Loading...
4.5. SR 10-19-1998ity of River Item # 4.5. MEMORANDUM TO: FROM: DATE: Mayor and City Council Scott Harlicker, Planning Assistan~ October 19, 1998 SUBJECT: Update on Northstar Corridor Project At the October 1, 1998 meeting of the Northstar Corridor Development Authority two main topics were discussed, highway alternatives and the commuter rail feasibility study. First of all I would like to remind the Council of the Northstar Corridor open house to be held on Tuesday October 20th. The open house will be held at the Sherburne County Government Center from 6 to 9 PM. A 15 minute presentation is scheduled for 6:15, 7:15 and 8:15. Seven information booths will be set up; each booth will have information on a specific aspect of the Northstar Corridor. Attached is a schedule outlining meeting times and what information will be available at the different booths. The discussion regarding highway alternatives centered on two options, construction of highway bypasses and a limited access freeway. These options were ruled out because of the cost associated with them. Attached are diagrams highlighting possible bypass locations and a summary of the costs involved. The Authority also received an update on the status of the commuter rail feasibility study. BRW is doing a ridership forecast and a station location performance analysis. BRW expects to have the ridership forecasts in time for the November meeting. Once the forecast is completed they will be in a position to recommend parking requirements for the various stations. Burlington Northern is working on their capacity modeling and preliminary capital cost estimates. 13065 Orono Parkway * P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 Dt~4,FT DRAFT DRAFT DRAFT DRAFT NORTHSTAR CORRIDOR DEVELOPMENT AUTHORITY Regular Meeting Minutes September 3, 1998 The Northstar Corridor Development Authority met on September 3, 1998, at the Sherbume County Government Center in the City of Elk River, Minnesota. The following members, alternates and citizens were present: Dan Erhart, Paul McCarron, Tim Yantos, Duane Grandy, A1 Seppelt, Gary Erickson, Terry Nagorski, Betsy Wergin, Gerry Donlin, Ken Paulson, Jim Dickinson, Donald Jolly, Scott Harlicker, Richard Turch, Bob Morgan, Tom Gamec, J.Patrick Cairns, Gary Hammer, John Norgren, Paul Goenner, Lewis Stark, LeRoy Pauley, Mary Richardson, David Loch, Ken Stevens, Jean Keeley, Lynn George, Stephanie Eiler, Paul Motin, Stephen Peka, Carl Milch, Tom Dwyer, Jim Barton, Brian Roper, Tom Cruikshank, Lynn Caswell, Rick Speak, Natalie St&fen, Michael Ringrose, Dan Meyers, Biz Colbum, Dick Wolsfeld, Mike Christensen o Chairperson Wergin called the meeting to order at 4:30 p.m. A motion was made by Paul McCarron, seconded by LeRoy Pauley and carried unanimously to approve the agenda of September 3, 1998, with no additions and the meeting minutes of July 9, 1998, regular meeting minutes as amended. Stephanie Eilers, Anoka County, provided information to the Committee on the Minnesota Planning Grant. A motion was made by McCarron, seconded by Gerry Donlin, carried unanimously to approve the recommendation of the Northstar Executive Committee to support the application of the Minnesota Planning Grant. A motion was made by Gerry Donlin, seconded by Duane Grandy and carried unanimously to approve the recommendation of the Northstar Executive Committee to pursue a lump sum agreement with the Minnesota Department of Transportation (MnDOT) for funding of the study to examine the feasibility of commuter rail in the St. Cloud area. DRAFT DRAFT DRAFT DRAFT DRAFT NORTHSTAR CORRIDOR DEVELOPMENT AUTHORITY Regular Meeting Minutes September 3, 1998 Page 2 o o o Tim Yantos and Mary Richardson presented a request from MetroBus, St. Cloud Metropolitan Transit Commission (MTC), requesting membership to the Northstar Corridor Development Authority. A motion was made by McCarron, seconded by Norgren and carried unanimously to approve the recommendation of the Northstar Executive Committee to approve the St. Cloud MTC's request to be a member in the Joint Powers Agreement of the Northstar Corridor Development Authority with Jerry Leese appointed as Member and Tom Cruikshank as Alternate. : Biz Colburn, informed the Committee that there will be three Open House meetings for the public at the following locations: September 22, 1998 September 23, 1998 September 24, 1998 Sherbume County Government Center, Elk River Whitney Senior Community Center, St. Cloud City Hall, Fridley 6:00-9:00 p.m. 6:00-9:00 p.m. 6:00-8:00 p.m. Members and public were encouraged to attend. All members were urged to notify Stephanie Eiler by Tuesday, September 8, 1998, with the names and addresses of individuals/business who should be sent notices regarding the Open House. Dick Wolsfeld, BRW, presented an update on following items with the Committee: a) a) b) c) d) Updated project schedule (dated August 28, 1998) Update on discussions with BNSF Capacity modeling Initial definition of potential capacity improvements Preliminary commuter rail service plan It was the consensus of the Authority to approve the preliminary conceptual service plan- illustrative timetable as presented by BRW with the recommendation that additional trains be available in the a.m. and p.m. from the City of St. Cloud to the City of Minneapolis and return. This preliminary schedule will be made available at the Open House meetings scheduled in September for public feedback. DRAFT DRAFT DRAFT DRAFT DRAFT NORTHSTAR CORRIDOR DEVELOPMENT AUTHORITY Regular Meeting Minutes September 3, 1998 Page 3 o o e) Proposed maintenance facility location It was the consensus of the Authority to continue evaluation of candidate locations for maintenance facilities in the City of Rice, the City of St. Cloud, the City of Elk River and the City of Minneapolis. .- Intermodal connections: Hiawatha LRT Bus Service The Committee viewed a video on the Northstar Corridor Development Corridor. A copy of this video will be provided each member to make available for their jurisdictions. Betsy Wergin, Chairperson, reminded the members that the next meeting of the Northstar Corridor Development Authority is scheduled for October 1, 1998 at 4:30 p.m. at the Sherburne County Government Center. 10. A motion was made by John Norgren, seconded by Duane Grandy and carried unanimously to adjourn the meeting at 6:25 p.m. Betsy Wergin, Chairperson Date slv~-l:~D MNDATA\COMMITrE-zCORRI DO R\ 1998~MINUTES'~'qORTHSTA\090398 .DOC ' BRW A ~ & MOOt~ GROUP COMPANy MEMORANDUM BRW Thresher Square 700 South Third Street Minneapolis, MN 55415 Phone: (612) 370-0700 Fax: (612) 370-1378 To: From: Date: Subject: NCDA Elizabeth Colburn, AICP September 23, 1998 Northstar Corridor Open House Agenda Item ~ a. The Public Information Open House for the Northstar Corridor Commuter Rail Project will be held in three cities along the 70-mile transportation corridor (Maps to each of the meeting locations are attached.): Tuesday, October 20, 1998 Thursday, October 22, 1998 Tuesday, October 27, 1998 Sherbume County Courthouse Fridley City Hall Whitney Senior Community Center Elk River Fridley St. Cloud Each meeting will be held: Open House from: Presentations at: The Open follows: 6:00 to 9:00 PM 6:15 PM 7:15 PM 8:15 PM House will be set up with stations describing different aspects of the project as Entry Station 1 Station 2 Station 3 Station 4 Station 5 Station 6 Station 7 Registration Table NCDA Representation Description of the characteristics of the Northstar Corridor Goals and Objectives What is a Major Investment Study? Commuter Rail BNSF Mn/DOT Commuter Rail Study Video Room Comments Mn/DOT will be co-hosting the Open House with the Northstar Corridor at the Fridley and Elk River events. We will need your help at one of the meetings, if you are available. U:\WPDOCShNORTSTAR\OPHSNCDA. WPD Northstar Corridor Open House Meeting Locations .. Tuesday, October 20, 1998 Sherbarne County Couxthouse 13880 HiEhway 10 '* Sherburne Cott/zty Government Center No~h ELK RIVER Thursday, October 22, 1998 Fridley City Hall 6431 Universit7 Avenue NE d Mississippi St. N.E. ~ 7J~FrMI¢Y C~O' · ~ 63rd Ave. N. Fridley 61st Ave. N. FRIDLEY Tuesday, October 27, 1998 Whitney Senior Community Center 1527 Northway Drive ST. CLOUD B RW A DAN~S &/~:X~E GROUP CON~PANy MEMORANDUM BRW Thresher Square 700 South Third Street Minneapolis, MN 55415 Phone: (612) 370-0700 Fax: (612) 370-1378 To: From: Date: Subject: NCDA Elizabeth Colbum, AICP September 23, 1998 Northstar Corridor Web Page Agenda Item~.b. We are in the process of setting up the Northstar Corridor Web Page. The asumptions and initial set up follow: Northstar Corridor Web Page assumptions: Use the Sherburne County Web Site to access the Northstar Corridor Web Page. Coordination will take place with the Sherbume County Web Master to get it up and running. Use the format already created for the project update and newsletter with the blue and yellow color scheme. All public relations materials such as newsletters, project updates, press releases, etc. will have the Web Site address. Web Page Address: http ://co. sherbume.mn, us/northstar Initial Web Page will consist of: Opening Page -Northstar Corridor Logo -List of Choices with icons on which to click Corridor Map -Segment Maps with Stations (3 pages) Fact Sheet Project Update Newsletter NCDA Representation Upcoming Meeings and Events U:\WPDOCSkNORTSTAR\WEBPAGE3 WPD SEP 24 '98 11:17 T0-2412707 FROH-RICHARD$ON,RITCItER &ASSOC, T-773 P, 04/05 F-28S Date: To: From: Subject: Agenda Item September 24, 1998 Northstar Corridor Development Authority Executive Committee Executive Committee Policy on Extensions of the Northstar Corridor The Northstar Corridor IS cleflned in State and federal legislation as linking downtown Minneapolis to the St. Cloud area. In response to a request from Benton County, the NCDA agreed to include the City of Rice es a per1: of the study area for the Major investment Study. The NCDA further agreed, at its last meeting, to include in its current study the assessment of the feasibility of commuter rail in St. Cloud. Mn/DOT has offerect to pay 1or the additional costs associated with the weetem extension of the Corridor. Morrison County has subrnitTM a resolution requesting a station in Little Falls and supporting the station in Rice if such an extension is not feasible. A[ its meeting on September 17, the Executive Committee discussed elements of a draft policy on extensions of the Northstar Corridor and recommends that the NCDA adopt the following policy, The NCDA will evaluate the initial terminus and future extensions of the Northstar Corridor using the following criteria: · EstimaTed Rider~hip · Capital Cost · Operating Cost · Environmental Impact , Station Site Availability · Station Area Accede , Economic Development Potential . Railway Operating Impact · Community and Governmental Support · Future Expansion Potential Given the limited resources of the NCDA, the governmental unit requesting the evaluation should secure the funding needed to conduct the evaluation. The NCDA will conduct the evaluation of the extension as soon as the NCDA deems it feasible and appropriate in light of its work on the Initial segment of the Corridor. ~ctiop Reouasted: Approval. NorOa'tar Corridor Development Authority 2100 3" Avenue, Anoka~ Minae,:ota 55303-2265 (6[2) 323-5700 Fax: (612) 323-5682 Agenda Item,~ a. NORTHSTAR CORRIDOR PASSENGER RAIL SERVICE PRELIMINARY PASSENGER RAIL SERVICE PLAN CONCEPT "B" Prepared for the NORTHSTAR CORRIDOR DEVELOPMENT AUTHORITY By LTK Engineering Services As a Subconsultant to BRW, Inc. 18 September 1998 (nst98-15.) This technical memorandum documents an illustrative response to comments made by members of the Northstar Corridor Development Authority Board at their meeting of Septmber 3. Passenger Rail Service "Concept B" incorporates most of the features of the original concept (to be designated "Concept A"), but also reflects changes made to accommodate the Board's comments. The principal adjustments made to the first service plan are: Operation of two southbound moming trips from St. Cloud to Minneapolis, arriving at peak commute times, and two northbound evening trips from Minneapolis to St. Cloud, departing at peak commute times. This feature augments the previous concept of only one through trip to and from St. Cloud during peak periods. Operation of one through peak period trip between Minneapolis and St. Cloud in the "reverse peak" direction. This feature makes possible an arrival at St. Cloud during typical work start hours, and a departure from St. Cloud during the evening peak. Possible location of the central maintenance facility at St. Cloud rather than at. Elk River. Additional comments received from the Board referred to the desirability of evening service, primarily on Fridays and Saturdays, for various kinds of events, such as large gatherings for sports events. That particular aspect is not addressed in the example schedules provided here since large-scale public events can begin and end at widely varying times. It is assumed that extra trains will be operated for these events on a schedule that meets the needs of these events. While they are not presented on the regular weekday schedule, an allowance will be made for them in the operating cost estimates when they are prepared. Absent Board comment, a revised weekend and holiday timetable has not been prepared at this time. It is assumed that the previous concept of three daily scheduld round trips (morning, midday, late afternoon) will be sufficient for the study's purposes at this point. Departure and arrival times have been adjusted to reflect a "memory" timetable concept, based on a half-hour module. For example, all trains departing St. Cloud leave at either 5 or 35 minutes after the hour. All trains arriving at Minneapolis arrive either on the hour or at half-past. The same is true at intermediate stations. For example, all Northbound trains at Anoka are on the hour or half hour. This concept permits easier memory of train times by the public, and, very importantly, makes coordination with local bus services easier, provided they also use memory scheduling on a compatible headway. The additional service incorporated per the Board's comments into Concept B requires a fourth trainset. It is assumed, as in Concept A, that all trainsets will consist of a locomotive, two coaches, and a cab coach for push-pull operation. As in Concept A, and for the same reasons, the rotation of the four trainsets underlying this revised concept provides for ovemight layover at both Elk River and at St. Cloud. In this case, however, two trainsets stay overnight at each location, alternating between the two each night. Thus, it is possible, from the point of view of routine maintenance, to locate the primary facility at either place, with the other serving only for routine servicing and cleaning. An advantage for the St. Cloud location would be the proposed weekend service pattern, since weekend and holiday trains require only one trainset which originates at St. Cloud, makes three round trips, and "ties up" at St. Cloud in the evening. Presumably, extra trains for special events would also run through to St. Cloud. However, Concept B will work with the central shops at either location. A recommendation and decision can thus be left largely to considerations other than the service pattern, such as site conditions, land costs, desirability of reuse of existing railroad property at St. Cloud, and so forth. Equipment requirements for the four trainsets in service would be four locomotives, eight coaches and four cab coaches, to which would be added one spare of each, for an overall Concept B requirement of: five locomotives, nine coaches and five cab coaches. Following are weekday example timetables for this general concept, plus an illustration of the rotation of trainsets which will accommodate maintenance facility location at either Elk River or St. Cloud. As was noted in the description of initial Concept "A", the running times shown in these example timetables are estimates based on a number of observations, and on comparisons with other systems and historic performance on this line. As the corridor operation has not yet been subjected to an operations simulation, it may be expected that some adjustments will be necessary. 2 CONCEPTUAL SERVICE PLAN - ILLUSTRATIVE TIMETABLES CONCEPT "B" - SOUTHBOUND - WEEKDAYS Amtrak N'thstr N'thstr N'thstr N'thstr N'thstr N'thstr N'thstr N'thstr N'thstr Station #8 #2 #4 #6 #8 #10 #12 #14 #16 #18 lv. St. Cloud ............... 6:05am 6:35am ..... 11:35 4:05 ..... 5:05 (CBD) am pm pm Iv. East St. 5:24am .......... 6:09am 6:39am ..... 11:39 4:09 ..... 5:09 Cloud am pm pm Iv. Clear ............... 6:25am 6:55am ..... 11:55 4:25 ..... 5:25 Lake am pm pm Iv. 12:02 4:32 5:32 Becket ............... 6:32am 7:02am ..... pm pm ..... pm Iv. Big 12:09 4:39 5:39 Lake ............... 6:39am 7:09am ..... pm pm ..... pm Iv. Elk 12:18 4:48 5:48 River ..... 5:48am 6:18am 6:48am 7:18am ..... pm pm ..... pm Iv. Ram ...... 5:55am 6:25am 6:55am 7:25am 7:55am 12:25 4:55 5:25 5:55 sey pm pm pm pm Iv. 1:00 5:00 5:30 6:00 Anoka ..... 6:00am 6:30am 7:00am 7:30am 8:00am pm pm pm pm Iv. 1:10 5:10 5:40 6:10 Coon ..... 6:10am 6:40am 7:10am 7:40am 8:10am pm pm pm pm Rapids Iv. 1:15 5:15 5:45 6:15 Fridely ..... 6:!5am 6:45am 7:15am 7:45am 8:15am pm pm pm pm arr. NE 1:20 5:20 5:50 6:20 Mnpls. - .... 6:20am 6:50am 7:20am 7:50am 8:20am pm pm pm pm arr. 7:05am Mnpls. (Mid- 6:30am 7:00am 7:30am 8:00am 8:30am 1:30 5:30 6:00 6:30 (5th St) way) pm pm pm pm CONCEPTUAL SERVICE PLAN - ILLUSTRATIVE TIMETABLES CONCEPT "B" - NORTHBOUND - WEEKDAYS N'thstr N'thstr N'thstr N'thstr N'thstr N'thstr N'thstr N'thstr N'thstr Amtrak Station #1 #3 #5 #7 #9 #11 #13 #15 #17 #7 lv. l 1:40 Mnpls 6:40am 7:10am 7:40am 1:10 4:40 5:10 5:40 6:10 6:40 pm (5th St) pm pm pm pm pm pm (Mid- way) Iv. NE 6:50am 7:20am 7:50am 1:20 4:50 5:20 5:50 6:20 6:50 Mnpls pm pm pm pm pm pm ..... arr. 6:55am 7:25am 7:55am 1:25 4:55 5:25 5:55 6:25 6:55 Fridley pm pm pm pm pm pm ..... arr. Coon 7:00am 7:30am 8:00am 1:30 5:00 5:30 6:00 6:30 7:00 Rapids pm pm pm pm pm pm ..... arr. 7:10am 7:40am 8:10am 1:40 5:10 5:40 6:10 6:40 7:10 Anoka pm pm pm pm pm pm ...... arr. Ram- 7:15am 7:45am 8:15am 1:45 5:15 5:45 6:15 6:45 7:15 ...... sey pm pm pm pm pm pm alT. Elk 7:22am ..... 8:22am 1:52 ..... 5:52 6:22 6:52 7:22 ..... River pm pm pm pm pm arr. Big 7:3 lam ..... 8:3 lam 2:01 ..... 6:01 6:31 ............... Lake pm pm pm arr. 7:38am ..... 8:38am 2:08 ..... 6:08 6:38 ................ Becket pm pm pm alT. Clear 7:45am ..... 8:45am 2:15 ..... 6:15 6:45 ................ Lake pm pm pm arr. East St. 8:01am ..... 9:01am 2:31 ..... 6:31 7:01 .......... 1:08am Cloud pm pm pm arr. St. Cloud 8:05am ..... 9:05am 2:35 ..... 6:35 7:05 ............... (CBD) pm pm pm 4 Example of Weekday Trainset Rotation Concept "B" Monday Tuesday Wednesday Thursday Friday Trainset A From Elk From St. From Elk From St. River: #2, Cloud: #6, River: #4, Cloud: #8, #1, #14, #13, #5, #12, #7, #3,#10, #11, #9, #16, #15, then #18, #17, then then ovrnight Repeat overnight at then overnight at at Elk River Monday St. Cloud overnight at St. Cloud Elk River Trainset B From Elk From St. From Elk From St. River: #4, Cloud: #8, River: #2, Cloud: #6, #3,#10,#11, #9, #16, #15, #1,#14,#13, #5, #12, #7, then then then # 18, # 17, Repeat overnight at overnight at overnight at then Monday St. Cloud Elk River St. Cloud overnight at Elk River Trainset C From St. From Elk From St. From Elk Cloud: #6, River: #4, Cloud: #8, River: #2, #5,#12,#7, #3,#10,#11, #9,#16,#15, #1,#14,#13, # 18, # 17, then then then Repeat then overnight at overnight at overnight at Monday overnight at St. Cloud Elk River St. Cloud Elk River Trainset D From St. From Elk From St. From Elk Cloud: #8, River: #2, Cloud: #6, River:#4, #3, #9,#16,#15, #1,#14,#13, #5,#12,#7, #10,#11, then then # 18, # 17, then Repeat overnigbht at overnight at then overnight at Monday Elk River St. Cloud overnight at St. Cloud Elk River This rotation will work with the central maintenance facility located at either Elk River or St. Cloud, though, as noted above, a weekend service pattern based at St. Cloud would tend to favor the latter location, other things being equal. In that case, overnight/weekend storage for two trainsets at Elk River, with routine servicing and cleaning capability there, would be sufficient. In principle, the main shop and storage facilities might then be located at the former Great Northern St. Cloud yard, but it is not yet known whether the amount of space required for this purpose is presently available and surplus to the needs of the Burlington Northern Santa Fe Railroad. The price which the BNSF might ask for such property, even if surplus, might also prove unattractive to the Authority. 6 MEMORANDUM BRW Thresher Square 700 Third Street South Minneapolis, MN $$415 Phone: (612) 370-0070 Fax: (612) 370-1378 To: From: Date: Subject: NCDA Copy: Dan Meyers, BRW Anthony Heppelmann, BRW September 23, 1998 Highway Alternatives within the Northstar Corridor File: 39935-001-0601 Agenda Item ~/a. As part of the Northstar Corridor Major Investment Study (MIS), a number of highway-related improvements along TH 10 were identified. These highway improvements would be part of the Commuter Rail study that is now being completed. The highway-related improvement evaluation was completed along the TH 10 corridor from the west side of the City of Anoka near the intemhange of TH 10 and TH 47 to the City of Rice. The corridor was divided into two general types of areas: current issue areas and current rural areas. The current issue areas were generally more developed areas along the corridor with significant traffic control. The issue areas are shown in Figure 1. Transportation related forces and issues were identified for the current issue areas, which will be presented at the NCDA meeting. In general, the issues in the urban areas deal with mobility, access, and safety. Issues within the current rural areas deal primarily with farm machinery traveling along TH 10, existing and future access to TH 10, and potential future land development. In order to address these issues, a toolbox of potential highway improvement strategies was developed and is shown in Table 1. For each current issue area, the toolbox of strategies will be evaluated to determine which strategies are applicable to that area. Within the toolbox of strategies are two improvements that are at the high end of the cost range of options to be considered. They are the construction of bypasses around cities in the TH 10 corridor and the upgrading of TH 10 into a fully controlled access highway. An initial screening of the highway alternatives will be completed at the NCDA meeting for each current issue area using the matrix shown in Table 2. The project team have identified some potential bypass alternatives for some of the current issue areas. These are not proposals and are shown in Figure 2 through Figure 6. While it is necessary at this point in the MIS to examine all potential solutions, it is expected that the potential bypass areas will be screened out. Additional information on the bypass alternatives will be presented at the NCDA meeting. Table 1 Toolbox of Potential Improvements to Address Issues on TH 10 Potential Improvements Mobility Safety Benefits Cost Environmental Impact Benefits 1. Add Right or Left Turn Lanes Low Low Low Low 2. ITS Technologies for Traffic Management 3. Access Consolidation/Frontage Road Development 4. Signal Improvements/Signal Coordination 5. Add Thru Lanes or HOV Lanes 6. Construct Interchanges at Key Locations 7. Construct Bypass 8. Fully Controlled Access Freeway Hii~h High High High NORTHSTAR CORRIDOR MIS September 23, 1998 Table 2 Screening of Potential Improvements by Current Issue Area Potential Impro~vements Anoka Elk Big CSAII Becker Tll 25 Clear St. Rice Issue River Lake 11 Issue Issue Lake Cloud Issue Area Issue Issue Issue Area Area Issue Issue Area Area Area Area Area Area 1. Add Right or Left Turn Lanes 2. ITS Technologies for Traffic Management 3. Access Consolidation/Frontage Rd. Development NA NA NA 4. Signal Improvements/Signal Coordination NA NA NA NA NA 5. Add Thru Lanes or HOV Lanes 6. Construct Interchanges at Key Locations Byp '- 7. Construct ass 8. Fully Controlled Access Freeway . NA - Not Applicable NORTHSTAR CORRIDOR MIS September 23, 1998 Monticello This Is Not A Prospoal Area of Potential Bypass River N A NOT TO SCALE fiBRW ]Elk Rive Big Lake Potential Bypass Alternatives >. ... :. % '~. '., '~ · · '~' ~ ' "' ":'" '.' "L'--.:':L ~'7'* ... oC-- '...:...,:..:':: .-. ~...'......-.. Potential Bypass - .:~ ':~ -~_ ~ . ".."..' '~':.,..: -'?.~.~.~. ~,. ~ .' . ~ ~ ' . ':. ,) ~. · .~ ~ ~ ~ ~ ".,..~.;~..:.'.~:.::. ~ .... . ....... ~.~. ::.~ :... ~.~.~, ..'_'...~: ." :~" ~;';.' .";"~ "'~":':' ': ~ ~~,....~..~,,,~ . ... ~. . ' ' : ' ~"~" ~ '~. This Is Not A Prospoal Becker Potential Bvrmss Alternatives NORTHSTAR CORRIDOR MAJOR INVESTMENT STUDY ORDER OF MAGNITUDE BYPASS COST Current Issue Area Parameter Elk River Big Lake Becker Clear Lake Type of Improvement Bypass Bypass Bypass Interchange Approximate Roadway Length 6.5 miles 6.1 miles 2 miles 0 Roadway Cost (1) $ 13,000,000.00 $ 12,200,000.00 $ 4,000,000.00 0 Number of River Crossings (2) 2 0 0 0 River Crossing Cost (3) $ 19,200,000.00 0 0 0 Number of Railroad Crossings (4) 0 I 2 0 Railroad Crossing Cost (5) 0 $ 1,280,000.00 $ 2,560,000.00 0 Number of Interchanges 4 3 0 1 Interchange Cost (6) $ 20,000,000.00 $ 15,000,000.00 0 $ 5,000,000.00 Total Cost $ 52,200,000.00 $ 28,480,000.00 $ 6,560,000.00 $ 5,000,000.00 Note 1: (1) Assumed cost for new 4-lane divided roadway is $2 million per mile. (2) Assumed dimension for river crossing bridge is 80 feet wide by 1500 feet long. (3) Assumed cost for river crossing bridge is $80 per square foot. (4) Assumed dimension for railroad crossing bridge is 80 feet wide by 200 feet long. (5) Assumed cost for railroad crossing bridge is $80 per square foot. (6) Assumed cost for interchange is $5 million per interchange (includes bridge, ramps, and roadways). Note 2: A bypass around the eastern edge of St. Cloud was found not to be warranted in a 1995 MnDOT District 3 study. Only 25 percent of the trips on TH 10 were found to be through trips that would use a bypass. The conclusion from the MnDOT study was that minor geometric improvements should be completed at existing intersections and interchanges as needed through the Year 2015. Additionally, system management was recommended in order to maintain the function of TH 10 as a principal arterial. This included transportation system management and land use management. Note 3: The yearly MnDOT District 3 Right-of-Way and Construction budget is $50 million. Of that $50 million, $8 million per year is for expansion projects such as bypass and interchange construction. Currently, the expansion budget has been allocated until the Year 2008. Source: BRW, Inc. 10/1/98 ~ice St. Gerrn~ St. Clout 7th St. S tuk Rapids MN 23 1 $th Ave. S.E. Haven Tpwnship CSA~ 6 Mississippi River Current Issue Areas Current Rural Areas Existing Traffic Signal Locations Clear Lake TH 25 Big. Lake,..~. .La. CS,Mi I1 Big Lake ~Rd. TH 25 US 169/. Jackson Ave. River Mississippi River TH 47 TH 242 Coon Rapids / Minneapolis A NOT TO SCALE September 24.1998 Figurf I TH 10 Issue Areas Minneapolis to St. Cloud