Loading...
8.2. SR 10-07-2013 City of Elk=' Request for Action River To Item Number Mayor and City Council 8.2 Agenda Section Meeting Date Prepared by General Business October 7, 2013 Zack Carlton,Planning Intern Item Description Reviewed by Twin Lakes Road Beautification Project Jeremy Barnhart,Deputy Director, CODD Reviewed by Cal Portner, City Administrator Action Requested Approve by motion the proposed landscape plans for Twin Lakes Road and authorize the advertisement for bids. Background/Discussion One of the goals identified in the 2013-2014 visioning process was city beautification. Have attractive, welcoming streetscapes at city entrances and primary corridors. Under this goal three capital improvement tasks were identified: Cl:Prepare plans to improve primary intersections avitb landscaping ligbting, and bardscaping. C4: Complete improvements to primary intersections. CS:Implement median and streetscape design and maintenance standards. The City Council reviewed plans to improve Jackson Avenue and Highway 10 earlier this year, directing staff to pursue MnDOT grant opportunities for construction in 2014. The 2013 budget included $80,000 for goal C5. The project includes planting 81 trees in the medians along Twin Lakes Road between 171" Avenue and 181"Avenue (CSAH 12). A second phase is to include the portion of Twin Lakes Road north of County State Aid Highway 12, some of which is managed by Sherburne County. Landscape Plan The landscape plan utilizes the plant pallet and spacing guidelines established during the Orono Parkway median planting project. Existing turf grass will remain, and mulch rings will be placed around each tree. Irrigation Irrigation lines and heads are in place throughout the Twin Lakes Road medians. However,the meters and controllers were removed a few years back and will need to be re-installed. Preliminary Estimate Staff contacted five landscape contractors and received two estimates of$29,975 and $36,963. This does not include the costs to complete the irrigation system. Maintenance Estimate Maintenance costs, as estimated by the Parks Department, include: ■ $6,900 for irrigation P a w E A E U s r NaA f RE] ■ $1,100 for tree care ■ $4,300 for mowing and weed whipping ■ $1,000 for weed control ■ $1,600 for fuel ■ $15,864 for water costs (4 million gallons annually, 666,670 gallons per month) Financial Impact Less than the 80,000 budgeted. Attachments • Landscape plans • CIP section • Parks Department maintenance estimate email, dated October 3, 2013 N:APubhc Bodies\Agenda Packets\10-07-2013\x8 2 sr Beaut Ptoj.docx r-.r Shut 181st Ave(CSAH 12) TH 169 f r F •� Twin Lakes ! 6 -'. C N ` I \ . 3 - r H 10 IShed w " �' . f list-Ave NW NORTH 0' 250' 500' 1000: F. Sh remit J AT SHEET Twin Lakes Road Landscaping DOWO BY ZO1 3 `K'°` Median Plantings Zoc E 1 River Sheet Location NTS Plant List Symbol Common Name Size RM Northwoods Red Maple 2" HB Hackberry 2" so swamp White oak 2" EM Emerald Lustre Maple 2" • ' SC Spring Snow Crabapple 1.5" JL Japanese Tree Lilac 1.5" PC Pinkspires Crabapple 1.5" SL 9 0 ., 3 P � L or . i c 1 ++ • � I � k r r ` PC o.N106 EM _ i • ' • w U •A NORTH 0' 50' 100' 200' 179th St NW Twin Lakes Road Landscaping o SHEET RAWN B�2o,3 E"'° Median Plantings ZDC 2 SCALE: River 1 ao Iloilo --Millis db ml r • 0♦� f l �b a Plant List Symbol Common Name Size RM Nord woods Red Maple 2" BB Haeldm y 2" SO Swamp White Oak 2" EM Emerald Lustre Maple 2" +s SC Spring Snow Crabapple 1.5" JL Japanese Tree Lilac 1.5" e PC Pinkspires Crabapple 1.5" y e Tyler St 175th Ave NW � r R 0 v * SO J } n iR � ., f 6 A r i'• or ■ k o i n f O NORTH SO' 100' 21000' P Twin Lakes Road Landscaping o SHEET RAWN B�2o,3 E"'° Median Plantings ZDC 4 SCALE: River 1 ao r � FYI Plant List �• Symbol Common Name Size RM Nmlhwoods Red Maple 2" +� �o ]FIB Hackberry 2" SO Swamp White Oak 2" EM Emerald Lustre Maple 2" SC Spring Snow Crabapple 1.5" JL Japanese Tree Lilac 1.5" PC Pinkspires Crabapple 1.5" i 4p, F 79:6„ 9y. QO W 3 HB ss ' vo r 4 F 3 o_ i 172nd Ave NW 3 � 4� r M t r�r NORTH 0' 50' 100' 200' ' I Twin Lakes Road Landscaping o SHEET RAWN B�2o�3 E"'° Median Plantings ZDC 5 SCALE: River 1 _,ao Planting List Common Name Scientific Name Size Quantity Red Maple Acer rubrum 2.5" 12 Hackberry Celtis occidentalis 2.5" 12 Swamp White Oak Quercus bicolor 2.5" 12 Emerald Lustre Maple Acer platanoides Il Emerald Lustre" 2.5" 12 Spring Snow Crabapple Malus"Spring Snow" 1.5" 12 Japanese Tree Lilac Syringa reticulata 1.5" 12 Pinkspire Crabapple Malus"Pinkspire" 1.5" 9 1 2 3 4 5 6 7 8 9 1=1 I I— 1=1 11=1 III—III— 11=1 I 1—I III=1 11=1 I I— 11—I I —I 11=1 I—III—III— 11=I I I—I I I—I III=1 11=1 11=1 11=1 I = _ — I =1 11=1 11=1 11=1 11=1 1. Hole width equal to 2 to 3 times the 5. First scaffold root at or slightly blow width of motba%at the surface the sob surface 2. Emmng soil surface(dashed line) 6. 2"-3"layer of mulch kept away from trunk 3. Bac 611ed native soul 7. Cut away upper half of the wire basket 4. Hole depth equals base of mot 9are 8. Undisturbed soul to bottom of mot ball 9. New root growth Tree Planting Detail Notes: • Trees to be located in the center of the median • Each tree will be warrantied for one year from the date of planting Twin Lakes Road Landsc. ��io,i�o,3 SHEET DRAWN BY: r Ckf El Median Plantings ZDC hV SCALE: River Project information NTS Capital Improvement Flan 2013 mru 2017 City of Elk River, Nfinnesota Project# 11-35 Project Name Boulevard improvements Type Improvement Department Infrastructure Improvements Useful Life 15 years Contact Planning Manager Category Landscaping/Boulevards Priority n/a i i G Description To achieve beautification goal for boulevard improvements Justification Several improvements to existing boulevards are planned; Twin Lakes Road(north of 171 st) 193rd(west of County Road 13,east of Xavier) Expenditures 2013 2014 2015 2016 2017 Total i Construction/Maintenance 80,000 100,000 80,000 260,000 Total 80,000 100,000 80,000 260,000 i Funding Sources 2013 2014 2015 2016 2017 Total Street Improvement Reserve 80,000 100,000 80,000 260,000 Total 80,000 100,000 80,000 260,000 i i I 2013-2017 CAPITAL IMPROVEMENT PLAN Page 23 Miller, Jessica From: Schreifels, Rodney Sent: Thursday, October 03, 2013 5:03 PM To: Carlton, Zachary Cc: Hecker, Michael Subject: RE: Twin Lakes Road Median plantings Zack, The vegetation is not much turf and is mostly weeds. The best way to accomplish good turf would be to spray round up to kill the weeds and then plant good turf seed along with properly working irrigation. Here are my estimates of annual cost for the proposed landscape plan: Irrigation to include labor and materials and winterization $6,900.00 Tree care to include labor and materials $1,100.00 Mowing and weed whipping to include labor and materials $4,300.00 Weed control spraying to include labor and chemicals $1,000.00 Approximate fuel cost$1,600.00 Water cost$? It will be approximately 4 million gals. of water to irrigate the medians annually. Can you check with Elk River Utilities to find out what the cost would be? Thanks, Rodney Schreifels I Parks Maint.Supervisor 763.635.1123 w 1763.238.0987 c 1763.635.1155 f 19000 Proctor Road Elk River I MN 155330 I R I R E N E 1 1 T Iiver INATUPEI From: Carlton, Zachary Sent: Wednesday, October 02, 2013 3:13 PM To: Schreifels, Rodney Subject: Twin Lakes Road Median plantings Rodney, What additional maintenance costs and time obligations do you anticipate once the Twin Lakes Median trees are planted. (See attached landscape plans) The project will include approximately 80 trees with mulch rings, and anticipate that the irrigation will be operational for watering purposes.Tree plantings will be completed by a contractor and the turf grass is already in place. Thank you for your help. Zack Carlton I Planning Intern 763.635.1035 w 1763.635.1090 f 1