Loading...
4.6. SR 12-16-2013 City of Elk - Request for Action River O. To Item Number Mayor and City Council 4.6 Agenda Section Meeting Date Prepared by Consent December 16, 2013 Justin Femrite, P.E., City Engineer Item Description Reviewed by 2014 Maintenance Agreement with Wright County Cal Portner, City Administrator for Parrish Avenue Bridge Reviewed by Action Requested Adopt by resolution the 2014 Maintenance Agreement between the City of Elk River and Wright County for routine maintenance work on the Parrish Avenue Bridge. Background/Discussion Annually, the City of Elk River is asked to enter into a maintenance agreement with Wright County for maintenance of the Parrish Avenue Bridge. Since the bridge was rebuilt, the City of Elk River and Wright County have shared maintenance duties. Since 2002, this agreement has been entered into annually; therefore,Wright County is asking the City of Elk River to once again enter into a maintenance agreement for the Parrish Avenue Bridge during 2014. The agreement is the same as the agreement entered into in past years. Financial Impact There is no financial impact beyond the maintenance issues that the city has currently been responsible for on the Parrish Avenue Bridge. These include maintenance of the street lights,removal of snow from the sidewalk, maintenance of the slope and berms on the north approach, snow and ice control from bridge and approaches,and removal of marking/spray paint from visible surfaces of bridge structure. Attachments • Cover letter from Virgil Hawkins,Wright County Highway Engineer • Resolution Approving Maintenance Agreement for 2014 P a w E A E U s r NaA f RE] OJN"TY ®,, WRIGHT COUNTY VIRGIL G. HAWKINS,P.E. DEPARTMENT OF HIGHWAYS Highway Engineer (763)682-7388 = AI CHAD D. HAUSMANN,P.E. d? Wright County Public Works Building Assistant Highway Engineer 1901 Highway 25 North (763)682-7387 ^dy Buffalo, MN 55313 y8gg MARK A.JOHNSON Jct. T.H. 25 and C.R. 138 Right-of-Way Agent (763)682-7386 Telephone:(763)682-7383 FAX.(763) 682-7313 November 2,2013 City of Elk River DEC 2 C Tina Allard, Clerk 13065 Orono Parkway, Box 490 Elk River, ININ 55330-0490 Dear Ms. Allard: Enclosed is a maintenance agreement for the maintenance activities on Bridge 86515. Two copies of this are enclosed for your review and execution by the City. As of 2002, this agreement has been changed to an annual agreement so that we can include it for approval with our other maintenance agreements,which are all submitted on an annual basis. The current agreement will be effective from January 1,2014,to December 31, 2014. Please return both copies of the executed agreement. After approval by the County Board, one of the copies will be returned to you for your files. If you have any questions concerning this agreement, please contact me. Sincerely, Virgil G. Hawkins County Highway Engineer Enclosure bh Equal Opportunity/Affirmative Action Employer RESOLUTION 13- MAINTENANCE AGREEMENT - 2014 THIS AGREEMENT made and entered into by and between the City of Elk River hereinafter referred to as the "City" and the County of Wright hereinafter referred to as the "County". WHEREAS, it is deemed to the best interest of all parties that the duties and responsibilities of both the City and the County as to maintenance on Bridge#86515 and its approaches should be clearly defined. NOW THEREFORE, IT IS AGREED with regard to said structure maintenance: MAINTENANCE CITY RESPONSIBLE FOR: (1) Maintenance of street lights; (2) Removal of snow from sidewalk; (3) Maintenance of slopes/berms and roadway on north approach (includes: turf maintenance, bituminous maintenance, drainage and riprap maintenance); (4) Snow and ice control from bridge and approaches; (5) Removal of markings/spray paint etc, from visible surfaces of bridge structure. COUNTY RESPONSIBLE FOR: (1) Periodic sweeping to remove sand and debris and removing sand/dirt from expansion joints; (2) Signing for bridge and approaches; (3) Maintenance of slopes/berms and roadway on south approach (includes: turf maintenance, bituminous maintenance, drainage and riprap maintenance); (4) Centerline and edge pavement marking (includes stop bar). The agreement between the City and County shall be for a one-year period and run from January 1, 2014, to December 31, 2014. All maintenance responsibilities will be deemed 'offsetting"therefore no payments will be required for the individual maintenance work which conforms to the areas stated herein and performed under authorization of either the City or County. In the event that the structure needs major maintenance/rehabilitation an agreement detailing the work and shared costs must be approved and accepted by the City and County. ADOPTED: 20 ATTEST: Mayor City Clerk CERTIFICATION I hereby certify that the above is a true and correct copy of a resolution duly passed, adopted and approved by the City Council of said City on 120 City Clerk APPROVED AND ACCEPTED: COUNTY OF WRIGHT Name of City Chairman of the Board Date ATTEST: County Coordinator Date