Loading...
7.1. PRSR 11-13-2013 S 1 ,� Request for Action River To Item Number Parks and Recreation Commission 7.1 Agenda Section Meeting Date Prepared by Action Item November 13, 2013 Chris Leeseberg, Park Planner - Planner Item Description Reviewed by Windsor 3rd Edition Private Park Donation Michael Hecker, Parks and Recreation Director Reviewed by Action Requested Due to the 2014 budget and limited staffing, staff is not recommending any action on this request. If recommended by the Parks Commission, staff may continue to work with the Windsor Park 3rd Home Owners Association (HOA) through 2014 and consider incorporating their park into the 2015 budget cycle Background/Discussion At the September 11, 2013 Parks and Recreation Commission meeting, a representative for HOA indicated that the HOA wanted to give ownership and maintenance of their private park to the city. The commission directed staff to assemble estimated costs for maintenance and upgrades. The Parks Supervisor worked with the Treasurer of the HOA and compiled this information which is outlined below. Currently in the 2014 budget, no monies have been earmarked for this project and the staffing level in the parks maintenance department is limited. If the Parks and Recreation Commission is interested for the city to take ownership of this park, it will still require City Council action to make the decision final. Currently, the city has at least three other areas that have park amenities that are privately owned by an HOA. The decision to take ownership of this private park may set precedence for other private owners to approach the city. This HOA has already turned over responsibility of their trail system to the city. NATURE Financial Impact Estimated Annual Maintenance Costs Electric $ 1,020 Fertilizing(one application of fertilizer like the association is currently doing) $ 600 Broadleaf control $ 300 Mowing --_- - -- - -- $ 3,900 Irrigation winterizing and spring start up $ 140 Irrigation maintenance $ 350 Playground inspections, repairs, and graffiti removal $ 250 Playground wood fiber $ 1,027 Basketball court to include repairing cracks, graffiti, nets, etc. $ 250 Tree maintenance to include wood mulch, trimming, pruning, etc. $ 230 Total estimated annual cost $ 8,067 Estimated Upfront Costs Upgrade playground fall protection to meet requirements to include wood fiber, concrete, and PIP $ 16,000 $ 16,000 Remove chain-link fence $ 440 $ 440 Repair basketball court cracks, align hoops, and surfacing $ 5,500 Completely renovate existing basketball court using existing basketball hoops $37,000* Upgrade to Bison basketball hoops $ 6,000 _ Total estimated upfront cost minimum repairs $ 21,940 Total estimated upfront cost doing complete upgrades $ 22,440 *Depends on the sub base Attachments • Windsor Park Third Addition Aerial N:\Departments\Parks and Recreation\Commission\Packets\2013\11-13-13 PRC Packet\7.1 Windsor 3rd Donation docs • N r •t � r. • f `�. • { p • B -..:Y'N+' • : .f: