Loading...
5.1. PCSR 05-25-2004 Item # 5.1. a River MEMORANDUM TO: Planning Commission FROM: Chris Leeseberg, Planner DATE: May 25, 2004 SUBJECT: Case No. CU 04-14 Request by BMS Investments for a Conditional Use Permit for Truck Terminal Request Consider a request by BMS Investments for a Conditional Use Permit for Truck Terminal. Location Lot 1, Block 1, Cascade Industrial Park Zoning/ Land Use I2 (Medium Industrial) / MI (Medium Industrial) 60 Day Rule In order to comply with Minnesota Statute 15.99 (60 -Day Requirement), action must be taken on this request by June 25, 2004 Attachments • Location Map • Memo from the City Engineer • Site Layout and Utility Plan • Grading, Drainage&Erosion Control Plan • Landscape Plan • Building Elevations Memo to Planning Commission/CU 04-14 May 25,2004 Page 2 Overview The applicant is proposing to construct a 6,000 square foot building in conjunction with a truck terminal. The truck terminal component of the use requires a conditional use permit. The property is located on Jarvis Street, north of the railroad tracks,in the Cascade Industrial Park The property is currently undeveloped. The lot to the south will be a masonry business; the property to the west is a pipe yard, and single family residences are on the east side of Jarvis Street in Ramsey. The surrounding properties, on the west side of Jarvis, have a zoning of I2 (Medium Industrial) and a land use designation of MI (Medium Industrial). The building will be used to store two trucks and up to five trailers could be parked in the outdoor storage area. There is an area in the building for a small office space, but currently the office activities happen off site. The hours of operation vary from job to job and from day to day as well as season to season. The applicant stated that trucks could leave as early as 4:30 a.m. on rare occasions. Analysis Site Plan Parking and Access The site plan indicates two driveways onto Jarvis Street. The site should be limited to one access point with an internal connection of the driveway and the parking area. A 14 stall parking lot is proposed south of the building,with 15 additional stalls marked as future. There is no specific parking requirement in the zoning code for a truck terminal business. The applicant is providing parking at a ratio of 1 space for every 315 square feet of floor area. For comparison, the parking requirement for a warehouse is 1 space per 2000 square feet of floor area and for office it is 1 space for every 300 square feet. Parking should be sufficient for the proposed use. Access to the area behind the building is provided via a drive isle through the parking lot. The driveways and parking area will be paved and have concrete curb and gutter. Truck Terminal The outdoor trailer parking area will be located at the rear of the building. Although no surface material was indicated on the plan,it minimally will have to have a Class V surface. The drain field for the septic system will be located between the building and the north property line. The trailer parking area will have a fence along the eastern edge and along both the north and south property line with it terminating in the drainage and utility easement. No fencing is shown along the west end. S:APLANNINGVCase Files\2004VC.0 04-14 BMS INvestmentsACU 04-14_PC.doc Memo to Planning Commission/CU 04-14 May 25,2004 Page 3 Landscaping The ordinance requires 48 trees with a mix of 50% (24) overstory, 25% (12) evergreen and 25% (12) ornamental trees. The applicant has proposed 48 trees, 33 overstory, 7 evergreen and 8 ornamental. They meet the total number of trees,but the specific quantity of each needs to meet the ordinance. Grading, Drainage and Utilities Grading, drainage and utility issues are addressed in the City Engineer's memo Signage There is no indication of any signage on the building or any freestanding signs. The ordinance allows: One on premises freestanding business sign per premises, not to exceed two square feet in sign area for each /inear foot of street frontage up to a maximum of 64 square feet. Such signs shall not exceed a height of 20 feet. One on-premises business wall sign per occupancy, not to exceed two square feet in sign area for each linear foot of building frontage, up to a maximum of 128 square feet per occupancy. Building Elevations The building will be 6,000 square feet in size and the exterior will have a metal panel finish. The front entrance will be covered with a metal canopy. The elevation facing Jarvis will have a four foot high rock wainscoting. Recommendation Staff recommends that the Planning Commission recommend approval of the Conditional Use Permit for a truck terminal with the following conditions: 1. ALL COMMENTS OF THE CITY ENGINEER SHALL BE ADDRESSED. 2. THE LANDSCAPE PLAN SHALL BE REVISED TO INCLUDE THE REQUIRED AMOUNT OF SPECIFIC TYPES OF TREES. 3. ALL SIGNAGE SHALL COMPLY WITH THE SIGN ORDINANCE. 4. ALL LANDSCAPED AREAS SHALL BE IRRIGATED. 5. THE EDGES OF THE TRUCK TERMINAL AREA SHALL BE PERMANENTLY DEFINED WITH SOME FORM OF LANDSCAPE PRODUCT THAT WILL NOT ALLOW FINE GRAVEL MATERIAL TO WASH INTO THE PONDING AREA. 6. THE EXTERIOR BUILDING MATERIALS SHALL COMPLY WITH THE ORDINANCE REQUIREMENTS. S:APLANNING\Case Files\2004\CU 04-14 BMS INvestrnentsVCU 04-14_PC.doe Memo to Planning Commission/CU 04-14 May 25,2004 Page 4 7. IF MORE THAN 5 TRUCKS AND/OR 10 TRAILERS ARE TO BE ON SITE, THE APPLICANT SHALL APPLY FOR AN AMENDMENT TO THE CONDITIONAL USE PERMIT. S:APLANNING\Case Files\2004\CU 04-14 BMS INvestmentsVCU 04-14_PC.doc X ti±i, 163RD INN C cCADE 9 S163RrI AVE �dj� 162ND w �O� 'z 0 SITE MI in AVE Q 161ST CASCADE 160TH kt 159TH / klikre 1 if � ��� 158TH 9 O o 4 O eENNEB k7s6 Q �� 157TH pws Nr rL�O�z a, 1 sir lm `` 444 156TH III ." y".III i N .� TH Location Map P N River Case Number. CU 04-14 BMS INVESTMENTS r ri a 1,2a I fowarc R. Greer Compary May 10, 2004 File: 823650J-0240 Mr. Chris Leeseberg City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: POWELL PETERSON, INC. BMS INVESTMENTS, LLC. Dear Mr. Leeseberg: As requested, we have reviewed the site plan information submitted for the proposed Powell Peterson truck terminal to be located on Lot 1, Cascade Industrial Park off of Jarvis Street. Hakanson Anderson Associates, Inc., of Anoka, Minnesota, prepared the information we reviewed. Based on our review, we would offer the following comments: 1. The site is proposing two access points onto Jarvis Street: one that leads directly into the 6,000 square foot building, and the second that leads into the parking lot to the south of the building. We would recommend that this site be limited to one driveway access off of Jarvis and have an internal connection to the parking lot. 2. The primary and secondary drain field sites are shown just north of the building near the front of the lot. It will be important that this area be well-protected during the grading of the site, since the majority of the remaining site is to have grading accomplished on it. 3. The parking area and the drive to the proposed building appeared to have curb and gutter around them and appear to be hard-surfaced, although it is not called out what type of material. The material type should be noted along with the type of concrete curb and gutter. The remaining portion of the site, again, is not noted as to the type of surfacing. At this point, we can only assume that it will be some sort of gravel surfacing. There are proposed yard bumpers around the perimeter. The site is graded to drain from east to west into the large ponding area located on the rear of the lot. A major concern would be what will keep the fine gravel material from washing into the ponding area under heavy rainfalls, and essentially plugging the pond bottom, eliminating infiltration? Some means of protecting against the gravel material ending up in the pond needs to be provided on this site. It appears that a portion of the north part of the gravel yard area will actually drain off to the north onto the adjacent property. Some adjustments to the proposed grading plan need to take place to ensure that the drainage will stay on the site and/or follow the drainage and utility easements along the perimeter to the ponding area. Ltr-051004-Leeseberg.doe Mr. Leeseberg May 10, 2004 Page Two 4. There is an existing storm sewer line, which runs along the frontage of the lot and then the north property line into the ponding area. This takes drainage from the lots further to the south. We would suggest that this lot tap into that existing storm sewer, a catch basin be put in the proposed parking area, and the flow be picked up internally from the parking area, rather than allowing to run into the ditch along Jarvis Street. If you have any questions regarding any of these comments, please call. Sincerely, Howard R. Green Company Terry J. Maurer, P.E. TJM:sw Ltr-051004-Leeseberg.doc A I}-1/2" P z "i i 1 ds -, `1= 117.1— gig 1 i3v 112' N 6.. Afl -1 C� . ,�,I I y H \�� DRAINAGE & UTILITY v 1 I Ail EASEMENT - ——\ r.ia N •w 1 t in mN mm Y u; Z a ,__E P m p g p z% ` „, m`y a. T PI y OC x i _-_ (' -i L�TF..1L9L =`]O OG ,�1 `i L� I1 I WI I 1111 I I a H 1 Il x I � II 1 i� I I (� � x 1 O2 .. A A A A A 1 (II Y fx O O 0 O 0 0 u U 1 9 O L Y" m mi O m 1n 1 1 1111121 C L x\ �'p 0 0 o O O O 11; al` i9oRa tp n .1 1 I ..ar,LA c s Y'° n Ill•9� i�d ? n ::: °z z 1 I 1- �.Yy'Y X v ° m 1 1 i "3 y_' r m y I 0 III VT e9�Noab m ; I I 1111 x aR aP y m I I�I 3 1111 d x A 1 1 f6 ' r. p l m I �� eO m I m + �1 I c ; / �I � ; _ m [All /UP_ AAe a II it 1 R f„_m � � IV x urea• m ° g�I nnx m x d m QL#1_ — --1 I ay =o Y F j1, (8ax o u o x ri x .N�u, C°l NO =1Z 1- Z nmoz z n-0 j ._ t=il o �'r ° 1n ° xvlyci p rov so r�.v4y rO UAO C OC ° m I N R' L Y —J �a uvmq in m aLa 117 CC-1° E174r Inm NNUm ]I 'JO.00� I b1 4y C Y m (/I YO pA n oYnon O v a .O LF 15`pA' a a ONm= 'R �x S -I 23,- I o m X x O TN APRONS u -Hpi kF-13=C .� j;.—_J• iy °2 l ° A m N; ° C m m O c. -- -- / _� µM1111 APRONS u \ • Y m n V r _ F . j -Y N O M m p Z _ _ _ --BITUMINOUS N0115 a vim _ o c.mC ” " ; PI JARVIS STREET SURIA�E;�-- c r EET N.W. r m D jF, -I Z o -I y ° {i4 i5 > U n °L VI VI I� _ Nn § Z O [a'1 N O z "a 6o c Zx 2 o z. a ti Z AC F r Y it g^ c n G o 2 o 1; m -O v 451 a 3 Z s 3 N. 1 (J r 1- In Lori i Iri. .;.m Y✓Y.. 1 es PL mm sa n m yy yy °vv "xmc'F'"ry Apo o Qg ^D $ay r 0 0 $ 9 0 $ a $ 9v$� $��'r�'I nn$ a v ��ni sm i�b' Yu'zi 5 a �m `i .'a � am ea oso"asa € g � ssm= u a Pi @F � 8 s " �i� tea» � ���, � �> 2n"") ,(.11,= Q1 `\ \ yn o i� n L �•v �m �n0 , Y'l T \ \ !!!��I m� Qq m M � n � m � i �' n P. \ \ �O H C o _ v p F �L m= C ` N o � m }r w o m 'o R� 1 I I I YI/ fNy - -- a � __ IIIr =-ee - II I//in//i, /i -_ cL9 - — _ N- - I I I�i,lil �(— —_—_ -._ _ _.. - Ili'1/ � l� r r _ s 11/,//,�( 1111 I sI//1(Iill ' ' lllli�l i I N - I'1 1 11 1 I _DRAINAGE & UTILITY 111111'\11 \11111 I EASEMENT - -- - \ II 1 '\1 11II11111i111II111,i'` — 1111111111111`I It p i° l+ ‘\ %\ 883— \\\ — I � 1 -- I S��—fir .�r-8e' — _ 1 � I f1,! � l- \ x� y6 CO 1 n f I I U IA 1 11 � \ � I i � Di e� '�' 1Ne I I I I I H 749 i `(II i I I I I / QII L :LI no ,...,,,,..„, „ TittliSfeliiii;MI 7' 71 i is is osa“)I 1 / 1 ms µ. L. �y f i C _ �� u ice . \ q 9�9g- - I \ °% r E t 12 20 cl, 93^•e iu 1 Q I i I. \ ` $ [l I �l as El 1 r I I I I V. �1m I I I I I 1 I 1 u' N , 1 m11 m ' E fit 1 r m 'r — x n. _ mar'r f�, 1 N n�m�mv \ _ y ' , m <mao m _.l 5O�' 11 DI_ c$ 0o IIO A a ...._' f¢ . m / , e I N I U A II m S Iu I aO 0 =o jO N I / o ry ! ■m b • I I A - ti Z _ z T a 1al I I I\' .ot v o v n �o Lam/ aaeo Cam! `. 7i� s eN � r' r a oN FEZ Z -- ._. 88 ._�TM p�4orvs J 0 * _ D o G m o JARVI —BITUMINOUS o cr S STREET n 1A/SURgCC \` s YV oAD Z A X �p en n z O O a 3 r�, F °T �Om z z m Z T Z Z �C� i D n 5 W R fU ItiATE-RECUT. J P A 1 ?D 5.) p/m gg AaF , 2 • - fpm. o zyg' o In _ Iv i oU l�f��.. :IS ` . vpA s �» m p I0 0 - -• § a0; I! N i o f c 1 i 1 s r Ai•14% . In ' $ N _DRAINAGE & UTILITY u u yp EASE MEN - - N. 6 f.1 u muA'L;un.h.; al ��`a 0 0 0 lr 1I • � x N. 0 fy 12 NM ka 1 il; I % 1 x 11 i 1 i jnl 01111;II ,x v. 1 1n I [11* IIi [ I id ill I I) �o ii FLig A�p >) U a H yIFUD tr III DI illi tig4—9 I� x �� III K *rr II I X11 () m D 3 n u x I �I _ ID qua VIII II 11:II I ,9 U 0 I� I I A i4,a I V. 3 r In n 3 r I 11 DO r: z t7 1 I� _— A- O S r I! z m D O q o C m m al AO ji n Ut z I :ill'? daa IIl z O x 1 • I /- i , 1' , t Hy rl I / T o m W L .°o % a n f°, p �' u N tly' fA' Qixo cA -.Or- I y9B I` k! 9 r0 _S" I z u 11 1=ca °o oa o > b J m O 0 a3 u Iz/1 Y �� A$I Ip�^� ZZU IidfM es gg J x On at3 m IIII 11'.4 1- QI1 `p z nnx 8 . . � gp I I L.- O d tl_y �° L _ 60 lai I L ^£ III m n- 0 n tlp -O J _-IJI H Cl I II - _ o hi11�`f ro 1 - N N O i1 0 11 — __ _J �? �u Az 2 S m 0 lF_I S' CM ° a A L (- 3 !N APRONS tl° -y - J' y a N £ Z _ -- __ \ -- -m APRONS R c./__ m m o 0 — _ -- _ _ — L -- -Q- m (A D - -- - _ -BITUMINOUS �� m J u Z SURFACE LS N A m JARVIS STREET N.W. o A p O u N Z A I I I n c• \ m z nU d A o R, R m o T Q D W Si W III • reptewe WI 6:11: ,�it!� - 10.01111 a MA ra -N ,, L ril @MVO 1.5111, — -1,epi a e a sip. 't3 ! �, . 1:1;01 Vie" or t't,, 1.1 -ri� J • n- u 4 m i'stark r m u,:lwn�,l > D lz 1 w .. -I `t dd O - i j Z O t -a lr dmiliPlitabl 1 D t r � n r . i I m l W t leritiostr o) �1; R 4 0) 9,•flat! in 1 ratilal DESIGNED BY PROJECT: POWELUPETERSON DAROLD DAUDT CONSTRUCTION DAROLD DAUDT TRUCKING COMPANY GENERAL CONTRACTORS - LIC. 8905 CONSTRUCTION LONGVILLE, MINNESOTA N) LOCATION: ELK RIVER, MINNESOTA 218-363-3085 FAX 218-363-2289 DATE; 04/21/04 c/- 240 —<o q a 5 — rr G) - _ m — --- H - run --_-- m r r m - _ _ - m G - _ _____ ------- - D ___ H O Z D D _ r - r m __ m II ---- II C, _. I ___ _ _____ ___._ I - -... __ —__—__- ._ ___ s_ _ _ . DESIGNED BY: PROJECT: POWELL/PETERSON • DAROLD DAUDT CONSTRUCTION DAROLD DAUDT TRUCKING COMPANY GENERAL CONTRACTORS - LIC. 8905 CONSTRUCTION LONGVILLE, MINNESOTA (13 LOCATION: ELK RIVER, MINNESOTA 218-363-3085 FAX218-363-2289 DATE; 04/21/04