6.0. SR 09-28-1998ity of 'ver MEMORANDUM Item #6. TO: FROM: DATE: SUBJECT: Mayor & City Council Pat Klaers, City Ad~/trs~or September 28, 1998 East Elk River Public Hearing A public hearing for the East Elk River sewer and water project is scheduled for Monday, September 28, 1998, at 6 p.m. at City Hall. The purpose of this meeting is to receive input from citizens and affected property owners regarding the possible extension of utilities. The attached material from City Engineer Terry Maurer provides background information on the project, public hearing format, and information he plans to present at the meeting. The City Council needs to make a decision regarding whether or not the East Elk R/vet project is going to be the commonly discussed '%rge" or "small" project or ff no project is going to take place at this time. The Trott Brook Farms plat on approximately 280 acres of developable property has been approved by the City Council conditioned upon the City Council ordering a sewer and water project. The Main Street/Highway 169 commercial redevelopment and Business Park project has been in the planning stages for a number of years and it is now moving toward Planning Commission review. The developers and landowners for both of these projects have petitioned the city for public improvements. After the September 28, 1998, improvement public hearing, staff supports City Council action to move forward with the resolution approving the plans and specifications for the project; going out for bids for the big project with information being included in the bid package which highlights the possibility of awarding only the small project; and, the Council calling for an assessment public hearing for the public improvement project. Action on at least these three items will set the stage for a final decision in early December by the City Council on what type of public improvement project to pursue and order for 1999. \\elkriver\sys\shrdoc\council\ester.doc 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 Howard R, Green Company CONSULTING ENGINEERS September 24, 1998 File: 800110J-0030 CONSULTING ENGIN~ Formerly MSA Consulting Engineers Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: EAST ELK RIVER PUBLIC HEARING Dear Council Members: As you are aware, on September 28, 1998, the public hearing for the East Elk River Project Area C is scheduled. Staff will be prepared to make a complete presentation on the project. It is anticipated that the presentation will cover the following items: Project History Proposed Trunk Utility Improvements Estimated Project Costs, including Street and Storm Sewer Proposed Assessments for Trunk Utilities 429 Process Future Project Schedule We will have handouts available for the public. After the presentation, we will be available to answer questions that the City Council and public may have. At the close of the public hearing, there are three attached resolutions that the City Council may want to consider adopting. After the public hearing, the first resolution orders the improvement, giving the project the official go-ahead to proceed to the next step. The second resolution approves the plans and specifications that were ordered on September 14th and authorizes the advertisement for bids. If this resolution is adopted, we would anticipate receiving bids for the trunk utilities sometime in mid to late November. The third resolution establishes the amount to be assessed and orders the preparation of the assessment roll. The assessment rate can be lowered at the assessment hearing, but it cannot be raised without starting the whole process over. If this resolution is adopted, staff would anticipate an assessment hearing being held sometime in early December, at which time the City Council could also consider the bids for the project. Finally, if the City Council proceeds with bidding the utility project, staff would request direction to work with Evergreen Land Services to pursue the necessary permanent and temporary utility easements. \\SPNWFS\VOL1\DATA\PROJ\800110j\0030\110-2105.sept.doc 1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free 888/368-4389 City of Elk River September 21, 1998 Page 2 If you have any questions or would like any additional information prior to the public hearing, please call. Sincerely, Howard R. Green Company Terry J. Maurer, P.E. TJM/st Enclosures Howard R, Green Company \\SPNWFS\VOLI\DATA\PROJ\8001 loj\q~9~t~LORIr4~.dE~ G i N E ERS RESOLUTION 98 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ORDERING THE IMPROVEMENT IN THE MATTER OF THE EAST ELK RIVER PHASE I IMPROVEMENT OF 1998 WHEREAS WHEREAS a public hearing relating to the East Elk River Phase I improvement was held before the Elk River City Council after ten days mailed notice and two weeks published notice of the hearing was given; and the City Council has duly considered the Feasibility Report and those matters presented at the public hearing by those persons desiring to be heard on the matter; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The East Elk River Phase I improvement is hereby ordered as recommended in the Feasibility Report dated July 21, 1997. Passed and adopted this 28th day of September, 1998. ATTEST: Henry A. Duitsman, Mayor Sandra A. Peine, City Clerk \\SPNWFS\VOL1 \DATA\PRO J\800110j\0030\110-2103.sept. Resolutions.doc RESOLUTION 98 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION APPROVING THE PLANS AND SPECIFICATIONS AND ORDERING THE ADVERTISEMENT FOR BIDS IN THE MATTER OF THE EAST ELK RIVER PHASE I IMPROVEMENT OF 1998 WHEREAS pursuant to Resolution 98 - 99, the Project Engineer has prepared plans and specifications for the East Elk River Phase I improvement, which plans and specifications have been reviewed by the City; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: Such plans and specifications, a copy of which is attached hereto and incorporated herein by this reference, are hereby approved. The City Administrator shall prepare and obtain the publication of an advertisement for bids for the making of the improvement pursuant to the attached plans and specifications. The advertisement shall be published once each week for three consecutive weeks, shall specify the work to be done, and shall state that the bids will be received by the City Administrator until 10:00 a.m. on Tuesday, November 17, 1998, at which time the bids will be publicly opened in the Council chambers of the City Hall by the City Administrator and the Project Engineer and will then be tabulated for consideration by the City Council at a meeting thereof at 6 o'clock p.m. on December 3, 1998, in the City Council chambers at City Hall. No bids will be considered unless sealed and filed with the City Administrator and accompanied by a cash deposit, cashier's check, bid bond, or certified check payable to the City Administrator in the amount of 5% of the amount of such bid. Passed and adopted this 28th day of September, 1998. ATTEST: Henry A. Duitsman, Mayor Sandra A. Peine, City Clerk O:\PROJ\800110j\0030\ll0-2103.sept. Resolutions.doc WHEREAS NOW, 1. RESOLUTION 98 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION DETERMINING ASSESSED COST OF IMPROVEMENT AND ORDERING PREPARATION OF PROPOSED ASSESSMENT ROLL IN THE MATTER OF EAST ELK RIVER PHASE I IMPROVEMENT OF 1998 costs have been determined for the East Elk River Phase I improvement consisting of a contract price of $9,307,328.00 and expenses incurred or to be incurred by the City in the making of the improvement in the amount of $3,056,052.00 for a total cost of the improvement of $12,363,380.00. THEREFORE, BE IT RESOLVED by the City Council for the City of Elk River, Minnesota: Based upon the City Assessment Policies, it is determined that the portion of this improvement to be paid by the City and not assessed to benefited properties is $7,863,380.00. The portion of the cost to be assessed against benefited properties pursuant to the Elk River City Assessment Policies shall be $4,500,000.00 The assessments shall be payable in equal annual installments and shall extend over a period of seven to fifteen years, the first of the installments to be payable on or before the first Monday in January, 2000, with interest at the rate of 8.0% per annum from the date of the adoption of the assessment resolution. The City Administrator with the assistance of the Project Engineer shall forthwith calculate the proper amount to be specially assessed for such improvement against every assessable lot, piece, or parcel of land, without regard to cash valuation, as provided by law, and shall have available to the City Administrator's office a copy of the proposed assessment roll for public inspection. Upon completion of the proposed assessment roll, the City Administrator shall notify the Council and schedule a public hearing upon the proposed assessment, causing notice of the hearing by publication and mail to be made at least two weeks prior to the hearing. Passed and adopted this 28th day of September, 1998. ATTEST: Henry A. Duitsman, Mayor Sandra A. Peine, City Clerk O:\PROJ\800110j\0030\ll0-2103.sept. Resolutions.doc IIIIIIIIIIII LEGEND PROPOSED TRANSPORTATION AND UTILITY CORRIDOR TRUNK SANITARY SEWER LATERAL SANITARY SEWER FORCEMAIN TRUNK WATERMAIN LIFT STATION COUNTY ROAD NO. 12 AVENUE EERCP-UT RKM AJB ~PRO~D: MARCH1998 DATE: 800110J JOB NO. EAST ELK RIVER UTILITY ALIGNMENTS JOHNS~. INC. 75--457-0210 1.03 -- 1.03 EASTEY, AND 75-457-0220 1.01 - 1.0t HICKMAN 75-457-0230 2.80 - 2.80 LEFEBVRE LEASING 75-591-0020 4.98 - 3.22* LEFEBVRE LEASING 75-591-0105 3.11 - 2.51 * LEFEBVRE LEASING 75-591-0010 1.71 - 1.71 HOULE OIL 75-011-2406 2.02 - 0.71' HOULE OiL 75--011-2402 2.03 - 0.47* HOULE OIL 75-011-2407 2.02 - 1.28' EBNER 75-011-2403 4.18 - 5.31' EBNER 75-011-2302 1,50 - 0.82' ROUSSEAU 75-011-2340 1,75 - 0.007 EBNER 75-011-2535 0.47 - 0.47 EBNER 75-011-2520 1.15 - 1.15 HOULE OiL 75--011-2330 1.66 - 1.66 HOULE 75-011-2325 1.06 - 0.92* SNYDER 75-011-2205 1.28 - 1.28 POV~LL 75-011-2215 4,55 - 4.~-9' POWELL 75-011-2200 5.50 - 3.50 KEMETI-IESE 75--011-224~50,69 - 0.69 JOHNSON 75-011-2102 1.20 - 1,05' HIPSAG 75-457-0110 1.00 - 1.00 RICHMAR CONS-fR. 75-457-0120 1.14 - 1.14 CARPE KAIROS 75-457-0130 2.15 - 1.20' NOVCO 75-457-0140 2,00 - 1.84' PO~ELL 75-011-2105 4.20 - 4.20 LOCHER 75--011-2115 0.66 - 0.007 EULL 75-011-1100 7.25 - 7.25 & W UMITED 75-002-540.3 1.60 -- 1.60 MINOR 75-002-5320 1.;37 - 1.,37 DEHN 75-002-3402 1.84 - 1.84 DEHN 75-002-3315 1.76 - 1.76 APS ENTERPRISES 75-002-3310 2.65 - 2.65 LUNDQUIST 75-002-3303 12.55 - 12.55 APS ENTERPRISES 75-002-;3305 0.97 - 0.97 LUNDQUIST 75-002-3202 1.22 - 1.22 LUNDQUIST 75-002-3400 2.12 - 2.12 LUNDQUIST 75-002-3301 0.87 - 0,87 MAJKRZAK 75-002-5405 1.59 - 1.59 MAJKRZAK 75-002-520.3 1.69 - 1.69 ENSMINGER 75-002-3202 0.70 - 0.70 PRICE 75-002-5200 6.17 - 6.17 PRICE 75-003-4100 0.72 - 0.72 KIRKEIDE 75-002-3110 2.00 - 0.007 BROWN 75-002-3300 0.40 - 0.40 VANDENBERO 75-002-2401 6.00 - 6.00 HOHLEN 75--005-1101 4.88 - 3,13' BLACK 75--002-2105 0.50 - 0.007 HOHLEN 75-002-2205 5.46 - 3.23 DIV1NE 75-135-4100 4,15 - 5.689 BLACK 75-135-5415 1.50 - 0.007 WARDEN 75-155-3315 4.33 - 3.9312 MEVlSSEN 75-135-5510 2.04- - 0.007 HOHLEN 75-135-3,300 15,02 - 15.26I''~ HOHLEN 75-135-3305 5.63 - 4,0714 HOHLEN 75-154-4410 12.23 - 10.6215 CHRISTIAN 75-135-3405 2.00 - 0.00Z AUST 75--135-3306 2.00 - 0.007 ENRON 75-135-3410 0.17 -- 0.00 SLIVNIK 75-135-,3216 0.64 - 0.007 HEATH 75-135-3215 1.85 - O.ooZ INDU~I~IAL 75--135-3210 1.52 -- 1.50' HARDFACtNGINDUS~IAL 75--135--23102.24 -- 2.24 D£V~LOPERS 75--155-2405 0.93 - 0.007 C~KA~;IUf< FNOff.75--155-1405 2.35 -- 2.35 DRAW~ BY: _~L_K ...... JOB DA!~_: DATE APPRO'v~D: ............ ]0~ NUMBER CAD DA~: .....~ ~S H~9~9 ..................... CAD FILE: ...... gs~e~ e~_j~ rll 75--135-4101 75-135-42~0 (~J-YAINd) Ld 75--011--1201 7~-oo2-240o VN~O~IERG 75-011-24~0 C)AGIM. 28.65--2,ke8' 7~-1,.~--,.~01 MULV/~NEY :~ j 2&00-24.72- I DENO'I~S PROPERTES TO BE ACQUIRED TOTAL ACRES IN PROJECT AREA (INCLUDING PROPERTIES TO BE ACQUIRED): TOTAL A____~_ ACRES: 757.85 *WETLAND AREAS ESTIMATED FROM AERIAL PHOTOS **FLOODPLAIN AREAS BASE ON FLOODPLAIN ELEVATION OF 862' POWELL 75-011-2225 %00 - 1.00 POWELL 75-011-2250 1,88 - %88 POWEU_ 75-011-2240 1.20 - 1.20 BENSON 75-011-2235 1.40 - 0.00'Z- SECOND GENERATION 75-521-0220 1.02 - 1,02 R,~d~ CORPORATION 75-521-0210 1.28 - 1,28 R&N CORPORATION 75-521-0150 6.23 - 3.97* PLAISTED 75-521-0130 1.82 - 1.0~" ELK RIVER MO'EEL 75-521-0120 1.91 - 1.03'" ELK RIVER MOTEL 75-521-0110 2.55 - 1.11*~ l&OO.-O. O0 Z 75-011-2305 PO~t~LL 14.82 ACRES WE31.AND, .17 ACRES ADDI'RONAL CSAH 12 RIGHT OF WAY 22.0 ACRES WE"PLAND, 1.29 ACRES PROPOSEB TYLER S~EET RIGHT ~ WAY AI.~ A~ES ~D, 1,31 A~ES PR~O~ ~R S~EET RI~T ~ WAY, .59 ACRES ADDI~AL CS~ 12 RI~T ~ WAY ~9.72 A~ES ~O, 4.~ ACRES PROPO~D ~R S~T RIGHTOFWAY ~7,94 A~ES ~D, 2.60 ACRES PROPO~ ~R S~T RIGHTOFWAY MINUS EXIS~NG ~ER S~EET RI~T ~ WAY ~3.05 A~ES ~D, 3,65 ACRES PR~OSED ~R S~T RI~T ~ WAY ZNO AS~S~ENT-H~ iF__}___i_} R. CONSULTING ENGINEERS ~'5.76 ACRES WETLAND, ,50 ~CRES ADDITIONAL CSAH 12 RIGHT OF WAY 9.15 ACRES WE'R-AND, .34 ACRES ADDFIIONAL CSAH 12 RIGHT OF WAY '1-Q12.08 ACRES WETI-AND, 1.15 ACRES ADDITIONAL CSAH 12 RIGHT OF WAY 1136,78 ACRES WE'R_AND, 1.45 ACRES ADDITIONAL CSAH 12 RIGHT OF WAY, ~2'.26 ACRES WETLAND, .14 AC~ES ADDI~ONAL CSAH 12 RIGHT OF WAY ~'1.59 ACRES WETLAND, .17 ACRES ADDITIONAL CSAH 12 RIGHT OF WAY ~1,43 ACRES WE'R-AND, .13 ACRES ADDmONAL CSAH 12 RIGHT OF WAY ~"1.34 ACRES WE'R.AND, .27 ACRES ADDITIONAL CSAH 12 RIGHT OF WAY, crrY OF ELK RIVER il EASTERN AFEA PROPERTIES TO BE ASSE~ PROJECT AFEA C GF~APHIC SCALE. 0 50O ~HEET NO. 2 2 EAST ELK RIVER PHASE I IMPROVEMENTS PUBLIC HEARING September 28, 1998 O:\PROJ\800110j\0030\110-2104.sept.doc EAST ELK RIVER IMPROVEMENTS PRESENTATION OUTLINE Project History Proposed Improvements Estimated Project Costs Proposed Trunk Sanitary Sewer/Water Assessment Area Proposed Assessments Minnesota Statute Chapter 429 Sanitary Sewer/Water Other Costs Future Schedule O:~PROJ\800110j\0030\ll0-2104.sept.doc EAST ELK RIVER IMPROVEMENTS PROJECT HISTORY Late 1980's May1996 July 1996 February 1997 May 1997 July 1997 September 1997 January - September 1998 September 28, 1998 · Discussion by City Council whether to go east or west with City utilities. · City Council receives limited appraisal prepared by Peter J. Patchin and Associates, Inc. ($6,000/acre). · City Council holds informational hearing for affected property owners. · City Council orders East Elk River Urban Service Area Planning Study. · City Council accepts East Elk River Urban Service Area Planning Study. · City Council orders East Elk River Phase I Feasibility Study based on petitions from Schulze and Hohlen. · City Council approves East Elk River transportation route and orders preparation of official map. · Phase I Feasibility Study presented to City Council. · Resolution 97-89 regarding Environmental Review Process. Various City Council meetings and workshops: · Initiate preparations of Plans and Specifications. · Have Patchin Limited Appraisal updated. · Hire Evergreen Land Services, start discussions on right-of- way acquisition. · Receive word on Federal High Priority Project and TEA 21 dollars. · Hold public hearing on East Elk River Phase I Improvements. \\SPNWFS\VOL1\DATA~PROJ\800110j\0030\110-2104.sept.doc EAST ELK RIVER IMPROVEMENTS ESTIMATED PROJECT COST Sanitary Sewer Water Storm Drainage Railroad Crossing (171st) Street Estimated Construction Cost City Overhead (28%) Land Acquisition (Estimated) Estimated Total Project Cost $2,316,160 $2,547,619 $1,287,682 $294,417 $2,861,450 $9,307,328 $2,606,052 $450,000 $12,363,380 O:~PROJ\800110j\0030\110-2104.sept.doc HILLSIDE CITY PARK 175TH 1/4- MILE PROPOSED ASSESSMENT AREA C EAST ELK RIVER EAST ELK RIVER IMPROVEMENTS TRUNK UTILITIES ASSESSMENTS · Gross Acreage minus wetlands, flood plain and Tyler Street right-of-way. · Small parcels used for homestead excluded from trunk utility assessment. · Total assessable acreage in East Elk River Phase I - 700 acres. · Assessment rate - $6,000/assessable acre. · No lateral sanitary sewer or watermain assessment proposed at this time. Properties that chose to hook up to sanitary sewer and/or watermain will have lateral assessments levied against them. · No street or storm sewer assessments proposed. (Developing properties will be required to pay their share for street and storm sewer through Developer's Agreement.) O:\PROJ\800110j\0030\110-2104.sept.doc EAST ELK RIVER IMPROVEMENTS "429" PROCESS · Minnesota Statute Chapter 429 "Local Improvements, Special Assessments" · Requires Two Hearings Before the City Council 1) Public Hearing 2) Assessment Hearing · Provides Method to Appeal Assessment to District Court O:\PROJ\800110j\0030\110-2104.sept.doc EAST ELK RIVER IMPROVEMENTS SANITARY SEWER/WATER OTHER COSTS There are a number of other costs associated with connecting existing homes to the City sanitary sewer and water system. These are described as follows: Sewer Availability Charge (SAC) Each property owner connecting to the City's sanitary sewer system must pay a fee at the time of the hook-up. This fee is intended to cover the individual property's "buy-in" to the wastewater treatment plant. This SAC charge is currently $1,300 per single family residential unit. Water Availabili _ty Charge (WAC) Each property owner connecting to the City's water system must pay a fee at the time of the hook-up. This fee is intended to cover the individual property's "buy-in" to the wells, elevated towers, and water treatment facilities. This charge is currently $1,350 per single family residential unit. Connection of sanitary sewer and water service from property line to home The individual property owner is responsible for bringing the sanitary sewer and water services from the property line to the home and connecting them. This cost will vary per property, depending on many variables, such as how far the home is from the property line, where the sanitary sewer and water enter the home, and what type of restoration must be done over the service lines. Existing Septic Tank City code requires that the existing septic tank be pumped and crushed and filled with dirt. This is for safety purposes. Existing Well City code allows wells to be used for outside irrigation, but they must be separated from the City system. Monthly User Charges There is a monthly user charge for City sanitary sewer and water service. These charges are based on water usage, and will vary according to how much water is used each month. O:~PROJ\800110j\0030\110-2104.sept.doc EAST ELK RIVER IMPROVEMENTS FUTURE SCHEDULE September 28, 1998 · Public Hearing. · Resolution ordering improvement. · Resolution approving plans/authorizing advertisement for bids. · Resolution authorizing preparation of assessment roll. · Start to acquire utility easements. Late November 1998 December 1998 · Assessment Hearing. · Resolution adopting assessment roll. · Resolution awarding construction bid. · Start construction on sanitary sewer/water. February 1999 Spring 1999 Early Summer 1999 · Start to acquire Tyler Street right-of-way (Federal paperwork complete). · Street and storm sewer project bid. · Street and storm sewer construction begins. Late Fall 1999 · Spring 2000 Summer 2000 · Sanitary sewer and water project substantially complete. Sanitary sewer and water project complete. Street and storm sewer project complete. O:~PROJ\800110j\0030\110-2104.sept.doc MONDAY, JULY 29, 1996 Members Present: Members Absent: Staff Present: Mayor Duitsman, Councilmembers Dietz, Scheel, Farber, and Holmgren None Pat Klaers, City Administrator; Terry Maurer, City Engineer; Peter Beck, City Attorney; Sandra Thackeray, City Clerk; Steven Ach, City Planner o 4.1. 4.2. Call Meeting To Order /' · / Pursuant to due call and notice thereof, the special me~ing of the Elk River City x uncil was called to order at 6:00 p.m. by Mayor DujJYmarL' / Item 6.~., 171~t Avenue and Item 6.4., Joplin No~ Frontage Road, were a~ed to the age~. COUNCI~ ~ FA~BE~ MOVED TO AP~V[ THE JULY 29, 1996, CITY ~OUNClL AGENDA AS ~NDEIk COUNCI~EMB~ HO~GREN SECONDED THE MOTION. THE MOTION ~RIED 5-0. osed Minutes COUNCILMEMBER COUNCIL MINUTES. MOTION CARRIED 5-0. Zone Chan Unit Develo Conditional Use Permi for Truck APPROVE THE 7/15/96 CLOSED MEETING CITY FARBER SECONDED THE MOTION. THE 11 Acres from I-1 (Liqht Industrial) to PUD (Planned 96-13 Preliminary and Fin Plat to Lot and One Outl, Case No. P 96-8 Ach indicated that City Planner following reqL Case No. CU 96-18 11 Acres Into One Industrial Companies, Inc. have made the · Rezonin y 3 acres from I-1 (L?g~ht Industrial) to PUD (Planned Unit De~ ) · PrelimS, Plat Request to subdivide approximately 11 acres into one industrial lot a fd two outlets. · Co~ titior~al Use Permit for site plan review of the pro'!q,osed planned unit d, Iopr~ent. · Plat approval to create one industrial lot and two 6vtloTs. July 29, 1996 Pace 4 6.1. Rivers Ed.qe Downtown Development Corporation '~ Marly Glines and Mum Beck from the Rivers Edge Downtown Development '"~r~oration requested the Council to consider funding $10,000 for.~e cost of Mayor DbLt~man indicated he felt that the gazebo ; a coordinated effort with the Riv~.,~ont Committee and the HRA. He a' ed he did not agree that the"~ ty should spend $10,000 ~g the effort with these other Mayor Duitsman stated received concerns from citizens regarding tact that the t block the view of the river. Councilmember Dietz the .$10,000 with the Rivers the other half. Councilm, people in the downtown favor of the project. C, Scheel. Cc and stated that downtown arec would be in favor of the city paying ~ of Development Corporation paying :heel indicated she was encouraged by the this on their own and indicated she was in concurred with Councilmember ~gren his complete support of the request has already spent on three studies for the SCHEEL MOVED TO AUTHORIZE THE )ITURE OF $10,000 FOR THE TO BE CONSTRUCTED IN JACKSON SQUARE, ELK RIVER. COU! FARBER SECONDED THE MOTION. THE MC 3-2. Duitsman and Councilmember Dietz opposed. Councilmember Dietz his opposition was based on the fact that he-felt the Rivers Edge should y half of the cost of the project. East Elk River Trunk Sewer and Water Public Informational Meetinq City Engineer Terry Maurer explained that the purpose of the public informational meeting is to receive input from the property owners regarding the timing and scope of project that the city should undertake regarding the extension of trunk utilities to the eastern area of the city. Jason Messner, Peter Patchin and Associates, Inc., indicated that the firm of Peter Patchin was requested to perform appraisals as to the market value benefit relating to trunk improvements for the eastern area of the city. He explained that the appraisal revealed that the market benefit of trunk sewer and water lines into the east Elk River urban service district is $6,000 per acre for residential and industrial lands and $8,000 per acre for commercial lands. City Attorney Peter Beck explained to the residents that it is the Council's intention to take public input regarding the extension of trunk sewer and water lines into the east Elk River urban service district in order to decide whether to proceed with the project. He further indicated that tonight's meeting was merely a public informational meeting and not an assessment hearing. Mayor Duitsman opened the public hearing. Dwight Kirkeide, 12230 173,~ Avenue NW, distributed a handout entitled Toward a New Game Plan. Mr. Kirkeide indicated he was opposed to the proposed project based on the increased cost to the homeowners. Special City Council Meeting July 29, 1996 Page 5 Roger EuII, 18880 Boston Street, indicated he owned 80 acres that would be affected by the proposed project. He indicated he did not feel he would receive benefit because he did not have highway frontage. He indicated he was opposed to the project. Mayor Duitsman entered two letters into the record; one from Ron Ebner in opposition to the project and one from Kemethese Motel, Inc. in favor of the project. Bob Vandenberg, 10811 181~ Avenue, indicated he owned 80 acres that would be affected by the proposed project. He stated he felt that $6,000 per acre for residential and industrial lands was a fair price and stated he was in favor of the proposed project. Rita Schmahl, representing Cargill, indicated that Cargill has 380 acres that would be affected. She stated that Cargill has no intention of moving its location and indicated that Cargill would receive no benefit from the extension of water and sewer. She stated Cargill is opposed to the proposed project. Joann Rousseau, Ebner's Live Bait, indicated that she was against the project based on the fact that their business has no need for sewer and water and therefore would receive no benefit. Paul Bell, owner of Bridgeman's Restaurant, questioned how the cost would affect him. City Engineer Terry Maurer reviewed the costs .associated with this type of project and suggested that Mr. Bell contact him at City Hall for more details. Dawn N~oyer, 16807 Highway 10, indicated her concern regarding the lapse in time between when the trunk system is put in and when the laterals are actually constructed. Truman Moyer, 16807 Highway 10, displayed a map of the area showing those residents who are in favor of trunk sewer and water and those residents who are opposed to trunk sewer and water. He indicated that there are many more residents opposed to the project than in favor. ~'~/'~ Ruth Brown, 10815 175th Avenue NW, indicated that she is opposed to the project. Rolland Benson, 17276 Highway 10, indicated he was opposed to the project. Landol Locher, 10983 171~ Avenue, indicated that he was opposed to the proposed project. Carol Turner, 18776 Cleveland, indicated that the map in the Star News did not agree with the map of the urban service area. Mary Jo Mishke, 10078 Twin Lakes Road, had some questions regarding the calculation of trunk footage and how a farm of 160 acres would be assessed. Kathy Specht, 16330 Highway 10, indicated that she had no intention of selling her property and stated she was opposed to the project. Special City Council Meeting July 29, 1996 Page 6 Mr. Dehn, 17369 East Highway 10, indicated he was opposed to the project and stated he did not see any benefit for sewer and water due to the high cost of the project. There being no further comments, Mayor Duitsman closed the public hearing. Mayor Duitsman indicated his appreciation to those people who showed up for the meeting and to those people who spoke at the meeting. He stated that the urban service area is an area that will be developed at some time in the future and indicated that it is the city's responsibility to plan for this development and further to inform the citizens as to what the cost may be. He stated that he will be requesting the City Council to acquire right-of-way rights for the project, but has no intention of moving forward with trunk improvements until petitioned for by a developer. COUNCILMEMBER HOLMGREN MOVED TO AUTHORIZE THE CITY ENGINEER TO DO A DETAILED STUDY REGARDING WHERE THE TRUNK SYSTEM COULD BE LOCATED. COUNCILMEMBER DIETZ SECONDED THE MOTION. THE MOTION CARRIED 5-0. COUNCILMEMBER HOLMGREN MOVED TO AUTHORIZE STAFF TO OBTAIN QUOTES FROM A FIRM TO ACQUIRE RIGHT-OF-WAY EASEMENTS WHEN THE LOCATIONS HAVE BEEN DETERMINED. COUNCILMEMBER DIETZ SECONDED THE MOTION. THE MOTION CARRIED 4-1. Councilmember Scheel opposed. Councilmember $cheel indicated that she is not ready to acquire easements at this time. 7. Adjournment There being no further business, COUNCILMEMBER FARBER MOVED TO ADJOURN. COUNCILMEMBER HOLMGREN SECONDED THE MOTION. THE MOTION CARRIED 5-0. The special meeting of the Elk River City Council was adjourned at 8:20 p.m. Respectfully submitted, Sandra Thackeray City Clerk s:\minutes\csO72996.doc ELK RIVER ARENA 1000 SCHOOL STREET P.O. BOX 720 ELK RIVER, MN 55330 (612) 441 - 2956 * FAX (612) 241 - 9432 TO: Mayor and City Council FROM: Rich Czech, Elk River Arena Manager DATE: September 28, 1998 SUBJECT: Selling of existing dehumidifiers Attachments: · Sale agreement for the purchase of the dehumidifiers · Memo from Nelson and Rudie and Associates · Insurance Certificate from Commercial Refrigeration Overview As you are aware of the Arena will be installing a new dehumidifier and heater unit this fall. The existing dehumidifiers will no longer be needed and can be sold. I have discussed the resale value of these units with Nelson Rudie and Associates and Mutners Dehumidifiers. The dehumidifiers in the Arena sell for about $9,000.00 each when new. The resale value of the units according to the two companies would be about 20% to 25%, of the purchase price of new units, which is about $4500.00 for both units. Mark Rodorigo from Commercial Refrigeration has agreed to purchase both units for $10,000.00 this is a little over 55% of what the units sell for when new. He has also agreed to remove the units from the Arena at his own expense. Recommendation I recommend that the City Council approve the sale of the two dehumidifiers to Commercial Refrigeration for $10,000.00 as stated in the agreement. City of iver This agreemeht is between the City of Elk River and Commercial~Refrigeration regarding the purchasing of the two Dectron dehumidifier units in the Elk River Arena. Commercial Refrigeration agrees to the following terms: To purchase the Dectron dehumidifier units as is at a cost of $10,000.00 for both unites. To cover all cost for the removal of the Dectron dehumidifier units from the Elk River Arena. To obtain insurance to cover any accidents that might occur during the removal of the Dectron dehumidifiers units. To provide payment 30 (thirty days) from the date of the invoice. I agree purchasing the Dectron dehumidifier units following the above terms. I understand that an invoice for the units will be issued once the units are removed from the arena. "~~gate: ~T;, ~1~ I~[~ Commercial Refrigeration { 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 14:35 FAX 612 647 4120 h~ELSON RUDIE [~o02 04/2o/98 Nelson-Rudie & Associates, Inc. Consulting Engineers 2575 university Ave. West, Suite 140, St. Paul, MN 55114 Dennis A. Ne~on, P.E. Scoll F. Rudle, P.E. Andrew N. Erdmann, P.E. Joseph M. Pearce, P.E. Mlch~l D, Woehrle April20,1998 Mr. Rich Czech ELk River Arena 1000 School Street P.O. Box 720 ELk River, Minnesota 55330 Re: Dehumidification System Elk River Arena Dear Rich: The existing Dectron direct expansion dehumidification units installed in thc new arena would not be required if a desiccant based system is installed. The existing units could be removed and sold to a reclaim company. The value of the equipment is greatly dependent on the needs of the company reclaiming the equipment. Removing the equipment will be difficult which will further reduce the resale value of the units. A very rough estimate of the value would be 20% of the or/ginal equipment cost. · The units could be left in service, which would give the arena a built in redundancy for the dehumidification systems. Please call if any further data is needed. Yours very truly, Michael D. Woehrle \~S E RVE R\DATA i ~=:ri~EP ROP~I~0312.DOC 6i2/644-2400 Fax: 612/647-4120 E-MaE: neisoemdie{~ibm.net Modem: 612/647-4139 J SYSTEMS MARl( & ,JOHN RODORIGO DBA j t04 E CHESTNUT ST , J c PO BOX 1066 I ~A~. THE ~E A~ 1 ~/21/97 12/21/97 &ODe,.y INJUI~ OTIII~ ~ aUTO EaCH *;::1.O00,O00 *'~ 1 O0.0O0 CITY OF ELK RIVER 7e 1000 SCHOOL ST PO BOX19G ' ~ .'" · '