Loading...
6.1. PRSR 09-11-2013City of Elk Ri. ver Request for Action To Item Number Parks and Recreation Commission 6.1 Agenda Section rsleptember eeting Date Prepared by Discussion Items 11, 2013 Chris Leeseberg, Park Planner - Planner Item Description Reviewed by Discussion of the Baldwin Park Playground Michael Hecker, Parks and Recreation Director $48,200 Reviewed by Action Requested No action is being requested. Staff will present estimated costs of a various park components. Background /Discussion At the August 14, 2013 Parks and Recreation Commission meeting, a resident representing several of the area apartments shared his concern over the removal of the playground and the squeaky swings at Baldwin Park. The resident presented a plan they would like to see implemented at the park. There are six apartment buildings in the area and the children miss the park and would like to see the space made into a useable space again, not an empty lot. Financial Impact Below are estimates to show what the costs would be to provide the items the resident's desire. To include all items on the plan presented, the estimated costs would be $47,900 - $55,700 depending on what playground equipment is utilized. This estimate does not include contingency, administration, engineering, seeding etc. Basics Gazebo $15,000 Picnic Area x4 $ 4,000 Swings $ 2,700 Concrete Curb $ 4,500 $26,200 Ootions w /basics w /basics &trail Playground A +chips $12,200 $38,400 $ 47,900 Playground B +chips $19,300 $45,500 $ 55,000 Palyground C +chips $50,000 $76,200 $ 85,700 1/2 Basketball Ct $22,000 $48,200 $ 57,700 Sand (V -ball) $20,000 $46,200 1 $ 55,700 10 -Trail 1 $ 9,500 rvATUR The volleyball court estimate includes excavation, drain tile, 9" pea gravel base for proper drainage, two feet of sand, volleyball posts and net, boundary material to separate the sand and grass, boundary lines, and concrete. The city has not constructed a proper volleyball court and this is the desired method to insure the courts longevity. Attachments • Aerial of Area • Residents Submitted Plan • Residents Plan Estimates Diagram • Playground A Design/Estimate • Playground B Design/Estimate • Playground C Design/Estimate • Shelter Designs /Estimates • Fish Township Design/Costs N. \Departments \Parks and Recreation \Commission \Packets \2013 \09 -11 -13 PRC Packet \6.1 Baldwin Parkdocx _, J El r i ¢io O o% Qg.9 +.a e3° O O Sl u• o +-D �9 ■I r 1 l,. N 4 0 V o Z V w ME - -.- - -.- - - - - -.- - -.- - .- - -. -.- I I I I I I I I I I GAZEBO AREA $15.000 ® I I ® I 1 } BASKETBALL 1 $22,000 or or SAND(V -BALL) 1 $20,000 1 or 1 I 1 I I I SMALL PLAYGROUND 1 Option A$9,400 SWINGS Option B $16,500 I $2.700 Option C $50,000 + WOODCHIPS $2,800 I CONCRETE CURB $4.500 325' Of TRAIL .$9.500 I I I I I I I I I I I I L J BALDWIN PARK 9.11 9.1 1.2013 � D El .�. RESIDENTS PLAN ESTIMATES cML 1 7� ' " Ver 371 BALDWIN AVE NOT NOT TO SCALE rl N b0 $4 x o a o' d a c 0 rna a3 Y vv mm me is ad sN� O N b�0 d -C V Q -C N °O o O cd O N V N � b4 b4 N b0 $4 x o a o' d a c 0 rna a3 Y vv mm me is ad sN� O N b�0 C �V L N C cd cd V U � s C O O O O O O O .,._._. Off' O ct Ln (/M�� s L.L V O O O O O �L\1(/1) ct (/M�� Shelter #I --A- -- Shelter #2