique because it has a high number of water resources, as well as a number of rural areas WSB remains an active partner in Minnetrista's MS4 that contribute runoff to the City's MS4 system. program. With regulatory audits, citizen awareness, and WSB worked with the City to identify and prioritize public works training, there are multiple opportunities the objectives that needed to be addressed first in for the City to engage WSB as the need for partnership the permit cycle. WSB then worked with the City to arises. The most beneficial part of these long-term integrate and enhance the current program components partnerships is for a city to utilize services that benefit into their permit reporting processes. This allowed their MS4 program without having to lay out capital costs the City to get credit from a regulatory agency for all to fund the same services that are engaged for only a the actions they were already implementing. WSB portion of the permit cycle. also worked very closely with the City to engage communication techniques to further highlight these Runoff from urbanized areas may contain pollutants practices to residents. This was a critical component to ranging from road salt and oil to gasoline and the overall success of the City's program. construction debris. Minnetrista is well positioned with their partnerships and MS4 program to minimize the WSB and the City engaged partners from surrounding impacts these pollutants could have on their adjacent areas, such as county and watershed district water resources for the long term. Proposed Project Team and Experience / 12 AProposal to Provide Professional Services for the Development of the WSSurface Water Management Plan for the City of Elk River L Y MS4 Permit Assistance Rosemount, MN WSB assisted the City of Rosemount in analyzing and examining their stormwater management program to meet the requirements of the state NPDES, MS4 permit. This complex process is variable per community; however, for the City of Rosemount it began with identifying their current program strengths and areas identified for improvement. This program design also engaged specialists from WSB to train the City's public works staff and City employees who are responsible for MS4 implementation. Beyond identifying and prioritizing a list of gaps and opportunities for enhancement of the SWPPP, WSB developed training, reporting procedures, and documentation methodology, and further supported the City should agency audits become necessary. WSB also assisted the City in leveraging their existing and potential future partnerships with other public entities to enhance their program offerings. In addition to other adjacent communities, WSB worked with the City to partner with Watershed Management Organizations and Soil and Water Conservation Districts to broaden their outreach to the public citizen and civic organization groups. These partnerships have positioned the City of Rosemount well for other mutually beneficial program partnerships. The City of Rosemount has a well-designed SWPPP that is clear, specific, and measurable to City officials. The tools and existing program components have allowed the City to continue to manage their stormwater system while effectively preventing pollutants from migrating into the very resources citizens expect the City to protect. Overall, an MS4 program that works within a city must be cost-effective and realistic for implementation; the City of Rosemount has a program this meets both of these criteria. Proposed Project Team and Experience / 13 AProposal to Provide Professional Services for the Development of the WSSurface Water Management Plan for the City of Elk River SCHEDULE This schedule requested by the City is very aggressive, however, we understand the value of having this plan completed at the same time your SWPPP is prepared. Provided authorization to begin the work is obtained by August 20, 2013, we will commit to preparing a plan and submitting a draft to City staff by November 1st. In addition, we will also provide a completed SWPPP Application for Reauthorization by this date as well, that will have content consistent with your stormwater plan. ESTIMATED COST The tasks associated with the completion of the Plan are proposed to be completed and time billed on an hourly basis by the staff listed in the Personnel Section of this proposal. The hours will be billed in accordance with the Fee Schedule we have included as part of this proposal. We estimated this cost to range from $26,500 to $29,800, with the higher fee to be considered a not to exceed cost for the scope of services listed. For the hourly billing rate for each individual on the project team, refer to the Project Team section. Schedule / 14 Peter R. Willenbring, PE Water Resources, Vice President Pete is a principal and co-founder of WSB Et Associates. Since starting the firm in 1995, he has developed and managed the Water Resources and Environmental Engineering Groups and selected day to day operations of the firm. From 1987 to 1995, he served as Manager of the Water Resources Department at OSM and Associates, and from 1980 to 1987 as a Project Manager and then Associate at E.A. Hickok and Associates. Prior to that time, he worked for the U.S. Environmental Protection Agency as an Environmental Engineer in the Surveillance and Analysis Division. Pete is a registered professional engineer, with over 30 years of Education: experience providing consulting services to over 100 city, county, state, Bachelor of Science in Civil and federal clients. Pete has expertise in most fields of civil engineering, Engineering, University of but is widely recognized to have developed special expertise in the fields Minnesota, 1980 of water resource and environmental engineering, project management, Registrations: design, and planning. Minnesota#15998 Over the course of his career, he has managed water resource related Memberships: projects or regulatory programs for over 50 cities or watershed districts American Society of within the Twin Cities Metropolitan area. He has reviewed, analyzed, Civil Engineers designed, or managed the construction of over 1,000 projects that were built to manage stormwater runoff rates, volumes, or quality in lakes, American Water streams, or drainage systems throughout the State of Minnesota. Resources Association Pete is a part time instructor at the University of Minnesota, teaching a master's degree course entitled "Water Resource and Environmental Engineering" to graduate students enrolled in the U of M's Master of Infrastructure Engineering Program. He periodically provides expert witness testimony on matters related to storm sewer system design, flooding, and construction management and is a trained civil mediator. Pete received national recognition in 2010 being selected as the "Water Resource Manager of the Year" by the American Public Works Association. SELECTED PROJECT EXPERIENCE Stormwater Management/Planning/Design • Prepared and assisted clients with the implementation of city-wide stormwater management plans for over 40 communities in the State of Minnesota including the Cities of Hugo, Richfield, St. Anthony, Circle Pines, Coon Rapids, Rosemount, Shakopee, Monticello, and many others. Plans required the development of complex hydrologic and water quality models to define peak discharge rates, flood elevations, and predict the quality of stormwater that would be present within the lakes and streams of the city. • Developed management policies and programs for dozens of communities and watershed districts that were used to fund improvements and regulate new development, and created a capital improvement plans that listed projects that would be WSB needed to meet plan objectives. Plan implementation generally Peter R. Willenbring, PE Water Resources, Vice President involved designing and constructing storm sewer or open channel drainage systems, dams/impoundments/levees, stormwater treatment facilities, or lake restoration improvements. • Completed hydrologic feasibility studies of over 100 areas that were experiencing flooding problems, developed plans and specifications for improvements, and provided bidding and construction management services to correct these problems. Water Quality Management, Planning and Lake Restoration • Developed Water Quality Management Plan and/or Non-degradation plans for the Cities of Hugo, Circle Pines, Coon Rapids, Maple Grove, Rosemount, Richfield, Shakopee, and others. These documents quantified existing and anticipated future pollutant loadings and outlined a plan to mitigate the water quality impacts that had or would be created by any past or future development. • Designed, constructed, and operated in multiple locations a portable flocculation treatment system capable of removing in excess of 90% of the phosphorus and other pollutants from stormwater treated by the system. This removal efficiency is significantly higher than the maximum removal efficiency of 50-60 percent commonly anticipated for conventional treatment devices. • Implemented Golden Lake Water Quality Improvement Demonstration Project in the City of Circle Pines. The project demonstrated the viability and cost effectiveness of using flocculation treatment to reduce phosphorus levels in stormwater runoff. • Prepared hundreds of permit applications and supportive technical information to agencies such as the Minnesota Department of Natural Resources, the US Army Corps of Engineers, and the Minnesota Pollution Control Agency for work in public waters, wetlands and navigable waters. • Prepared dozens of environmental assessments for larger scale projects that have the potential for environmental impact. These assessments were completed consistent with the requirements of the Minnesota Environmental Quality Board rules. Flood Control • Completed detailed hydrologic analyses, reports, and other supportive documentation needed to correct/update FEMA floodplain maps for dozens of communities in the state of Minnesota. Wetland Management • Completed wetland delineation training program administered by the State of Minnesota Board of Water and Soil Resources. • Prepared dozens of wetland mitigation, wetland replacement and/or wetland banking plans in conformance with regional, state WSB and federal regulations. ��77 Jason Wedel, PE Municipal Senior Project Manager Jason is a Senior Project Engineer in our Municipal Group. Jason has proven managerial expertise related to municipal engineering and land development. He has a verifiable track record for the successful completion of multi-million dollar projects through contract negotiation, developing partnerships, and building positive rapport with architects, engineers, and state and local officials, while maintaining costs. He is versed in public speaking, administration, financial analysis, project estimating, resolving complicated entitlement and design problems, document preparation and site management. Education: GENERAL EXPERIENCE Bachelor of Science, Civil Engineering, University of City Engineering and Public Works Minnesota, 1995 Jason was previously the Public Works Director/City Engineer for the City of Savage. During his tenure at the City of Savage he provided direction Registrations: and supervision to the Engineering, Street, Utilities, and Parks Minnesota#26768 Departments (Total of 45 employees). His responsibilities included oversight of the preparation of plans and specifications for City Memberships: improvement projects prepared by in-house staff as well as outside American Public Works consultants. He was responsible for updating information related to MSAS Association Needs, Annual Mileage Certification, and bridge inspections. He prepared and reviewed annual budgets for Engineering, Streets, Utilities and Parks Departments. He also updated the City's 5-year Capital Improvement Plan as part of the City's budgeting process and provided direction to the City Council as an active participant in all of the City Council meetings. Jason also coordinated the design and financing of new projects with State and County officials to facilitate joint projects. He successfully applied for and received both State and Federal funding for bridge and major roadway improvements. He also has experience as a member of the Technical Advisory Committee to the Met Council Transportation Advisory Board which included selecting projects for the Surface Transportation Program (STP) and the Transportation Enhancements Program (TEP). Land Development Jason's also has experience working for a national home building company performing land acquisition and development which provides him with a unique perspective and understanding of how to work with developers in constructing projects that work well for both the City and the developer. Jason's experience also provided opportunities to work on projects located within 17 different cities and observe how the various cities work with developers. This information provides tremendous insight on what types of things cities can do to ensure the desired end result is achieved. A WSB Jason Wedel, PE Municipal Senior Project Manager SELECTED EXPERIENCE Bailey Lake Trunk Sanitary Sewer, Woodbury, MN Jason coordinated the study, design and construction of over two miles of trunk sanitary sewer. The City of Woodbury decided to open up their Phase II area of the City for new development which includes hundreds of acres of land that had been previously used for agricultural purposes. This required an EAW, land planning to establish potential development patterns, a feasibility report, easement acquisition, final plans, and construction management for a 27-inch trunk sanitary sewer main that ultimately connected to a Met Council interceptor and provided the sanitary sewer backbone for the entire area. Jason and other WSB staff worked with the City to review the proposed land uses for the area and created concepts on how this area would likely develop in the future. Final plans were then created and constructed based on the proposed alignment which required portions of the sanitary sewer to be constructed at depths exceeding fifty feet in some locations. Wayzata Boulevard Street Reconstruction, Wayzata, MN As Project Manager, Jason oversaw the reconstruction of Wayzata Boulevard from TH 12 to Superior Boulevard. This project involved reducing the width of the street, adding landscaped medians, and included bump outs at key pedestrian crossings. The result was a new street that was pedestrian friendly, aesthetically pleasing, and reduced the impervious surface by over an acre thereby reducing the storm water runoff directed to Lake Minnetonka. Construction is scheduled to begin in June of 2012. South Park Drive - Utility and Street Improvements, Savage, MN As City Engineer, Jason oversaw this one mile long State Aid project which was designed and contracted by in-house staff. It involved coordinating the construction with intersection signal improvements at TH 13, wetland impacts and mitigation as well as providing utility service for significant development along either side of the roadway including Super Target and a 166 unit townhome development. 150th Street - Utility and Street Improvements, Savage, MN As City Engineer, Jason oversaw the upgrade of an existing two lane rural roadway to a 52-foot wide urban street with trunk sanitary sewer and watermain improvements. This project required significant right-of-way acquisition as well as a number of neighborhood meetings with impacted property owners. The project also provided utility service and access to the new high school on the south side of the street. All design, contract administration, and right-of-way acquisition was completed in-house. A WSB Andrea M. Moffatt, PWS Environmental Planning Et Natural Resources Group Manager, Principal Andrea is the head of WSB's Environmental and Natural Resource Group and has 17 years of experience in project management in this area. Her experience includes environmental assessment, wetland delineations and assessment, natural resource management plans, permitting, mitigation plans, and wind energy projects. She has a thorough understanding of the State and Federal environmental review process through MEPA and NEPA. Andrea has extensive experience with state and federal wetland and stormwater management rules such as the Wetland Conservation Act, Section 404 of the Clean Water Act, and the NPDES Storm Water Rules. Education: SELECTED PROJECT EXPERIENCE Master of Science in Plant Environmental Assessment and Review Pathology, Minor in Plant Biology, Andrea has led our environmental review team in preparing, submitting, University of Minnesota, 1998 and responding to comments for more than 60 EAWs, EAs, and AUARs for Bachelor of Arts in Biology, residential, commercial/industrial, roadway, and natural resource College of St. Catherine, 1994 projects through MEPA and NEPA regulations. These projects have included CSAH 17 and CSAH 116 in Anoka County, CSAH 61 in Hennepin Registrations: County, Park Cove in Minnetrista, Gateway Area in Edina, UMore Site in Professional Wetland Rosemount, CSAH 17 in Anoka County, Vesterra Gravel Mine in Scientist #1502 Rosemount, and dozens more. Certifications: In the development and preparation of these documents, Andrea works MnDNR Certified- closely with her clients, makes solid recommendations to decision- Botanical Surveys makers, and diligently tracks the environmental review schedule and follows up on agency comments. Storm Water Pollution Prevention Plan Design Natural Resource Inventory and Assessment Andrea has completed Natural Resources Inventories and Assessments for Certified Wetland small projects and entire cities. This work included developing a natural Delineator#1034 resources assessment for a number of communities using Minnesota Land Memberships: Cover Classification System (MLCCS). She has also completed assessments Society of Wetland Scientists for individual projects. Andrea used this information and assist cities in developing policies to protect and manage these resources. Minnesota Wetland Wetland Delineation, Mitigation Design, and Permitting Professionals Association Andrea has extensive experience in wetland delineation and mitigation. American Wind She has delineated hundreds of wetlands in the metro and outstate areas Energy Association for clients. Many of these projects also included obtaining permits from local, state, and federal agencies, as well as designing sustainable Women of Wind Energy wetland mitigation sites. Some of the projects include: • CSAH 17 (Anoka County) • CSAH 116 (Anoka County) • Swamp Lake Mitigation site (21 acres), Shakopee and Scott County • TH 55/13oone Avenue Wetland and Floodplain Mitigation Project, Golden Valley, MN • Woodley Street Reconstruction, Northfield, MN • CSAH 61, Hennepin County, MN WSB Andrea M. Moffatt, PWS Environmental Planning Et Natural Resources Group Manager, Principal Local Government Unit (LGU) Experience Andrea provides oversight and management of the Minnesota Wetland Conservation Act (WCA). She has assisted the cities of Prior Lake, Lakeville, Minnetrista, Hugo, Grant, Sunfish Lake, Shakopee, Monticello, Rosemount, and Richfield with the LGU role and provided technical expertise in wetland determinations, LGU paperwork, and permitting in conformance with state rules. She also provides training to city staff in their role as LGU. Comprehensive Wetland Management Planning Andrea worked closely with city staff, agencies, and residents to prepare user-friendly Wetland Management Plans in conformance with the Wetland Conservation Act. She has evaluated the functions and values of over 2,500 wetlands in the metro area using the Minnesota Routine Assessment Method, placed wetlands into management categories, and prepared the plan based on the cities' and review agencies' needs and requirements. She has developed Wetland Management Plans for the following communities: • Coon Rapids • Rosemount • Lakeville . St. Louis Park • Medina • St. Paul • Bloomington • Savage • Richfield . Champlin • Sauk Rapids Environmental Review and Design for Wind Energy Projects Andrea leads our wind-energy service team and coordinates the civil design, survey, environmental reviews, and project management. She has completed site permit applications, environmental site assessments, Phase I Assessments, wetland studies, and avian and bat assessments for wind energy projects. She works effectively with clients and provides analysis in a timely manner to keep the project on schedule. Recent project studies have included: • Civil design project management, Shiloh IV Wind Farm, Solano County, California • Project management for site permits and environmental analysis, Community Wind South, Nobles County, MN • Weste Phase 1, Howard County, TX • Project management for site permits and environmental analysis, Wind Farm, Webster County, IA • Grant County Bird 8t Bat Assessment, Grant County, MN • Valley View Bird 6t Bat Assessment, Murray County, MN • Project management for site permits and environmental analysis, Wapsipinicon Wind Farm, Mower County, MN WSB Jennifer Edison, EIT Water Resources Project Engineer Jennifer is a water resource engineer with nearly three years of experience in water resources design. She has worked on a variety of projects to gain experience in stormwater modeling, flood damage reduction and floodplain modeling, water quality modeling, stormwater management plans, permitting, and development review. In addition to experience in water resources, Jennifer also has nearly seven year experience in municipal and site design where she gained knowledge in designing and drafting municipal infrastructure projects. She is also experiences in construction inspection. SELECTED PROJECT EXPERIENCE •- County Road 19 Drainage Study, Woodbury, MN Education: Jennifer served as the water resources engineer assisting the Bachelor of Civil Engineering developmentof a detailed XP-SWMM model to determine capacity University of Minnesota, 2004 constraints. The two mile road project extended through numerous wetlands and included an upstream watershed of 1,800 acres, and two Master of Science - Infrastructure FEMA mapped basis. The majority of the water bodies on the corridor are Systems Engineering, affected by tailwater from the downstream lake. Analysis of capacity University of Minnesota, 2007 constraints included review of changes to the 100-year high water level due to expansion of the roadway and analysis of culvert crossings for Registrations1 capacity. Minnesota EIT#135531 Woodbury 2012 Street Reconstruction, Woodbury, MN Mn/DOT Certifications: Jennifer served as the water resources engineer responsible for the sizing Bituminous Street 1, Concrete Field I, Aggregate Production, and location of a variety of BMPs within the linear corridor and in Grading and Base I, Erosion adjacent public and/or open space to comply with City's MS4 permit for Control nondegradation and watershed requirements. The street reconstruction projects included eight miles of roadway. Memberships: American Public Works Association (APWA) ��/ A WS Jeffrey Peters, CPESC, CESSWI Environmental Compliance Specialist Jeff is a dedicated Environmental Scientist with ten years of experience in stormwater project management, incident investigation, and permit research. He is skilled in assisting clients with permit submittals, SWPPP preparation, and compliance issues. Jeff has expertise in carrying out programs to eliminate errors and resolve issues through preventative practices. He is an experienced liaison between regulatory officials and clients. Jeff has excellent project management, organization, communication, and problem solving skills. Jeff has experience in 1 assisting many municipalities, townships, counties, and private clients submit NPDES Permit applications and prepare and implement Education: Stormwater Pollution Prevention Plans (SWPPPs). Bachelors of Environmental Design, University of Minnesota, SELECTED EXPERIENCE 2002 Associates Degree, Bethany Stormwater Compliance Team Leader Lutheran College, 1999 Experienced in issues surrounding the National Pollutant Discharge Elimination System (NPDES) requirements, Stormwater Pollution OSHA 10 hour Construction Safety Prevention Plans (SWPPP), and erosion and sediment control plans. Et Health • Stormwater program development (DR Horton, Lennar) Certifications: • MS4 education and training to municipal clients (New Hope, Dayton, Erosion and Sediment Control Spring Lake Park) (CPESC) • NPDES education and training for St. Cloud, Fargo, and Moorhead Municipal Separate Storm Sewer Builders Associations System Specialist (MS4S) • Co-authored SDDOT field guide. The guide serves as a tool for choosing erosion and sediment control BMPs for construction Erosion, Sediment, and projects. Stormwater Inspector(CESSWI) • Wisconsin Stormwater Basics program. Helped develop a NPDES Erosion, Sediment Control training program for residential contractors in conjunction with the Inspector/Installer City of Muskego. Erosion, Sediment Control Site Management Environmental Scientist II Erosion, Sediment Control Oversaw local, state, and federal permit requirements. Experience in SWPPP Design construction oversight, environmental compliance, and wetland Confined Space Training monitoring. • Enbridge Pipeline, Streator to Manhatten project "Southern Lights" - Environmental and Agricultural Inspector • Stormwater compliance monitoring for linear projects (195th Street construction in Farmington, MN) • Local, state, and national training presentations on effective SWPPP design and implementation (Lennar, SDDOT, Minnesota Utility Contractors Association MUCA, Kraus Anderson) • Erosion and sediment control training and education program for all South Dakota Department of Transportation employees. WSB Kelsey Johnson, AICP Community Planner Kelsey is a community planner with extensive public sector experience. She has worked as a planner and consulting staff planner for the City of Ankeny, Iowa; the City of Mahtomedi, Minnesota; the City of Saint Anthony Village, Minnesota; the City of Tonka Bay, Minnesota; and Denmark Township, Minnesota. Her experience as a staff planner allows her to ensure that planning decisions can be practically applied. Kelsey has also served as the project manager and lead planner on land use plans, comprehensive land use plan updates, zoning ordinance updates, subdivision regulation updates, housing action plans, and Education: small area studies. Each of these initiatives involved a degree of public Bachelor of Science participation and involvement. Kelsey's strong leadership resulted in Community and Regional successful implementation of the plans she has worked on. Planning, Iowa State Kelsey is also a grant and funding specialist on WSB's Grant and University, 2006 Funding Committee. As a specialist, Kelsey diligently tracks and stays Registration: informed of funding and grant opportunities. Specifically, Kelsey is an American Institute of expert in planning and economic development funding sources which Certified Planners allows the documents she works on to set the state for future funding opportunities. This background and knowledge allows for realistic Affiliations: implementation policies, all while creating dynamic land use and American Planning Association redevelopment documents. Kelsey has assisted numerous clients with identifying funding opportunities, writing funding applications, and Sensible Land Use Coalition documenting/tracking funding once obtained. SELECTED PROJECT EXPERIENCE Comprehensive Plan Updates Kelsey has assisted in the preparation of a major comprehensive plan updates communities throughout Minnesota including the City of Mahtomedi and Grey Cloud Island Township. The Plans identify where the communities have been, where the communities are now, and where the communities seem to be heading. Key components of these plans are identifying land future land uses and growth patterns throughout the community. These visions are obtained by setting goals, objectives, policies and plans to guide the community in getting where they want to be. Public participation was promoted throughout these planning processes, which was facilitated in part by Kelsey, including meetings with Steering Committees, Planning Commissions, residents and neighborhood groups, members of the City Council/Town Board and staff. By engaging the public early on, the communities were able to ensure that their Plan would be valued and effectively implemented. Environmental Assessment and Review Kelsey has assisted in the preparation of EA's and AUARs for a number of projects throughout Minnesota including those for the City of Minnetrista and the City of Elk River. Kelsey works closely with WSBs environmental and natural resource staff throughout these processes to ensure land use decisions take into consideration the environmental and natural resource A amenities within the study area. WSB Kelsey Johnson, AICP Community Planner Zoning Ordinances Kelsey has served as the project manager and lead consultant on numerous zoning ordinance updates including those for the City of Mahtomedi and the City of Cloquet. Previous ordinances were a compilation of many patches that were prepared over many years. As a result, it was important that the updated Ordinances eliminated conflicting language, provided consistency with the recently updated Comprehensive Plans, and to respond to pertinent changes in the Minnesota State Law. By serving a role as a staff planner and a consulting staff planner, Kelsey has the institutional knowledge of not only how to prepare plans and ordinances, but ensuring these plans and ordinances can be implemented by staff. Housing Action Plans Kelsey has worked as the lead project manager and planner on the Housing Action Plan 2011-2020 for the City of Mahtomedi in association with the City's participation in the Local Housing Incentives Account Program (LCA LHIA) under the Metropolitan Livable Communities Act. The Plan provides the City with a reference to guide planning efforts, financial initiatives and strategies, and direction to the City regarding the approach it should take; the types of housing opportunities the City should promote; and the roles in providing those opportunities. City and Consulting Staff Planner Kelsey served as a planner for the City of Ankeny, Iowa, and currently serves as the consulting staff planner for the City of Mahtomedi, Tonka Bay, Saint Anthony Village, and Denmark Township. As such, she reviews all building permits for zoning compliance, conducts small area studies, prepares staff reports, ordinances, resolutions, and presents to Council's, Town Board's, and Commissions. In addition, Kelsey assists residents, developers, consultants, and builders with City policies, land use decisions, ordinances, sign codes, and zoning and subdivision regulations. Coordination with different stakeholders is an important role in Kelsey's day-to-day experiences as a planner. She knows the importance of how the plans and implementation tools we create really have an impact on the residents, staff, and community as a whole. A WSB Edward Youngquist Water Resources Engineering Specialist Ed has more than 15 years of experience in the civil engineering design field. He has extensive background in grading design, street and utility plans, SWPPP and MPCA permits, specifications, and construction administration. Ed has managed CADD technician staffs and worked directly with clients to maintain clear and thorough communications for all projects. Ed has worked with both the public and private sector on site design, roadway reconstruction, and construction staging. Ed is very proficient on the use of current CADD technology, including Autodesk n , Land Desktop/Civil 3D and MicroStation/Geopak. Education: SELECTED PROJECT EXPERIENCE Areas of Study in Business, City/State Parks Projects Civil Design) Economics, Math, and Science, St. Y J ( g ) Johns University / University of • Round Lake Park Improvements (splash pad), civil design and Minnesota, 1985 stormwater management, Eden Prairie, MN • UMore Athletic Complex (baseball/softball fields), civil design and stormwater management, Rosemount, MN • Andrews Park Improvements (splash pad and park upgrades), civil design and stormwater management, Champlin, MN • Hilde Amphitheatre (park improvements), civil design and stormwater management, Plymouth, MN • Zachery Park and Plymouth Creek Park (paved in-line hockey rink), civil design and stormwater management, Plymouth, MN • Farview Park Zero Depth Wading Pool, civil design, sewer separation and stormwater management, Minneapolis, MN • Shady Oak Beach Improvements (splash pad), civil design and stormwater management, Minnetonka, MN • Elk River Youth Athletic Complex (YAC), baseball fields/pavilion, Brainerd, MN • Sunrise Prairie Trail Project, North Branch, MN • Rogers Middle School Football Complex, Rogers, MN • Charles Perry Park, Arden Hills, MN • Hilde Performance Center, Plymouth, MN • Split Rock Light House State Park, Minnesota DNR City Street Beautification/Restoration Projects (Civil Design) • Main Street Renovation Project, Elk River, MN • Brooklyn Boulevard Restoration Project, Brooklyn Park, MN Water Resources Experience • Stormwater modeling (HydroCAD, P8) • Stormwater quantity and volume reduction design, St. Paul, MN • East Phalen Wetland Enhancement, St. Paul, MN WSB Edward Youngquist Water Resources Engineering Specialist • St. Albans/Arundel Infiltration Project, St. Paul, MN • Victoria Street Infiltration Project, St. Paul, MN • Phosphorous Reduction - WWTF Expansion Project, Princeton, MN • Crystal Lake Flocculation Treatment System, Robbinsdale, MN Street Construction Experience • Design for grading and street and utility plans for a broad range of public and private sector site development and street reconstruction projects • Develop construction staging plans for: - TH 169/Cedar Avenue Bridge Project - 1-35E/1-694 Weave Project • Develop project specifications for a variety of public and private sector reconstruction, utility, and grading projects • Manage construction administration for municipal and developer construction and reconstruction projects • Design for SWPPP and MPCA permits for various reconstruction projects • Establish and implement CADD draft standards and manage the quality control to ensure their use A WSB Theodore Witkowski Water Resources Engineering Specialist, Technical Associate Ted has over 21 years of experience in the field of water resources engineering. As a Hydrologic Technician, Ted is responsible for completing hydrologic and hydraulic analyses of drainage systems for a wide variety of surface water management-related projects. He is also familiar with numerous water quantity and quality models that can be used to assist in hydrologic/hydraulic analysis. SELECTED PROJECT EXPERIENCE Hydraulic/Hydrologic Design Calculations Education: Tasks performed included catch basin inlet spacing calculations, drainage Civil Technology Program, St. area delineation and drafting, storm drain computations, structure sizing Paul Technical College, 1992 calculations, hydraulic cost split analysis, detention basin sizing, and water quality analysis. Some project examples include: • Sparrow Road - 2013 Road Reconstruction, Minnetonka, MN • Rockville County Park, Stearns County, MN • Northfield Intermodal Project, Northfield, MN • Great River Trailway Project, Monticello, MN • Valley View Road, Shakopee, MN • Millerwoods Development, Andover, MN • CSAH 21 and Arcadia, Prior Lake, MN • CSAH 17 and 78, Shakopee, MN • Bren Road/TH 169 Interchange, Minnetonka, MN • CSAH 101, Shakopee, MN • Fillmore to County Road 17 - Downtown • CSAH 26, Houston County • Old 18, Princeton • TH 13/101/Quentin Avenue, Savage, MN • CSAH 56 (Concord Boulevard), Inver Grove Heights 6t South St. Paul, MN • MRRT, Dakota County (1-90) BOMC Design Build, Mower County • TH 23/1-35 Interchange, Pine County • CR 99, Chisago County, MN • CSAH 21, Shakopee-Prior Lake, MN • CSAH 86 - TH 19, Scott/Rice County, MN • CSAH 56, Dakota County, MN • Lyndale Avenue/1-494 Interchange, Richfield/Bloomington, MN • TH 52/TH 55/CSAH 42 Preliminary Design, Rosemount, MN • CSAH 42, Rosemount, MN • 1-94/CSAH 18, Monticello, MN • TH 7/41, Shorewood and Chanhassen, MN WSB Theodore Witkowski Water Resources Engineering Specialist, Technical Associate • TH 13, Savage and Prior Lake, MN Tilden Avenue, Champlin, MN • CSAH 16/83, Shakopee, MN • 10th Et 6th Avenue (Old TH 300), Shakopee, MN • CSAH 75 Pedestrian Underpass, Monticello, MN • Richmond Street/Hardman Avenue, South St. Paul, MN Black Dog Power Plant Access Road Et Bridge Replacement, Burnsville, MN • TH 55/71, Belgrade, MN • Valley View Road, Eden Prairie, MN Letter of Map Revision (LOMR) Prepared LOMR's for 165th Street Ditch System, Victor Hugo Boulevard Bridge, Fable Hills Bridge, South Fork of the Crow River, Fillmore County, Sherburne County, Scott County, Rice County, Wright County, and Washington County bridge designs. For Clearwater Creek, the design programs HEC II and HEC-RAS were used. Box Culvert/Bridge Design • Black Dog Road Bridge, Burnsville, MN • CSAH 51, Anoka County, MN • CSAH 26, CSAH 54, Anoka County, MN • CSAH 86, Scott County, MN • CSAH 6, Wright County, MN • Vierling Drive, Shakopee, MN • CSAH 29 Et TH 95 Bridge, Mille Lacs County • CR 59, Rice County • Bridge 6628, Dodge County • CSAH 12, Mille Lacs County • CSAH 21, Shakopee, MN Hydrologic Analysis and Review Completed hydrologic analysis and review of existing completed XP-SWMM XPSWMM stormwater model for: • New Brighton Flood Problem Analysis, New Brighton, MN • City of Bloomington's Storm Sewer System, Bloomington, MN • Prior Lake Outlet Channel, Shakopee, MN • Judicial Ditch 2, Hugo, MN • 29th Avenue, St. Anthony, MN • CSAH 16/83, Shakopee, MN WSB • Simon's Ravine Restoration, South St. Paul, MN