4.5. SR 09-21-1998"ity of
iver
Item# t~.5.
MEMORANDUM
TO:
FROM:
DATE:
Mayor and City Council
Scott Harlicker, Planning Assista~{
September 21, 1998
SUBJECT: Update on Northstar Corridor
Project
At the September 3rd meeting of the Northstar Corridor Development
Authority, one of the main agenda items discussed was the public
involvement activity of the Major Investment Study (MIS). A series of three
public workshops are scheduled for mid October. One wokshop will be held in
St. Cloud, one in Fridley and one at the Sherburne County Government
Center. The workshops will be held in the evenings, probably from 6 pm to 9
pm. Each workshop will follow the same format. A 15 minute presentation is
scheduled for 6:15, 7:15 and 8:15. Information booths will be set up; each
booth will have information on a specific aspect of the Northstar Corridor.
Notices will be published in the local papers and media releases will also go
out to area radio and television stations as well as area newspapers. A short
video will be available to show on local cable networks. I will find out the
exact date of the Sherburne County Government Center meeting at the next
meeting of the Authority, which will be on Thursday October 1st.
The Commuter Rail Feasibility Study was also discussed. One item that will
be of special interest to Elk River is the need for a central maintenance
facility. The study has identified the need for a central maintenance facility
located midway along the corridor. Elk River has been tentatively identified
as a possible location. The facility would be located to the west of the Elk
River station, would require about 20 acres immediately adjacent to the
BNSF mainline and as close as possible to the station. Highway access will
also be needed. Given these parameters, it will be difficult to find a suitable
site in Elk River. A possible alternative may be a site in eastern Big Lake
Township. Additional information on this item is included in the packet.
A preliminary service plan was also presented. A copy of the service plan has
been attached. Included in that plan were preliminary timetables that BNSF
will use in their capacity modeling. The preliminary schedule includes
weekday departure times from Elk River at 6:15 am, 6:48 am, 7:18 am, 12:44
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425
Northstar Corridor Update
September 21, 1998
Page 2
pm, 4:43 pm and 5:23 pm. Arrival times at Elk River at 8:57 am, 2:17 pm,
5:12 pm, 5:42 pm 6:17 pm and 6:57 pm. These times are subject to change
and are intended to present a general concept as to the scheduling of the
commuter trains.
We were also informed that the Authority has funding through 1999 and are
still in the running for full funding through TEA-21 legislation.
\\elkriver\sys\shrdoc\planning\scott\ncdasept.doc
NORTHSTAR CORRIDOR DEVELOPMENT AUTHORITY
Regular Meeting Minutes
July 9, 1998
The Northstar Corridor Development Authority met on July 9, 1998, at the Sherburne County
Government Center in the City of Elk River, Minnesota.
The following members, alternates and citizens were present Jean M. Keely, Chuck Lenthe, Gary
Erickson, Mary Beth Christi~ason, David Loch, Gerry Donlin, Mary Richardson, Tim Yantos, Dan
Erhart, Jerry Newton,' Steve Billings, Lewis Stark, John Norgren, Gary Hammer, Ken Paulson, Bab
Haarman, Richard Monk, Scott Harlicker, Paul McCarron, Patrick Cairns, Donald Hanson, Carl Yellick,
Duane Grandy, Don Jolly, Jim Dickinson, Terry Nagorski, Rick Speak, A1 Seppelt, Stephanie Eilers,
Ken Stevens, Jim Barton, Brian Roper, Elliot Perovich, Dick Wolsfeld, Dan Meyers, and Elizabeth
Colburn of BRW, Inc., Kary Tillmann (for Lynn George)
..The following members and alternates were absent:
o
Chairperson Donlin called the meeting to order at 4:37 p.m.
A motion was made by John Norgren, seconded by Duane Grandy and carried unanimously to
· approve the Northstar Corridor Development Authority minutes from the meeting held on June
4, 1998, as presented.
Dick Wolsfeld, BRW, discussed the general purpose and need subject areas of the Major
Investment Study. The following issues were discussed:
Corridor Mobility
Roadway Congestion
Number and Severity of Accidents
Containment of Sprawl
Economic Development
Travel Choices
Intermodal Connections
Air Quality
Freight Service Improvements
There were no additions/comments by the group.
Northstar Corridor Development Authority Regular Meeting Minutes of July 9, 1998
Page 1
Discussion was held regarding station locations and the importance of those locations to the
planning process. The following points of analysis are used to determine station locations:
1 -- Impact on travel time
2 -- The potential direct impaci on freight traffic of BNSF
3 -- Local Planning Activities
At this time, the committee needs to identify station locations and then take those suggestions to
local units of government to see if those identified stations will work out. It should be noted that
none of the station locations decided on by the committees are cast in stone. It could be that
stations may need to be removed, or possibly even added, within a mile or two of where one has
been identified. Individual areas/units of government will decide exact stop location. Target is
to have results of the analysis by the end of the year.
The potential station locations as identified by the Local Use Forum were presented by
BRW.
Discussion was held regarding whether the committee would be voting on general proximity of
the stop or if the location given was relative to particular locations. BRW stated that the
recommended locations were the best consensus on where stations ought to be for analysis. Then
local units of government will decide on preferred location and recommend back to NCDA.
The Chair called a recess at 5:34 p.m. and reconvened the meeting at 5:42 p.m.
5. The committee voted on recommended the following locations to be studied:
a)
A motion was made by Duane Grandy, seconded by Patrick Cairns and carried
unanimously to approve the recommendation for the City of Rice station location near
CR 2.
b)
c)
A motion was made by Duane Grandy, seconded by Steve Billings and carried
unanimously for the City of St. Cloud station locations at East St. Cloud, South of Wye
West to downtown and a second location at downtown St.~X~ml~between 1 lth and River.
A motion was made by Richard Monk, seconded by Lewis Stark and carried unanimously
for the City of Clear Lake station locations at Highway 10 and 24 and a second location
at Highway 10 and 70th Street.
d)
A motion was made by Ken Paulson, seconded by Gary Hammer and carried
unanimously for the City of Becker station location at Hancock'.
Northstar Corridor Development Authority Regular Meeting Minutes of July 9, 1998
Page 2
o
e)
A motion was made by Jim Dickinson, seconded by John Norgren and carried
unanimously for the City of Big Lake station location at Highway 25 and Eagle Lake
Road.
A motion was made by Scott Harlicker, seconded by Terry Nagorski and carried
unanimously for the City of Elk River station location near_ .?mctar' Avenu%cn Wc3t side
g)
A motion was made by John Norgren, seconded by Dan Erhart and carried unanimously
for the Cities of Anoka and Ramsey joint station location near the Vo-Tech College on
border between Ramsey and Anoka.
h)
A motion was made by Jerry Newton, seconded by Paul McCarron and carried
unanimously for the City of Coon Rapids station location at Foley and Coon Rapids
Boulevard.
I)
A motion was made by Jerry Newton, seconded by Paul McCan'on and carried
unanimously for the City of Fridley and City of Columbia Heights joint station location
at 61 st Avenue.
J)
A motion was made by Paul Ostrow, seconded by Gary Erickson and carried
unanimously for NE Minneapolis station location at Broadway and 18th on Central.
k)
A motion was made by Paul McCarron, seconded by Gary Erickson and carried
unanimously for downtown Minneapolis station location at 5th Street and 5th Avenue.
Public Involvement Update --
The third newsletter recently was sent out. All should have received a copy. The public update
should be used when taking information back to the local units of' government. A presentation
was made to St. Cloud Metro Transit local officials.
Discussion was held regarding the 1999 budget. There was a recommendation by the Executive
Committee that the 1999 budget be approved as presented in the total amount of $200,000. The
budget is on file in the Sherburne County Administrator's Department.
A motion was made by Paul.McCarron, seconded by Jerry Newton and carried unanimously to
approve the 1999 Northstar Corridor Development Authority budget of up to $200,000 with
contributions to be made by the counties of Anoka, Benton, Sherburne and Hennepin as allocated
according to population along the corridor.
Northstar Corridor Development Authority Regular Meeting Minutes of July 9, 1998
Page 3
10.
11.
There was a question as to where Stearns County fits in. There has been discussion with Gerry
Donlin and local officials to see if they want to be involved in the project. Cairns commented
that if the majority of the ridership is in the St. Cloud area, a portion of the funding should come
from them.
David Loch, Tim Yantos, Ken Stevens, Stephanie Eilers, Mary Richardson, provided
update of the Project Management Team's recent trip to Chicago to evaluate the rail
system.
An update was provided regarding the informational Land Use Forum held on June 26. No
action taken.
There was no other business. The next meeting was scheduled for August 6, 1998 at 4:30
p.m., at the Sherburne County Government Center.
A motion was made by Ken Paulson, seconded by John Norgren and carried unanimously to
adjourn at 6:12 p.m.
Betsy Wergin, Chairperson
H:kADMNDATA\COMMITTE\CORKiDOR\ 1998~MINUTESkNORTHSTA\070998.DOC
Date
Northstar Corridor Development Authority Regular Meeting Minutes of July 9, 1998
Page 4
NORTHSTAR CORRIDOR PASSENGER RAIL SERVICE
PRELIMINARY PASSENGER RAIL SERVICE
MAINTENANCE FACILITY LOCATION
" Prepared for the
'NORTHSTAR CORRIDOR DEVELOPMENT AUTHORITY
,"~LTK Engineering Servic'es
21 August 1998
(nst98-10.)
Maintenance and servicing of the cars and locomotives for a passenger rail system of the type
envisioned for the Northstar Corridor must reflect the characteristics of the service plan as well
as the realities of the availability of real estate convenient to the railroad line itself.
A "Preliminary Passenger Rail Serx)ice Plan" has been prepared and submitted to the Authority.
As the conceptual service plan which has been developed is only preliminary at this time, the
implications of that plan for the location of the maintenance facilities should be regarded as very
tentative. An operating simulation of the service pattern has not yet been run, so that the
-, accuracy of the running times is still an open question. Similarly, demand forecasts have not
been developed, so that the fleet size is still at issue. The service plan itself has only now been
submitted to the Authority for review, so that its acceptability as a concept is still not established.
Finally, other than conclusions reached through ~vindshield surveys, the actual availability of
land has not been determined.
However, if the initial service plan concept is taken as a starting point, some preliminary
conclusions can be reached.
The service concept provides for both an "intercity" type of service, with morning, midday and
afternoon trains in both directions from both St. Cloud and Minneapolis, running every day
(weekdays, weekends and holidays) between the two ends of the Northstar Corridor. On
weekdays, there is superimposed on the through trains a set of peak-hour "commuter trips"
which operate only between Minneapolis and ~lk River or Ramsey, slightly short of halfway
between the Twin Cities and St. Cloud. For purposes of economical operation, the initial
timetable has been designed to permit this entire service to be operated with only three sets of
equipment, and, as noted in the "Preliminary Plan," based on an assumed use of bi-level
equipment in push-pull mode, this might require a total fleet of four locomotives, four cab cars,
and seven coaches. These figures are highly preliminary, and subject to modification for several
reasons, not the least of which is the need to balance fleet size with projected ridership.
Under the example timetables, no trains lay overnight at Minneapolis. This is primarily because
of the nature of the "commuter" part of the-business, in which trains originate in suburban areas
and operate to the CBD in the morning, and back out in the evening. It also reflects the reality of
real estate demand, which produces high prices in downtown areas, thus discouraging semi-
industrial uses such as railroad maintenance facilities. Trains will lay over for varying periods
during the day at the Downtown Minneapolis station, and one or two off-line storage tracks and
the ability to provide minimal between-trip cleaning and servicing will be required. These
functions cannot take place on the mainline, ~:s the Burlington Northern Santa Fe Railroad
requires the tracks for its own fi'eight operations during the day.
In the morning, one train will originate at ,St. Cloud (or Rice, if that is chosen as the northern
terminus). That train is one which makes the last through trip outbound from Minneapolis at
5:35pm, arriving in St. Cloud at 7:00pm. The service concept provides for a daily rotation of
equipment from train to train, so that a different trainset will be laying over at St. Cloud each
weekday night. That trainset is one which originates at Elk River that morning, makes a couple
of commute trips, and then one and one-half St. Cloud round trips. That trainset is thus
accumulating mileage during the day so that it will require cleaning and servicing at night in St.
Cloud. In addition, on weekends, one trainset performs all of the Northstar Corridor work, so
that having left Elk River on a Friday morning, it sees productive service fairly continuously until
Monday evening. When there are three-day weekends, this train will be out for yet another day's
service. Consequently, it is probable that fueling capability will be required in St. Cloud. As has
been noted in the "Preliminary Plan," with a Downtown St. Cloud station, it is assumed that
-, trains could continue a short distance to the west (less than one mile) to the BNSF's former Great
Northern Railway yard, where it appears that there would be ample space to store, clean, service
and fuel one trainset.
As Elk River, pending more accurate running time simulations, is the center of the system from
the point of view of originating and terminating trains, it is recommended that a Central Shop be
located there. The actual requirements for site and shop size will depend on further analysis, as
the actual size of the fleet is still not known, and since preventive maintenance requirements vary
depending upon the choice of rolling stock. Push-pull trailer coaches will require little work
other than periodic inspection and replacement of worn materials relating to trucks, brakes and
· ancillary car systems (batteries, HVAC, lights, etc.) All control units - locomotives, cab control
coaches, and self-propelled cars~ if any - are subject to federal rules requiring periodic (30-day)
inspections of devices related to safe operation. Refueling, cleaning, washing, watering cars, and
so forth, would also be routine activities. Realistically, repair functions would also have to be
planned for.
The example timetables prepared are also only those which might reflect service at startup,
tentatively in 2003. As the Northstar Corridor is growing rapidly, and may be expected to
continue to grow, it is a reasonable assumption that the passenger rail fleet will grow also, and
that the maintenance needs of this eventually larger fleet will have to be accommodated at the
Central Shop. Given that there are still many unknowns, a preliminary concept of maintenance
site requirements in this area would be for a site of about 20 acres, immediately adjacent to the
BNSF mainline, and as close as possible to the Elk River station. Preferably, this site would be to
the west (north) of Elk River. In this way, trains originating at Elk River can pull out of the
Central Shop yard and directly onto the mainline, operate to the Elk River Station, then simply
continue on their way to Minneapolis; trains will not have to change direction and occupy the
BNSF mainline for any longer than is absolutely necessary - thus minimizing the impact on
railroad freight operations. Similarly, when going out of service at Elk River, trains would make
their last passenger stop, then simply continue onward in the same direction, and leave the
mainline at the turnout leading to the Central Shop - thus quickly getting out of the way of
following traffic. The Central Shop site should also, if possible, be organized to permit, at least
in the long run, direct access to the west, so that trains may be sent directly to or from the St.
Cloud end of the line. This may become more important as the corridor grows, and more service
is developed farther out on the corridor. Highway access for cars and trucks associated with this
facility must also be provided, and shoulcl be considered when making a decision on site location.
Conceptual Service Plan - Rotation of Trainsets
The example schedules provided in the "Preliminary Passenger Service Plan" have been
designed, in part, to permit the regular rotation of trainsets through the Central Shop at Elk River.
Every night, two trainsets and all o'f the spare equipment will be at the Elk River shop, and one
set will lay overnight at St. Cloud. The St. Cloud set is different every week night, so that
equipment can cycle through the shop for optimum maintenance scheduling.
As has been noted, on weekends and holiclays, the St. Cloud trainset may be out for several days.
It is assumed that this practice will be acceptable from the point of view of scheduled
maintenance, provided fueling and servicing of that set can take place in St. Cloud. If not,
periodic "swapping" of that set with one from the Central Shop can be arranged, although that
will require a deadhead move between St. Cloud and Elk River.
_Example oI' Weekday Trainset Rotation
Monday Tuesclay Wednesday Thursday Friday
Trainset A From Elk From St. From Elk
River: #2, #1 Cloud: #6, River: #4, #7,
#8, #5, #12, #3, #10, #9, #14, #13, Repeat Repeat
#11, then then then Monday Tuesday
overnight at overnight at overnight at
St. Cloud. Elk River Elk River
Trainset B From St. From Elk From Elk
Cloud: #6, River: #4, #7, River: #2, #1,
#3, #10, #9, #14, #13, #8, #5, #12, Repeat Repeat
then then #11, then Monday Tuesday
overnight at overnight at overnight at
Elk River Elk River St. Cloud
Trainset C From Elk From Elk From St.
River: #4, #7, River: #2, #1, Cloud: #6,
# 14, # 13, #8, #5, # 12, #3, # 10, #9, Repeat Repeat
then # 11, then then Monday Tuesday
overnight at overnight at overnight at
Elk River St. Cloud Elk River
In this example, Trainset B would have operated the service the previous weekend, then will
have two nights in the Central Shop at Elk River. The following weekend, service will be
provided by Trainset C. The overall effect of this rotation will be to average the scheduled
mileage over all of the equipment, rather than concentrating wear and tear disproportionately on
fewer cars and locomotives.
4
Stearn~
MN 95
VVdght
~ Sherbum
Be~a' Township
Big Lake .... t-- '-
Townahip
.~ Hennepi~
W F f
$
i,~nti
I~Jms
To'*~ship ~.
1:~3~Lsey
Anoka
B~/ne
POTENTIAL STATION LOCATION
T. FL 10 Multi-lViodai Transportation Corridor Development Project
6/15/98
NORTHSTAR CORRIDOR PASSENGER RAIL SERVICE
PRELIMINARY PASSENGER RAIL SERVICE PLAN
- Prepared for the
NORTHSTAR CORRIDOR DEVELOPMENT AUTHORITY
LTK Engineering Services
21 August 1998
(nst98-09.)
1. Corridor Description
The Northstar Corridor's rail component consists of approximately 65 miles of track connecting
the heart of the Twin Cities Metropolitan Area with the City of St. Cloud. It includes all of the
communities along the east and no~:th bank of the Mississippi River between North Minneapolis
and St. Cloud: Columbia Heights, Fridley, Coon Rapids, Anoka, Ramsey, Elk River, Big Lake,
Becker, and Clear Lake. Beyond St. Cloud the railroad line continues on to reach Sauk Rapids
and Rice, which are also in the study area. The line serves parts of the counties of Steams,
,,Benton, Sherburne, Anoka, and Hennepin.
The main rail line serving the corridor, and the only line linking the core of the Twin Cities
Metropolitan Area with St. Cloud, is a mainline of the Burlington Northern Santa Fe Railroad
(BNSF). Field observations indicate that the BNSF mainline is built and maintained to high
standards. The line is CTC-equipped between the Northtown Yard (north of Minneapolis)and
Coon Creek Junction, in the City of Coon Rapids, and between Big Lake and the west. The
intermediate section has automatic block signals. North of Northtown Yard, the line is double-
tracked, except for the 10 1/2 mile section between Big Lake and Becker. The line has heavy
Class IV track, with continuous welded rail for the most part. Between Coon Creek Jct. and St.
Cloud, passenger train speeds are 75mph or greater, with the exception of some crossovers and a
few other restrictions.
2. Present and Historic Service
AMTRAK's westbound transcontinental Empire Btdlder, en route to Seattle, is scheduled to
cover the 63 miles between Midway Station in St. Paul and St. Cloud in 90 minutes without an
intermediate stop, an average speed of 42mph. A disproportionately large share of the 90
minutes is consumed threading the few miles between St. Paul and the north end of the
Northtown Yards between Minneapolis and Fridley.
The daily Empire Builder is presently the only rail passenger service on this line. Originally, this
stretch of railroad was a joint line of two of BNSF's predecessors - the Great Northern Railway
and the Northern Pacific Railroad. In relatively "modern times", most of the passenger service,
and almost all of the service performing any local work between St. Cloud and the Twin Cities,
was performed by the Northern Pacific. Great Northern, having its own direct western
transcontinental mainline via Willmar, and its own secondary route to St. Cloud via Monticello,
operated only a few through trains over this line. In 1960, Northern Pacific's Mainstreeter was
scheduled for the Minneapolis (Hennepin Avenue) - St. Cloud run of 65 miles in 77 minutes,
including one stop in Elk River; average speed: 5 lmph. Interestingly, purely local coach trains
continuing to International Falls, Bismarck and Mandan covered the 65 miles to St. Cloud in 78
minutes, with scheduled stops in Anoka and Elk River, and flag stops in Big Lake, Becker and
Clear Lake.
Freight service is heavy on this line, with 35-50 trains per day.
3. Service Assumptions
As demand forecasts have not yet been run for this service, it is being assumed for purposes of
beginning this evaluation that beyohd Elk River, the Northstar Corridor may best be served by an
"intercity" pattern of all-day passenger service. "Commuter rail" service, typically, consists of
largely peak-period, unidirectional trains oriented to people making work trips to the CBD in the
rush hour.
This initial service concept assumption is based on a couple of observations. One is that St.
Cloud itself is, at 65+ miles, beyond the distance at which a large number of peak-hour work
trips destined to the Minneapolis CBD are likely to be generated. A second is that St. Cloud,
while not large, and not apparently a "bedroom community" for the Twin Cities, is a university
city and regional service center, generating trips for a variety of purposes. University towns,
especially, tend to generate more passenger traffic per capita than other cities their size (examples
which come to mind are Davis and San Luis Obispo, California, and Eugene, Oregon). This kind
of passenger traffic is not typically oriented primarily to peak travel periods alone. It represents a
combination of trip purposes and times, suggesting that a diversity of potential travel times
· offered to the traveling public will tend to meet needs better than purely commuter-oriented
scheduling. Accordingly, mornir4g, midday and evening trips, in both directions, are hypothesized
in this concept. The early and late trips, however, are designed to fit into classic "commuter" time
slots. Third, it is interesting to not that some "commuter" rail systems now actually serve a
market which is not predominantly composed of peak hour, peak-directional trips to and from the
regional CBD; San Francisco's Caltrain, Miami's TRI-RA/L, and some lines of the SEPTA
"Regional Rail" system in Philadelphia provide examples of this.
It is recognized that no decision has been made as whether the northern terminal of the Northstar
Corridor rail service will be St. Cloud or Rice. In the example service timetables that are
presented here, it has been assumed for illustrative purposes that the service will terminate at a
station in Downtown St. Cloud. With n'finor adjustments, however, the concept, will work just as
readily with a terminal in Rice.
In St. Cloud, the former Northern Pacific station, located on the BNSF mainline, is used by
AMTRAK as the passenger station for the single daily Empire Builder in each direction. This
station is located on the north/east bank of the Mississippi, across the river from Downtown in a
semi-industrial area, in the middle of the wye formed at the junction of the former Great
Northern Monticello-St. Cloud line, and the GN/NP joint mainline (also sometimes referred to as
the "Elk River" Line). The Great Northern Bridge is still in use, and could be used to take
Northstar Corridor trains across the Mississippi directly into Downtown St. Cloud. Here, it
would be about a 20-minute walk to the St. Cloud State University campus, and close tO the
county courthouse and central business activities of the city. It would also be possible to closely
integrate the rail service into the city transit network, in a more intensive way than would be
possible across the river. Trains could continue to the GN yard area for layover and servicing,
but passengers would be handled downtown. The old station could be retained as an "East St.
Cloud" stop for both the Empire B~tilder and the corridor trains, but other than for nostalgic
reasons, an East St. Cloud station might be better located where there would be less overlap of
station coverage area, readier access to a higher density residential area, and more opportunity for
park and ride.
If, instead, a terminal in Rice is selected, the present station building may be retained as a St.
Cloud station.
One of the significant negative factors affecting the development of a commuter or regional rail
,, service for the Twin Cities area, is the fact that the direct rail links between Downtown St. Paul
and Downtown Minneapolis have been abandoned, and the tracks removed. This means that in
order to serve both Downtowns with one train, and provide a larger menu of potential
destinations for the rail passenger market, reversing moves and circuitous routings would be
required. An earlier service concept for the Northstar Corridor proposed splitting corridor trains
at Fridley into separate Minneapolis and St. Paul sections so that both downtowns could be
served. However, for purposes of this study, that feature has been elinfinated from this initial
service concept.
As is typical for rail systems of this type, it is assumed that a reduced level of service will be
provided on weekends and holidays. A chief transportation characteristic of weekend travel, in
comparison to weekdays, is reduced peak demand for work trips, this initial service concept
assumes that the peak "commute" trips operated on weekdays will not be operated on weekends
or holidays, and that the three round-trips (morning, midday and evening) between St. Cloud and
Minneapolis will be retained on weekends.
4. Equipment Concept
It is assumed that the kind of equipment typically used in "new start" commuter rail operations
will be used on the Northstar Corridor. This will consist of bi-level coaches, operating with
locomotives in "push-pull" mode. The service described in the following example timetables can
be operated with only three trainsets, provided the preliminary running time estimates prove
reasonably accurate. As there has not yet been a demand forecast, it is not possible to say
precisely what train lengths should be, but given the forecasts initially generated for the MnDOT
study, it is assumed that all trains will consist of a locomotive and three cars (two coaches, and a
cab car). This suggests a fleet of about seven coaches, four cab cars, and four locomotives (these
figures include spares). This fleet size should be considered only an example until demand
forecasts have been prepared, and associated schedule refinements written. At that time, a more
accurate estimate of the number of coaches, cab cars and locomotives required for the service
will be prepared.
The reduced weekend and holiday service can be operated with a single trainset.
5. Example Timetables
Based on the assumptions and discussion above, the following timetables are presented as an
initial service concept. Four timetables are shown: Southbound Weekday, Northbound
Weekday, .Southbound Weekend and Holiday, and Northbound Weekend and Holiday. Running
times have been estimated from observations taken at the time of the "Commuter Rail
Demonstration Project" last year, descriptions of track conditions, comparisons with similar
services elsewhere, and historic performance on this line. They appear to be a few minutes
shorter than those estimated for the MnDOT study. As the corridor rail operation has not yet
been simulated, some adjustments in estimated running times can be expected.
CONCEPTUAL SERVICE PLAN - ILLUSTRATIVE TIMETABLES
SOUTHBOUND . WEEKDAYS
(To follow a train, read down. To read departure/arrival times at any station, read across.)
Amtrak N'thstar N'thstar N'thstar N'thstar N'thstar N'thstar N'thstar
Stations #8 #2 #4 #6 #8 # 10 # 12 # 14
Iv. St.
',Cloud .....
.......... 6:35am ..... 12:01 4:00pm .....
(CBD) pm
Iv. East
St. 5:24am .....
..... 6:39am ..... 12:05 4:04pm .....
Cloud
pm
lv.
Clear .....
.......... 6:55am ..... 12:21 4:20pm .....
Lake
pm
lv. 12:28
Becker .....
.......... 7:02am ..... pm 4:27pm .....
lv. Big 12:35
Lake .....
.......... 7:09am ..... pm 4:34pm .....
Iv. Elk 12:44
River ..... 6:18am 6:48am 7:18am ..... pm 4:43pm 5:23pm
lv. 12:51
Ramsey ..... 6:25am 6:55am 7:25am 7:55am pm 4:50pm 5:30pm
lv. 12:56
Anoka ..... 6:30am 7:00am 7:30am 8:00am pm 4:55pm 5:35pm
IV.
Coon ..... 6:40am 7:10am 7:40am 8:10am l:06pm 5:05pm 5:45pm
Rapids
Iv.
Fridley ..... 6:45am 7:15am 7:45am 8:15am l:llpm 5:10pm 5:50pm
arr. NE
Minpls. - .... 6:50am 7:20am 7:50am 8:20am l:16pm 5:15pm 5:55pm
arr.
Minpls. 7:05am 7:00am 7:30am 8:00am 8:30am l:26pm 5:25pm 6:05pm
(5th St) (Mdwy)
6
CONCEPTUAL SERV.ICE PLAN - ILLUSTRATIVE TIMETABLES
NORTHBOUND - WEEKDAYS
N'thstar N'thstar N'thstar N'thstar N'thstar N'thstar N'thstar Amtr~
Stations #1 #3 #5 #7 #9 #11 #13 #7
Iv.
11:40
Minpls. 7:10am 8:15am l:35pm 4:30pm 5:00pm 5:35pm 6:15pm pm
' (Sth St)
(Mdwy)
Iv. NE
Minpls. 7:20am 8:25am l:45pm 4:40pm 5:10pm 5:45pm 6:25pm .....
arr.
.... Fridley 7:25am 8:30am 1..50pm 4:45pm 5:15pm 5:50pm 6:30pm .....
arr.
Coon 7:30am 8:35am l:55pm 4:50pm 5:20pm 5:55pm 6:35pm .....
Rapids
arr.
Anoka 7:40am $:45am 2:0Spin 5:00pm 5:30pm 6:05pm 6:45pm .....
arr.
Ramsey 7:45am 8:50am : 2:10pm $:0$pm 5:35pm 6:10pm 6:50pm .....
arr. Elk
River ..... 8:57am 2:lTpm 5:12pm $:42pm 6:l?pm 6:5?pm .....
arr. Big
Lake ..... 9:06am 2:26pm .....
..... 6:26pm ..........
arr.
Becker ..... 9:13am 2:33pm .....
..... 6:33pm ..........
arr.
Clear ..... 9:20am 2:40pm .......... 6:40pm .........
Lake -
St ...... 9:36am 2:56pm ] .......... 6:56pm ..... l:06am
Cloud
arr. St.
Cloud ..... 9:40~m 3:00pm .......... 7:00pm ......
(CBD) . - - - -
CONCEPTUAL SERVICE PLAN - ILLUSTRATIVE TIMETABLES
SOUTHBOUND - WEEKENDS AND HOLIDAYS
Stations Amtrak #8 N'thstar #6 N'thstar #10 N'thstar #12
Iv. St. Cloud
(CBD) ........... 6:35am 12:01pm 4:00pm
lv. East
St. Cloud 5:24am 6:39am 12:05pm 4:04pm
lv. Clear Lake ........... 6:55am 12:21pm 4:20pm
lv. Becket ........... 7:02am 12:28pm 4:27pm
Iv. Big Lake ........... 7:09am 12:35pm 4:34pm
lv. Elk River ........... 7:18am 12:44pm 4:43pm
Iv. Ramsey ........... 7:25am 12:51pm 4:50pm
lv. Anoka ........... 7:30am 12:56pm 4:55pm
lv. Coon Rapids ........... 7:40am l:06pm 5:05pm
lv. Fridley ........... 7:45am l:llpm 5:10pm
arr. NE
Minneapolis ........... 7:50am l:16pm 5:15pm
arr. Minneapolis 7:05am
(5th Street) (Midway) 8:00am l:26pm 5:25pm I
CONCEPTUAL SERVICE PLAN - ILLUSTRATIVE TIMETABLE~
NORTHBOUND - WEEKENDS AND HOLIDAYS
Stations N'thstar//3 N'
,,. ~ thstar #5 N'thstar #11 Amtrak #7
lv. Minneapolis ll:40pm
(5 th Street) 8:15 am 1: 35p m 5:35pm (Midway)
lv. NE
Minneapolis 8:25am 1:45pm 5:45pm ...........
arr. Fridley 8:30am 1:50pm 5:50pm ...........
arr. Coon Rapids 8:35am i 1:55pm 5:55pm ...........
arr. Anoka 8:45am I 2:05pm 6:05pm ...........
arr. Ramsey 8:50am I 2:10pm 6:10pm ...........
arr. Elk River 8:57am 2:17pm 6:17pm ...........
arr. Big Lake 9:06am. 2:26pm 6:26pm ...........
arr. Becker 9:13am 2:33pm 6:33pm ...........
arr. Clear Lake 9:20am 2:40pm 6:40pm ...........
arr. East
St. Cloud 9:36am 2:56pin 6:56pm 1:06am
arr. St. Cloud
(CBD) 9:40am 3:00pm 7:00pm ...........
9
I 94
Steam~
MN 95
Haven i
To~)~ip
~ Sherbum9
Becke~ To~ip
Wright
Tov,~3ship
isanti
Bums
To',',r~ship
Ranzsey
Anoka
-,:~
~dowr
N
Hennepii
Elaine
POTENTIAL STATION LOCATION
T. FL 10 Multi-Modal Transportation Corridor Development Project
6/15/98
ST. CLOUD METROPOLITAN TRANSIT COMMISSION
WAITE PARK. SAUK RAPIDS. ST. CLOUD MINNES
665 FRANKLIN AVE. N.E,, ST, CLOUD,'MN 5630~>TA
(320) 251-1499 * FAX (320) 251-3499
America's Best Sma//Transit System as judged by the American Pub/lc Transit Association ~ 1989-90
J'uly 22, 1998
~" Ms. Mary I. Richardson
Richardson, Richter & Associates
413 Wacouta Street
200 Gilbert Building
St. Paul, MIN' 55101-1957
Dear lk .~ardson:
At the .]'uly 21, 1998 reg'ular meeting of' the St. Cloud Metropolitan Transit Commission,
the attached Joint Powers Agreement Establishing The Northstar Corridor Development
Authority was approved, and thus the St. Cloud Metropolitan Transit Commission is formally
requesting membership from the NCDA. r understand your next full board Authority meeting is
Thursday, August 6~ or 13u', and that our request would be considered at that time.
The Commission would also like to formally thank the Authority for inviting the MTC to
be on the Project Management Team as an ex-officio member, along with Metro Transit,
Metropolitan Council, and the St. Cloud APO. The MTC is committed to the public transit and
alternative transportation mission, and is excited about the opportunity to work with others to
ensure that our industry continues to address the benefits of.building healthy livable communities
with transit.
Si cer_
David W. Tripp
Executive Director
attachment
COMMISSIONERS: JERRy LEESE. CHAIR. WOODy BISSETT. VICE CHAIR. CHUCK WINKELMAN. ~REASURER. PAUL L. RINGSMUTH. SECRETARy
EXECUTIVE DIRECTOR - DAVID W. TRIPp
Schedule
mil i '
· Purpos And Ne~ed law An ¥~is
· Definil ~n of Alternative F~t~l
Work Scope
B Jdget Comm
MIS
~nd
tment
~T~ORTH~T~
"~O~TR/DOR
~I'A approva
PE on Comn~
II!11
to Enter
uter Rail
PE
Com
III
'ElS on
nuter Rail
August 2M, 199~
Exhibit A
Agenda Item//6b
Schedule
SCENARIO
ELEMENT
BASE CASE I 2 3 4 5
ANALYSIS TIME 8/20-10/1/98 10/1-10/30/98. 11/1 - 11/15/98 11/15 - 12/30/98 1/15 - 2/15/99 2/15 - 3/15/99
FREIGHT SERVICE 1998 and 2003 2003 Horizon Horizon/2020 Horizon 2003
COMMUTER RAIL N/A START-UP SERVICE N/A 2020 SERVICE 2020 SERVICE 2020
(NORTHSTAR) (2003)
AMTRAK I I 1 1 1 1
ST PAUL - MSP N/A N/A N/A N/A LIKELY 2020
COMMUTER RAIL ·
SERVICE SERVICE
BETHEL - MSP N/A N/A N/A N/A LIKELY 2020 9
COMIvlUTER RAIL ·
SERVICE SI~RVICE
DATE INPUT N/A 8/30/98 (STATIONS- N/A 1 I/1/98 1/I/99 2/15/99
NEEDED FROM SERVICE PLAN)
NORTHSTAR
PRODUCT* SIMULATION OF IMPROVEMENTS IMPROVEMENTS IMPROVEMENTS REQUIRED TO MEET IMPROVEMENTS
EXISTING FREIGHT REQUIRED TO REQUIRED TO FREIGHT NEEDS AND LIKELY REQUIRED TO MEET
CONDITIONS TO MEET 2003 START- ONLY MEET COMMUTER RAIL SERVICE 2003 FREIGHT NEEDS
DETERMINE UP COMMUTER HORIZON YEAR AND LIKELY 2020
CAPACITY RAIL SERVICE FREIGHT NEEDS COMMUTER RAIL
REQUIRED FOR
FREIGHT GROWTH SERVICE
OTE: Potential modtficat~ons to commuter rail service 0frequired) to mitigate/minimize railroad improvements include varying headways, time of service,
geographic length of service, arm reverse commute service. Reducing freight demand from horizon year levels is also possible. Only base case and scenarios
1-3 are within the scope of this Agreement.