Loading...
8.1. SR 11-18-2013 City of Elk - Request for Action River O. To Item Number Mayor and City Council 8.1 Agenda Section Meeting Date Prepared by General Business November 18, 2013 Michael Hecker, Parks and Recreation Director Item Description Reviewed by Select Consultant to Facilitate Parks Cal Portner, City Administrator Comprehensive Plan Reviewed by Action Requested By motion,hire Hoisington Koegler Group Inc. (HKGi) to complete the Parks and Recreation Master Plan. Background/Discussion A Parks and Recreation Master Plan has been identified as a priority project in the Park Improvement Fund for the past two years. For this reason, staff prepared a Request for Proposal this past fall for a plan that will guide the investment and operation of our entire park system into the foreseeable future. The city received 10 proposals, of which 9 met the requested scope,ranging in cost from$76,000 to $130,000. An internal review of the proposals was completed by the Parks and Recreation staff with the same four firms receiving top scoring consideration. HKGi received unanimous support as the first choice due in part to their proposed organization and clarity,work plan deliverables, strong community involvement and the cost. Their cost including a community needs assessment and a public art plan is $82,700. Representatives from Parks and Recreation, Community, Operations and Development and Administration met with HKGi on November 12 to discuss the project and outline the master planning process, should they be hired. Staff is proposing that a planning group guide the master plan process and work. This will include staff from the Parks and Recreation Department,led by the Parks and Recreation Director,and up to two members from the Parks and Recreation Commission. Highlights of the proposal include: • In approximately nine months,regular ongoing meetings with the planning group, a City Council introduction,two interactive community forum meetings, three focus group sessions (including one with youth sports organizations),plus two Parks and Recreation Commission meetings and a final presentation to City Council. • A needs assessment to include a mailed statistically valid community survey to help measure satisfaction,identify needs and define priorities for the future of our park system. An online parks and recreation questionnaire will also be included to test community satisfaction and priorities. P a w E R E U 6 Y NaA f RE] • Public information communicated to residents and interested parties via HKGi-prepared information for the website, Cable Channel 12, social media, newsletter articles and through the various parks and recreation printed media. • A parks and recreation system evaluation that will include parks, trails natural and cultural resources, connectivity,programs and facilities. This includes a review of recreation program use and delivery performance. • An updated Capital Improvement Plan with estimated capital costs including asset management and funding strategies. • A park dedication strategy and recommended park dedication rates. • An action plan framework to include park acquisition,park and facility improvements,park development, connectivity enhancements and maintenance strategies. This will include cost estimates for priority areas. • An optional public art plan to identify and prioritize potential sites and opportunities for public art projects within the city and define locally-based art themes and funding opportunities. Financial Impact A not to exceed amount is proposed at$82,700 for the Parks and Recreation Master Plan to be paid for from the 2014 Park Improvement Fund. The total amount includes the bid alternate needs assessment and an optional public art plan. Attachments • Parks and Recreation Master Plan RFP • HKGi Proposal N:\Pub1icBodies\Agenda Packets\11-18-2013\Final\x8.1 sr Hue HKGi for parks master plan.docx REQUEST FOR PROPOSALS PARKS AND RECREATION MASTER PLAN ELK RIVER, MINNESOTA Proposal Due Date/Time October 21,2013 4:00 P.M. (CST) ELK RIVER PARKS AND RECREATION P 0 W I R I D 0 Y N Af' U IM,?",k N S P I R E * PLAY * G ROW CITY OF ELK RIVER Parks and Recreation Department 13065 Orono Parkway Elk River, MN 55330 REQUEST FOR PROPOSAL PARKS AND RECREATION MASTER PLAN CITY OF ELK RIVER, MINNESOTA 1 SECTION 1. GENERAL INFORMATION This document is to solicit request for proposal to prepare a Parks and Recreation Master Plan for the City of Elk River, Minnesota. Contract Administration All correspondence regarding this Request for Proposal (RFP) and the proposed work must be addressed to: Michael Hecker, CPRP Parks and Recreation Director City of Elk River 13065 Orono Parkway Elk River,MN 55330 mhecker @ElkRiverMN.gov All firms whom receive or download this RFP are requested to register their name and email address by sending an email to mhecker&ElkRiverMN.gov. Any revisions or corrections to this RFP, after it has been posted,will be communicated to those registered RFP holders. Failure to register your contact information is at your own risk. A proposal will not be considered if it fails to include all requested information as detailed in this original RFP and any subsequent modifications. Any requests for additional information that may be needed for the preparation of the proposal should be directed to Parks and Recreation Director,Michael Hecker, at (763) 635-1161, or mhecker°,E1kRiverMN.gov All questions must be received before 4:00 pm, October 21,2013. No questions after that time will receive a response. Submittal of Proposal Please provide five paper copies and one electronic (pdf copy of the proposal for the evaluation process. Submittals shall be addressed to: Michael Hecker, CPRP Parks and Recreation Director City of Elk River 13065 Orono Parkway Elk River,MN 55330 Submittals will be accepted until 4:00 p.m. on October 21 , 2013. Acceptance of Proposal Contents The contents of this RFP will be included as part of the contractual obligations if a contract ensues. All information in the proposal is subject to disclosure under the provisions of Minnesota Statutes Chapter 13 —Minnesota Government Data Practices Act. 2 SECTION 2. COMMUNITY BACKGROUND The City of Elk River is located just 35 miles northwest of Minneapolis-St. Paul between the Twin Cities and St. Cloud on the Mississippi and Elk Rivers. As the Sherburne County Seat, the city covers an area of 44 square miles making it one of the largest land-based cities in the state and the largest city within the county with nearly 24,000 residents. The city continues to develop while retaining its historical perspective and small-town flavor. Highways 10, 169, 101, nearby Interstate 94 and the new Northstar Commuter Rail provide fast and easy access to the greater metropolitan area as well as the gateway to Minnesota's lake country. The city recently went through the branding process in which we found that Elk River is Powered By Nature This is the brand which resulted from our branding process and sums up the major characteristics of our community— small, friendly, outdoorsy, and well-located. `Vorpeople wbo want to breathe the outdoor,yet avant access to big city amenities. Elk River is an emerging small city here the Elk And Mississippi Rivers floav to on the fringe of the Twin Cities and where the heart is powered by its nature so you are energi.Zed and inspired to make a difference" —brand promise. The city branding was the impetus for the Parks and Recreation Department to find its own brand core values,and mission. Various visioning workshops were held in early 2012 with staff and the Parks and Recreation Commission. It was through these workshops that the department came up with the taglines for its own brand—"Inspire Play Grow" ELK RIVER PARKS AND RECREATION P D W I R E R R Y NA ' u E N S P I RE 'r P LAY * G ROW The Parks and Recreation Department mission statement is,Elk River Parks and Recreation is ricb in diverse programs and facilities, dedicated to enhancing lives by inspiring play and embracing the nature of our city. Elk River Parks and Recreation achieves its mission by: • Promoting and expanding community partnerships and opportunities. • Providing a variety of recreation and service programs that contribute to the health and well- being of people of all ages and abilities. • Coordinating creative events that enhance community and add to the city economic vitality. • Maintaining the community's investment in the natural environment,with an emphasis on sustainability, safety,accessibility,aesthetic quality and fiscal responsibility. The City of Elk River Parks and Recreation Department currently services and is responsible for 44 parks consisting of over 900 acres. Many of the parks are smaller,undeveloped neighborhood parks acquired through park dedication funds. The more visible community type parks that are well used in our city include Hillside Park,Lions Park,Woodland Trails Park and Orono Park. 3 Our smallest yet,most visible park in the city is River's Edge Commons Park. This riverfront park in downtown Elk River has spectacular views of the Mississippi River, an amphitheater, splash fountain and picnic gazebo. The park fits well within the branding and nature of our city as a "river city". A few blocks from downtown and along the Mississippi River is the recently acquired Bailey Point Nature Preserve park that also fits well into a river city connection. Bailey Point Nature Preserve is a 23-acre nature preserve of historic and scenic property with over 3,300 feet of natural largely untouched shoreline at the confluence of the Mississippi and Elk Rivers. The Parks and Recreation staff prioritized in early 2013 city services into the following three priorities: 1. Maintenance—take care of what we have 2. Preservation of open space 3. Take care of our youth These are viewed as core services which are defined as our department's basic civic duty and prime value to our community. All core services should fit into the overall department mission. SECTION 3. SCOPE OF SERVICES 1. Public Process a. Gather information from key leaders and stakeholder groups. Groups include:youth sports associations; service organizations;arts organizations;Elk River Chamber of Commerce; City officials; schools;partners and citizens. Outline your approach to identify and implement a methodology for citizen involvement in this Master Plan process. b. Conduct Community Workshops, and focus groups and individual stakeholder interviews. Participants to be determined. The workshops will be scheduled at the beginning of the planning stage to critique current services and proposed services. Solicit input on physical facilities and service needs. c. Provide well organized and directed activities,techniques and formats that will ensure that a positive, open and proactive public participation process is achieved. d. Provide written records and summaries of the result of all public process and communications strategies. e. One (1) meeting with the Parks and Recreation Commission at the time of adoption of the Master Plan. f. At least one (1) meeting with the City Council for the presentation and adoption of the final Master Plan. 2. Demographic Trends a. Validate demographic trends and characteristics of the City of Elk River using information from the 2013 City Comprehensive Plan currently being developed, and other regional and local sources. 4 3. Existing and Future Facilities —Analysis of Level of Service a. Compile an inventory and assessment of the existing parks, trails, open space and facilities. This includes the exact acreage of each park location. b. The assessment will include a comparative analysis to regional communities of similar size and density using nationally accepted standards. The analysis should consider the capacity of each amenity found within the system (playgrounds,ball fields,trails, natural areas,golf courses, special facilities, etc.) as well as functionality, accessibility, condition, comfort,and convenience. Evaluation criteria should be based on the expressed values of the community. The analysis will also include identification of best possible providers of community and recreation services and recommendations for minimizing duplication and enhancing possibilities for collaborations where appropriate. 4. Rank and Prioritize Demand and Opt2ortunities a. Prioritize recommendations for needs regarding land acquisition,and the development of parks,trails, open space and recreation facilities based on national, state and regional criteria,including local resident interaction. b. Develop a set of prioritized recommendations for maintenance and renovation of parks and trails. c. Develop a set of prioritized recommendations for recreation programs and facilities. d. Establish documented capital funding priorities for improvements to the overall park system. 5. Creation of a Signature Park Overview: Every great city has signature parks. A signature park helps define a city and generates substantial civic, economic and fiscal value. a. Analyze the ability to develop both Orono Park and Orono Athletic Complex into a signature park. Include the creation of a conceptual design plan,development and operating costs, revenue potential and identification of community benefits. The consideration of a park admission or parking fee has been suggested by the Parks and Recreation Commission. b. Identify and assess other possible locations for the creation of a Signature Park. 6. Activity Center Renovation and Location Overview: The Activity Center serves as the center for a very active senior community. The current facility is outdated and programming is restricted due to its current design. a. Identify future needs for a senior center and programming in the community. 7. Great Northern Trail in Woodlands Park Overview: The Great Northern Trail in Woodlands Park will provide a paved pathway for recreation use that will connect the City of Elk River to the cities and townships north of Elk River and to the Mississippi River Trail (MRT) currently under development. The City of Elk River has completed the development of its portion of the trail in its entirety. a. Analyze and recommend actions to increase citizen use of the trail and economic development opportunites on the trail. 5 8. Creation of a Mississippi River Trail Overview: The city acquired Bailey Point Nature Preserve on November 20,2012 into the park system. Bailey Point Nature Preserve is a 23 acre parcel of historic and scenic significance with over 3,300 feet of natural,largely untouched shoreline at the confluence at the Mississippi and Elk Rivers. a. Analyze the ability to develop a trail system along the Mississippi River that clearly defines Elk River as a "river city" and connects Bailey Point Nature Preserve with Rivers Edge Commons Park and Babcock Park. b. Analyze the ability and if the timing is correct for the possibly of acquiring the Houlton Farm property and its connectivity along the Mississippi River. 9. Action Plan a. Develop an action plan which will include issues, strategies,priorities and an analysis for budget support and funding mechanisms for the short term up to five years. Also a long term up to twenty years for the parks system, open space, trails, athletic facilities, recreation facilities,recreation programs and services. b. Collect and analyze information on participation,needs, desires, operations, programming, and land use trends and make Level of Service recommendations. c. Identify areas of service shortfalls and projected impact of future trends. d. Develop a definitive program for acquisition and development of parkland, recreation facilities, open space, trails and parks maintenance and administration of facilities for the future five to ten years. e. Provide a maintenance and operation analysis. 10. Development of Final Plans and Supporting Materials a. The Master Plan must include written goals,plans, objectives,and policy statements that articulate a clear vision "road map" and model for the Parks and Recreation Department's future. b. An executive summary of existing conditions,inventories, and Level of Service analysis. c. An Action Plan. d. A color version of the final Master Plan document consisting of one (1) printed and bound color copy and an electronic copy both in a .pdf format and Word format. e. A color version of the final Executive Summary consisting of one (1) printed copy and an electronic copy both in a .pdf format and Word format. f. Electronic files (.psd., .ai, .indd, etc) used to create supporting graphics. 11. Develop recommendations toward developing a park dedication policy based on current Minnesota State Statutes and levels of service. a. The recommendations must follow a specific formula for commercial,industrial and residential developments. 12. Other Development Recommendations a. Development recommendations for areas not previously addressed by the city to enhance the current delivery system of parks and services within the community. 6 Note: The city shall be responsible for the public notice and any of the travel costs associated with the above meeting schedule. The consultant shall review with the City's Project Manager all prepared information for the public meeting at least three (3) days prior to the scheduled meetings. SECTION 4. SCOPE OF SERVICES BID ALTERNATE Needs Assessment Please submit a separate proposal to complete the following with a price breakdown. 1. Statistically Valid Community Survey Provide a city-wide, statistically valid community needs assessment survey with a return rate that accurately represents a sampling of the community population to identify community needs and issues on the park and recreation programs and facilities. The survey will be used as a baseline to determine needs,desires and willingness to pay. 2. Internet Survey Immediately following the completion of the statistically valid survey or concurrently,the consultant will conduct an internet survey. This could be done using the "survey monkey" website or another internet survey method agreed upon by the consultant and the city. While this is not a statically valid survey technique,it does provide residents with another venue to participate in the needs assessment process. SECTION 5. SERVICES PROVIDED BY THE CITY 1. The Parks and Recreation Director for reference of city history and to act as project manager on behalf of the city. 2. A copy of the City Comprehensive plan documents currently under development. 3. A copy of the 1997 Parks Master Plan (most recent Parks and Recreation Master Plan). 4. Copies of all existing studies,plans,programs,and other data including access to all applicable records. 5. Assistance with on-going community meetings. SECTION 6. PROJECT BUDGET Fees for services including reimbursable expenses may not exceed$65,000.While the $65,000 figure was established as the not-to-exceed amount based on dollars allocated for this project by the Elk River City Council,proposals may be less than$65,000. This does not include the bid alternate of the Needs Assessment services. Fees for the needs assessment scope bid alternate shall be in the range of$10,000 to $18,000 including reimbursable expenses. 7 SECTION 7. CONSULTANT SELECTION Proposals will be reviewed and evaluated by a team of city staff on the basis of the following criteria: 1. Project approach and organization 2. Demonstrated related experience 3. Consultant fees and costs 4. Proposed schedule Process City staff will evaluate and rank all submitted proposals. After conclusion of this review, staff will recommend the most qualified consulting teams or firms to the City Council. The decision will not be made by ranking alone, but based on a combination including, but not limited to: ranking, presentation, and other qualifications. The City Council will make the final decision on the consultant firm selection, with input from the subcommittee, Parks and Recreation Commission and/or staff. Once authorized to proceed, the "most qualified" consulting team or firm will be expected to immediately assist in developing a final scope of services and contractual agreement. Following review of the proposals by the city, selected consultants may be asked to make oral presentations of their proposals to city representatives. Upon conclusion of the presentations, the city will select a consultant to negotiate a contract as follows: 1. If, for any reason, a firm is not able to commence the services in that firm's proposal within 30 days of the award,the city reserves the right to contract with another qualified firm. 2. The city shall not be liable for any expenses incurred by the consultant prior to the signing of a contract including,but not limited to, the proposal preparation, attendance at interviews, or final contract negotiations. 3. The proposal must be signed in ink by an official authorized to bind the consultant to its provisions that will be included as part of an eventual contract. The proposal must include a statement as to the period during which the proposal remains valid. This period must be at least 90 days from the date of the submittal. 4. The city reserves the right to reject any and all proposal submittals or to request additional information from any or all of the proposing firms. The City of Elk River reserves the right to waive any irregularity in any submittal or reject any or all proposals. Ranking Criteria A selection committee established by the city will review all submissions. A selection committee will invite selected firms for an interview. Below are the criteria that will be used in screening, interviewing and selection of consulting firms. 1. Proposed Project Approach and Organization (50% of Rating) a. Understanding the opportunities and desired outcomes in conducting a park and recreation master plan. 8 b. Understanding the needs of the city,businesses,residents and park users as it relates to the use of the City's park system and services. c. How does the consultant plan to facilitate, encourage and implement public participation? d. A statement by the consultant regarding how a team approach can be developed and maintained by all parties involved in the project. e. Level of detail related to accomplishing the prescribed scope of services. 2. Demonstrated Related Experience (25% of Rating) a. Successful experience in park master planning projects of similar type, size and setting. b. Demonstrated experience in coordination of project specifics with multiple entities. c. Demonstrated experience in leading and facilitating public meetings. d. Successful experience in meeting project timetables and project budgets. e. List at least three references that are familiar with your firm's demonstrated experiences with similar projects. 3. Consultant's Fees and Costs (15% of Rating a. Demonstrated successful previous budget performance and experience in meeting project budgets. b. Financial information on ability of consultant to provide trained and experienced staff to accomplish work in time allotted. 4. Schedule (10% of Rating a. The consultant should provide a proposed project schedule and the staffing plan that will facilitate completion of the Parks and Recreation Master Plan in a timely manner. b. Number of on-site visits and meetings planned. SECTION 7. PROJECT SCHEDULE The following tentative schedule is anticipated for selection, contract negotiations and contract award. Contract award will be expected in November, 2013. Once a consultant firm has been selected,the actual planning process schedule should include all major tasks and milestones to be accomplished through the Parks and Recreation Master Plan process. 9 PROPOSAL FOR THE CITY OF ELK RIVER NOW hr" � yy Yi �.4 - 9 1 A' 'town% Nam*10A 140 - � �A34, ©e October 21, 2013 Hoisington Koegler Group Inc ,i TABLE OF CONTENTS Cover Letter i Project Understanding&Team Members 4 Project Approach 5 Community & Stakeholder Involvement 6 Work Plan 7 Schedule, Fee &City Responsibility 13 Related Experience 14 References 23 Resumes 24 IEEE" .1mb—MEMW low" October 20,2013 Im[a Michael Hecker,Director ©e Elk River Parks and Recreation 13065 Orono Parkway Elk River,MN 55330 Re: Parks and Recreation Master Plan Dear Mr.Hecker and Members of the Selection Group, On behalf of the Hoisington Koegler Group (HKGi)Team,we are pleased to submit this proposal to conduct a comprehensive evaluation and planning process to prepare an inspiring and practical Parks and Recreation Master Plan for Elk River.As you know, we are familiar with Elk River from our work on River's Edge Commons and other City projects. In addition,we have over 25 years of experience preparing park master plans and have prepared park and recreation plans for over 50 cities in the upper Midwest. The combination of HKGi's extensive award-winning expertise in park and recreation system planning,needs assessment and park design,our past work in Elk River,and the collective knowledge of city staff,officials,stakeholders and the community will result in a sustainable and visionary plan for Elk River Parks and Recreation. Greg Ingraham will be the project manager for the Master Plan work.Greg,a landscape architect and park planner and former manager of Bloomington Parks and Recreation,has over 25 years experience with all facets of parks and recreation. Lil Leatham will be the lead park and recreation planner. She is an award winning planner/landscape architect with over 10 years experience in park,trail,and open space planning and public participation. Landscape architect Paul Paige,an Elk River resident and former Park and Rec Commissioner will lead the design work for a signature park. They will be supported by a talented group of professionals. We encourage you to view recent parks and recreation master plans HKGi prepared for Duluth,MN,Saint Paul,MN,Bloomington, MN and our web site www.hkgi.com to get a good idea of our experience. See the references section of this proposal for web links to these projects. Our proposal includes a comprehensive scope of work and deliverables that assure a cost-effective guide to physical actions/ improvements, programs,facilities,operations and funding. Our work plan,schedule and fees are based on meeting the scope outlined in the city request for proposal with additions and revisions to reflect our vision of the project's needs. We included optional services that would provide an expanded public engagement scope and a public art plan. We welcome the opportunity to review and fine tune the scope based on further discussions with City staff. Contact Greg Ingraham at 612-252-7132 or greg @hkgi.com to discuss the proposal or to authorize us to begin work on this exciting project. Sincerely, Greg Ingraham,Senior Planner Lil Leatham,Associate 612.252.7132 greg @hkgi.com 612.252.7127lil @hkgi.com °°- � � f e r ///09`5 2013 HONOR AWARD ZOOS MINNEAPOLIS PRESERVATION AWARD , . The Waterfront Center Minneapolis Heritage Preservation Commission ' Great River Passage Master Plan;St.Paul,MN University of Minnesota Southeast Heating Plant;Minneapolis, Minnesota 2013 MERIT AWARD American Society of Landscape Architects,Minnesota Chapter ZOOS EXCELLENCE IN AFFORDABLE HOUSING DESIGN/ p - q PRESERVATION HOUSING DESIGN AWARD River's Edge Commons;Elk River,MN Minnesota Housing Finance Agency 2012 HONOR AWARD Heritage Greens;Cambridge,Minnesota American Society of Landscape Architects,Minnesota Chapter (ASLA-MN)Metropolitan Council Stormwater Reuse Guide 2004 AWARD FOR AN OUTSTANDING PLAN American Planning Association,Minnesota Chapter(MnAPA) ZO12 MERIT AWARD Downtown East/North Loop Master Plan;Minneapolis,Minnesota American Society of Landscape Architects,Minnesota Chapter (ASLA-MN) 2003 MERIT AWARD Osseo Central Avenue Streetscape American Institute of Architects,Minneapolis Chapter 2012 MERIT AWARD Bloomington Civic Plaza;Bloomington,Minnesota American Society of Landscape Architects,Minnesota Chapter 2003 AWARD FOR AN OUTSTANDING PLAN (ASLA-MN) American Planning Association,Minnesota Chapter(MnAPA) North Creek Greenway and Minnesota River Greenway Master Plans Downtown Revitalization Master Plan;Hutchinson,Minnesota 2011 PROJECT OF THE YEAR AWARD 2003 MERIT AWARD FOR PROJECT DESIGN City Engineers Association of Minnesota American Society of Landscape Architects,Minnesota Chapter Osseo Central Avenue Reconstruction (ASLA-MN) 2010 PRESERVATION AWARD River Flats Master Plan;Hastings,Minnesota Minnesota Preservation Alliance 2002 NATIONAL MERIT AWARD FOR PUBLIC PLANNING Red Wing Downtown Action Plan American Society of Landscape Architects 2010 MERIT AWARD FOR PLANNING AND RESEARCH Mississippi River Greenway Strategic Plan;Dakota County, Minnesota American Society of Landscape Architects,Minnesota Chapter (ASLA-MN) 2002 AWARD OF EXCELLENCE Red Wing Downtown Action Plan Minnesota Recreation and Park Association 2009 HONOR AWARD FOR PLANNING AND RESEARCH Normandale Lake Bandshell;Bloomington,Minnesota American Society of Landscape Architects,Minnesota Chapter 2002 PRESERVATION AWARD (ASLA-MN) Minneapolis Heritage Preservation Commission UMore Park:A University Founded Community Main Street/6th Avenue SE Streetscape;Minneapolis,Minnesota 2009 HONOR AWARD FOR PLANNING AND RESEARCH 2002 PROJECT OF THE YEAR American Society of Landscape Architects,Minnesota Chapter Civil Engineering Association of Minnesota (ASLA-MN) Saint Paul Park and Recreation Vision Plan Lock and Dam Road;Hastings,Minnesota 2007 MERIT AWARD FOR PLANNING 2001 PROJECT OF THE YEAR—ENVIRONMENTAL AWARD American Society of Landscape Architects,Minnesota Chapter Minnesota Public Works Association (ASLA-MN) Lock&Dam Road Improvements;Hastings,Minnesota Bassett Creek Valley Master Plan;Minneapolis,MN 2001 MERIT AWARD FOR PUBLIC LANNING 2007 MERIT AWARD FOR PRIVATE LANDSCAPE DESIGN American Society of Landscape Architects,Minnesota Chapter American Society of Landscape Architects,Minnesota Chapter Taylors Falls Strategic Guide;Taylors Falls,Minnesota (ASLA-MN) Chevalle,A Country Estate;Chaska,MN � I of HOISINGTON KOEGLER GROUP INC. 123 North Third Street Suite loo Minneapolis, Minnesota 55401 • : •:•• 612-338.6838 -= - • .: r f PRINCIPALS: . '� - President.�__ Paige,PLA,Vice President - - Brad Scheib,AICP,Vice President _— — -- _ HKGI APPROACH Lil Leatham, Hoisington Koegler Group(HKGi)is a firm of talented planners,landscape architects,and urban designers who share their passion for planning and design with client communities striving to create lasting places of quality.HKGi has over thirtyyears of experience designing high quality 8 Registered Landscape Architects and distinctive public and private spaces on budget and on time.Communities seek HKGi to 3 Certified Planners lead their planning and design efforts because of our ability to creatively synthesize complex Graduate program needs and planning issues within a process of community consensus-building. Graduate Landscape COLLABORATE We strive to integrate diverse perspectives into all of our work.We bring together teams Landscape. Architecture of professionals that thrive on a studio approach to design and are passionate about the Streetscape Design continuous process of teaching and learning. School Campus Planning&Design LISTEN Site Design In order for design to reflect the unique character of any given place,the natural,cultural,and Park Planning- • Design historical values need to be heard and understood.We will continually listen to clients and Public Participation stakeholders to ensure we build upon the inherent strengths of the land and consistently Zoning Ordinance provide direction that respects the context of the project at hand. Comprehensive Planning EXPLORE Greenway Planning By embracing the complexities of our projects we can create new solutions that bring obvious Bikeway • and Trail Planning and measurable value to our clients.Our thirst to seek out new connections between people Strategic and the land is at the heart of our explorations and is integral to our design process. Commercial Area Revitalization CREATE Urban Design Only by understanding how a planning principle evolves into a built community asset can Transit Oriented D- - •• we actually begin to see how our work affects the physical character of any given place.We Environmental Review will always strive to carry our conceptual planning ideas forward to built realities so that our Corridor Studies plans can have a real and tangible contribution to our culture. Streetscape Design ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL-PAGE 3 PROJECT UNDERSTANDING & TEAM MEMBERS PROJECT UNDERSTANDING The City of Elk River has a high-quality park and recreation system,and would like to assure that it 4i continues to fully meet community and visitor needs now and in the future. The City also desires to +, maximize the park system's role in fostering quality of life,supporting the"Powered by Nature'brand, and utilizing and benefitting from its riverfront setting. For those reasons,the City is requesting the services of a highly qualified park planning and design firm to prepare an inspiring and implementable plan to guide the investment and operation of the park system for the foreseeable future. The planning process is to include a needs assessment. This assessment should be based on detailed professional evaluation,stakeholder and public input,facility and program evaluation,and analysis +� of trends and changes in recreation. The process should also be hands-on and inclusive. The end product will include plans and priorities that will guide decision-making to create a cost effective, i maintainable system that effectively meets the recreation needs of Elk River residents. In addition to system-wide plans for parks and recreation,the Master Plan is to include detailed plans for key focus areas identified in the RFP,including signature parks,the senior activity center,riverfront parks and connectivity,Great Northern Trail/Woodlands Park,the Mississippi River Trail/Bailey Pointe Nature Preserve,and potential acquisition of the Houlton Farm property.The System Plan is to include tools to guide capital planning and implementation(priority actions,cost estimates for key projects, finance,maintenance,service,and asset management tools). Parks and recreation are the lifeblood of a community,and they are vital to Elk River's economy, environment,and overall livability. Convenient access to quality neighborhood and community parks,trails,and natural areas are important aspects of quality of life,growth,economic development, and a sustainable,vibrant future. The HKGi Team has the expertise to work with you to develop a plan and establish the tools necessary to achieve that vision. HKGI TEAM AND ROLES We view the Parks and Recreation Master Plan process as a partnership between our consulting team �- and city staff,officials,stakeholders and the public. The combination of HKGi's expertise in park, recreation and trail planning and park financing,and the collective knowledge of city staff,officials, _ - stakeholders and the community will result in a sustainable and visionary plan for Elk River Parks and Recreation. HKGi team roles and responsibilities are outlined below. See the attached resumes for more information about the HKGi team members. x i Greg Ingraham,project manager,will manage the preparation of the Elk River Parks and Recreation Master Plan,directing HKGi's work and assuring the highest quality process and deliverables. Greg - tw has managed over 100 successful park,recreation,and trail plans for communities across the upper Midwest. Greg's experience as a former manager of Bloomington Parks and Recreation, his work teaching active living courses at the University of Minnesota,and his 30 years of park,recreation,and trail master planning will help ensure a functional and innovative plan for Elk River's future. PAGE 4-ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL PROJECT APPROACH Lil Leatham,lead park and recreation planner, is an award-winning park planner and landscape architect who brings hands- on experience. Lil has prepared successful park, recreation,and trail and bikeway plans for Brooklyn Park, Inver Grove Heights, Rosemount,Dakota County,St.Paul,Duluth and Cloquet,among others. Lil will lead the preparation of plan content and will share facilitation responsibilities with Greg. Paul Paige,lead park designer,is a highly experienced landscape architect and park designer, Elk River resident,and former Elk River Parks and Recreation Commissioner. Paul will lead the preparation of detailed plans for park and recreation focus areas and will assist with preparation of the Master Plan. Gabrielle Grinde,park and recreation planner,brings her knowledge,communication skills,and design and graphic abilities to park and recreation planning. She will assist with plan preparation,graphics,and meeting support. Gabrielle has hands-on experience with planning in Saint Paul,Brooklyn Park,Edina,Dakota County and other communities. Kevin Clarke,park and recreation planner,is an experienced park planner who has worked with Douglas County,Worthington, White Bear Lake, and Minneapolis on park and recreation system master plans. Kevin will assist with facility evaluation, plan preparation,and meeting support. Rita Trapp,planner and funding specialist,brings her extensive knowledge of grant and foundation funding,and park dedication to the Elk River Park and Recreation Plan. PROJECT APPROACH We at HKGi view the Elk River Parks and Recreation Master Plan as a guide to a sustainable path for the future of the parks,recreation, trails,active living,and natural resource system. To create that guide we propose a five step process: 1.Inventory and Evaluation 2.Needs Assessment 3.Synthesis and Prioritization 4.Draft Master Plan and Focus Area Plans 5.Final Master Plan and Action Plan These phases are designed to work as sequential work tasks and deliverables leading to an innovative, user-friendly plan for the future. Community,staff,officials and stakeholder input will help inform all phases of the process. We see the park and recreation planning process as a partnership between a core group of City staff and HKGi's park planners, landscape architects,designers, resource specialists and funding experts. Through a series of hands on planning work sessions with staff we will evaluate the system,develop goals and plans and prioritize projects and actions. That detailed work combined with the input and direction from engaging community forums,community surveys,stakeholders and City officials ensures a comprehensive and user friendly plan for the future. Some of the key questions the master planning process will answer are: • What are resident,business and stakeholder priorities for the park,trail and recreation system? • How will trends,changing demographics and growth influence park,trail,natural resource and recreation needs? • How can Elk River best take advantage of its riverfront setting and access to nature? • What park improvements are needed and where should future park land acquisition occur? • What should the future Elk River recreation,park and trail system look like? • What priority actions are needed to obtain the preferred system? • What funding tools,resources and partnerships are needed to implement the plan? ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL-PAGE 5 COMMUNITY & STAKEHOLDER INVOLVEMENT COMMUNITY&STAKEHOLDER INVOLVEMENT Park and Recreation Planning Group—We view preparation of the Master Plan as a partnership with City staff. As such we will work hands-on with a core group of City staff as the primary group to guide the process and work. We will hold regular meetings with staff to test ideas,develop plans,review work,and guide the process. We will also hold work sessions with staff to develop the priorities,framework,goals,Draft Master Plan,Focus Area Plans and Action Plans. Parks and Recreation Commission Meetings —The Parks and Recreation Commission is to act as a sounding board for the planning process. We propose to hold two meetings/workshops with the Commission and Commission members will be invited to participate in the Community Forums and Focus Group sessions. In addition,we ask that City staff provide regular project updates to the Commission. City Council Involvement—We have found that keeping the City Council informed throughout the planning process is an essential component of building plan support. We will meet with the City Council early on in the process,keep them informed through the use of project briefing packets during each phase of the planning process,and make a final presentation to the Council. Community Forums—HKGi will hold two interactive community forum meetings with the public and stakeholders. A meeting early in the process will allow participants to provide input on needs,opportunities and priorities for Elk River Parks and Recreation. A second forum will allow the public and stakeholders to review and comment on the Draft Master Plan. These forums will be fun events where attendees can actively participate through dot ranking,park planning exercises,etc. On-line Parks and Recreation Questionnaire— HKGi will prepare an engaging web based questionnaire using Survey Monkey software to test community satisfaction,gather ideas and define priorities for the parks and recreation system. Web Based Content—As digital media becomes more widespread and more mobile,we have found web input to be an extremely effective way to reach residents. For each phase of the process,we will supply the City with content for the project page hosted on the City website. We will also provide two opportunities for on line-input through questionnaires in the needs assessment and draft plan review portions of the plan process. On-line input has the advantage of allowing users to conveniently respond on their own time. Partners and Stakeholder Focus Group Sessions—We will hold a series of(up to 3) focus groups sessions with partners and stakeholders. These sessions allow detailed input from stakeholders and a dialog about system priorities. Potential participants include:representatives of the school district,youth athletics,seniors,the Chamber of Commerce,service and arts organizations, and the Parks and Recreation Commission. Optional Additional Involvement Service-(See Fees section of this proposal for the cost of optional additional service) Public Opinion Survey— HKGi would prepare,administer and analyze the results of a mailed statistically valid community survey to help measure satisfaction,identify needs and define priorities for the future of the Elk River park and recreation system. Our surveys have proven to be effective tools to"take the pulse of the community" More specific descriptions of the public involvement components are included as part of the Work Plan. PAGE 6-ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL WORK P N WORK PLAN TASK 1 MEETINGS: Hoisington Koegler Group has prepared and implemented park and recreation master -. .. . p,. .. .._ plans for over 25 years. During that time we have learned that an effective system plan •losl !boe!sf dsf biJ p process and the plan itself must have several key elements. Our proposed work plan tour for the Elk River Parks and Recreation Master Plan includes the following elements: ,p- • •_ . . , f!qLjz!Dpvodjm 1 . INVENTORY & EVALUATION NOVeUMR015CeMSER2013 In this task we will confirm and fine tune the project scope,public involvement efforts, TASK 1 DELIVERABLES: and work plan. We will also gather background information,tour the park system and . .. Ooh!.rbot introduce the project to the City Council and Commissions. t Lvejf ••- -• 1.1 Organizational Session and Recreation & Park System Tour •` • ' ' •' HKGi will meet with City staff to review the process,acquire data,and to define the - • • ••- • sO meeting schedule,public outreach and communications. We will tour the park and evaluation findings recreation system with City staff to evaluate park improvement,development and maintenance needs,growth areas,and potential park acquisition sites,looking at existing conditions,needs,opportunities,connectivity,etc. 1.2 Gather and Synthesize Existing Plans, Studies and Background Data We will gather and synthesize paper and digital data pertinent to the planning effort for review and use.City documents will include Comprehensive Plan Update information,existing mapping and GIS data, program information and other pertinent plans and background data. 1.3 City Council Introduction and Input We will prepare an introductory presentation outlining the project purpose and goals and present it to the City Council to get their initial feedback on park and recreation priorities. We ask that the City staff use the presentation to introduce the project to the Parks and Recreation Commission to gather their initial goals and priorities. 1.4 Inventory and Evaluation A park system inventory will be prepared and the findings from the tour/evaluation and review of existing data will be summarized for use in subsequent work. 2. NEEDS ASSESSMENT NOVEMBER 2013-JANUARY2014 This task will determine current and future needs and desires through the use of stakeholder and public meetings,survey/questionnaire input and detailed evaluation of the park and recreation system and programs. A web-based questionnaire and an optional mailed survey will help take the pulse of the community regarding satisfaction, needs and priorities. This input will form a needs assessment report which will guide the Master Plan content. ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL-PAGE 7 2.1 Park and Recreation System Evaluation Evaluation will include parks,trails,natural and cultural resources,connectivity,programs and facilities. We will document the system evaluation findings and opportunities graphically and in a summary report.We anticipate the evaluation will include: Assessment of conditions,quality,distribution,amenities,accessibility,connectivity, and proximity to natural areas of the park,recreation,natural resources,facility,and trail system. Evaluation of individual park and system-wide needs and opportunities. Review of recreation program use and assess delivery performance. Evaluation of current park classification system and standards. Evaluation of service areas and future growth and development needs. 2.2 Peer Community Comparison We will compare Elk River's park system features and facilities to peer communities to identify challenges and strengths. 2.3 Level of Service Analysis We will evaluate the supply and distribution of Elk River's park and recreation system facilities,fields and courts to accepted national level of service standards to identify needs and opportunities. 2.4 Trends Evaluation HKGi will analyze the emerging recreation,fiscal,environmental,land development,social and demographic trends and projections influencing Elk River and its parks,recreation and trails. A"best practices"trends presentation will be prepared for use at the Community Forum and other meetings. RECREATION what 1 _ r High Quality:Ch ster Bowl,Harrison,Morgan Park,Portman,Irving,Woodland, Wheeler,Park Point,and Grant Community Recreation Centers Medium Quality:Central Hillside,Duluth Heights,Hillside Sport Court,Lafayette, Lincoln Park,PiedmontWashington,and Memorial Community Recreation Centers Low Quality:Fond Do Lac�Gary New Duluth,Lower Chester,Merritt,Norton Park, observation,and Riverside Community Recreation Centers The quality rating of the Community Recreation Centers reflects more than just the structure of the building.It explores a number of criteria,including: - --. 1 \.. •xagn a ooaiity of Recreation Cen[ers 9 0 Dpoejqpo!WL&(cLvsf •I• - �aaswa„o. !:• •CII qqpayojqft!gDdDfoLEbjJhjpo �. :.'. •� D• Q c I e,.I The Duluth Park ft�creatlon Auer Flan created byWGi included an inventory and analysi$of current recreation centers PAGE 8-ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL A 2.5 Community On-line Questionnaire HKGi will develop a user-friendly on-line questionnaire to determine park and TASK 2 MEETINGS: recreation use,satisfaction,needs,preferences and priories. The questionnaire pix •' •• ' is to be posted on the Master Plan web page(hosted by the City). The on-line staff questionnaire is an effective tool to take the pulse of the community on potential q . -. .X psi .. issues such as park improvements,recreation needs,trail connections,park Dpn In vojLz!Q)stn financing,etc. A summary of questionnaire input and findings will be prepared. Note:We feel that an on-line survey is a key component of the needs assessment TASK 2 DELIVERABLES: process,so it is included in the core scope of service instead of an optional service. Cb' -!sf dsf bIjpo-!boe!LEbjrii \AbrvibIj.. 2.6 Focus Group Sessions Partner and stakeholder focus groups are an effective way to understand community resources beyond the City's system,to identify needs,opportunities C''l t!boe!sf dsf • •• "• and priorities. Participants will include,but are not limited to,representatives of t f 94df Lboelbsaflf • " •' the school district,youth athletics,seniors,the Chamber of Commerce,service '. #f!of f- and arts organizations,and the Parks and Recreation Commission. With City staff r vf t qpoobjsf assistance,HKGi staff will facilitate three focus group sessions(24-32 participants Uf oet!!boerjcf tdqsbdqdf total). qsf tf. . .. 2.7 Community Forum D• ' Q'' ••- q • An engaging and interactive community meeting will be held to obtain input and psi •• • • •• ideas on parks and recreation needs,issues,opportunities and priorities. Trend, "best practices"and evaluation findings will be presented and participants will be Of et!bttf ttn f odtvn n •s given multiple opportunities to provide input(written,verbal,ranking exercises, epdvn • games,etc.)to help define the desired future park and recreation system. '• ••• • - •• • ' -• . • iz ••- ••• 2.8 Needs Assessment Summary We will prepare a graphic summary and digital presentation of the needs assessment findings from the information gathered in Task 2. The Needs New Brighton CommunitySunvey �aama, �K�o ciiy'o�' Assessment will provide the direction and background for the formation of a =�9,peeae e,o� "`g clear and compelling parks and recreation master plan. °°a °'6 "�°° "g . " rope""°��p°=ryc1r Optional Additional Servicesu,^e« �_ "" ""'°"� k °•°adfe°efBa=°°=° Mailed Community Survey—We will prepare and administer a statistically valid 0 Mn mailed survey of Elk River residents to gather information on satisfaction,needs ° and priorities. Our mailed surveys allow a scientific view of resident's wants,needs and desires. We will mail a graphically pleasing,user-friendly survey questionnaire to a random sample of Elk River households. The survey form will include a pre- paid City mail permit for ease of use and to ensure a high return rate. Survey content will developed with City staff and can be routed to the City Council prior to mailing. We will administer the survey process,enter the data,analyze the „m° ae O.e'°�^� results and present the findings HKG designed and administered a community survey for New Brighton's Park&Recreation Master Ran ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL-PAGE 9 `vrte►nV no A k.! TASK 3 MEETINGS: 3. SYNTHESIS, PRIORITIES & FRAMEWORK FEBRUARY2014 In this task we will use the needs assessment findings and the existing Vision,Mission staff� and brand to define the initial priorities and direction for the parks and recreation master plan. TASK 3 DELIVERABLES: 3.1 Goals and Priorities Workshop _ bo_ In a workshop with City staff,we will compare the needs assessment findings bs to the City-wide and parks and recreation department vision to define the bo psi -Hplorti priorities,goals and directions for the Elk River Parks and Recreation system as well as strategies for delivery of programs,services and maintenance. This will include an evaluation of the"fit"with fiscal and staffing resources. The priorities and direction will fit with the realities of resources,the physical Decision Pri « • :s setting,and reflect community values. 3.2 Draft Plan Framework and Goals ��'• ■ " " ' We will use input from the workshop to produce a draft framework for the master plan,goals,and priorities. The framework will be the"big picture"guide ■ •• •• • to the Master Plan and Focus Area Plans(Task 4). 4. DRAFT PARK & RECREATION MASTER PLAN, FOCUS ■ •• •• odpvsbhf AREA PLAN MARCH-MAY2014 ' dp This phase translates the needs and priorities into a comprehensive plan for parks ■ •• •• and recreation,develops detailed plans for parks and recreation focus areas and ' ' '' of presents the plan to the community for input and prioritization. We see the Master sf dsf• •• •o ••s t @ Plan as an integrated document with strategic plans for parks,trails,facilities, ■ recreation,funding and operations. The Plan will be designed to meet the vision ■ �� �� and create a sustainable system. dpn n vojdxjpo!Lp! •• s• • • 4.1 Staff Work Session `'•I rno!Cbs1 @ At this work session we will review and get input on draft plan content and ■ bc , organize Commission,stakeholder and public review of the Draft Master Plan. 4.2 Focus Area Planning Workshop ■ ' " " "' ' Key elements of the Master Plan will be focus area plans for signature parks,the senior activity center,riverfront parks and connectivity,Great Northern Trail/ ■ • bckj•• •spvf Woodlands Park,the Mississippi River Trail/Bailey Pointe Nature Preserve,and efficiency of recreation and potential acquisition of the Houlton Farm property and potentially other focus ••. • areas that may arise during the needs assessment process. HKGi will conduct ■ ' " " '' 'uf!of x a hands-on planning and design charrette(intensive design session)with City staff and invited stakeholders to explore opportunities and develop concept ■ • bdo•• oclsf btf plans for the focus areas. These plans will be incorporated into the Master Plan. 5 5 bxbsf of •• CsppI rno! b ' " ' ' ' ' 4.3 Draft Master Plan Preparation HKG'sPark&Recreation Master plan for The Qtyof Brooklyn We will work closely with City staff as we develop the draft park and recreation Park featured a toolkit that included a derision-making checklist and a series of icons used throughout the plan master plan. The Plan will be based on the Framework and direction document. established in Task 3 and will consist of the inventory,needs assessment,goals, PAGE 10-ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL WORK P N policies,strategies and priorities,programming,operations and maintenance tools TASK 4 MEETINGS: as well as maps and illustrations to support the Plan direction. The Master Plan will reflect the ability to fund and maintain the system. pix •' •• ' staff 4.4 Graphic Executive Summary Packet We will produce a graphically rich master plan summary illustrating plan highlights X•_ ti •• and directing residents to on-line information and input. The draft executive summary will be sent as an information item and status report for Park and D� •• • Recreation Commission and City Council informal review. nffqoh 4.5 Staff and Commission Review D q,- The Draft Master Plan will be sent to City staff for review.After staff review,we will nffqoh present the Draft Master Plan to the Parks and Recreation Commission for review and TASK 4 DELIVERABLES: comment and input on priorities. Based on their feedback we will refine the Draft f,• • b• Parks and Recreation Master Plan. It will include an inventory,the needs assessment, _ _ system plans for park land acquisition,park improvements,park development, �•� �' •• •+ • •• focus areas,connectivity,goals and strategies for facilities,recreation,maintenance, •o_ •- a• di _Master Plan g) programs and operations. Maps and graphics will be prepared to illustrate the Plan. sf...- . ..0- .. 4.6 Community Forum We will hold an engaging community meeting to inform the public about the - "'• bhf ' Plan content and obtain community input. Questionnaires,comment boards and rfnbtf •s • a dot ranking exercise will be used to obtain feedback and to solicit priorities for • •° priority Plan actions. We will prepare a summary of the review meeting input. Note: Council briefing packet Stakeholders and focus group session participants will get an e-mail invite to the _ meeting as well as a link to the draft plan • • �� �• • 4.7 Internet-based Content and Review ... . Q d .. We will post the draft Plan on-line to allow for web-based review and comment. 4.8 Optional Additional Service Public Art Plan HKGi would prepare a Public Art Plan for the Elk River park system and other city properties. The plan would identify and prioritize potential sites and opportunities for new public art projects within the city,and define locally-based art themes,materials,scales and locations. The plan will include strategies for coordination of public art projects with planning and development initiatives,art and artist selection,potential partnerships and funding opportunities. 5. FINAL MASTER PLAN & ACTION PLAN JUNE-JULY2014 The Final Park and Recreation Master Plan will be prepared by adding detail and specific tools that will further guide park and recreation decision making and implementation. - The Final Master Plan will be presented to the City Council for adoption. 5.1 Prepare the Final Master Plan The HKGi team will use the staff,public,Commission and Council direction to refine ----_ , the Master Plan and to add the Action Plan and key implementation tools. ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL-PAGE 11 5.2 Action Plan and Tools TASK 5 MEETINGS: Implementation strategies and priority projects/actions will form the ' " action plan section of the Master Plan. This is likely to include park land staff acquisition,park and facility improvements,park development,connectivity Qf tf• b• • C•- ••- enhancements, recreation program,communications and maintenance Sf dsf bIJpo!Dpn n jttjpo strategies. We will prepare cost estimates for priority actions. �� 5.3 City staff Work Session HKGi will work with staff to develop the Final Master Plan identify action plans TASK 5 DELIVERABLES: and implementation tools. e.. C,- ..- p (digital Master Plan 5.4 Park Dedication Strategy boe!p1hjobrIWn H LHj!g)sl HKGi will prepare a park dedication strategy and recommended sf's' ' "0 " park dedication rates based on the Final Master Plan. This will include UZ* documentation of the"rationale nexus"required by State statutes. 5.5 Asset Management Strategies HKGi will work with City staff to identify appropriate operation and management actions such as refined park roles/classifications,maintenance levels/priorities,service pricing,use of volunteers,etc. 5.6 Cost Estimates and Update the CIP HKGi will work with City staff to prepare an updated Capital Improvement Plan(CIP)with estimated capital costs for key implementation actions. The CIP costs will be phased over short-term (0-5 years),and general tasks and costs identified for mid-and long term (20 year)periods. Funding strategies will be prepared for these actions. 5.7 Master Plan City Review Once the final draft of the Master Plan and the associated implementation strategic/tools are defined it is to be reviewed by City staff. The Parks and Recreation Commission will be asked to make a recommend the Plan to the City Council for adoption. 5.8 Council Adoption -° We will present the final plan to the City Council for adoption. 5.9 Plan Delivery We will provide the final Park and Recreation Master Plan in reproducible/ editable digital format and pdf format. PAGE 12-ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL SCHEDULE, FEE & CITY RESPONSIBILITY SCHEDULE&FEE The table includes the proposed project schedule and consulting fees by phase with direct expenses(mileage,printing,etc.). We are committed and have the staff and resources to meet this schedule and deliver a creative and effective Master Plan by August 2014.The schedule assumes a November 2013 start of work. We are open to discussion about revisions to the proposed work plan in order to best meet your needs and budget. START PHASE • • 1. Inventory and Evaluation November 2013 December $ 5,800 2. Needs Assessment November January 2014 $13,650 3. Synthesis and Prioritization February March $4,975 4. Draft Parks&Recreation Master Plan,Focus Area Plans March May $23,800 5.Final Master Plan and Action Plan June July 2014 $16,475 TOTAL NOT-TO EXCEED $64,700 Optional Community Survey-preparation,mailing,data entry and analysis,summary presentation $13,850 Optional Public Art Plan-Art priorities,themes,and strategies $4,150 TOTAL NOT-TO EXCEED W/O PTIONS �I_ $68,850-$82,700 Notes: 1. Community input to occur across all phases as noted in the Work Plan. 2. Expenses including mileage,printing,plotting and meeting supplies are included in each task. RATES&EXPENSES HOURLY RATES Principal $145-175/hr Associate $100-145/hr Senior Professional $90-150/hr Professional II $80-100/hr Professional I $50-80/hr INCIDENTAL EXPENSES Mileage....................................................Current federal rate/mile Large Format Scanning............................Actual Cost Photocopying BW.............................15C/page B/W Bond Plots..............................................$ 5.00 each Photocopying Color........................$1.00/page Color Bond Plots...........................................$20.00 each Outside Printing.................................Actual Cost Photo Paper Color Plots...........................$40.00 each CITY RESPONSIBILITIES The City of Elk River is to provide digital air photos,GIS base data,Comprehensive Plan,existing Parks,Open Space and Trail Master Plan, park and trail facility inventory,access to pertinent previous studies, program information,data and plans. City staff is to participate in planning meetings and assist with the Parks and Recreation Commission,focus group sessions and community input meetings. The City is responsible for reserving rooms for community meetings,inviting participants for focus group sessions, distributing meeting information,distributing project status updates,and posting project information on the city web site and with local media (content provided by HKGi). For the optional mailed community survey,the City will provide a data base of residential addresses and a postage paid mail permit with sufficient funds for return postage for completed surveys. Invoicing will occur monthly for work completed according to the Work Plan. The City of Elk River shall pay HKGi within 30 days of receipt and acceptance of project invoices. ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL-PAGE 13 RELATED EXPERIE, ` BENEFITS OF THE HKGI TEAM HKGi brings the following skills,experience,and knowledge to the analysis and plan for Elk River's parks and recreation system: • Award-winning history of creative and effective park,recreation and trail master plans • In-depth knowledge of Elk River and its park system • A deep and successful history of city wide park and recreation system plans and individual park planning and design,including riverfront parks,trails and greenways and signature parks • Acknowledged experts in innovative park dedication and financing methods • Hands-on experience operating and managing park and recreation departments • Community engagement experts: • In-house public opinion survey specialists • Innovative and effective outreach and input methods • Skilled at prioritization of projects and financing • Proven success in reaching community consensus and building support for park plans and actions • Authorities on social,demographic and recreation trends and park and recreation improvement costs _ Commitment to crafting a sustainable vision and plan for Elk River's park and recreation system • Deep experience in a team approach to planning incorporating our staff,City staff, stakeholders,officials and the public RELATED PARK, TRAIL&RECREATION MASTER PLANNING EXPERIENCE HKGi has prepared award-wining park,trail and recreation master plans, strategic plans,and needs assessments for cities and park agencies across the Midwest. To get a good idea of our experience we encourage you to view recent park and recreation master plans HKGi prepared for: Duluth http://www.duluthmn.gov/parks/master_plan.cfm Saint Paul http://www.stpaul.gov/index.aspx?nid=3845 Bloomington http://www.ci.bloomington.mn.us/cityhall/dept/commsery/parkrec/parks/ parkplan/parkplan.htm PAGE 14-ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL RELATED EXPERIENCE A few of our park and recreation master planning projects are highlighted* in the following pagesand othersare listed below. •Brooklyn Park Recreation Parks and Trail Plan* •Duluth Parks and Recreation Master Plan* L •Saint Paul Parks and Recreation System Plan* - •New Brighton Parks,Recreation,Trails and Open Space Plan* — Y •Mankato Parks and Recreation Plan* •Rivers Edge Commons Park Master Plan and Construction Documents* •Bloomington Parks and Recreation Master Plan* a •Saint Paul Parks and Recreation Vision Plan* HKG has a depth of experience working in 8k aver, including concept development for Orono park •Great River Park Plan-the Mississippi River corridor in Saint Paul •Ford Property Open Space Study •Minneapolis Parks and Recreation Board Comprehensive Plan (strategic advisor for in- house planning work and plan development) •Bloomington,MN-Park Needs and Financing Study •Minneapolis Parks and Recreation Board-Grand Rounds Scenic Byway Missing Link Parkway Development Plan A •Douglas County Park,Trail and Bikeway Plan •Minneapolis-Downtown park and open space study •Dakota County Greenway Collaborative Guidebook •Dakota County North Creek and Minnesota River Greenway Master Plans •Mississippi River Greenway Strategic Plan •Park and Recreation portion of the comprehensive plan for Faribault,MN,Northfield MN, Elk River MN and others. tr " •Hastings Recreation Needs Evaluation •�'. • •Farmington Recreation Needs Assessment •City of Minneapolis Downtown Park Space Initiative •Park and Recreation System Master Plans for Independence,Hassan,Dayton,Savage, Shakopee,Prior Lake and Prior Lake School Districts,Minnetrista,Rosemount,Cottage Grove,Richfield,Northfield,Arden Hills,Woodbury and Shoreview,MN. ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL-PAGE 15 RELATED EXPERIENCE Legend Proposed Priority Actions _ Pks wth unique co mm dy-wide use .rfh�W�ds Pa,.. ¢ - EidEln Homestead:Continue r_Naw^,ban g,aanway to celebrate Brooklyn Park's Msss PPiRheroe^ide Planned Reg"nal Tra k - '� History.Potential location for local P,o,f Tai Net-rk New community park and potential catalyst for P.�1–� .�-- q historical society,farmer's market, faegiwelTails developmentJredevelopment. _ -_ Oak GrovePark ex ansionofcommunit gardens CoonRapidp: ® InternalRarkwalkl"gTa,le E ;, Regional Perk Potential location for outdoor 7d We- d -w Informational performance space andlorarts �� c � Historical5ne center. Existing Parks �H.61p c`3 walk --•Planned Trail Tril N. 5vana P __.Planned Sidewalk _._� P Wiilawatvn Schools - f i"P?.,k enroll—Park • - came: y� MISSISSIPPI RIVER P­ Mania"nP°'" Near Term: �� - -"' Pa`k J` •Enhance&expand A—"P-1, s Edi b„gM1 Gaif S ratfurtl Illl�k River Park r ,gs,Ay_�r .�g��SAH ios�c aaf ca - •Enhance Mississippi m. aed�Amvry - re RiverTrail c�^w dP..k e e^ Provide accessto -- .r hB w k� Central Park _ w river islands for River Pa � - N da.,k. .!1� special programs Look for opportunities to - �, � -, � p p g establish a new park with P P'n H Long Term: picnicking and amplified _ – •Redevelopment of sound west of CR-81 ; land adjacent to the river >•a­-� +rcc -isai I ­1.,,ua,m —. ar E t b Brookdale Pk r s a lisp continuous •public open space along the river edge Z.,i4 un P. weed Pan 4^�RZan ..I-Co.- d s +1 k - 4T .:.. E..- ..A Develop an urban greenway along Bass Creek and Shingle Creek 0 0.25 0.5 � a Ik Pant connectin totheMississipppi River, mMies O Bit BROOKLYN PARK REC REA TI O N AND PARKS MASTER PLAN BROOKLYN PARK, MINNESOTA Over the last 10 years, the City of Brooklyn Park,Minnesota(76,893 population)has become one of the most diverse communities in Minnesota. This,in combination with aging park facilities in the southern portion of the city and needs for new parks in developing areas,created a need for a city-wide recreation and parks master plan to guide park investment for the next 25 years. In 2011,the City hired HKGi in conjunction with Tree Line Inc, to create a plan for community supported vision for where recreation and parks is going and a guide to how it will get there. The resulting plan will help the Recreation and Parks Department balance investment in park facilities and programs with available resources and adapt to changing community needs. Plan components include a detailed needs assessment;goals and objectives organized around 6 focus areas for the department;and an implementation tool kit identifying priorities, park standards and activity delivery guidelines, and typical capital and annual operations and maintenance costs. As part of the planning process,HKGi developed and tested a pilot neighborhood park planning process to address changing neighborhood needs within the framework of the city-wide plan. Lessons learned will inform future individual park master planning in the city. PAGE 16-ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL RELATED EXPERIENCE E01 0 LEGEND 61 Fyjtyoh ZV VOhf 96oeTbl fx brh isgrtggbN e' - -- QboofaUbjn)gbA e' d P fsFyjtyoh U4rt s e+ Pzrjof!(b9xte!bt!qpgptfe L Tvgf;ps!l jljoh"r !� (2pgptfe!np Zot!cjl f!ubjr y cpoofdjpot!.!btltl�tt 4pgpggehf �I Upgptfe!utyrppoofdjpot!. 8 bipoh!x brtsgpoLLboeNgi jn t - (h1t $ Lake Superior S E ,. f1 PA RKS A N D REC REA TO N M A STER PLA N DULUTH, MINNESOTA The City of Duluth is blessed with a wonderful and extensive parks,recreation and open space system that is a defining element of the community. Like many cities,Duluth has experienced budget issues which challenge the ability to maintain and sustain the park and recreation system. In 2009 the City hired HKGi to prepare a comprehensive master plan to guide park and recreation management and investment. Over 1,000 residents provided input into the planning process. Input opportunities included a community survey,focus group sessions,community open house meetings and web/e-mail input. The Master Plan includes a system-wide evaluation of parks and facilities and an action plan for improvements. Key recommendations of the Plan are: Improve the quality of existing parks(especially neighborhood parks), Focus on connecting the community through trails and bikeways, Have fewer,but higher quality recreation buildings, Enhance stewardship of natural resources, Expand partnerships with schools for community recreation and gathering, Increase use and recognition of volunteers and volunteer groups,and Create stable and sustainable funding sources to improve the park system. In 2011 Duluth residents approved a bond referendum dedicating approximately $2.6 million a year to park improvements, maintenance and recreation programs. The Master Plan was an important tool in getting the referendum approved and is a guide to improvements. ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL-PAGE 17 RELATED EXPERIENCE - � t - - I - a ;pkte — I n"ling P.oku•ay � �� o �I 0 an, ) y o m , r — � — --' c auPlece n n Pa,k,,,.y ea < �. .4 j rya, R t inkthe - � 4 � e° x It Gr Rounds j , Ti - a ve E_lktrto �` �•��1``ray y ■ - I Ahtu Sanceery Inoran Mk _w l�� j _ 1 1 _ 1 a Abed no rave-coax m, V \\erg� ,s aarueCr k I i Reg Felt w1ietlsla . -------_________ / ZZ,• � nfta �T wePro� I . r� '�. Pal Pan Ff9s Eye 4 Raj R�anal�n6 1 RwP k � -- -- Trals,94evays&card Rwr6 1 � -_ �Mnalf-ma]ha�s '\ �• ifV E;r Fails e a r_ f �Oiraad dke r r ;' ` z arm` __ReWNSd Bf�waYlCmP Ran) P f � r y.' �RgnsdTals�kenay PaMS&R�Lei y, - _ o P0-Mlles � �drk 1,aN d T,,1 L,s,pPs k eAlSnay'tCd,,fi Rakgvle al PaM1 5 QIV dI t- :do Sa,".•��_\ ._-------- SA I N T PA UL PA RKS A N D REC REA TO N SYSTEM PLA N SAINT PAUL, MINNESOTA The City of Saint Paul,Minnesota(278,752 population)has a well loved and well used park and recreation system that is experiencing significant infrastructure needs in a time of declining budgets. In 2009,the City engaged the HKGi Team (HKGi assisted byTreeline and Miller Dunwiddie Architects)to prepare a comprehensive plan for all parks and recreation facilities in Saint Paul to make the system more financially sustainable and more relevant to current recreation trends. The Plan considered public,private and non- profit recreation providers and facilities. The System Plan includes an inventory,evaluation and recommendations for the city's 170 park properties,41 recreation center buildings,trails,parkways,fields,courts,and other facilities. A series of interactive communities meetings helped shape Plan content and recommendations. Web,e-mail,focus group,staff,and Mayor,City Council and Parks and Recreation Commission input also guided the Plan content. The Plan is designed to prioritize investment in city facilities and expand partnerships to match resources with expenditures while updating the city's recreation facilities to better meet current and future recreation needs. The Plan envisions a transformed 21 st Century recreation system that is more relevant, more connected and more sustainable. The Plan is a blueprint and asset management tool. It contains plans and specific recommendations for recreation centers,parks, trails, parkways,access to nature,athletic fields and facilities, play equipment,and specialty facilities. The Benefits section of the Plan shows a savings from the recommended reconfiguration of recreation center buildings of$1 million per year that can be reinvested in other facilities to achieve the comprehensive transformation of the parks and recreation system. PAGE 18-ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL RELATED EXPERI ENS 1 waw i I . -�4•.� == _'iii—•I <—==_2!W✓awx t �I US IM �� .•w..wwl wl KEY iioMn' ' cx..cwo PARK SERVICE AREA ANALYSIS 5.l " [1M MILE WALI°MGDI8TIMIGE3 FIG.3:TRAIL&SIDEWALK SYSTEM PLAN 3.15.06 PARKS, REC REA T O N & TRAILS STRATEGIC PLAN NEW BRIGHTON, MINNESOTA After a national search,the City of New Brighton hired the Hoisington Koegler Team to prepare a Parks, Recreation and Trails Strategic Plan. HKGi led the strategic planning effort in partnership with the City and with the assistance of recreation experts. The planning process included significant input from the public, a variety of stakeholders, and city officials. Engaging input techniques included a public opinion survey(20%response rate),interviews,focus group sessions with youth,seniors,recreation stakeholders,arts advocates,other cities'recreation peers and golfers. Broader public input opportunities included a Town Forum and neighborhood meetings,interactive web postings,and informational displays at the Family Service Center. The Strategic Plan developed a vision and mission for the Department and put"play"into the City vision statement.The plan emphasizes the promotion of active living strategies,raising awareness of recreation facilities and programs,and displaying the benefits of parks and recreation across the spectrum of department communications and actions.Strategic priorities focus on five commitments:improving health,protecting natural resouces,fostering healthy youth development,sustaining fiscal responsibility, ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL-PAGE 19 RELATED EXPERIENCE 4 F Ar 7r iI a al u.., 1116. rc ;*iA77 il I . . I -�� ilk LAk WOW x � rr■`rt 'ev The Master Plan recommends that the City explore methods to develop unique parka men ities afforded by features like the spent quarry pictured above.Such a park might be able to offer interpretation of the city's industrial history as well as provide a unique recreational opportunity. PA RKS A N D O PEN SPA C E M ASTER PLA N MANKATO, MINNESOTA The City of Mankato hired HKGi to develop a master plan to help guide the City in its park development and parkland acquisition efforts for the next twenty years. HKGi's park planners first performed an analysis on Mankato's current park system and on other recreational opportunities found in the immediate region.Using a combination of the current park inventory,land use maps and population projections,HKGi also performed a needs assessment in order to identify neighborhoods that are currently underserved by the park system as well as to identify areas in which future growth would necessitate the acquisition and development of new parkland. Mankato's natural environment lends the city a truly unique identity that the Parks and Open Space Master Plan recognizes as a force that guides development and should also guide park development.The Minnesota,Le Seuer and Blue Earth Rivers have carved beautiful valleys,bluffs and ravines out of the landscape and the Master Plan recognizes these natural features as opportunities to create unique park and trail amenities.The Master Plan includes a set of both general and specific recommendations dealing with parkland acquisition and development in Mankato's future growth areas and the creation of a more coherent,well-connected park system through the use of trails,linear parks and parkways. PAGE 20-ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL RELAT"' cXmcRI ENCE AMERICAN 2013 Merit SOCIETY OF LANDSCAPE Award Winner ARCHITECTS MINNESOTA IL �P 4 �k h s s.. .. .A1.• - RIVER'SEDGECOMM0 INS PARK ELK RIVER, MINNESOTA River's Edge Commons Park is located in the heart of downtown Elk River,Minnesota. The park connects Main Street to the adjacent Mississippi River and provides a venue for community festivals and concerts in the park,drawing thousands of visitors every year to the downtown. The City recognized the need to better assure the long-term viability of downtown by making a stronger connection to the rest of the community and by utilizing the riverfront location. River's Edge Commons Park is critical to that plan and has provided a significant economic boost to the downtown business district since opening in 2007. The design process for the park began when Hoisington Koegler Group was commissioned by the City to develop park concepts and complete construction documents for the design;culminating in the construction of the park in the summer of 2007. The design incorporates an upper square with shade trees and a popular in grade fountain feature at the street level,a grand staircase with a terraced stone amphitheater at the hillside,and a performance area and gazebo overlooking the River below. The project has earned high reviews from the public and the industry, being recognized with an honor award by the Minnesota Recreation and Parks Association as a significant public park space. ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL-PAGE 21 RELATED EXPERIENCE • a stop fencing _._. - prowecrion rencing . ,prayer 4 -safety netting •relocate player's benches 1' -bull penlbatting cages -outfield fence -dugouts with storage -warning fence •outfield fence -Warring fence OLDS KOPEE ROW Proposed ti K shade trees, o typ.Fiel nt d Improvemes, m ir'a tFJr1Q07) i,, •backstop fencing _ -irrigated turf neg � Proposed: 1 back m stop fenc wU - _ stakeboar I park y- -bull penlbatting�a es In -dugouts with sU� ep g-- > 1_ •scoreboard n ` Proposed Urge U- picnic shelter tto sr w , ` I i yip. k y t L 1 R. `Prg osetl - .fit r sha rees, - 1 6 F .. b'P e Proposed water eld fmens IP la rV ed 1007} pro o olav rea 1 nt ar PA RK A N D REC REA T O N MASTER PLA N BLOOMINGTON, MINNESOTA The City of Bloomington,Minnesota,a city of 87,000 located on the Minnesota River,hired HKGi in 2006 to prepare a master plan to guide the operation,redevelopment and funding of their extensive parks and recreation system. HKGi worked closely with city staff,a citizen's advisory task group,stakeholders and the public to prepare a strategic master plan to guide improvement of the park and recreation system through 2025. Key elements of the planning process include an on-line community survey,a staff visioning workshop,focus group meetings,a partner meeting,peer city comparisons and use of service area standards. The plan includes strategies and actions for nine core topic areas,park improvement plans for key parks and a financial plan designed to increase fiscal sustainability and to implement plan recommendations. The Park and Recreation Plan was integrated with and builds on the Imagine Bloomington 2025,a city- wide strategic planning process. The Plan advocates a park re-positioning approach to create signature parks to serve districts within the city. Re-positioning will achieve several key goals—creating higher quality experiences and park facilities,providing community gathering places,focusing reinvestment and achieving an initial cost savings and long-term operating efficiencies. The Plan also recommends a Park Revitalization Program-regular funding for life-cycle park infrastructure replacement. Core Strategy Areas: Park Renovation Recreation Facilities Park Land Acquisition Programs and Events Natural Resources and Operations and Maintenance Environmental Sustainability Arts,History and Culture Trails and Bikeways Communications,Marketing and Partnerships PAGE 22-ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL REFERENCES REFERENCES: RANDY QUALE Manager of Parks&Recreation City of Bloomington,Minnesota (952)563-8876 rquale @ci.bloomington.mn.us Bloomington Parks&Recreation Master Plan KATHY BERGEN Manager of Parks&Recreation City of Duluth,Minnesota (218)730-4309 kbergen @duluthmn.gov Duluth Parks&Recreation Master Plan TOM RUSSELL Administration,Planning&Finance Manager City of Saint Paul,Minnesota (651)266-6415 tom.russell @ci.stpaul.mn.us Saint Paul Parks&Recreation System Plan y dd yr z Y _ ,Es ti ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL-PAGE 23 RESIN . .. AREAS OF EXPERTI SE Hsf h!,bhsbi bn -!b!tf ojps!grhoof s!boe!rboetdbgf!bsdi juf dulxjui !1 pjtjohupo!Lpf hrf� Hspvq-!i bt!gspvyef e!gbsl !boe!usbjdgrboojoh-!ef tjho!boe!rboetdbgf!bsdi juf dwsf! tfs4dit!up!gvcrjd!boe!q�v Lf!tfduodtoout!Ts!36!zfbst/!!Hsfhl!dsfbuj4!bggspbdi ! up!jn bhjojoh!x i bulb!gb§ !boe!grbdf!dbo!cf-!gbjsfe!xjd !i jt!gsbdujdbdiDggspbdi !up! grboojoh-!ef tjho!boe!jn qft f oubujpo-!i bt!rfne!up!d f!ef 4 rpgn f odpdt pn f!pdd f! sfhjporl!n ptulrp4e!tgbdit/!!Bt!b!g)sn fs!Nbobhfs!pdOpipnjohupo-!NO!Gbsl t!boe! Sf dsf bujpo-!Hsf h!i bt!i boet.po!f yqf if odf!jo!brrtw ut!pdsf dsf bujpo!boe!gbd t/1 Hsf h!g)dvtf t!po!n bt of s!grbot-!dpn qsf i f otju&f!gbsl -!sf dsf bujpo-!uEbjrtboe!cjl f x bz! tztuf n !grbotabdujud!tMoh!tudxf hjf t4jouf sgsf o\Af!ef tjho-!qbd !boe!grlmhspvoe!ef tjho! and specifications, needs assessment, public art design,funding, and community jo\Aprvi n f Od GREG I NGRAHAM,ASLA PROJECT EXPERI ENCE New Brighton,MN SptQpIf Parks,Trails,and Recreation Plan (Sty of Saint Paul,MN Park development plans EDUCATION: Parks and Recreation Vision Plan Master's of Business Communication, Parks and Recreation System Plan Woodbury,MN University of St.Thomas School of Central Corridor Bike/Walk Plan Parks Recreation,Open Space and Trails Management Plan Bachelor's of Landscape Architecture, Minneapolis Parks and Recreation Board Park development plans University of Minnesota Victory Memorial Regional Parkway Master Plan Minnesota Historical Society M EMBERSHI PSAND AFFI LIATIONS Grand Rounds Missing Link Parkway St.Anthony Falls Area Interpretive Plan American&Minnesota Planning Association Development Plan Minnesota Recreation and Parks Association Youth Sports Facility Grants Wright County,MN American Society of Landscape Architects Trail and Bikeway Master Plan member(ASLA) Minneapolis,MN Collinwood Regional Park and Registered Landscape Architect(RLA)-State Lake Harriet-"Pathway to Peace"Public Art Campground Master Plan of Minnesota and Gateway Design and Fabrication Member of the Association of Pedestrian and Midtown Greenway-Public Art"Personal Douglas County,MN Bicycle Professionals(APBP) Journeys"sequential sculptures Kensington Runestone Park Master Plan University of Minnesota-Planning and Design Instructor,Urban Studies Department Bloomington,MN Eagan,MN "Designing Healthy,Active Communities" Parks and Recreation Master Plan Patrick Eagan Park Master Development/ and the Humphrey Institute to Management Plan p Y Park Needs and Finance Study Site Planning Park development plans and playground p p p Yg Ramsey County,M N design Tamarack Nature Center-Destination of Pond Dakota Mission Park Master Plan Discovery Master Plan and Exhibit Design Hastings,MN Savage,MN Recreation Needs Assessment and Parks,Recreation and Trails Plan Strategic Plan Three Rivers Parks District Shoreview,MN Hyland Bush Anderson Lakes Regional Park Park Needs Assessment and Improvement Reserve Master Plan Plan Inver Grove Heights,MN Bismarck,ND Community Center Park,Play Area and Parks and Recreation District Strategic Plan IM13 Skate Park Trail Gap Plan Dakota County,MN Thompson County Park Master Plan fflnRichfield,MN (Sty of New Ulm,M N Park and Trail System Plan Parks and Recreation Plan PAGE 24-ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL RESUMES AREAS OF EXPERTI SE: bd bn !jt!b!sf hjtLf sf e!rbbetdbgf!bsdi jr.f ddXjd !f yqf ajtf!jo!gbsl !grboojoh!boe! of tjho-!rEbjrriboe!cjl f x bztaboe!pgf o!tgbdf!grboojoh!boe!ef tjho/!1 f slbx bga!xjoojoh! x psi !jor.f hsbuf t!sf dsf bypo!boe!obu✓sbdsf t pvsdf!gspuf dypo!r.p!dsf buf!n f n psbc rfi! gvcrjd!grb:tf t/!Ti f!i bt!dpor>jcvrf e!up!dpn qsf i f otjNf!gbsl !boe!rEbjNrbot!jo!ep{f ot! pddpn n vojrjft!.!cpn !rbshf-!ftubcrjfii fe!gbsI !tztufn t!r.p!hspxjoh!dpn n vojrjft/1 K#Vsf tgpotjcjrjnjf t!xjd !1 LHj!jodrmef!gsplf ddn bobhf n f odboe!d)djrjubrjoh!gvcIA! jo\Aprvaf n f od ULLIAN LEATHAM, RLA PROJECT EXPERI ENCE Farmington,MN Sprfi;!M beKJ !' !Sf dsf bypo!Qbr)of s P Planning (various p arks) Bloomington,MN YEARS OF EXPERIENCE 15 Parka nd Recreation Plan Hassan Township,MN Hyland Bush Anderson Regional Park Henry's Woods Park Master Plan EDUCATION: Master Plan Comprehensive Park,Trail and Greenway Masters of Landscape Architecture- Plan University of Minnesota Brooklyn Park,MN County Road 144 Trail Feasibility Study Recreation and Parks Master Plan Bachelors of Arts,Political Science-Emory Waite Park Hastings,MN University,Georgia Mississippi River Greenway Strategic Plan Chanhassen,MN REGISTRATION: Park and Trail Planning and Design (various Independence,MN Landscape Architect,Minnesota,Licence projects) Park,Trail and Open Space Plan No.42512 2030 Comprehensive Park Plan Update Chanhassen 2005 AUAR Inver Grove Heights,MN M EM BERSHI PSIAFFI LI ATI ONS Trail Gap Study American Society of Landscape Architects Cloquet,MN (ASLA) Comprehensive Trail Plan Minneapolis Nrk Board 2012-14 ASLA-Minnesota Chapter- Missing Link Design Initiative Executive Committee Dakota County,MN Association of Pedestrian and Bicycle Miesville Ravine Park Reserve Master Plan Mound,MN Professionals(APBP) Thompson County Park Master Plan Lost Lake Greenway CR 15 AWARDS Lake Byllesby Regional Park Master Plan 2012 ASLA-MN Merit Award,Minnesota Minnesota River Greenway Master Plan Rosemount,MN and North Creek Greenway Master Plans, North Creek Greenway Master Plan Natural Areas Identification Dakota County,MN Rosemount Greeenway Master Plan 2030 Parkand Recreation Plan Update 2010 ASLA-Honor Award,Saint Paul Parks Vermillion Highlands Greenway Master Pedestrian and Bicycle Master Plan and Recreation Vision Plan PLan ASLA Merit Award,Mississippi River Saint Paul,MN Greenway Strategic Plan Dayton,MN Saint Paul Parks&Recreation Vision Plan 2: : : !BTNB!Nf IdBx bse!g)s1Tu✓ef odX psl Park,Trail and Open Space Plan Central Corridor Bike/Walk Action Plan KAoetdbgf!Bgdi juf du✓sf!Bdbef n jd! Saint Paul Parks&Recreation System Plan Bdi jf wf n f odBx bse-!2: : 942: : : Duluth,MN Park Master Plan West St.Paul,MN Trail and Bikeway Master Plan Bicycle and Pedestrian Master Plan ©© Bk River,MN Wright County,MN ©e Comprehensive Plan Trail and Bikeway Plan ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL-PAGE 25 + AREAS OF EXPERTI SE: CbvrlQbjhf-!Vjttf!Caftjefourlgpttfttft!n psf!d bo!31!zfbst!pdfygfIfodf!jo!dpn grNoh! gvcgd!boe!q1\nbuf!gsplf dut!d spvhi pvdd f Upvombfl.1 jt!f yuf otjwf!gEplf ddn bobhf n f od boe!ef tjho!f yqf If odf!bt!b!Njoof tpub!rjalf otf e!IUboetdbgf!Bgdi juf duljodnnef t!cspbe! tdbrfi!grboojoh!pdgbsl !boeef dsf bgpo!tztuf n !grbot-!d f!eftjho!boe!dpotubvdujpo! Z. ben jojtLEbgpo!g)s!rbshf!boe!tn brlgbsl t!boe!gvcrjd!tgbdit-!bd rfiujd!d)djrjnjf t!boe! dpn grfiyft-!tusffutdbgf!eftjho-!boe!dbn gvt!grboojoh!g)s!dpsqpsbuf-!n vojdjgbr4h boe!f evdbujpobriulrjfiout/!!1 f!gf r of ouz!bevytf t!gvcro!boe!gl\Abuf!rboe!px of st!jo! d f!dpoufyulpdbdijfvyoh!d f!i jhi ftulboe!cftulvtf!pdd fjs1rboe/!!,b!beejujpo!up!ijt! t uEbuf hjd!grboojohatjuf!ef tjho!boe!sf dsf bgpo!grboojoh!f yqf if odf aCbvrin bt!g3f r of ourt gspvgef e!dpot Lwdypo!epdvn f oubypo!pvf stjhi ulboe!f yqf sujtf!bt!x f nN!dpot Lwdypo! ben jojtudDujpo!tf 94cft!gs!drjfiod/ PAUL PAIGE, RLA PROJECT EXPERI EN CE Plan Sprfi;!M be!Cbd !Ef tjhof s Blaine,MN Elk River,MN YEARS OF EXPERI ENCE 23 The Bridges River's Edge Commons Downtown Park Town Square Park Plan and Construction Administration EDUCATION: Youth Athletics Complex Master Plan B.L.A.,University of Minnesota Bloomington,MN Highway 10 Corridor Study Normandale Lake Bandshell REGISTRATION: France Avenue/Old Shakopee Road Faribault,MN Landscape Architect,Minnesota,License Streetscape Central Avenue Streetscape No.23594 Bush Lake Beach Renovation Civic Campus Site Design Farmington,MN Meadowview Park Master Plan MEMBERSHI PS/AFFILIATIONS: Hill Dee Park Master Plan Elk River Parks and Recreation Commission Brooklyn Park,MN (former) Village Creek and Arbor Plaza Silver Springs Park Master Plan Sensible Land Use Coalition Park and Recreation System Plan Middle Creek Park Master Plan AWARDS: Chanhassen,MN Hassan Township,MN 1988 ASLA Honor Award for Student Work Marsh Glen Trail Extension Parks,Trails and Open Space Master Plan Lake Ann Stairway and Overlook Henry Woods Memorial Park Plan 15+Park Improvement Projects over 15 County Road 144 Trail Feasibility Study years Independence,MN Parks,Trails and Open Space Master Plan Circle Pines,MN Little Canada,MN Village Master Plan,Streetscape,and Permanent dock Little Canada Road Streetscape Clock Tower Plaza Design and Construction Mankato,MN Crow Wing County,MN Parks and Open Space Master Plan Mississippi Northwoods Conservation Strategies Minneapolis Park and Recreation Board Victory Park Master Plan and Renovation Crystal,MN Keewaydin Park Renovation Hagemeister Pond Preserve Master Plan Lake Calhoun Parking expansion Bassett Creek Park Extension Cedar Field Neighborhood Park ©© Forest School Soccer Field Levin Triangle Park Renovation East Phillips Park Master Plan Inn Dayton,MN Bottineau,Currie,and Stewart field Parks,Trails and Open Space Master Plan improvement projects Edina,MN Minnetrista,MN Countryside Neighborhood Park Master Comprehensive Parks,Trails,and Open Space Master Plan PAGE 26-ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL RESUMES AREAS OF EXPERTI SE: Hbcsjf rrfn!i bt!g)vs!zf bst!pdf yqf If odf!x psi joh!xjLi !dpn n vojrjf t!po!rb hf.tdbrh! planning efforts and small-scale site improvements.At HKGi,she contributes to park boe!usbjrlgrboojoh-!dpodfqu,/bftf4rpgn fodgrboojoh-!epdvn fodrbzpvuE!boe!tjuf! of tjho!bt!b!gsplf dulef tjhof s1boe!gsplf ddgrbaof 5!Hbc jf refn!dpn cjof t!hsbgi jd!ef tjho! boe!bobrztjt!tl jr*iup!dsf buf!bx bge.xjoojoh!boe!drhbs!grbaojoh!upprtlg)sldpn n vojyf t/. Ti f!i bt!x psi f e!po!b!xjef!sbohf!pdgsplf dut-!jodrmejoh!rboetdbgf!sf tupsbujpo!boe! t upsn x buf ssf rbuf e!rbDetdbgf!ef tjhot-!hsf f ox bz!grbot-!dpn n vojue!ef v\f rpgn f oul grbataboe!jouf sbdg4!porjof!grbaojoh!upprYi!!I f s!g)sa f sIx pd !bt!b!rbaetdbgf!b9di juf dd jouf so!bdd f!Djue!pgX i juf!CF bsll%l f!jodrmef e!uEbjrlaf tjhoarld f ti psf!sf t upsbgpo!ef tjho-! dpotubvdujpo!p4stjhi ut!boe!gbd !grbaojoh/ GABRI ELLE GRI NDE, RLA PROJECT EXPERI EN CE Elk liver,MN Sprfi;!Cbd !' !SFdsf bgpo!C2boofs Main Street and Hwy 169 Intersection Bloomington,MN Landscape Improvements YEARS OF EXPERI ENCE 4 Lyndale Avenue streetscape Orono Parkway Landscape Improvements EDUCATION: Brooklyn Park,MN Hennepin County,MN Master of Landscape Architecture- Recreation and Parks Master Plan Minnehaha-Hiawatha Investment University of Minnesota,2008 Hartkopf Park Master Plan Framework Port Cities Study Abroad,Lisbon,Barcelona, Byron MN Inver Grove Heights,MN and Venice-Univ.of Minn.Dept.of 2030 Comprehensive Plan Parks and Recreation System Plan Architecture,Spring 2007 Frontage Road Redesign Concepts,2012 Saint Paul,MN Bachelor of Arts,Political Science-University Parka nd Recreation System Master Plan of Wisconsin-Madison,2003 Chanhassen,MN Great River Park Master Plan Lake Ann Park Entry Sign design MEMBERSHIPSrAFFILIATIONS: Lake Minnewashta Rain Garden Planting White Bear Lake,MN Co-Director of Awards and Banquet, Plan *2030 Comprehensive Plan Update American Society of Landscape Architects- Lake Ann Hillside Restoration Minnesota Chapter Lions Park Lakeshore Restoration and Trail p Lakeview Neighborhood Park Concept Plan *Lake Avenue Streetscape&Monuments AWARDS: Dakota County,MN *Marina Triangle Conceptual Master Plan 2012 Honor Award for Communications, Greenway Collaborative Guidebook Metropolitan Council Stormwater Reuse Minnesota River Greenway Master Plan Metropolitan Council Guide,ASLA-MN Stormwater Reuse Guide North Creek Greenway Master Plan 2012 Merit Award for Planning,Dakota Rosemount Greenway Master Plan Minneapolis,MN County Greenways:Minnesota River and Vermillion Highlands Greenway Master Plan Lake Hiawatha Bluewater Rain Garden North Creek,ASLA-MN Mendota/Lebanon Hills Greenway Master Design Plan REGISTRATION: Minneapolis Park and Recreation Board Lake Marion/South Creek Greenway Master Park Features Cost Estimating Minnesota Landscape Architect#50416 Plan g Lebanon Hills Regional Park Master Plan North Saint Paul,MN Duluth,MN Downtown Redevelopment Master Plan Park and Trail System Master Plan Storm Lake,Iowa Edina,MN North Lake Avenue Trail Concept Plan ©© Countryside Park Master Plan University of Minnesota ©e UMore Park AUAR ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL-PAGE 27 RESUMES AREAS OF EXPERTI SE: Lfvyo!jt!b!dpn n vojue!grbbofs!boe!rhoetdbgf!bsdijLfduljo!uEbjojohPl3u!I LHj4i f!i bt! cffo!ftgfdjbnzfjovprvte!xjd !dpn gsfi fotjvf-lofjhi cps ppeaboe!gbd !grboojoh/!I f! g)dvtft!porsfdsfbypo!bu rfxjd!g)djr)w!grboojoha!HJfln bggjoha!boe!qrbox1yohMI—fWO! is also involved with volunteer community planning efforts including the Minnesota Eftjho!tfbn !boe!Li f!TLbsrjmh!Q pI#dWbo!fgpsu!Lp!forjWo!boe!tvtLbjo!Vojv�fstjue! Bvrfovf!d spvhi !d f!rjhi ds4rl dpotuwdypo!gEpditt!cz!tvggpajoh!Lfn gpsbsz!vtftljo! vrbdboLltLpsfgpodP!BL1u f lV ojvrfstjuz!pdNjooftprb!Lfvgo1!DbgtLpof x pd !g)dvtfe!po! d f!joLf hstxjpo!pggvcrjd!jogbtL&du✓sf!boe!pgf o!tgbdf!bt!b!dbrbAUg)slofjhi cps ppe! efvrfrpgn foul jo!b!ubotjuldps1epsnXijrfi!bLIU flKot!Kotf o!Df oLf s!boe!U f!D"oh! jo!Epps!DpvoLEaXjtdpotjo4Lf vyo!gsftfsde!boe!sftLpsfe!i jtLpld!rboetdbgft/!I f lbrfp! brings construction experience from multiple urban infill projects in Portland,Oregon. KEVI N CLARKE Sprf1!!Cbd !' !SF dsf bypo!Ctboof s! YEARS OF EXPERI ENCE 2 PROJECT EXPERI ENCE EDUCATION Inver Grove Heights,MN Dakota County,MN Bachelor of Arts,Economics-Saint John's Concord Boulevard Neighborhood Plan Grant Writing Services University Northwest Area Street Plan Study Abroad-Universidad Valladolid, Parka nd Recreation System Plan Douglas County,MN Spain&University College Cork,Ireland Parks,Trails,and Bikeways Master Plan Master of Urban&Regional Planning- Anoka County,MN Hubert H.Humphrey School of Public Grant Writing Services Minneapolis Park&Recreation Board Affairs,University of Minnesota,2012 Northeast Park, Master of Landscape Architecture-College Arden Hills,MN of Design,University of Minnesota,2012 County Road E Streetscape Perry,IA Comprehensive Plan M EMBERSHI PSAND AFFI LIATIONS Bondurant,IA American Planning Association Comprehensive Plan Ramsey County,MN American Society of Landscape Architects Rice Creek North Regional Trail Master Plan The Urban Land Institute Baxter,MN Minnesota Design Team Timberwood Business Park Saint Louis County,MN Potlatch Corporation,Land Use Concepts The Starling Project Brooklyn Park,MN Recreation and Park System Plan Storm lake,IA Comprehensive Plan and Zoning Byron,MN Ordinance Comprehensive Plan White Bear Lake School District,MN Chanhassen,MN Athletic Facility Needs Assessment Downtown Parking Study Aquatic Invasive Species Program Analysis Worthington,MN Recreation Facility Master Plan Crow Wing County,M N Potlatch Corporation,Land Use Analysis IM13 ffln PAGE 28-ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL RESUMES AREAS OF EXPERTI SE: Sjub!i bt!cf f oft vddf ttgi*!bttjtujoh!24!rladbrhp\nf son f odbhf odjf t!tf dvsf!of bsz10i/: ! n jr*o!jo!gioejoh/!Ti f!sf hvrbazlvodp\Af st!hsbodpggpsa✓ojrjf t!d spvhi !sf tf bsdi !boe! networking.She then is able to align and prioritize projects that are the best fit for J f!gioejoh!pggpsu✓ojyft/!I fs!tuspoh!n bobhfn fodtljrrk1boe!bcj*!up!tzod ftj{f! �' jog)sn bypo!fbtft!d f!hshodgsfgbdjpo!gspditt!g)slgbsr.Dfst!tp!d fz!dbo!tjn grdfejul sbd f s!d box Iuf U f!hshoLA f s1HJflboe!hsbgi jd!tl jr*idpoLl cvuf!up!d f!qsf gbsbgpo!pd maps and supporting materials that effectively communicate the scope of the project and justify the need for the grant.Communities have also benefitted from her attention up!ef ubjrbt!ti f!obvghbuft!d f!hsboulben jojtuEbypo!gspditt!g)s1hshodt . PROJECT EXPERI ENCE Hennepin County&(Sty of Edina,M N RI TA TRAPP,AICP, LEED AP Greater Southdale Land Use and Anoka County, Transportation Study Sprfi;.C�bDOf�' C�oejoh.Tgf djbrjfiu Y, N SHIP Grant Writing YEARS OFEXPERIENCE 9 Partner Training Services Inver Grove Heights,MN Trail Gap Study EDUCATION: Banter,MN Bachelor of Science in Land Use Geography Potlatch Corporation-Comprehensive Plan Lakeville,MN and Economics,University of Wisconsin-Eau Amendment Downtown Redevelopment Plan Claire Blaine,MIN Luverne,M N MEMBERSHI PSAND AFFI LIATIONS EECBG Grant Administration Assistance Comprehensive Plan American Institute of Certified Planners (AICP) Brooklyn Park,MN Minneapolis,MN Accredited Professional,Leadership in Energy Recreation and Parks Master Plan Ryan Companies-Bassett Creek Valley and Environmental Design (LEED) Redevelopment Plan Professional Development Officer for Dakota County,MN Minnesota Chapter,American Planning SHIP Grant Writing Tr Department of Transportation Association Trunk Highway 14 Corridor Study Greenway Master Plans Board of Directors,Minnesota Chapter,US Monticello,MN Green Building Council Eagan,MN Comprehensive Plan LEED Neighborhood Development(ND) NE Land Use Study review of Loring Park Neighborhood Comprehensive Plan Moorhead,MN 2006 Chair,Minnesota Design Team and co- Comprehensive Plan leader of Walker and Maple Plain Visits Fargo,ND Growth Area Plans Former Vice Chair,Planning Commission, Design Guidelines for Growth Areas Growth Area AUARs Vadnais Heights,Minnesota Implementation Ongoing Planning Services Grand Rapids,M N Zoning Ordinance Mound,MN Consulting Planner Hassan Township,MN Comprehensive Plan Consulting Planner Visions AUAR Comprehensive Plan Zoning Ordinance Hennepin County,MN Osseo,MN SWTransitway Alternative LRTAlignment Downtown Market&Planning Study Analysis ©© Metro Transit-NW Corridor BRT Station St,Paul,MN Area Plans Parks and Recreation System Plan Inn Minnehaha-Hiawatha Community Works Strategic Development Framework ELK RIVER PARKS&RECREATION MASTER PLAN PROPOSAL-PAGE 29 s f 9 - h � w Ak will.- r oil i CREATINGplaces that E N R I C H people's lives do atom& M % a , b WAM E M K _ % # , s