10.2. SR 10-07-2013 City of Elk=' Request for Action River To Item Number Mayor and City Council 10.2 Agenda Section Meeting Date Prepared by Worksession October 7, 2013 Tim Simon, Finance Director Item Description Reviewed by 2014 Capital Improvement Plan Cal Portner, City Administrator Reviewed by Action Requested Continue 2014-2018 Capital Improvement Plan (CIP) discussion. Background/Discussion On August 12, 2013,we reviewed the 2014-2018 equipment purchase requests with the Fleet Committee. City Engineer Justin Femrite will present the infrastructure improvement funds and Information Technology Manager Bob Pearson will present the technology needs for the next five years. Pavement Management Fund The fund was created in 2013 to provide long-term funding for our pavement management program. The franchise fee collected is the primary revenue source outside of the state-aid portions of the related construction projects. We have just started collecting the franchise fee and the revenue estimates will be updated upon a few months of collections. The city engineer will review the 2015 &2017 projects. Municipal State Aid The city engineer will review the future Municipal State Aid (MSA) allocations and estimates and how they are tied into the Pavement Management Fund. These funds will fund a portion of future street projects in 2015 and 2017. The maintenance (sealcoat) portion goes into the Pavement Management Fund to offset the cost of the sealcoating expenditure for street maintenance. Trunk Utilities Fund The city maintains a Trunk Utilities Fund made up of special assessment revenue from water and sewer improvement projects. The funds are to be used on certain trunk water and sewer expansion / improvement projects. The funds may be used only for trunk connections and improvements in the area for which the assessments were collected,unless there is no further need in the existing area, then they can be used in another area. These funds would be used in lieu of having to issue bonds on future expansions of the systems and waiting for future revenues to repay the bonds. As part of the sewer expansion plan,we anticipated using a portion to fund the sewer expansion which is a result of increased capacity. P a w E A E U a r NaA f RE] 2014 projects include: Zone Estimated Cost Project Description Northeast $300,000 Well #7 Filter New water main connecting the Well #7 Filter plant to water main at Co. Rd. 12. Northwest $40,000 Mining Study Master Planning Study Street Improvement Reserve Fund This fund covers transportation improvements outside of the Pavement Management Fund,including boulevard and median enhancements. Special assessment repayments and bonding are the main funding sources in the fund which will end shortly as we no longer assess for street improvements. Technology Replacements Technology replacements/software replacements for the most part are funded out of the IT operating budget and the Capital Outlay Reserve Fund. One item to be reviewed over the next year is the phone system replacement. It is currently listed in 2015 and was moved back from 2014. Next meeting: Review of the following CIP funds will occur on November 4. • Government Building Fund • GRE Reserve Fund • Development Fund (City) • Capital Outlay Reserve Fund • Park Dedication Fund • Park Improvement Fund Financial Impact N/A Attachments ■ 2014-2018 Capital Improvement Plan Worksheets N:\Public Bodies\Agenda Packets\10-07-2013\Final\x10.2 sr CIP.docx Capital Improvement flan 2014 rhru 201 Department Infrastructure Improvements City of Elk River, Minnesota Contact Engineer Type Improvement Project# PM-01 Useful Life 25 years Project Name Pavement Management Program Category Street&Utility Construction Priority n/a Description Replace,overlay or rehabilitate aged and deteriorated streets,water mains,sewer mains,storm drainage,and pedestrian pathways. Projects will be completed every other year. Justification Individual street pavement conditions will dictate what pavement management technique will be utilized to extend the life of that specific street segment. These techniques may range fi'om a full reconstruction of the surface and aggregate base to simply overlaying the existing pavement. As they are implemented,the prescribed techniques will continually be gauged to assure their performance is proper in extending the life of our pavements. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 4,000,000 4,330,000 8,330,000 Total 4,000,000 4,330,000 8,330,000 Funding Sources 2014 2015 2016 2017 2018 Total Municipal State Aid 2,500,000 1,000,000 3,500,000 Pavement Management Fund 1,350,000 3,180,000 4,530,000 Storm Sewer 150,000 150,000 300,000 Total 4,000,000 4,330,000 8,330,000 2014-2018 CAPITAL IMPROVEAIENTPLAN ,I�I .I�IJ�IJ �IJJ�I�_I ��I �IJ.Ie ��I�zI�JJ,I,I.I .I��I �I �J�� � _I � J31J.I�I �I��.I .IJ���I .IaI �I�IPIaIJ��l�l_I�JaIJ.I Jel.l�l_I n , 7"L s j tj i-may � I 0 .fir lr�J �U •.:, ,_:• I , �c �I � _ �/,9�°, -.�'` .� / Jkl TO NIA s ® � - = m U i IS, RECONSTRUCTION � OVERLAY WITH EDGE MILL pr FULL DEPTH RECLAIM WITH CURB PATCHING 10 \ WEAR COURSE PAVING ON UNFINISHED DEVELOPMENT STREETS River a� R °" 2015 2012 T 8.2.2°,E ElDRAWN BY City STREET IMPROVEMENTS cML R7� w1 SCALE: iver NOT TO SCALE ,I�I .I�IJ�IJ �IJJ�I�_I ��I �IJ.Ie ��I�zI�JJ,I,I.I .I��I �I �J�� � _I � J31J.I�I �I��.I .IJ���I .IaI �I�IPIaIJ��l�l_I�JaIJ.I Jel.l�l_I n , s 0 Lino ` ice Lill IUI A uCir- ._0 Ira kl �I =1 'I 41 °I °I 'i° I "I �I'I�°I°I °I�I�I'I 1 dl=I�I`I sl�I�I`I 1°I`I � °I al �I sl gl�I�I °I �I xl •� �1�� c..�� �� RECONSTRUCTION � OVERLAY WITH EDGE MILL pr FULL DEPTH RECLAIM WITH CURB PATCHING 10 WEAR COURSE PAVING ON UNFINISHED DEVELOPMENT STREETS . River x ... m R DATE: 2017 2012 � 8.2.2°,E ElDRAWN BY city STREET IMPROVEMENTS cML R7� w1 SCALE: iver NOT TO SCALE Capital Improvement Plan 2014 thM 201 Department Infrastructure Improvements City of Elk Diver, Minnesota Contact Street Supt. Type Improvement Project# SC-03 Useful Life 7 years Project Name Annual Sealeoat Program Category Street Maintenance Priority n/a Description Sealcoat city streets and parking lots as identified by Street Superintendent. Justification Method of maintaining the surface condition of the city public facilities and streets Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 379,650 365,199 394,382 396,268 392,156 1,927,655 Total 379,650 365,199 394,382 396,268 392,156 1,927,655 i I Funding Sources 2014 2015 2016 2017 2018 Total Government Buildings Reserve 15,000 15,000 15,000 15,000 15,000 75,000 Municipal State Aid 291,721 297,555 303,506 309,576 315,768 1,518,126 Pavement Management Fund 72,929 52,644 75,876 71,692 61,388 334,529 Total 379,650 365,199 394,382 396,268 392,156 1,927,655 i 2014-2015 CAPITAL IMPROVEMENTPLAN " i O 0 Cl) O O 0 - O V 00 O N O N N (n O 11- 0 ' O ' 00 O 0 0 O C? O M N O (n O M (h 00 t•* C E M M cc M d- n 000 N r r (N V d LU 0 0) 00 0 - (D 00 LO LCOO Cl) N O ti r ' I ' ' V• , r r M O vi.. 00 m o E Cl) M (O M co Cl) V) w W CD co m o �r 0 co 00 It Vs 10 O (n h• O M O (O (O Cl) C, I- N O f� Lr O M O N N 0 C :Ot- - r N O V• 0 O d• O (O (fl r� to - LO (O O LO I- M 0) N Lo C*O -E Cl) M r c0 M M f- c0 t°af co N y r r N d' d' r !3 r.* LLJ i O O (° (O N N V O V7 co Q CD O 000 L0O i i i i M I � � C ,y N E M M M 0(0 M M N r LU 43- O rn LO O IZr 0 m rn u> w ,r r; a) O 0 O N O C r 0 L O 0) f- O f-- O LO LO � t- O (O N M LO N O (0 co M T+ co N M N M O M M m ui r (N d• �r d• y r t4! O O 0 0 r iS3: C LQ i i i i N i O O N 0) OA (N to t- , N y M r N CEO M (n7 N LLI r r r ro * ro T O O O N N (n N ' Cl (M ' LP m 10 r E LO O O Cl) W 0 LO i O r O O N h N n O N o) (0 O Cl) O M M r- w . , W (6 M M !' N r r L N U N O N � ro N � Z •o U (D U) (� Q N = c c c d Q- : ro o a °-� a c c ayi y a) a W ayi .0 as a� E •� � � � O ippu m CL y 0) � N y N Q C d = ° X ('6 (6 7 m c ro LL' w 'a ._ (6 Ill # O c s LL �a � � ti� (n (n (n LU c Q- LL c y y U ® h is C ro d .c .0 d ro w- O K U O a) m fa- 15 11 II 0 M N M O 00 LL (T - 00 00 0 O N co N N .- �. '- �Y N O o0 co LL M O ' O co 0 LO N N N 00 N C Cl) '- r EFT 69, 0 (D SO -,- O 0 o l-- CV: I- (0 00 O d7 [C7: N 0 N 00 (N 0 v d• (n O o O M d' M (SO N p N N OM co N r 64 6q O CJ LL Cl ' ' c � u ( r LO OMO (A O 0 ' N r N O L r to N m N r r N ttb (fl v 6q D �, 0 M O P/$ LL N 0 0 h o 'd• 00 (0 r M O (D (T 00' N N r, r C14 LO a� (h r 00 O C&'. L_& M M M CO N O O O M r N (n I-- C N .= On CN ti 00 Cl M N -4- 00 O N N 47 r to fR > 6Ft LLI 06 N W C � C C ro N N j a a N w Q C N O > -0 N k tt1 p t CL N N Q.0) 0) 00 O C .E 0 � Y 0 U) m o ro ro M m 5 •C Q •*- N E O O C = C ( C J C a mZ U) (L � W !� Capital Improvement flan 2014 thru 201 Department Infiashuchue linprovements City of Ells Diver, Minnesota Contact Engineer Type hifi•astiucture Project# II-3S Useful Life 20 years Project Name Well#7 Filter Category Street&Utility Constriction Priority n/a Description Add new water main connecting the well#7 filter plant to water main at Co.Rd. 12. Justification This project will direct water to the south including Nature's Edge Business Parlc increasing system capacity. �I i I i Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 300,000 300,000 Total 300,000 300,000 Funding Sources 2014 2015 2016 2017 2015 Total Trunk Utility Fund 300,000 300,000 Total 300,000 300,000 I i 2014-2018 CAPITAL IMPROVEMENTPLAN I ElkRiver Municipal Utilities ®= 763.441.2020 13069 Orono Parkway®P.O. Box 430 Fax: 763.441.8099 Elk River,MN 55330-0430 www.elkriverutffi ics.com The City of Elk River October 1, 2013 Attn: Mr. Cal Portner—City Administrator 13065 Orono Parkway Elk River, MN 55330 Subject: Request for Approval of Trunk Utility Funding for the Well #7 Water fain Improvements Project. Mr. Portner, Elk River Municipal Utilities requests the Council to approve funding for the Well #7 water main improvements project for an estimated amount of$300,000.00 from the Trunk Utility Fund. The Well #7 water main improvements project will add over 2,700 additional feet of water main on the east side of Elk River in the vicinity of Twin Lakes Road and County Road 12. This water main improvement will route the output from the filter plant at Well #7 located on Twin Lakes Road and connect with water main at the intersection of Twin Lakes Road and County Road 12. This project is the second phase of the Well #9 water main improvements project that was completed in 2012 and was funded from the City's j Trunk Utility Fund. This addition will improve water capacity to the southeastern area of Elk River, specifically the Natures Edge Business bark. The water main additions of this project are in accordance with the City's Trunk Utility Fund Policy and this request has been reviewed with the City Engineer and City Financial Director. This project is proposed as part of the 2014 capital budget and will be presented for final approval in December by the Utilities Commission contingent upon City Council approval of the use of trunk funds. i Best Regards: Troy Adams,P.E. General Manager Cc: David Berg—Mater Superintendent Justin Fernrite, P.E. —City Engineer Tim Simon—City Financial Director File ® P Ti E@ E 0 R Y it . ' R)'t Reliable PuUlc Power Provider P 0 w e a e o To Stove Capital Improvement Plan 2014 thru 2018 Department Planning City of Elk River, Minnesota Contact Planning Manager ............. Type Study Project H Plan-01 Useful Life Unassigned Project Name Mining Study Category Street&Utility Construction ................ ............ ------ -------------- ............................... Priority, n/a Description Major Planning Study-Gravel mining area Justification The Comprehensive Plan(2004) identified several areas requiring master plans,including the mining area,and the old town area, It is expected that the revised comprehensive plan(2013)will identify areas requiring further study. The need to do these master plans will be evident as the City experiences development pressure in the area,coupled with a desire to proactively accommodate market goals while promoting a unified vision. It is envisioned that funds will be used to assist the private market in the development of a plan in a cooperative effort, Expenditures 2014 2015 2016 2017 2018 Total Engineering 40,000 40,000 Total 40,000 40,000 Funding Sources 2014 2015 2016 2017 2018 Total City Wide Trunk Utilities 40,000 40,000 Total 40,000 40,000 2014-2018 CAPITAL IMPROVEMENT PLAN i Capital Improvement Flan 2014 thru 2018 Department Infrastructure ILnprovements City of Elk Diver, Minnesota Contact Engineer Type lnfiastruchue Project# 11-39 Useful Life 20 years Project Name Proctor Ave water main _ _ J Category Street&Utility Construction i I Priority n/a Description Add new water main connecting Highland Road to Proctor Ave near the public worlcs building. i Justification Increase system capacity to the north. i i Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 250,000 250,000 Total 250,000 250,000 I Funding Sources 2014 2015 2016 2017 2018 Total i Trunk Utility Fund 250,000 250,000 Total 250,000 250,000 i I I 2014-2018 CAPITAL IMPROVEMENT PLAN Capital Improvement flan 2014 thru 201 Department Infiashucture Iznprovements City of Elk Diver, Minnesota Contact Engineer Type Infrastructure Project# 11-40 Useful Life 20 years Project Name Highland Ave. Water Maint. Category Street&Utility Construction Priority n/a Description New water main during City road reconstruction project for Oxford Street,Norfolk Street, 192nd Ave,Lowell Circle. I I Justification Increase system capacity. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 150,000 150,000 Total 150,000 150,000 Funding Sources 2014 2015 2016 2017 2018 Total Trunk Utility Fund 150,000 150,000 Total 150,000 150,000 2014-2018 CAPITAL IMPROVEMENT PLAN Capital Improvement Plan 2014 thru 201 Department Infiasttucture Improvements City of Elk River, Minnesota Contact Engineer F Type Infrastructure Project# II-41 Useful Life 20 years Project Name Phase 11 Natures Edge Business Paris Category Unassigned Priority n/a Description Implementation of sewer lines for phase II of the Nature's Edge Business Park. Justification No existing sanitary sewer. I Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 500,000 500,000 Total 500,000 500,000 I Funding Sources 2014 2015 2016 2017 2018 Total Trunk Utility Fund 500,000 500,000 Total 500,000 500,000 I i I I 2014-2018 CAPITAL IMPROVEMENT PLAN NW Area Western Area Eastern Area NE Area Interest Sewer Water Sewer Water Sewer Water Sewer Water 2013 Balance 673,438.63 573,438.62 411,173.23 490,996.88 1,943,028.79 310,723.74 141,892.38 141,892.38 171 st Area(Phase 1) - - (131,994.20) (218,845.00) - - 185th Ave Project (185,000.00) Pressure Zone change - (40,000.00) 2013 Estimated Balance $673,438.63 $673,438.62 $411,173.23 $306,996.88 $1,811,034.59 $ 61,878.74 $141,892.38 $141,892.38 2014 Activity Assessment Revenue 5,596.48 5,596.48 - - 62,996.00 62,996,00 44445 5,096.48 5,096.48 - - 44477 500.00 500,00 - - 98243 - - 62,996.00 62,996.00 Well#7 Filter Plant (300,000.00) Transfer from Weste:r;Area (160,000 00) 160,000.00 Mining Study (20,000.00) (20,000.00) Sever Plant Expansion (5460-00-00) (100,0A0`00) (213,{100 W) 2015 Activity Assessment Revenue 500.00 500.00 44477 500.00 500.00 2016 Activity Assessment Revenue 500.00 500.00 44477 500.00 500.00 2017 Activity Assessment Revenue 500.00 500,00 44477 500.00 500.00 Proctor Ave.Watermaln (250,000.00) Highland Ave Water Main (150,000.00) Phase li of Natures Edge (500,000,00)' - 2018 Activity Assessment Revenue 500.00 500.00 44477 500.00 500.00 - - Estimated Balance 15,035.11 161,035.10 311,173.23 145,996.88 1,161,030.59 114,874.74 0.00 1,892.38 Capital Improvement Plan 2014 thru 201 River, Infi•astnictlu•e Improvements City of Elk River, innesota Contact Engineer Project# II-00 Type Infrastructure —— — Useful Life 25 years Project Name Intersection Enhancements Category Street Construction Priority n/a Description Complete enhancements of underperforrning intersections within the City of Elk River. Improvements will be considered on a yearly basis and may include costs for right-of-way acquisition and construction of intersection enhancements. Such enhancements may include the extension or addition of turn lanes,restriping,modifications of medians,or drainage. 2014 Project: Left turn arrows @ Proctor&CSAH 1 Main/Parish Intersection Flashing stop signs@ Highland Road&Proctor Justification These proposed enhancement projects are relatively small in size and cost for the benefit they will provide to the overall transportation system. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 150,000 100,000 250,000 Total 150,000 100,000 250,000 Funding Sources 2014 2015 2016 2017 2018 Total Street Improvement Reserve 150,000 100,000 250,000 Total 150,000 100,000 250,000 2014-2018 CAPITAL IMPROVEMENT PLAN i i Capital Improvement Flan 2014 thru 2018 Department hifiastructure Improvements City of Elk Diver, Minnesota Contact Engineer Type Unassigned Project# II-32 Useful Life 15 years Project Name Eastern Area Trail&Mobility Imp. Category Trail Improvements Priority n/a Description Construct the missing pieces of trail along the east side of Twin Lakes Road from the Northstar commuter rail station to Trott Brook Parkway. Also provide ADA compliant sidewalks and pedestrian ramps along Line Avenue from Main Street to 3rd Street. Justification This trail/sidewalk project will provide safe connectivity of our existing off street trail and sidewalk systems in the area. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 400,000 400,000 Total 400,000 400,000 Funding Sources 2014 2015 2016 2017 2018 Total Federal Grants 320,000 320,000 Street Improvement Reserve 80,000 80,000 Total 400,000 400,000 2014-2018 CAPITAL IMPROVEMENT PLAN Capital Improvement Plan 2014 thru 2018 Department Infrastructure Improvements City of Elk River, Minnesota Contact Planning Manager Type Improvement Project# II-33 Useful Life 15 years Project Name Intersection Improvements Category Landscaping/Boulevards Priority n/a Description hnprove major intersection with landscaping I Justification Beautification of School/169,Jackson/169,Proctor/10,Main/10,and 171SO0 intersections i i I Expenditures 2014 2015 2016 2017 2018 Total i Construction/Maintenance 60,000 30,000 30,000 30,000 150,000 Total 60,000 30,000 30,000 30,000 150,000 i� Funding Sources 2014 2015 2016 2017 2018 Total Street Improvement Reserve 60,000 30,000 30,000 30,000 150,000 Total 60,000 30,000 30,000 30,000 150,000 I I i 2014-2018 CAPITAL IMPROVEMENT PLAN Capital Improvement Flan 2014 thm 201 Department Infiastr•ucriue Improvements City of Ells River, Minnesota Contact Planning Manager Type Improvement Project# 11-34 Type Life 25 years Proiect Name Monument Signs Category Landscaping/Boulevards Priority n/a Description Add entrance monument signs at southbound 169,westbound 10,and northbound 169/101 Justification Beautification goal: add large monument signs at city entrances to satisfy beautification goals. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 40,000 40,000 40,000 120,000 Total 40,000 40,000 40,000 120,000 r Funding Sources 2014 2015 2016 2017 2018 Total Street Improvement Reserve 40,000 40,000 40,000 120,000 Total 40,000 40,000 40,000 120,000 f 2014-2018 CAPITAL IMPROVEMENT PLAN Capital Improvement Plan 2014 airu 2018 Department Infrastructure Improvements City of Elk Diver, Minnesota Contact Planning Manager r Type Improvement Project# II-35 Useful Life 15 years Project Name Boulevard Improvements Category Landscaping/Boulevards Priority n/a Description To achieve beautification goal for boulevard improvements Justification Several improvements to existing boulevards are planned: Twin Lakes Road(north of 171 st) 193rd(west of County Road 13,east of Xavier) Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 100,000 80,000 180,000 Total 100,000 80,000 180,000 Funding Sources 2014 2015 2016 2017 2018 Total Street Improvement Reserve 100,000 80,000 180,000 Total 100,000 80,000 180,000 2014-2018 CAPITAL IMPROVEMENT PLAN P1 70}4 �/o70�� Capital o� nx»^,onm, Infrastructure mpmvomn m City of Elk River, Minnesota cvum,t Engineer � ........... ------------------------------------------- ----------...............---------------- ---------------' 7rp, |mpmvomoo/ |r'oj'*N SL-09 | Useful Life 20 years pnoj,um,m, Signal— Light Painting c^ux^ / a�um Maintenance Priority mh Description Paint signal systems Justification According to MNDOT/City signal agreements it is the responsibility of the City to repaint signal systems as needed. With the age of the remaining signal systems,repainting of 5 will be required in 2013, The last 2 systerns will be scheduled for painting in 2016 or as their condition requires. Expenditures 2014 2015 2016 2017 2018 Total oonmmmion8woimonmncw 12.000 1e.00 Total 12,000 12000 Funding Soomom 2814 2015 2016 2017 2018 Total Street Improvement Reserve 12000 12,000 Total 12,000 Capital Improvement flan 2014 thru 201 Department Infiastructure linprovements City of Elk River, Minnesota Contact Engineer F Type Infiastiucture Project# ST-12 Useful Life 20 years Project Name Signalization of 193rd Avenue&Evans Street Category Street Construction Priority n/a Description Install a signal system including EVP at the intersection of 193rd Avenue and Evans Street.Because of the proximity to TH169,the signal system must be interconnected with the existing highway signal system. Justification The construction of 193rd Avenue(2009)street improvement opens 193rd to CSAH 13 allowing another route to and from TH169. In anticipation of the increased traffic flow the intersection of 193rd Avenue and Evans Street was constructed to accept a signal system. Expenditures 2014 2015 2016 2017 2018 Total Planning/Design 250,000 250,000 Total 250,000 250,000 Funding Sources 2014 2015 2016 2017 2018 Total Municipal State Aid 250,000 250,000 Total 250,000 250,000 i i i 2014-2018 CAPITAL IMPROVEMENTPLAN i Capital Improvement flan 2014 thru 201$ Department Iufiastnicture Unprovements City of Elk liver, Minnesota Contact Engineer Type Infrastructure Project# QZ Useful Life 25 years Project Name Quiet Zones — — Category Street Construction Priority n/a Description Establish a quiet zone at all street crossings along the BNSF rail line. Justification This project will involve the installation of supplemental safety measures and wayside horns to qualify the entire rail corridor through Elk River as a quite zone. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 500,000 500,000 Total 500,000 500,000 Funding Sources 2014 2015 2016 2017 2018 Total Street Improvement Reserve 500,000 500,000 Total 500,000 500,000 2 014-2 018 CAPITAL IMPROVEMENT PLAN M W t � r C07 00 N (D r 00 r r r r 00 r r r r r r r r r hN+ N I a C r W V f`') O O M "e0 M co 0 N Co 0) V• O M ttD E - U (Vf M CD N m 8h�A O _ O 'y N W N E O N r 0 r 0 0 0 r r . r r r r r r r r N (D 00 O 00 N co O O O 00 -C@ O O ' M M N h O O O co 11 VO' CDC r LO M000 d0' M O •N N W h t.(C) M 00 CO x 0 0 0 r r r 0 1 r r r r r r r r M 0.3. 40 00 O 00 co co O O O O O r cc '. ' O W N h 0 0 O 0 'O X00 f(DD N0000 r C) C) cN- M co n N r W N e O O r N N 00 r 00 ' 0 0 0 r r r 0 r r r r r r (0 h U') O (D V 0o O O O O M to 0) �$ W O O (O M (q O O O O O r (6 N h N O N V O O O o O e' Q Eon OM N � 00 (D MO V• C) co O N r r W W O ' r r r 0 0 r r 00 0 0 r 0 r r r r r 0 r r r r r 00 Py. M O 0) M 00 O O Cl o 00 St: N M O O tc LO 0 0 O O W ` (0 CA (D N co 0 0 0 O CD O h. Ecr o mm ou>o v 0 w W N N N r W f\ d. r (D r r r 00 (q M r O W r O 0 r O . r r r r r 0 r 00 m .D CD (D M O co Cl O - O O 00 M. CO N r O M O O C I M N m Q1 - O O O O m O 00 O .�-- O CD N W O n O 0) W co N 0.' Iq M M N N h h h 0) h 000 r r N 0 r r r .� O O r CO LO o 0 r 0) V N Q0 0o N m N VV'� M V•CD O O N O (° (n 'V• 03 NO (flN «)rC V (DN co � rO (n - Lr(U G M lcw hU�l O M W (D O r O Cl) 0) V' m 00 O 4 N m N W d' N V• V 00,E r- h M 'V•Cl) M M .-- (C) h co Co Wit. w O v 0) r ' 00 'd' (q O r r r r N N h r r r r r r o «7 (0 U) a) d' (D M (D N M 'd• LO M W) O N h M W N O (0 'd• M cc O (n (n O N O co d' N rn m (h 0A (Ni (D Cl) O N h O r m V N h W N N N N 7 v-• C 0) E 0) O) N C (6 E c (D y E m c @ CL ° C m c Q O m U. v ° c co p '� C N O lv Q T m Y O S 0) C C y a� n N o o ° E o (� S o E �?t '(o (co ° a a Q m e aciaci v aM � o i @� o � a�i (ri � 0) Y) E N � � ° 2N0W- Enrnn� m � Na) u)mr n � np CL c0i N N ° �° (n U) N � li c c � � a o� c E N o-a-- ° � a c ¢NQa�iNm c c - N ° OEomEc > roa� oW roc ° `—° ) ° = c ca°ia°i > E °• >—°-) ° O � � (nompmpiv _ w 03 R) f0 .Q CA (w W '(0 N U ` ` N 7 D- O (0 'D ° J (n E N N U °U C Jm � oaco a)o m 2 � � 00012)ly) 2 az ! a�ia@i � m LtJ C. ° (ncnO � v� c d W I i __ m U _ (n OF � ZU � cnt�0 co a U. U rn '"' a °' N ® � ° w in D ro U C 2 c o) i a m 5 w (� o a o ro ,' co N h ~ W ~ W i w; LL O O O 00 µ OD 1 0 1 1 1 O O O O N LO � N O o e W O O 00 O O 1 0 0 0 1 1 1 0 t o 0 O N O N N O �- Lo Imo- Ln � K N �s 00 00 O 0 0 1 00 1 1 00 0 0 0 r <L O O O L() LO O LC) n r LO d O LO O O O O O O l•J"1 Y' m O 1 1 � O I O 1 1 1 1 L 1 O Ljj .- O to Ln LL) N �- c O O O O O O O CD m 1 Op 1 1 0 0 1 0 0 0 O O Ln O Ln LC) O O r M .- N ti N LO n E C C C U N a U N � (U O N y Q U + 5 E N p c N p N (n .y (Y N y Z � y O fn Q N ((f C + N V) N s' y Q N 0 W 5, N Z3 N Q w y U 1 Y y N Q _U O �o d .N n y O W G m O doll £ ��I O .N U O L ® Q r /� C L V (Cf L M N y (u M,_. l!J W5 (nzLLN > U (n J h LL (D