ICESR HANDOUT 11-06-2003 p dor STEVENS ENGINEERS November 6, 2003 Mayor and City Council Members City of Elk River 13065 Orono Pkwy Elk River, MN 55330-5600 RE Ice Rink Floor Replacement Project-Bid Results Our File No. 6008 • Dear Mayor and City Council Members: On Thursday,October 30,2003 bids were opened for the Ice Rink Floor Replacement Project- The low bid was$253,097 submitted by Commercial Refrigeration Systems located in Virginia,Minnesota. There was a lot of interest in the project but in the end only two contractors submitted bids on the project. The bid are summarized below along with the engineers estimate. Bidder Base Bid Alternate 1 Alternate 2 Alternate 3 Commercial Refrigeration Systems $253,097.00 $0.00 $45,815.00 $22,660.00 Rochon Corporation $352,385.00 ($14,010.00) $40,298.00 526,521.00 Engineers Estimate $249,500.00 $0.00 $45,000.00 $25,000.00 Alternate Bid 1 - Change project schedule to May 5, 2004 through August 23, 2004 Alternate Bid 2-Demolition of rink floor and perimeter slab Alternate Bid 3-install sub-floor heating system pipe grid The spread between the two bids is not surprising. Commercial Refrigeration Systems specializes in repairing direct refrigeration systems and will do most of the work themselves. Rochon Corporation is inexperienced at constructing ice rink floors and would give most of the work to subcontractors. The low bid compares favorably with the engineers estimate. The engineer's estimate was prepared prior to opening the bids and is based on final plans. We have reviewed the bids and recommend awarding the contract to the low bidder Commercial Refrigeration Systems on the condition that the contractor will execute the contract documents and return them to the City within ten (10)days in conformance with the bidding documents. Since it is still unknown whether the repairs to the existing ice rink floor will be successful, the options for awarding the contract are summarized below. 1656 Livingstone Road • Hudson,WI 54016 715-356-5819•651-436-2075 •800-822-7670 • fax: 715.386-5679 •www.stevensengineers.com 1. if the ice rink floor repairs are not successful by November 10th the options for awarding the contract are as follows: Option 1A: Base Bid- Commercial Refrigeration System $253,097.00 Ice rink floor demolition to Mpls Concrete Saw(Quote reed on 10-13-03) $39,882.75 Add demolition in resurfacer room by Change Order(estimated$1500) $1,500.00 Alternate 3 -Add sub-floor heating grid (if rink will be year round someday) $22,560.00 Additional inspection and administration for two contracts(estimated) $1,200.00 Total $317,139.75 Option 113_ Base Bid-Commercial Refrigeration System $253,087.00 Alternate 2-Add demolition of ice rink floor $45,815.00 • Alternate 3-Add sub-floor heating grid (if rink will be year round someday) $22,660.00 Total $321,572.00 2. If the ice rink floor repairs are successful b by November 10th the options for awarding the contract are as follows: Option 2k Base Bid- Commercial Refrigeration System $253,097.00 Rabid ice rink floor demolition in spring $42,000.00 (7) Alternate 1 - Change in project schedule to 2004 $0.00 Alternate 3-Add sub-floor heating grid (if rink will be year round someday) $22,660.00 Additional engineering-updated demo bidding documents and admin. (est) $1,100.00 Additional inspection and administration for two contracts (estimated) $1.200.00 Total $320,057.00 Option 28: Base Bid- Commercial Refrigeration System $253,097.00 Alternate 1 - Change in project schedule to 2004 $0.00 Alternate 2-Add demolition of ice rink floor $45,815.00 Alternate 3-Add sub-floor heating grid (if rink will be year round someday) 522.660.00 Total $321,572.00 For options 1A and 2A additional inspection and administration will be required because the demolition contract Is separate from the Base Bid contract If you have any questions after reviewing this letter please feel free to call us at 551.438,2075, Yours very truly, STEVENS ENGINEERS, NC. 1 )r , _ Scott A. Ward, P.E. Enclosure Honorable Mayor and City Council November 8, 2003 Page 2 r star STEVENS ENGINEERS November 6,2003 Mayor and City Council Members City of Elk River 13065 Orono Pkwy Elk River, MN 55330-5600 RE: Ice Rink Dasher Board Replacement Project-Bid Results Our File No.6008 Dear Mayor and City Council Members: On Thursday,-October 30, 2003 bids were opened for the Ice Rink Dasher Board Replacement Project, The low bid was $81,884.00 submitted by Commercial Refrigeration Systems located in Virginia, Minnesota. The bid are summarized below along with the engineer's estimate. Bidder Base Bid Alternate 1 Commercial Refrigeration Systems $81,884.00 $3,900.00 Athletics $109,340.00 ($4,685.00) Engineer's Estimate • $102,500.00 $0.00 Alternate Bid 1 -Change project schedule to May 5, 2004 through August 23, 2004 The spread between the two bids is not unusual in the dasher board industry. Both contractors were interviewed after the bid opening to discuss their bids. Factors that gave Commercial Refrigeration Systems the advantage over Athletica included the reuse of the existing gate sections,no travel expense, and their ability to build the steel frames for the player's box more efficiently. Commercial Refrigeration Systems is using Becker Arena Products as their subcontractor. Becker Arena Products is well respected in the dasher board industry. The low bid is substantially lower than the engineers estimate for some of the reason discussed above. The engineer's estimate was prepared.prior to opening the bids and is based on final plans. We have reviewed the bids and recommend awarding the contract to the low bidder Commercial Refrigeration Systems on the condition that the contrectorwill execute the contract documents and return them to the City within ten(10) days in conformance with the bidding documents. 1656 Livingstone Road •Hudson, WI 54016 715-386-5619 • 651-436-2075• 800-622-7670 •fax: 715-386.5879 •www.stevensengineera.com Wife ice rink floor repairs are successful, then the project will be constructed next year and both the base bid and Alternate I should be awarded. If the ice rink floor repairs are not successful, then the project will be constructed this year and only the base bid should be awarded. If you have any questions after reviewing this letter please feel free to call us at 651.4362075. Yours very truly, STEVENS ENGINEERS, INC. Scott A. ard,Ward, C: Rich Czech-City of Elk River Honorable Mayor and City Council November 6, 2003 Page 2