Loading...
5.3. SR 07-08-2002Item 5.3. M =MOFLANDUM TO: FROM: DATE: SUBJECT: Mayor and City Council Pat Klaers, City A~lministrator July 8, 2002 ?~'"~'"~__ Consider Public Safety - City Hall - Utilities Construction Bids On July 8, 2002, the City Council is scheduled to consider and award most of the bid packages for the Public Safety-City HaH-Utilities construction project. The bidding of this project was complicated and additional work was required to separate out various parts of the project so that everyone is funding its fair share. By this I mean things like the Site work, parking lot improvements, and the cost for the shared basement under the Utilities facility needed to be prorated out to either the Public Safety project, the Utilities project, Or the City Hall project. This is because the Public Safety project has a separate budget financed by a lease purchase bond; the City Hall part of the project is financed with reserves; and ithe Utilities are funding their own project through city issued lease purchase bond. As discussed at the June 24, 2002, meeting, the bids that were received were very good. The positive bidding environment, which was expected, was taken into consideration as the construction budget estimate evolved based on what everyone was r~questing. The City Hall part of the project increased since its original concept mainly because of the basement space that the city will "own" underneath the Utilities building and because digital controls were added to replace our existing system. A new roof was also incorporated into the project which was not part of the original concept. If all goes according to projections, funding for the City Hall construction project will be available by the end of 2004. The construction project is scheduled to end in late spring/early summer 2004 so some internal loans will be required until the end of the calendar year. The one item with this City Hall project that still needs to be decided is the roof (metal vs. shingles). Staff is recommending the metal roof based on the life of the metal roof, the price difference ($59,372 vs. $34,000), and the appearance. Once the Council decides this issue on Monday, then this bid will come back to the Council on July 15, 2002. At the June 24, 2002, meeting the City Council discussed various parts of the Public Safety project that needed to be scaled back or removed in order to have the project come in on budget. The geothermal system remains in this construction project, iThe most difficult part of the project to remove is the upstairs shell area to accommodate futule growth of the department. Attached is a memo from Gary Tushie and a list of the lhanges that are recommended in order to bring this construction project in on budget. A lot of what is on this list as cuts will need to be funded at some time in the future - most likely through the annual budget process. Also, please note that the six additional garage stalls have been added as this garage space continues to be a very high priority and the floor covering in the fire garage is included. Finance Director Lori Johnson has been working with the city financial consultant, Ehlers and Associates, Inc., on the lease purchase bonds for the Public Safety p~oject. As discussed in January, the reason why only $7 million dollars is available for the prbject when the lease purchase amount is $8 million has to do with the reserve requireme~. Ms. Johnson and representatives from Ehlers and Associates will be at the City Council meeting to discuss the possibility of reducing the reserve requirement by way of insuring th9 bonds. If this happens, additional monies will be available for the construction project; however, if the city decides to pursue the insurance approach there is a timing issue that we must aOdress. This timing issue is that a final decision on the insurance approach will not be made b~f the bonding companies until near the end of July and the bids must be awarded in early July. iAccordingly, many of the items changed at this time for awarding the bids on July 8, 2002, ma~ come back into the project if the insurance approach is pursued and the city is successfu! in using this approach. At this time we are optimistic that the reserve requirement will change and that more than $7 million dollars will be available for the Public Safety Facility. AccOrdingly, the upstairs part of the project is scheduled to be awarded; however, if additional moues are not available, then this upstairs component would need to be removed by way of a char~ge order. We will get less value by removing this upstairs area later, but it is practically impossible to remove the upstairs area now and then add it back later because of its impact on other pt rts of the building. Gary Tushie of Tushie Montgomery Architects, and Jim Beckwith ot' Kraus Anderson Construction Company will be in attendance to present the bids and the recommendations for awarding the bids. Recommendation It is recommended that the City Council approve the bid packages aa submitted by Kraus Anderson Construction Company for the Public Safety Facility and fbr the City Hall and Public Utilities projects. It is recommended that the City Council authorize the metal roof fo~ the City Hall project. JUL-OE-2002 11:27 TUSHIE MONTGOMERY 612 861 96E2 P.02×0~ July 2, 2002 Mr. Pat Klaers City of Elk River 13065 Orono Parkway, Box 490 Elk River, MN 55330 Re: Public Safety Building Bids City Hall Remodeling and Utility Building Bids Dear Pat: T U S H I E MONTGOMERY ARCHITECTS Attached is a Bid Summary from Kraus-Anderson Construction Compa projects. We are within the project scope and budget for the City Hall ~ Building addition and, as such, we are recommending that the majority and awarded. The Public Safety Building bids, however, were over bu( $560,000.00 when considering the entire project budget that includes f~ architectural and engineering fees, etc. In an effort to bring the project met with the Police and Fire Departments to determine what cuts couldl be made. If the proceeds from the bond sales do not exceed $7,000,000.00 the following Scope'and Budget Changes would be necessary to maintain the overall budget of $7,000,000.00. ' qy for the above referenced emodeling and Public Utility of the iow bids be accepted Iget by approximately Jrniture, fixtures, equipment, costs back into budget, we Budget Gap Reduction Required Re-allocation for sitework costs (all costs bid as part of Public Safety) Reduce Construction Contingency to 4% Reduce Security Equipment Eliminate 2"~ Level Eliminate Masonry Piers and Ornamental Fence at Impound Lol and replace with ~ mesh chainlink Eliminate infra red heating in Apparatus Garage and replace wit~3 unit heaters Eliminate Autofiles Eliminate moveable files Eliminate fixed shelving Re-use ten (10) existing site poles and light fixtures Eliminate bollards at entrance drive and add two (2) pole lights [nd architectural Bollards Reduce ceramic tile quantity and replace with carpetNCT Reduce furniture budget Eliminate Computer budget Eliminate rubber treads at stair to lower level To Be Change wall tile to Group I from Group 2 and reduce quantity oI wall tile to ( wet walls only Eliminate del-corem underground conduit ( $560,000.00 (137,522.00) 0 oo,ooo.oo) (7o,ooo.oo) (130,000.00) (25,000.00) (lO,OOO.OO) (20,236.00) (19,622.00) (10,000.00) (lO,OOO.OO) (14,ooo.oo) (15,00o.oo) (50,000.00) (lO,OOO.OO) Determined 5,000.00) 18,990.00) 7645 Lyndale Avenue South, # 100 Minneapolis, Minnesota 55423 612.861 . 9636 Fax: 612. 861 . 9632 TUSHIE MONTGOMERY 612 861 Pat Klaers City of Elk River Public Safety Building Bids July 2, 2002 Page 2 of 2 Reduce millwork as follows: Change Zodiack counter to Plastic Laminate Eliminate base cabinets and Plastic lamina!e tops in Ro(~ms 169, 184, 192, 145, 198, B19, B04, 109, (106 base cabine~t, 36' upper cabinet) ' Add six (6) garage stalls to Police Garage Add epoxy flooring in Apparatus Garage Total Savings ASSUMPTIONS: 4. 5, 6. 7. 8. Reject Alternate 6 - deduct upper level Reject Alternate I - Geothermal in Apparatus Bay Accept Alternate 2 - Epoxy flooring in Apparatus bay Accept Alternate 3 - Six (6) additional garage bays / Reject Alternate 4 & 5 - Equipment and mechanical for Gun Rlnge Reject Alternate 7 - Built-up roofing Reject Alternate 8- UPS System I Reject the following bids and rebid: Bid Package 2 -Irrigation Bid Package 7 - Landscaping Bid Package 22 - Ceramic tile Bid Package 25 - Carpet Bid Package 31 - Storage shelving Bid Package 33 - Appliances Bid Package 37 - Autofiles Bid Package 38 - Moveable files Pat, if you have any questions please contact our office. Sincerely, TUSHIE-MONTGOMERY & ASSOCIATES, INC, CC' Lorie Johnson - Elk River Jim Beckwith - KA Bryan Adams - Elk River Utility Dan Pellinen - TMA Jeff Wrede - TMA Gary Fischer - TMA (41,600.00) 80,696.00 17,500.00 $588,774.00 TOTRL P.02 JUL 1 KRAUS-ANDERSON® CONSTRUCTION COMPANY CONTRACTORS & CONSTRUCTION MANAGFRS July 1, 2002 Messenger MEMO TO: CITY OF ELK RIVER Attn: Pat Klaers FROM: Jim Beckwith & Don Stutesman RE: Elk River Projects Attached are copies of the "Contract Award Recommer 07/01/02, to the City of Elk River for the Public Safety City Hall Remodel & Utilities. Should you have any questions, please contact me. cc Tushie Montgomery - Gary Tushie (via FAX) #763441-7425 dations" dated Pacility and the St. Paul Division 200 Grand Avenue, St. Paul, MN 55102 Phone: (651) 291-7088 FAX: (651) 290-6120 Equal Opportunity Employer I~US-~DE~ON® CO~T..R,A,C,.TQ.R,S, & CONSTRUCTI( NAGERS COMPANY PROJECT: LOCATION: 'ELK RIVER - PUBLIC SAFETY Elk River, Minnesota DESCRIPTION: BID DATE: Prepared by: Date Prepared: CONTRACT AWARD RECOMMENDATIONS TO 6/13/02 Kraus-Anderson Construction - Jim Beckwith 07/01/02 iLK RIVER WORK ITEM CONTRACT AW/~RD RECOMMENDATION BASE ALT.#2 0 0 0 ALT.#3 0 0 0 Contract Package #1 Contract Package #2 Contract Package #3 Execavatinc Inc. $11~ & Omann Brothers, Inc. $13( Contract Package #4 Duncan Concrete Inc. $17( Contract Package #5 Contract Package #6 Contract Package #7 Contract Package #8 Inc. $54,7z 0 0 ected/Redesigning & Rebidding ected/Redesi¢ & Rebiddin¢ Kelleher Construction, Inc. $33.c 0 11,310 Contract Package #9 Contract Package #10 Contract Package #11 Contract Package #12 Contract Package #13 Contract Package #14 ;ontract Package #15 Contract Package #16 Contract Package #17 Contract Package #18 Contract Package #19 Contract Package #20 Molin Concrete Products Company Serice Construction, Inc. $55 0 0 $995 0 24,000 $16£ 0 4,500 Weatern Steel Erection Inc. $106 0 2,750 Contractors, Inc. $263 0 0 F. Cook Construction Company $386 0 2,100 Kremer-Davis, Inc. $21 0 0 Custom Drywall~ Inc. $10.c 0 0 Weather-Proof $10.c 0 8,860 ;arciofini Caulkin( $16 0 276 Glewwe Doors Inc. $5zl 0 0 Door Store $26 0 0 Page 1 of 3 St. Paul Division 200 Grand Avenue, St. Paul, MN 55102 Phone: (651) 291-7088 FAX: (651) 290-6120 Equal Opportunity Employer ~US-ANDERSON® CONTRACTORS & CONSTRU( ~CTION COMPANY PROJECT: LOCATION: DESCRIPTION: BID DATE: Prepared by: Date Prepared: ELK RIVER - PUBLIC SAFETY Elk River, Minnesota CONTRACT AWARD RECOMMENDATIONS TO 6/1 3/02 Kraus-Anderson Construction - Jim Beckwith 07/01/02 WORK ITEM Contract Package #21 Contract Package #22 Contract Package #23 Contract Package #24 Contract Package #25 Contract Package #26 Contract Package #27 Contract Package #28 Contract Package #29 Contract Package #30 Contract Package #31 CONTRACT AWARD RECOMMENDATION BASE $154 nc. ected/Redesi¢ & Rebiddin( St. Cloud Acoustics, Inc. Concrete Specialties Midwest, Inc. $3C ected/Redesic & Rebiddin( Steinbrecher Painting~ Inc. Marsden Buildin( Maintenance Com Sales Com Inc. ' Sales Inc. $65 9cted/Redesi( & ected/Redesi & Rebidding Contract Package #32 ected/Redesi, & Rebiddin Contract Package #33 Contract Package #34 Contract Package #35 Contract Package #36 Contract Package #37 Contract Package #38 Contract Package #39 Contract Package #40 ected/Redesk Rebiddinc ected/Redesi, & Rebiddim & & Rebiddinq ected/Redesi & Rebiddin ected/Redesigning & Rebiddinq Schindler Elevator Company Northern Air Corporation iLK RIVER ALT.#2 ALT.#3 0 0 Page 2 of 3 St. Paul Division 200 Grand Avenue, St. Paul, MN 55102 Phone: (651) 291-7088 FAX: (651) 290-6120 Equal Opportunity Employer 0 0 17,500 0 0 1,300 0 0 0 0 0 0 $71 0 0 $292 0 7,500 KRAUS-ANDERSON® CONTRACTORS & CONSTRUCTI( NAGERS COMPANY PROJECT: LOCATION: ELK RIVER - PUBLIC SAFETY Elk River, Minnesota DESCRIPTION: CONTRACT AWARD RECOMMENDATIONS iLK RIVER BID DATE: 6/1 3/02 Prepared by: Kraus-Anderson Construction - Jim Beckwith Date Prepared: 0 7/01/02 / WORK ITEM CONTRACT AWARD RECOMMENDATION BASE BID ~ ALT. #2 ALT. #3 Corr"rest Package #41 ......... Tri-Stat Fir~'""P rotectio'n', Inc. ' ........ $5!1,500[] ~ Co~tract Package #42 "' Northern Air"C0rP0rati0n ................. $99~,Ioo.~ 1 ' ~ Contract Package' #43 ' Seni'~a~sota Sheetmetal, 'i'nc. ' ........... $2'3~,800'~ I ~ 8180'0 Contract Package #44 ~a~i g i rTeecCth glc I~ i°tga~', Inc' of MinnesOta, $38[,385I O O contract Package #45 ~011ins EleCtr'ical Construction, Inc. $7381,450 ~1900 Contract Package #46 ~iYnStn~sm(~taManagement & Balancing °f $~,540/ 0 200 Page 3 of 3 St. Paul Division 200 Grand Avenue, St. Paul, MN 55102 Phone: (651) 291-7088 FAX: (651) 290-6120 Equal Opportunity Employer US-ANDERSON® CONTRACTORS & CONSTRUCTI( NAGERS COMPANY PROJECT: LOCATION: ELK RIVER - CITY HALL & PUBLIC Elk River, Minnesota [ES DESCRIPTION: BID DATE: Prepared by: Date Prepared CONTRACT AWARD RECOMMENDATIONS TO CITY OF 6/1 3/02 Kraus-Anderson Construction - Jim Beckwith & Don 07101/02 WORK ITEM CONTRACT AWARD RECOMMENDATION BASE BID ALT. #1 ALT. #2 ALT. 3 ALT. #4 ALT. #5 ALT. #6 u°mpany 'Contract Package .2 Schulender Construction" $26.450 0 0 0 Contract Package#3 RHCConstruction. lnc. $149,506 O OJ ~ O O 0 O Contract Package ~4 Molin Concrete Products o Company $40,555 0 0 0 0 Contract Package ,5 Oakwood Builders~ Inc. $198.500 0 0~ 14.~00 1.500 0 0 COntract package ~6 Not Req~i~d ~)~ ~R N~, ~ N/R N/R N/R I Contract Package ~7 Minnetonka Iron works. Inc. $76,074 0 0~ J] 0 0 0 0 Co~tract Package~8 WesternSteelErection, lnc. $78,27~ ~ 00l ~O 0 0 0 C;~t;act Package ~ Regai contracto;s,i;c~ $263,452 ~ 0 o[o o o I George F Cook Construcbon Contract Package ~10 :~ ' ' $297.400 34.000 0~ 4.~00 3.000 0 0 ~0mpany contract PaCkage ~11 Kre~er & ~is, inc~ $i2,750 0 0~"]]~ o o o c0'ntr~C~ PaCkage ~ ~i~mpic wail s~ Inc~ $46,450 . o 0~ ~ ~ ~0 o o 2, oo Contra~t ~aeka~o ~1~ ~oof Toch~ Inc. $180,~00 0 0 0 0 0 0 contract Package ~i~ speCialty systems, i;~ $59,372 lO 0~ 0 0 0 Contract Package ~15 Carciofini Caulking Company $12.080 0 0 0 0 0 contract package ~16 Giew~e Doors, Inc. $~3'400 0 ~' 0 0 o Page 1 of 3 St. Paul Division 200 Grand Avenue, St. Paul, MN 55102 Phone: (651) 291-7088 FAX: (651) 290-6120 Equal Opportunity Employer K~US-ANDERSON® CONTRACTORS & CONSTRUCTI( NAGERS COMPANY PROJECT: LOCATION: ELK RIVER - CITY HALL & PUBLIC Elk River, Minnesota [ES DESCRIPTION: BID DATE: Prepared by: Date Prepared CONTRACT AWARD RECOMMENDATIONS TO CITY OF I 6/1 3/02 Kraus-Anderson Construction - Jim Beckwith & Don o7/ol/o2 CONTRACT AWARD WORK ITEM RECOMMENDATION BASE BID ALT. #1 ALT. #2 ALT. 3 ALT. #4 ALT. #5 ALT. #6 Contract Package #17 Garage Door Store $12,550 0 01 ~0 0 0 0 Contract Package #i8' ' EmPireh0use, incl ' $i09,7~7 01 o 747 o I Contract Package #19 ?.win City Tile & Marble $93 500 0, 4 3601 ~ 0 1,000 0 0 contraCt PaCkage #20 ceilin[~s & FI00~S, Incl $~1485 0 0 oo o o c°ntract PaCkage #2i ~;Ctra oo~t;a~t""~'i~g;i~g $74:6Oo 0 o o o Contract Package #22 Steinbrecher Painting, Inc. $76,800 0 0~ 0 0 0 0 Contract Package #23 .M.a!s.den auil~ng $8 685 0 0~ /I o o 0 0 Ma,ntenance L. ompan¥ ' Contract Package #24 Bartley Sales Company, lnc. $4,541 0 Olj, ]1° o o o ....... ~._,. ...... Rejected/Redesigning & g Rejected/Redesigning & Contract Package #26 ...... - - - HeDlaalng .... .~ ............. Rejected/Redesigning & V Anderson Enterprising Contract Package #28 I~'c. ' ' ' $5,300 0, 0 0 0 0 Contract P k Rejected/Redesigning & i ac age #29 Rebidding ' ' ' Rejected/Redesigning & Contract Package #30 ...... - ..... J ^_..~_o ~._,._~_ ~,~ Rejected/Redesigning & Page 2 of 3 St. Paul Division 200 Grand Avenue, St. Paul, MN 55102 Phone: (651) 291-7088 FAX: (651) 290-6120 Equal Opportunity Employer ~US-ANDERSON® CONTRACTORS & CONSTRUCTI( NAGERS COMPANY PROJECT: LOCATION: ELK RIVER - CITY HALL & PUBLIC Elk River, Minnesota [ES DESCRIPTION: CONTRACT AWARD RECOMMENDATIONS TO CITY OF BID DATE: 6/1 3/02 Prepared by: Kraus-Anderson Construction - Jim Beckwith & Don Date Prepared 0 7 ! 01 ! 0 2 ............... Rei'e'cted/Redesigning'& Contract Package #32 ...... - - -[ ~ .... / TI Contract Package #33 Schlindler Elevator Company $44,760 0 0[ 1]0 0 0 0 Contract Package #34 A~lbe. rs Mech.anical $287,045 0 o/ ~ o 0 0 0 L, on[ractors,lnc. [ I We~dner Plumbing & Heating Contract Package #36 C ~ n ' ' : $224,000 0ol ~o o o o Prairie Technology Inc. of [ ~ Contract Package #37 Minnesota, $102,793 0 0[ ~ 0 0 0 0 iD A Direct Digital ,[ ~i~ Contract Package #38 Reliance Electric~ Inc. $384,672 O O~ Ii0 O 0 0 Contract Package #39 ~Sy.stems Management & $14 700 0 0~ ~ 0 0 0 0 ~a~ancin~l of Minnesota ' ~ ~ Page 3 of 3 St. Paul Division 200 Grand Avenue, St. Paul, MN 55102 Phone: (651) 291-7088 FAX: (651) 290-6120 Equal Opportunity Employer