Loading...
8.1. PRSR 01-08-2014 City of Elk Request for Action River To Item Number Parks and Recreation Commission 8.1 Agenda Section Meeting Date Prepared by Action Item January 8, 2014 Michael Hecker, Parks and Recreation Director Item Description Reviewed by Windsor 3rd Edition Private Park Donation Reviewed by Action Requested Staff is recommending that the Parks and Recreation Commission reconsider the action taken at the November 13, 2013 Commission meeting to accept a park fenced in playground donation from the Windsor 3`d Edition Home Owners Association. By motion, staff is currently recommending for the Parks and Recreation Commission to not accept the donation of a new park or playground at this time. Background/Discussion At the November 13, 2013 Parks and Recreation Commission meeting it was presented by Mr. Felska of the Windsor III Homeowners Association (HOA) that the HOA would like to donate the playground area at Windsor III to the City. The HOA wants to donate their private playground because it receives usage from surrounding residents and the cost of maintenance continues to increase. Staff did present at the November meeting the annual maintenance costs of the entire park that was originally proposed. A breakdown of these annual maintenance costs including the upfront costs if the City were to acquire the property is outlined below. The Commission then discussed that donating only the playground should change the financial numbers. After further review by staff since the November meeting, staff estimates that the costs really do not decrease. In fact the condition of the basketball court requires a complete renovation with estimated costs of up to $43,000. A new city staff standard that has been brought to my attention since this property was discussed is for the city to not accept property or a road if its condition is in disrepair. This means for example, that the basketball court surface should be in decent shape with no cracks. This policy will save taxpayers money. Staff is not recommending accepting this donation because of the court's poor condition and the capital costs involved. Also,parks maintenance staff have since inspected the irrigation system and found that it is all connected between the park and playground areas. It will be difficult for the city to maintain an irrigation system that it does not fully control. A presentation on the condition of the Windsor III playground and court will be made at the January 8 Commission meeting. It was also discussed at the December Parks and Recreation Commission meeting that any park improvement requests, donations or acquisitions from organizations or individuals should be placed on hold until the Parks and Recreation Master Plan is completed later this year. INP or [ N [ o er NATURE • Currently in the 2014 budget, no monies have been earmarked for this project and the staffing level in the parks maintenance department is limited. If the Commission still has the desire to acquire this property, staff recommends that changes to the priorities in the park improvement fund should be discussed. City Council will want to know how the Commission recommends the city fund this donation- both capital costs and annual maintenance costs. Financial Impact Estimated Annual Maintenance Costs Electric $ 1,020 Fertilizing(one application of fertilizer like the association is currently doing) $ 600 Broadleaf control $ 300 Mowing $ 3,900 Irrigation winterizing and spring start up $ 140 Irrigation maintenance $ 350 Playground inspections, repairs, and graffiti removal $ 250 Playground wood fiber $ 1,027 Basketball court to include repairing cracks, graffiti, nets, etc. $ 250 Tree maintenance to include wood mulch, trimming, pruning, etc. $ 230 Total estimated annual cost $ 8,067 Estimated Upfront Costs Upgrade playground fall protection to meet requirements to include wood fiber, concrete, and PIP $ 16,000 $ 16,000 Remove chain-link fence $ 440 $ 440 Repair basketball court cracks, align hoops, and surfacing $ 5,500 Completely renovate existing basketball court using existing basketball hoops $37,000* Upgrade to Bison basketball hoops $ 6,000 Total estimated upfront cost minimum repairs $ 21,940 Total estimated upfront cost doing complete upgrades $ 22,440 *Depends on the sub base Attachments • Windsor Park Third Addition Aerial N:\Departments\Parks and Recreation\Commission\Packets\2014\01-0&14 PRC Packet\8. 1 Windsor 3rd Donation 2.doca • ' � • • w � w St , -/ 1 Y. Y • C_: N., S t :P y fr 4 T S. 4 ..„ , „... .. .„0,w,., N ,CCC / / • . 0.v /y,V w L - ,. ,. A _. .. ;E .__ , „. -0,, . ,_ • ,.,_ . _ , , . . ,,,,,,... , . .„,....), •,. , .. . '•N'.; _ii l,yy • .4'.. , ,. , .. .,. . 4. . .. ELK RIVER 2014 BOARD & COMMISSION MEETING DATES Library Board meets at the Elk River Library,13020 Orono Parkway Utilities Commission meets at Elk River Municipal Utilities,13069 Orono Parkway Unless otherwise noted,all other meetings take place at City Hall,13065 Orono Parkway,Elk River,MN Minnesota Statute SI3DA4 Notice of Meetings:Subs'.I.Regular meetings.A schedule of the regular meetings of a public body shall be kept on file at its primary offices.ifs public body decides to bold a regular meeting at a time or place different from the time or place stated in its schedule of regular meetings,it shall give the same notice of the meeting that is provided in this section for a special meeting. NOTE;ALL DATES ARE SUBJECT TO CHANGE JANUARY FEBRUARY MARCH APRIL 6-HRA 5:30 p.m. 3-HRA 5:30 p.m. 3-HRA 5:30 p.m. 7-HRA 5:30 p.m. 8-Ice Arena 6:00 p.m. 11 -Utilities 3:30 p.m. 11-Utilities 3:30 p.m. 8-Utilities 3:30 p.m. 8-Parks&Rec.6:30 p.m 11-Planning 6:30 p.m. 11-Planning 6:30 p.m. 8-Ice Arena 6:00 p.m. 14-Utilities 3:30 p.m. 12-Parks&Rec.6:30 p.m. 12-Parks&Rec.6:30 p.m. 8-Planning 6:30 p.m. 14-Planning 6:30 p.m. 18-EDA 5:30 p.m.(Toes)* 17-EDA 5:30 p.m. 9-Parks&Rec.6:30 p.m. 15-Energy City 8:30 a.m. 19-Energy City 8:30 a.m. 19-Energy City 8:30 a.m. 16-Energy City 8:30 a.m. 16-HPC 6:00 p.m. 20-HPC 6:00 p.m. 20-HPC 6:00 p.m. 17-HPC 6:00 p.m. 21-EDA 5:30 p.m.(rues)* 25-Library 5:00 p.m. 21-EDA 5:30 p.m. 28-Library 5:00 p.m. *Presidents'Day-17th *Martin Luther Icing Jr.Day—20th MAY JUNE JULY AUGUST 5-HRA 5:30 p.m. 2-HRA 5:30 p.m. 7-HRA 5:30 p.m. 4-IIRA 5:30 p.m. 13-Utilities 3:30 p.m. 10-Utilities 3:30 p.m. 8-Utilities 3:30 p.m. 12-Utilities 3:30 p.m. 13-Planning 6:30 p.m. 10-Planning 6:30 p.m. 8-Planning 6:30 p.m. 12-Ice Arena 6:00 p.m. 14-Parks&Rec.6:30 p.m. 11 -Parks&Rec.6:30 p.m. 16-Energy City 8:30 a.m. 12-Planning 6:30 p.m. 15-HPC 6:00 p.m. 16-EDA 5:30 p.m. 17-HPC 6:00 p.m. 13-Parks&Rec.6:30 p.m. 19-EDA 5:30 p.m. 18-Energy City 8:30 a.m. 21-EDA 5:30 p.m. 18-EDA 5:30 p.m. 21-Energy City 8:30 a.m. 19-HPC 6:00 p.m. 22-Library 5:00 p.m. 21-HPC 6:00 p.m. 27-Library 5:00 p.m. 20-Energy City 8:30 a.m. SEPTEMBER OCTOBER NOVEMBER DECEMBER 2-H12S 5:30 p.m.(Toes)* 6-HRA 5:30 p.m 3-HRA 5:30 p.m. 1-HRA 5:30 p.m. 9-Utilities 3:30 p.m. 8-Parks&Rec.6:30 p.m. 11-Utilities 3:30 p.m. 9-Utilities 3:30 p.m. 9-Planning 6:30 p.m. 14-Utilities 3:30 p.m. 11-Planning :30 m. 9-Planning 6:30 p.m. 10-Parks&RM.6:30 p.m. 14-Planning 6:30 p.m. 12-Ice Arena 6:00 p.m. 10-Parks&Rec.6:30 p.m. 15-EDA 5:30 p.m. 15-Energy City 8:30 a.m. 12-Parks&Rec.6:30 p.m. 15-EDA 5:30 p.m. . 17-Energy City 8:30 a.m. 16-HPC 6:00 p.m. 17-EDA 5:30 p.m. 17-Energy City 8:30 a.m. 18-HPC 6:00 p.m. 20-EDA 5:30 p.m. 19-Energy City 8:30 a.m. 18-HPC 6:00 p.m. 23-Library 5:00 p.m. 20-HPC 6:00 p.m. j Labor Day-1st 25-Library 5:00 p.m.